Form Density Dan DCP Ok
Form Density Dan DCP Ok
Form Density Dan DCP Ok
Proyek :
Lokasi :
Km/Sta :
Ukuran Konus :
Tanggal :
BANYAK KUMULATIF PENETRASI (MM) KUMULATIF DCP LOG CBR CBR (%)
TUMBUKAN TUMBUKAN PENETRASI (MM) (MM/TUMBUKAN)
0 0 0 0 0 0.00 0.00
1 1 15 15 15.0 1.27 18.59
1 2 5 20 10.0 1.50 31.66
1 3 11 31 10.3 1.48 30.33
1 4 5 36 9.0 1.56 36.36
1 5 6 42 8.4 1.60 39.80
1 6 10 52 8.7 1.58 38.20
1 7 8 60 8.6 1.59 38.76
1 8 10 70 8.8 1.58 37.73
1 9 11 81 9.0 1.56 36.36
1 10 12 93 9.3 1.54 34.82
1 11 12 105 9.5 1.53 33.65
1 12 11 116 9.7 1.52 33.10
1 13 13 129 9.9 1.50 31.98
1 14 17 146 10.4 1.48 29.96
1 15 19 165 11.0 1.45 27.94 25.93
1 16 20 185 11.6 1.42 26.16
1 17 21 206 12.1 1.39 24.60
1 18 23 229 12.7 1.36 23.08
1 19 24 253 13.3 1.34 21.74
1 20 21 274 13.7 1.32 20.94
1 21 24 298 14.2 1.30 20.00
1 22 26 324 14.7 1.28 19.04
1 23 28 352 15.3 1.26 18.11
1 24 28 380 15.8 1.24 17.32
1 25 30 410 16.4 1.22 16.54
1 26 31 441 17.0 1.20 15.82
1 27 38 479 17.7 1.17 14.91
1 28 37 516 18.4 1.15 14.19
1 29 40 556 19.2 1.13 13.47
1 30 42 598 19.9 1.11 12.80
LOKASI / KM KETERANGAN
I. KALIBRASI PERMUKAAN :
1 Berat pasir dalam corong 1520 1520 1520
2 Berat isi kering pasir 1.547 1.547 1.547
Peminta Jasa
Jenis Contoh / Sumber Contoh
Tanggal
Dihitung
I. KALIBRASI PERMUKAAN :
1 Berat pasir dalam corong 1520 1520 1520
2 Berat isi kering pasir 1.547 1.547 1.547
0 0
1.27 18.59
1.50 31.66
1.48 30.33
1.56 36.36
1.60 39.80
1.58 38.20
1.59 38.76
1.58 37.73
1.56 36.36
1.54 34.82
1.53 33.65
1.52 33.10
1.50 31.98
1.48 29.96
1.45 27.94
1.42 26.16
1.39 24.60
1.36 23.08
1.34 21.74
1.32 20.94
1.30 20.00
1.28 19.04
1.26 18.11
1.24 17.32
1.22 16.54
1.20 15.82
1.17 14.91
1.15 14.19
1.13 13.47
1.11 12.80