NAMA KEGIATAN : BIAYA REHABILITASI GEDUNG LINGKUP PUSKESMAS ALASA (DAK AFIRMASI TAHUN 2017)
1 PEK. PERSIAPAN 2,363,739.72 0.37% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02% 0.02%
2 PEK. BONGKARAN DAN SISIPAN 20,627,383.49 3.25% 0.20% 0.20% 0.20% 0.20% 0.20% 0.20% 0.20% 0.20% 0.20% 0.20% 0.20% 0.20% 0.20% 0.20% 0.20% 0.20%
4 PEK. BETON, BATU, PLESTERAN 41,502,717.34 6.53% 0.59% 0.59% 0.59% 0.59% 0.59% 0.59% 0.59% 0.59% 0.59% 0.59% 0.59%
6 PEK. KAYU 8,557,912.40 1.35% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19%
8 PEK. PLAFOND 103,188,440.00 16.24% 2.32% 2.32% 2.32% 2.32% 2.32% 2.32% 2.32%
11 PEK. PENGECATAN 102,000,879.80 16.06% 2.01% 2.01% 2.01% 2.01% 2.01% 2.01% 2.01% 2.01%
13 PEK. SANITARI / PLUMBING 109,642,384.48 17.26% 2.47% 2.47% 2.47% 2.47% 2.47% 2.47% 2.47%
RENCANA KEMAJUAN PEKERJAAN / MINGGU 0.226% 0.309% 0.903% 1.096% 3.246% 4.807% 5.983% 11.517% 11.517% 13.929% 12.238% 14.923% 9.826% 7.019% 2.233% 0.226%
RENCANA KEMAJUAN PEKERJAAN KOMULATIF 0.226% 0.535% 1.439% 2.534% 5.780% 10.587% 16.571% 28.088% 39.605% 53.534% 65.772% 80.695% 90.521% 97.541% 99.774% 100.000%
DEVIASI
Lotu, …………………….2017
Dibuat oleh
CV. DEVERIAN CONSULTANT
ENGINEERING ESTIMATE
: PEKERJAAN
: KONSULTAN PERENCANA
Kegiatan :
PENGADAAN SARANA DAN PRASARANA PUSKESMAS
DINAS KESEHATAN KABUPATEN NIAS UTARA
SUMBER DANA : DAK
Pekerjaan :
BIAYA REHABILITASI GEDUNG LINGKUP PUSKESMAS ALASA (DAK AFIRMASI TAHUN 2017)
SUB.JUMLAH
NO. JENIS PEKERJAAN KETERANGAN
(Rp.)
1 2 3 4
Lotu, …………………….2017
Dibuat oleh
CV. DEVERIAN CONSULTANT
Diketahui oleh
KEPALA DINAS KESEHATAN
KABUPATEN NIAS UTARA
SELAKU PENGGUNA ANGGARAN
Kegiatan :
PENGADAAN SARANA DAN PRASARANA PUSKESMAS
DINAS KESEHATAN KABUPATEN NIAS UTARA
SUMBER DANA : DAK
Pekerjaan :
BIAYA REHABILITASI GEDUNG LINGKUP PUSKESMAS ALASA (DAK AFIRMASI TAHUN 2017)
3 Pasangan dinding bata merah camp 1 : 4, untuk rehab Puskesmas A.4.4.1.9 5.00 M2 238,790.00 1,193,950.00
4 Pasangan batu belah camp 1 : 4, untuk selasar belakang Puskesmas A.3.2.1.2 7.22 M3 1,204,238.00 8,694,598.36
dan Pas. Parit batu belah di Pondasi selasar R. Inap
5 Plesteran Dinding yang Direhab , Pondasi selasar , pasanga parit yang A.4.4.2.4 52.70 M2 77,761.00 4,098,004.70
terlihat serta Kanopi Puskesmas dan R. Inap
7 Plesteran Kembali Bongkaran Dinding Jalur Instalasi Listrik A.4.4.2.4 19.09 M2 77,761.00 1,484,457.49
8 Plesteran Jalur Dinding yang retak / patah Lingkup Puskesmas Al. Tambahan 12 673.26 M' 18,559.70 12,495,503.62
9 Acian Dinding yang Direhab , Pondasi selasar yang terlihat di R. Inap A.4.4.2.27 87.12 M2 43,504.00 3,790,068.48
dan atas teras Plat beton Puskesmas dan R. Inap
10 Acian Kembali Bongkaran Dinding Jalur Instalasi Listrik A.4.4.2.27 19.09 M2 43,504.00 830,491.36
11 Acian Jalur Dinding yang retak / patah lingkup Puskesmas Al. Tambahan 13 673.26 M' 4,350.00 2,928,681.00
12 Pek. Beton bertulang :
a. Balok Latei 13 x 15 cm, Sisip di Ruang IGD
Beton cor K-125 atau camp. 1 : 3 : 3.6 A.4.1.1.2 0.03 M3 1,365,198.00 40,955.94
Pembesian A.4.1.1.17 5.93 KG 16,618.80 98,549.48
Bekisting A.4.1.1.21 0.51 M2 102,520.00 52,285.20
Sub Jumlah D 41,502,717.34
E. PEK. KERAMIK
1 Pasangan keramik 20 x 25 pada dinding Kamar Mandi dan dinding Al.Tambahan 1 16.52 M2 267,475.00 4,418,687.00
Rehab Ruangan IGD
2 Pasangan keramik lantai dalam kamar mandi 20 x 20 A.4.4.3.36 23.24 M2 279,125.00 6,486,865.00
H. SATUAN JUMLAH HARGA
No. JENIS PEKERJAAN ANALISA VOLUME SATUAN
Rp. Rp.
1 2 3 4 5 6 7
3 Pasangan keramik 30 x 30 pada selasar Ruang Inap dan Keramik Al.Tambahan 2 55.84 M2 283,421.00 15,826,228.64
Lantai sisipan di lingkup Puskesmas
4 Pasangan keramik 40 x 40 pada Dinding, R. Bersalin, R. Poli KIA/KB , Al.Tambahan 3 115.66 M2 197,698.00 22,865,750.68
R. Poli Umum, R. Poli Gigi dan R. Laboratorium, Tinggi = 2,00 M'
Sub Jumlah E 49,597,531.32
H. SATUAN JUMLAH HARGA
No. JENIS PEKERJAAN ANALISA VOLUME SATUAN
Rp. Rp.
1 2 3 4 5 6 7
F. PEK. KAYU
1 Menyediakan & mengerjakan kusen pintu, jendela dari kayu kelas I A.4.6.1.2 0.40 M3 8,711,948.00 3,484,779.20
(simalambuo) jenis keras diketam rapi
2 Menyediakan & mengerjakan daun pintu panel, Jendela dan daun A.4.6.1.5 6.80 M2 746,049.00 5,073,133.20
ventilasi dari kayu kelas I (simalambuo) jenis keras diketam rapi
Sub Jumlah F 8,557,912.40
G. PEK. ATAP
1 Pekerjaan Rangka +Penutup atap Genteng Metal t = 0.30 mm, Untuk Ditaksir 85.06 M2 225,000.00 19,138,500.00
Teras Selasar Gedung A (Puskemas)
2 Pekerjaan Penutup atap Genteng Metal t = 0.30 mm, untuk Gedung Al.03-3436-1994-33 518.40 M2 106,870.00 55,401,408.00
Puskesmas
3 Pekerjaan Penutup atap Genteng Metal t = 0.30 mm, untuk sisipan Ditaksir 10.00 Lbr 66,198.16 661,981.60
gedung Lingkup Puskesmas
4 Pekerjaan Listplank GRC 8 x 200 mm Gedung A, B, C dan D Ditaksir 334.78 M' 20,166.67 6,751,396.67
Sub Jumlah G 81,953,286.27
H. PEK. PLAFOND
1 Pekerjaan Rangka + Plafond Gipsum Tbl= 9 mm Gedung A, B, C dan D Ditaksir 554.88 M2 133,000.00 73,799,040.00
2 Pekerjaan Rangka + Plafond PVC (Sunda Plafond) Tbl= 6 mm Sisi Luar Ditaksir 127.78 M2 230,000.00 29,389,400.00
selasar Puskesmas atas
Sub Jumlah H 103,188,440.00
I. PEK. DAUN PINTU KAMAR MANDI
1 Menyediakan & memasang daun pintu Aluminium + accessories Ditaksir 8.00 Set 1,000,000.00 8,000,000.00
Sub Jumlah I 8,000,000.00
J. PEK. KUNCI DAN ASSESSORIS
1 Engsel Uk. 4" (Pintu) Ditaksir 141.00 Bh 82,500.00 11,632,500.00
2 Engsel Uk. 3" (Jendela) Ditaksir 190.00 Bh 68,200.00 12,958,000.00
3 Grendel Pintu 12" (Pintu Ganda sisi Atas). Untuk P2 Ditaksir 11.00 Bh 67,500.00 742,500.00
4 Grendel Pintu 6" (Pintu Ganda sisi Bawah). Untuk P2 Ditaksir 11.00 Bh 33,750.00 371,250.00
5 Grendel Kodok (Jendela+ Ventilasi ). Ditaksir 95.00 Bh 23,700.00 2,251,500.00
6 Hak Angin Jendela Ditaksir 190.00 Bh 28,500.00 5,415,000.00
7 Kunci Tanam Biasa Ditaksir 36.00 Bh 200,400.00 7,214,400.00
8 Kaca Buram t= 5 mm untuk Daun Pintu Ditaksir 3.42 M2 267,201.32 913,828.51
9 Kaca Polos/bening t= 5 mm Jendela (60 x 134 cm) Ditaksir 5.63 M2 133,600.66 752,171.72
10 Kaca Buram t= 5 mm Jendela Ditaksir 12.34 M2 267,201.32 3,297,264.29
11 Kaca Buram t= 5 mm Ventilasi (V1)+(V3) Ditaksir 1.54 M2 267,201.32 411,490.03
Sub Jumlah J 45,959,904.55
K. PEK. PENGECATAN
1 Pengecatan dinding dan kolom Gedung A, B , C dan Pelataran Parkir A.4.7.1.10 2,547.89 M2 26,870.00 68,461,804.30
2 Pengecatan plafond Gedung A, B dan C A.4.7.1.10 710.71 M2 26,870.00 19,096,777.70
3 Pengecatan listplank A, B dan C A.4.7.1.5 60.36 M2 54,960.00 3,317,385.60
4 Pengecatan Plat beton Atas Teras depan (Aquaprooff) Al. Tambahan 15 34.40 M2 35,808.00 1,231,795.20
5 Pengecatan kusen, dan daun pintu, daun jendela yang diganti A.4.7.1.5 292.30 M2 26,870.00 7,854,101.00
6 Pengecatan Anti Maling Jendela, Pintu dan Ventilasi yang Lama A.4.7.1.5 37.10 M2 54,960.00 2,039,016.00
Sub Jumlah K 102,000,879.80
L. PEK. ELEKTRIKAL
1 Menyediakan & memasang lampu LED 12 Watt + Fitting Ditaksir 8.00 Set 114,150.00 913,200.00
2 Menyediakan & memasang lampu LED 16 Watt + Fitting Ditaksir 32.00 Set 126,750.00 4,056,000.00
3 Menyediakan & memasang lampu LED 20 Watt + Fitting Ditaksir 58.00 Set 178,200.00 10,335,600.00
4 Menyediakan & memasang saklar tanam tunggal Ditaksir 79.00 Set 37,965.00 2,999,235.00
5 Menyediakan & memasang stop kontak tanam Ditaksir 58.00 Set 33,000.00 1,914,000.00
6 Menyediakan & memasang kabel listrik NYM 2 x 2.5 mm Ditaksir 900.00 M' 8,000.00 7,200,000.00
7 Menyediakan & memasang pipa konduit listrik + persambungan Ditaksir 900.00 M' 6,000.00 5,400,000.00
antara cabang
8 Biaya pemasangan instalasi titik api Ditaksir 156.00 Ttk 60,000.00 9,360,000.00
Sub Jumlah L 42,178,035.00
M. PEK. SANITARI / PLUMBING
1 Menyediakan & memasang pipa dia.1/2" (air bersih) Besi Ditaksir 195.80 M' 33,800.00 6,618,040.00
2 Menyediakan & memasang Pipa pembuangan dari wastafel Pipa PVC Ditaksir 84.40 M' 32,500.00 2,743,000.00
dia.2"
3 Menyediakan & memasang Pipa pembuangan dari Plat beton Pipa PVC Ditaksir 22.60 M' 73,000.00 1,649,800.00
dia. 2" Gedung Puskesmas dan Parkir
4 Menyediakan & memasang closet jongkok Ditaksir 8.00 Set 285,574.00 2,284,592.00
5 Menyediakan & memasang pipa dia.3" (air kotor) kamar mandi PVC Ditaksir 26.40 M' 73,000.00 1,927,200.00
6 Menyediakan & memasang pipa dia.4" (air tinja) PVC Ditaksir 94.45 M' 89,500.00 8,453,275.00
7 Menyediakan & memasang kran air .1/2" (air bersih) besi Ditaksir 8.00 Bh 26,468.75 211,750.00
8 Menyediakan & memasang kran angsa .1/2" (air bersih) Ditaksir 8.00 Bh 100,500.00 804,000.00
9 Menyediakan & memasang kran duduk wastafel .1/2" (air bersih) Ditaksir 5.00 Bh 105,875.00 529,375.00
H. SATUAN JUMLAH HARGA
No. JENIS PEKERJAAN ANALISA VOLUME SATUAN
Rp. Rp.
1 2 3 4 5 6 7
10 Menyediakan & memasang Stop kran .1/2" (air bersih) Ditaksir 1.00 Bh 78,000.00 78,000.00
H. SATUAN JUMLAH HARGA
No. JENIS PEKERJAAN ANALISA VOLUME SATUAN
Rp. Rp.
1 2 3 4 5 6 7
11 Menyediakan & memasang wastafel keramik + sifon. Ditaksir 5.00 Bh 550,000.00 2,750,000.00
12 Menyediakan Bak air Fiberglas Ditaksir 8.00 Bh 608,781.25 4,870,250.00
13 Menyediakan & memasang floor drain Ditaksir 8.00 Set 85,000.00 680,000.00
14 Menyediakan & memasang talang tegak pipa PVC dia.3" Ditaksir 131.90 M' 73,000.00 9,628,700.00
15 Menyediakan & Memasang Klem pipa dia. 3" Ditaksir 75.00 Bh 25,500.00 1,912,500.00
16 Menyediakan & memasang talang datar Plat segi 4, Uk. 8 x 17 x 16 Ditaksir 232.26 M' 95,000.00 22,064,700.00
17 Menyediakan & memasang penggantung talang datar Ditaksir 332.00 Bh 25,000.00 8,300,000.00
18 Pekerjaan Water Tank
a. Galian tanah pondasi A.2.3.1.1 1.66 M3 77,962.00 129,416.92
b. Pasangan pondasi batu belah camp. 1:4 A.3.2.1.2 2.77 M3 1,204,238.00 3,335,739.26
c. Timbunan tanah kembali A.2.3.1.9 0.12 M3 56,925.00 6,831.00
d. Timbunan tanah di bawah lantai A.2.3.1.14.a 0.55 M3 310,497.00 170,773.35
e. Pasir Urug dibawah lantai A.2.3.1.11 0.04 M3 335,921.00 13,436.84
f. Watertank beton bertulang
- Beton cor K-175 atau camp. 1 : 2.3 : 3.1 A.4.1.1.5 1.03 M3 1,458,412.00 1,502,164.36
- Pembesian A.4.1.1.17 208.03 KG 16,618.80 3,457,208.96
- Bekisting A.4.1.1.21 16.84 M2 102,520.00 1,726,436.80
g. Plasteran bidang yang terlihat A.4.4.2.4 4.70 M2 77,761.00 365,476.70
h. Acian bidang yang terlihat A.4.4.2.27 14.78 M2 43,504.00 642,989.12
i. Pengecatan bidang yang terlihat A.4.7.1.10 14.78 M2 26,870.00 397,138.60
j. Pintu Besi Penutup Watertank Ditaksir 1.00 Set 250,000.00 250,000.00
19 Pekerjaan Septictank (3 Unit)
a. Galian tanah A.2.3.1.1 11.75 M3 77,962.00 916,053.50
b. Pengecoran beton mutu K-100 lantai atau camp. 1 : 4 : 4.5 A.4.1.1.4 0.98 M3 1,230,254.00 1,205,648.92
c. Pasangan dinding bata merah camp 1 : 3 A.4.4.1.20 27.98 M2 374,674.00 10,483,378.52
d. Plasteran dinding camp. 1 : 3 A.4.4.2.3 29.25 M2 80,663.00 2,359,392.75
e. Acian bidang yang terlihat A.4.4.2.27 29.25 M2 43,504.00 1,272,492.00
f. Beton bertulang t = 10 cm :
- Beton cor K-175 (plat penutup) atau camp. 1 : 2.3 : 3.1 A.4.1.1.5 1.00 M3 1,458,412.00 1,458,412.00
- Pembesian A.4.1.1.17 129.85 KG 16,618.80 2,157,951.18
- Bekisting A.4.1.1.24 8.71 M2 145,320.00 1,265,737.20
g. Menyediakan & memasang pipa besi hawa dia.2" Ditaksir 3.00 Bh 35,000.00 105,000.00
20 Pekerjaan Peresapan ( 3 Unit)
a Galian tanah A.2.3.1.1 3.00 M3 77,962.00 233,886.00
b Lapisan pasir A.2.3.1.11 0.80 M3 335,921.00 268,736.80
c. Lapisan kerikil A.2.3.1.14 0.45 M3 410,230.00 184,603.50
d. Lapisan ijuk Ditaksir 1.20 KG 35,000.00 42,000.00
e Timbunan tanah A.2.3.1.14.a 0.60 M3 310,497.00 186,298.20
Sub Jumlah M 109,642,384.48
N. PEK. BESI PABRIKASI
1 Pek. Pabrikasi Pintu Besi :
1.1 Pintu Besi (PB2) uk. 160 x 216 ( 2 Unit ) Sesuaikan dengan Kusen
a. Mendatangkan Harga Bahan 126.06 KG 15,953.46 2,011,093.17
b. Memotong dan Merakit A.4.2.1.3 126.06 KG 137.00 17,270.22
c. Pengelasan A.4.2.1.5 1,664.00 CM 1,375.00 2,288,000.00
d. Pengecatan A.4.7.1.5 8.78 M2 54,960.00 482,548.80
1.2 Pintu Besi (P1B2)uk. 140 x 216 (1 Unit ) Sesuaikan dengan Kusen
a. Mendatangkan Harga Bahan 57.62 KG 15,953.46 919,238.37
b. Memotong dan Merakit A.4.2.1.3 57.62 KG 137.00 7,893.94
c. Pengelasan A.4.2.1.5 832.00 CM 1,375.00 1,144,000.00
d. Pengecatan A.4.7.1.5 4.010 M2 54,960.00 220,389.60
1.3 Pintu Besi (PB1) uk. 80 x 216 (4 Unit ) Sesuaikan dengan Kusen
a. Mendatangkan Harga Bahan 126.05 KG 15,953.46 2,010,933.63
b. Memotong dan Merakit A.4.2.1.3 126.05 KG 137.00 17,268.85
c. Pengelasan A.4.2.1.5 1,664.00 CM 1,375.00 2,288,000.00
d. Pengecatan A.4.7.1.5 8.78 M2 54,960.00 482,548.80
H. SATUAN JUMLAH HARGA
No. JENIS PEKERJAAN ANALISA VOLUME SATUAN
Rp. Rp.
1 2 3 4 5 6 7
2 Pek. Pabrikasi Anti Maling Jendela :
2.1 Anti Maling Jendela Type JB 1 (58x132 cm) (3 Unit)
a. Mendatangkan Harga Bahan 38.98 KG 15,953.46 621,865.87
b. Memotong dan Merakit A.4.2.1.3 38.98 KG 137.00 5,340.26
c. Pengelasan A.4.2.1.5 192.00 CM 1,375.00 264,000.00
d. Pengecatan A.4.7.1.5 1.90 M2 54,960.00 104,424.00
2.2 Anti Maling Jendela Type JB 1 (60x132 cm) (6 Unit)
a. Mendatangkan Harga Bahan 78.62 KG 15,953.46 1,254,261.03
b. Memotong dan Merakit A.4.2.1.3 78.62 KG 137.00 10,770.94
c. Pengelasan A.4.2.1.5 384.00 CM 1,375.00 528,000.00
d. Pengecatan A.4.7.1.5 3.86 M2 54,960.00 212,145.60
2.3 Anti Maling Jendela Type J4B 1 (60x182 cm) (4 Unit)
a. Mendatangkan Harga Bahan 90.82 KG 15,953.46 1,448,893.24
b. Memotong dan Merakit A.4.2.1.3 90.82 KG 137.00 12,442.34
c. Pengelasan A.4.2.1.5 336.00 CM 1,375.00 462,000.00
d. Pengecatan A.4.7.1.5 4.43 M2 54,960.00 243,472.80
Sub Jumlah N 17,056,801.45
NILAI FISIK Rp. 635,268,595.04
IURAN JAMSOSTEK Rp. 1,204,545.45
PAJAK PERTAMBAHAN NILAI (PPN) 10 % Rp. 63,526,859.50
JUMLAH KESELURUHAN Rp. 700,000,000.00
PEMBULATAN Rp. 700,000,000.00
Lotu, …………………….2017
Dibuat oleh
CV. DEVERIAN CONSULTANT
Kegiatan :
PENGADAAN SARANA DAN PRASARANA PUSKESMAS
DINAS KESEHATAN KABUPATEN NIAS UTARA
SUMBER DANA : DAK
Pekerjaan :
BIAYA REHABILITASI GEDUNG LINGKUP PUSKESMAS ALASA (DAK AFIRMASI TAHUN 2017)
A.2.3.1.1
Menggali 1 m3 tanah biasa sedalam 1 meter
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Pekerja OH 0.750 Rp 99,000.00 Rp 74,250.00
Tenaga kerja
Mandor OH 0.025 Rp 148,500.00 Rp 3,712.50
Jumlah Harga / Satuan Pekerjaan Rp 77,962.50
Dibulatkan Rp 77,962.00
A.2.3.1.9
Mengurug kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Pekerja OH 0.500 Rp 99,000.00 Rp 49,500.00
Tenaga kerja
Mandor OH 0.050 Rp 148,500.00 Rp 7,425.00
Jumlah Harga / Satuan Pekerjaan Rp 56,925.00
Dibulatkan Rp 56,925.00
A.2.3.1.11
Mengurug 1 m3 pasir urug
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Bahan Pasir urug m 3
1.200 Rp 253,946.80 Rp 304,736.16
Pekerja OH 0.300 Rp 99,000.00 Rp 29,700.00
Tenaga kerja
Mandor OH 0.010 Rp 148,500.00 Rp 1,485.00
Jumlah Harga / Satuan Pekerjaan Rp 335,921.16
Dibulatkan Rp 335,921.00
A.2.3.1.14.a
Mengurug 1 m3 Tanah timbunan untuk peninggian lantai bangunan
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Bahan Bukho m 3
1.200 Rp 235,029.00 Rp 282,034.80
Pekerja OH 0.250 Rp 99,000.00 Rp 24,750.00
Tenaga kerja
Mandor OH 0.025 Rp 148,500.00 Rp 3,712.50
Jumlah Harga / Satuan Pekerjaan Rp 310,497.30
Dibulatkan Rp 310,497.00
A.2.3.1.14.b
Mengurug 1 m3 Tanah timbunan (Upah dibayarkan)
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Pekerja OH 0.250 Rp 99,000.00 Rp 24,750.00
Tenaga kerja
Mandor OH 0.025 Rp 148,500.00 Rp 3,712.50
Jumlah Harga / Satuan Pekerjaan Rp 28,462.50
Dibulatkan Rp 28,462.00
Page 10 of 35
A.2.3.1.14
Mengurug 1 m3 sirtu padat untuk peninggian lantai bangunan
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Bahan Sirtu m 3
1.200 Rp 318,139.80 Rp 381,767.76
Pekerja OH 0.250 Rp 99,000.00 Rp 24,750.00
Tenaga kerja
Mandor OH 0.025 Rp 148,500.00 Rp 3,712.50
Jumlah Harga / Satuan Pekerjaan Rp 410,230.26
Dibulatkan Rp 410,230.00
Page 11 of 35
ANALISA PEKERJAAN BETON (A.4.1.1)
A.4.1.1.4
Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Semen kg 230.000 Rp 2,149.06 Rp 494,283.80
Bahan Pasir beton kg 893.000 Rp 287.54 Rp 256,769.27
Krikil sungai disaring Uk. 0,5 - 2 cm kg 1,027.000 Rp 312.58 Rp 321,021.03
Pekerja OH 1.200 Rp 99,000.00 Rp 118,800.00
Tukang batu OH 0.200 Rp 137,500.00 Rp 27,500.00
Tenaga kerja
Kepala tukang OH 0.020 Rp 148,500.00 Rp 2,970.00
Mandor OH 0.060 Rp 148,500.00 Rp 8,910.00
Jumlah Harga / Satuan Pekerjaan Rp 1,230,254.09
Dibulatkan Rp 1,230,254.00
A.4.1.1.2
Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 2) cm, w/c = 0,78
±
A.4.1.1.5
Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 2) cm, w/c = 0,66
±
A.4.1.1.17
Pembesian 10 kg dengan besi polos atau besi ulir
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Besi beton (polos/ulir) kg 10.500 Rp 13,699.56 Rp 143,845.38
Bahan
Kawat beton kg 0.150 Rp 27,698.16 Rp 4,154.72
Pekerja OH 0.070 Rp 99,000.00 Rp 6,930.00
Tukang besi OH 0.070 Rp 137,500.00 Rp 9,625.00
Tenaga kerja
Kepala tukang OH 0.007 Rp 148,500.00 Rp 1,039.50
Mandor OH 0.004 Rp 148,500.00 Rp 594.00
Jumlah Harga / Satuan Pekerjaan Rp 166,188.60
Dibulatkan Rp 166,188.00
A.4.1.1.20
Page 12 of 35
Memasang 1 m2 bekisting untuk pondasi ( 2 x Pakai )
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Kayu Sembarang m3 ### Rp 2,307,580.00 Rp 92,303.20
Bahan
Paku biasa Uk. 1" s/d 4" kg ### Rp 20,823.16 Rp 6,246.95
Pekerja OH ### Rp 99,000.00 Rp 51,480.00
Tukang kayu OH ### Rp 137,500.00 Rp 35,750.00
Tenaga kerja
Kepala tukang OH ### Rp 148,500.00 Rp 3,861.00
Mandor OH ### Rp 148,500.00 Rp 3,861.00
Jumlah Harga / Satuan Pekerjaan Rp 193,502.15
2 X Pakai Rp 96,751.07
Dibulatkan Rp 96,751.00
Page 13 of 35
A.4.1.1.21
Memasang 1 m2 bekisting untuk sloof ( 2 x Pakai )
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Kayu Sembarang m 3
### Rp 2,307,580.00 Rp 103,841.10
Bahan
Paku biasa Uk. 1" s/d 4" kg ### Rp 20,823.16 Rp 6,246.95
Pekerja OH ### Rp 99,000.00 Rp 51,480.00
Tukang kayu OH ### Rp 137,500.00 Rp 35,750.00
Tenaga kerja
Kepala tukang OH ### Rp 148,500.00 Rp 3,861.00
Mandor OH ### Rp 148,500.00 Rp 3,861.00
Jumlah Harga / Satuan Pekerjaan Rp 205,040.05
2 X Pakai Rp 102,520.02
Dibulatkan Rp 102,520.00
A.4.1.1.22
Memasang 1 m2 bekisting untuk kolom ( 2 x Pakai )
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Papan Kayu sembarang m3
### Rp 2,307,580.00 Rp 92,303.20
Paku biasa Uk. 1" s/d 4" kg ### Rp 20,823.16 Rp 8,329.26
Bahan
Balok kayu sembarang m3 ### Rp 2,307,580.00 Rp 34,613.70
Kayu sokong Batang 2.000 Rp 5,813.24 Rp 11,626.49
Pekerja OH ### Rp 99,000.00 Rp 65,340.00
Tukang kayu OH ### Rp 137,500.00 Rp 45,375.00
Tenaga kerja
Kepala tukang OH ### Rp 148,500.00 Rp 4,900.50
Mandor OH ### Rp 148,500.00 Rp 4,900.50
Jumlah Harga / Satuan Pekerjaan Rp 267,388.65
2 X Pakai Rp 133,694.33
Dibulatkan Rp 133,694.00
A.4.1.1.23
Memasang 1 m2 bekisting untuk balok ( 2 x Pakai )
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Papan Kayu sembarang m3 ### Rp 2,307,580.00 Rp 92,303.20
Paku biasa Uk. 1" s/d 4" kg ### Rp 20,823.16 Rp 8,329.26
Bahan
Balok kayu sembarang m3 ### Rp 2,307,580.00 Rp 41,536.44
Kayu sokong Batang 2.000 Rp 5,813.24 Rp 11,626.49
Pekerja OH ### Rp 99,000.00 Rp 65,340.00
Tukang kayu OH ### Rp 137,500.00 Rp 45,375.00
Tenaga kerja
Kepala tukang OH ### Rp 148,500.00 Rp 4,900.50
Mandor OH ### Rp 148,500.00 Rp 4,900.50
Jumlah Harga / Satuan Pekerjaan Rp 274,311.39
2 X Pakai Rp 137,155.70
Dibulatkan Rp 137,155.00
A.4.1.1.24
Memasang 1 m2 bekisting untuk lantai ( 2 x Pakai )
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Kayu Sembarang m3 ### Rp 2,307,580.00 Rp 92,303.20
Paku biasa Uk. 1" s/d 4" kg ### Rp 20,823.16 Rp 8,329.26
Bahan
Balok kayu sembarang m3 ### Rp 2,307,580.00 Rp 34,613.70
Kayu sokong 6.000 Rp 5,813.24 Rp 34,879.46
Pekerja OH ### Rp 99,000.00 Rp 65,340.00
Tukang kayu OH ### Rp 137,500.00 Rp 45,375.00
Tenaga kerja
Kepala tukang OH ### Rp 148,500.00 Rp 4,900.50
Mandor OH ### Rp 148,500.00 Rp 4,900.50
Page 14 of 35
Jumlah Harga / Satuan Pekerjaan Rp 290,641.63
2 X Pakai Rp 145,320.81
Dibulatkan Rp 145,320.00
Catt : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Bukling factor pasir = 20 %
Page 15 of 35
ANALISA PEKERJAAN PONDASI (A.3.2.1)
A.3.2.1.9
Memasang 1 m3 batu kosong (aanstamping)
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
A.3.2.1.2
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Batu belah uk. 10 -15 cm m3
1.200 Rp 310,549.80 Rp 372,659.76
Bahan Semen kg 163.000 Rp 2,149.06 Rp 350,296.78
Pasir Pasang m3 0.520 Rp 398,812.30 Rp 207,382.40
Pekerja OH 1.500 Rp 99,000.00 Rp 148,500.00
Tukang batu OH 0.750 Rp 137,500.00 Rp 103,125.00
Tenaga kerja
Kepala tukang OH 0.075 Rp 148,500.00 Rp 11,137.50
Mandor OH 0.075 Rp 148,500.00 Rp 11,137.50
Jumlah Harga / Satuan Pekerjaan Rp 1,204,238.94
Dibulatkan Rp 1,204,238.00
A.4.2.1.3
Mengerjakan 100 kg besi profil memotong dan perakitan
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Tenaga Kerja Tukang besi OH 0.100 Rp 137,500.00 Rp 13,750.00
Jumlah Harga / Satuan Pekerjaan Rp 13,750.00
Jumlah Harga / Kg Rp 137.50
Dibulatkan Rp 137.00
A.4.2.1.5
Mengerjakan 10 cm pengelasan dengan las listrik
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Bahan Kawat las listrik kg 0.400 Rp 27,500.00 Rp 11,000.00
Tenaga Kerja Tukang besi OH 0.020 Rp 137,500.00 Rp 2,750.00
Jumlah Harga / Satuan Pekerjaan Rp 13,750.00
Jumlah Harga / Cm Rp 1,375.00
Dibulatkan Rp 1,375.00
A.4.4.1.20
Memasang 1 m2 dinding HB 10, campuran spesi 1 PC : 3 PP (Bata merah)
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Page 16 of 35
Bata Merah Buah 70.000 Rp 2,139.50 Rp 149,765.00
Bahan Portland Cement kg 15.160 Rp 2,149.06 Rp 32,579.75
Pasir Pasang m3 0.364 Rp 398,812.30 Rp 145,167.68
Pekerja OH 0.300 Rp 99,000.00 Rp 29,700.00
Tukang batu OH 0.100 Rp 137,500.00 Rp 13,750.00
Tenaga kerja
Kepala tukang OH 0.010 Rp 148,500.00 Rp 1,485.00
Mandor OH 0.015 Rp 148,500.00 Rp 2,227.50
Jumlah Harga / Satuan Pekerjaan Rp 374,674.93
Dibulatkan Rp 374,674.00
Page 17 of 35
A.4.4.1.9
Memasang 1 m2 dinding bata merah tebal 1/2 bata, campuran spesi 1 PC : 4 PP
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Bata Merah Buah 70.000 Rp 2,139.50 Rp 149,765.00
Bahan Portland Cement kg 11.500 Rp 2,149.06 Rp 24,714.19
Pasir Pasang m3 0.043 Rp 398,812.30 Rp 17,148.93
Pekerja OH 0.300 Rp 99,000.00 Rp 29,700.00
Tukang batu OH 0.100 Rp 137,500.00 Rp 13,750.00
Tenaga kerja
Kepala tukang OH 0.010 Rp 148,500.00 Rp 1,485.00
Mandor OH 0.015 Rp 148,500.00 Rp 2,227.50
Jumlah Harga / Satuan Pekerjaan Rp 238,790.62
Dibulatkan Rp 238,790.00
A.4.4.2.27
Memasang 1 m2 acian
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Bahan Semen kg 3.250 Rp 2,149.06 Rp 6,984.45
Pekerja OH 0.200 Rp 99,000.00 Rp 19,800.00
Tukang batu OH 0.100 Rp 137,500.00 Rp 13,750.00
Tenaga kerja
Kepala tukang OH 0.010 Rp 148,500.00 Rp 1,485.00
Mandor OH 0.010 Rp 148,500.00 Rp 1,485.00
Jumlah Harga / Satuan Pekerjaan Rp 43,504.45
Dibulatkan Rp 43,504.00
A.4.4.2.3
Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 15 mm
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
A.4.4.2.4
Memasang 1 m2 plesteran 1 PC : 4 PP, tebal 15 mm
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
A.4.4.3.36
Memasang 1 m2 lantai keramik ukuran (20 x 20) cm
Page 18 of 35
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Keramik Buah 26.500 Rp 3,857.93 Rp 102,235.05
Portland Cement kg 10.400 Rp 2,149.06 Rp 22,350.22
Bahan
Pasir Pasang m3 0.045 Rp 398,812.30 Rp 17,946.55
Semen warna kg 1.620 Rp 5,415.70 Rp 8,773.43
Pekerja OH 0.700 Rp 99,000.00 Rp 69,300.00
Tukang batu OH 0.350 Rp 137,500.00 Rp 48,125.00
Tenaga kerja
Kepala tukang OH 0.035 Rp 148,500.00 Rp 5,197.50
Mandor OH 0.035 Rp 148,500.00 Rp 5,197.50
Jumlah Harga / Satuan Pekerjaan Rp 279,125.26
Dibulatkan Rp 279,125.00
Page 19 of 35
Al.Tambahan 1
Memasang 1 m2 dinding keramik ukuran (20 x 25) cm
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Keramik Buah 21.500 Rp 4,616.16 Rp 99,247.40
Portland Cement kg 10.400 Rp 2,149.06 Rp 22,350.22
Bahan
Pasir Pasang m3 0.045 Rp 398,812.30 Rp 17,946.55
Semen warna kg 1.620 Rp 5,415.70 Rp 8,773.43
Pekerja OH 0.620 Rp 99,000.00 Rp 61,380.00
Tukang batu OH 0.350 Rp 137,500.00 Rp 48,125.00
Tenaga kerja
Kepala tukang OH 0.035 Rp 148,500.00 Rp 5,197.50
Mandor OH 0.030 Rp 148,500.00 Rp 4,455.00
Jumlah Harga / Satuan Pekerjaan Rp 267,475.11
Dibulatkan Rp 267,475.00
Al.Tambahan 2
Memasang 1 m2 lantai keramik ukuran (30 x 30) cm
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Keramik Buah 11.870 Rp 9,101.99 Rp 108,040.68
Portland Cement kg 10.000 Rp 2,149.06 Rp 21,490.60
Bahan
Pasir Pasang m3 0.045 Rp 398,812.30 Rp 17,946.55
Semen warna kg 1.500 Rp 5,415.70 Rp 8,123.55
Pekerja OH 0.700 Rp 99,000.00 Rp 69,300.00
Tukang batu OH 0.350 Rp 137,500.00 Rp 48,125.00
Tenaga kerja
Kepala tukang OH 0.035 Rp 148,500.00 Rp 5,197.50
Mandor OH 0.035 Rp 148,500.00 Rp 5,197.50
Jumlah Harga / Satuan Pekerjaan Rp 283,421.38
Dibulatkan Rp 283,421.00
Al.Tambahan 3
Memasang 1 m2 lantai keramik ukuran (40 x 40) cm
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
A.4.5.1.1
Memasang 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 6 mm
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Page 21 of 35
ANALISA PEKERJAAN KAYU (A.4.6.1)
A.4.6.1.2
Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu Kelas I (simalambuo)
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
A.4.6.1.13
Memasang 1 m3 konstruksi kuda-kuda / rangka atas, kayu kelas I (simalambuo)
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Broti kayu m 3
1.100 Rp 4,410,642.50 Rp 4,851,706.75
Bahan
Paku biasa Uk. 1" s/d 4" kg 5.600 Rp 20,823.16 Rp 116,609.70
Pekerja OH 4.000 Rp 99,000.00 Rp 396,000.00
Tukang kayu OH 12.000 Rp 137,500.00 Rp 1,650,000.00
Tenaga kerja
Kepala tukang OH 1.200 Rp 148,500.00 Rp 178,200.00
Mandor OH 0.200 Rp 148,500.00 Rp 29,700.00
Jumlah Harga / Satuan Pekerjaan Rp 7,222,216.45
Dibulatkan Rp 7,222,216.00
A.4.6.1.20
Memasang 1 m2 rangka langit-langit (60 x 80) cm, kayu Kelas I (simalambuo)
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
A.4.6.1.21
Memasang 1 m1 lisplank ukuran (3 x 20) cm, kayu Kelas I (simalambuo)
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
A.4.6.1.7
Membuat dan memasang 1 m2 pintu dan jendela jalusi, kayu Kelas I (simalambuo)
Page 22 of 35
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Papan kayu m 3
0.064 Rp 4,410,642.50 Rp 282,281.12
Bahan
Lem kayu kg 0.500 Rp 12,298.16 Rp 6,149.08
Pekerja OH 1.000 Rp 99,000.00 Rp 99,000.00
Tukang kayu OH 3.000 Rp 137,500.00 Rp 412,500.00
Tenaga kerja
Kepala tukang OH 0.300 Rp 148,500.00 Rp 44,550.00
Mandor OH 0.050 Rp 148,500.00 Rp 7,425.00
Jumlah Harga / Satuan Pekerjaan Rp 851,905.20
Dibulatkan Rp 851,905.00
Page 23 of 35
A.4.6.1.10
Memasang 1 m2 jalusi kusen, kayu Kelas I (simalambuo)
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Papan kayu m 3
0.060 Rp 4,410,642.50 Rp 264,638.55
Bahan
Paku biasa Uk. 1" s/d 4" kg 0.150 Rp 20,823.16 Rp 3,123.47
Pekerja OH 0.670 Rp 99,000.00 Rp 66,330.00
Tukang kayu OH 2.000 Rp 137,500.00 Rp 275,000.00
Tenaga kerja
Kepala tukang OH 0.200 Rp 148,500.00 Rp 29,700.00
Mandor OH 0.335 Rp 148,500.00 Rp 49,747.50
Jumlah Harga / Satuan Pekerjaan Rp 688,539.52
Dibulatkan Rp 688,539.00
A.4.6.1.5
Membuat dan memasang 1 m2 daun pintu dan jendela panel, kayu Kelas I (simalambuo)
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
A.4.6.1.15
Memasang 1 m3 konstruksi gordeng, kayu kelas I (simalambuo)
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
A.4.7.1.10
1 m² Pengecatan Tembok Baru ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Cat Dasar Tembok Kg 0.100 Rp 41,448.16 Rp 4,144.82
Bahan
Cat Tembok Kg 0.260 Rp 41,448.16 Rp 10,776.52
Pekerja Oh 0.020 Rp 99,000.00 Rp 1,980.00
Tukang Cat Oh 0.063 Rp 137,500.00 Rp 8,662.50
Tenaga
Kepala tukang Oh 0.006 Rp 148,500.00 Rp 935.55
Mandor Oh 0.003 Rp 148,500.00 Rp 371.25
Jumlah Harga / Satuan Pekerjaan Rp 26,870.64
Dibulatkan Rp 26,870.00
A.4.7.1.16
1 m² Pengecatan Permukaan Baja dengan Cat Meni
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Page 24 of 35
Bahan Cat Meni Kg 0.100 Rp 30,448.16 Rp 3,044.82
Pekerja Oh 0.020 Rp 99,000.00 Rp 1,980.00
Tukang Cat Oh 0.200 Rp 137,500.00 Rp 27,500.00
Tenaga
Kepala tukang Oh 0.020 Rp 148,500.00 Rp 2,970.00
Mandor Oh 0.010 Rp 148,500.00 Rp 1,485.00
Jumlah Harga / Satuan Pekerjaan Rp 36,979.82
Dibulatkan Rp 36,979.00
Page 25 of 35
A.4.7.1.5
1 m² Mengecatan Bidang Kayu Baru ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Cat Meni Kg 0.200 Rp 30,448.16 Rp 6,089.63
Bahan
Cat Minyak Kg 0.350 Rp 75,823.16 Rp 26,538.11
Pekerja Oh 0.070 Rp 99,000.00 Rp 6,930.00
Tukang Cat Oh 0.105 Rp 137,500.00 Rp 14,437.50
Tenaga
Kepala tukang Oh 0.004 Rp 148,500.00 Rp 594.00
Mandor Oh 0.003 Rp 148,500.00 Rp 371.25
Jumlah Harga / Satuan Pekerjaan Rp 54,960.49
Dibulatkan Rp 54,960.00
Al.Tambahan 4
1 m³ Membongkar Dinding 1/2 batu ( Batako / Batu Lega )
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Pekerja Oh 2.000 Rp 99,000.00 Rp 198,000.00
Tenaga
Mandor Oh 0.100 Rp 148,500.00 Rp 14,850.00
Jumlah Harga / Satuan Pekerjaan Rp 212,850.00
Dibulatkan Rp 212,850.00
Al.Tambahan 5
1 m² Membongkar Lantai
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Pekerja Oh 0.100 Rp 99,000.00 Rp 9,900.00
Tenaga
Mandor Oh 0.010 Rp 148,500.00 Rp 1,485.00
Jumlah Harga / Satuan Pekerjaan Rp 11,385.00
Dibulatkan Rp 11,385.00
Al.Tambahan 6
1 m³ Membongkar beton bertulang
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Pekerja Oh 8.000 Rp 99,000.00 Rp 792,000.00
Tukang Oh 1.600 Rp 137,500.00 Rp 220,000.00
Tenaga
Kepala tukang Oh 0.160 Rp 148,500.00 Rp 23,760.00
Mandor Oh 0.400 Rp 148,500.00 Rp 59,400.00
Jumlah Harga / Satuan Pekerjaan Rp 1,095,160.00
Dibulatkan Rp 1,095,160.00
Al.Tambahan 7
1 m² Membongkar Plesteran
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Pekerja Oh 0.050 Rp 99,000.00 Rp 4,950.00
Tenaga
Mandor Oh 0.0025 Rp 148,500.00 Rp 371.25
Jumlah Harga / Satuan Pekerjaan Rp 5,321.25
Dibulatkan Rp 5,321.00
Al.Tambahan 8
1 m² Membongkar Atap Seng dan Plafond
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Pekerja Oh 0.050 Rp 99,000.00 Rp 4,950.00
Tenaga
Mandor Oh 0.010 Rp 148,500.00 Rp 1,485.00
Jumlah Harga / Satuan Pekerjaan Rp 6,435.00
Page 26 of 35
Dibulatkan Rp 6,435.00
Al.Tambahan 9
1 m² Membongkar Rangka Atap dan Rangka Plafond
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Pekerja Oh 0.100 Rp 99,000.00 Rp 9,900.00
Tenaga
Mandor Oh 0.005 Rp 148,500.00 Rp 742.50
Jumlah Harga / Satuan Pekerjaan Rp 10,642.50
Dibulatkan Rp 10,642.00
Page 27 of 35
Al.Tambahan 10
1 m³ Membongkar Kusen Pintu dan Jendela
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Tukang Oh 1.000 Rp 137,500.00 Rp 137,500.00
Tenaga Kepala tukang Oh 0.100 Rp 148,500.00 Rp 14,850.00
Mandor Oh 0.015 Rp 148,500.00 Rp 2,227.50
Jumlah Harga / Satuan Pekerjaan Rp 154,577.50
Dibulatkan Rp 154,577.00
Al.Tambahan 11
1 m² Membongkar Daun Pintu dan Jendela
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Pekerja Oh 0.020 Rp 99,000.00 Rp 1,980.00
Tenaga
Mandor Oh 0.001 Rp 148,500.00 Rp 148.50
Jumlah Harga / Satuan Pekerjaan Rp 2,128.50
Dibulatkan Rp 2,128.00
Al. Tambahan 12
Memasang 1 m2 plesteran 1 PC : 4 PP, tebal 15 mm (Sisipan dinding Retak / Patah)
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Semen Kg 6.240 Rp 2,149.06 Rp 13,410.13
Pasir Pasang M3 0.024 Rp 398,812.30 Rp 9,571.50
Bahan
Kawat Nyamuk Logam / Aluminium M2 1.000 Rp 48,268.16 Rp 48,268.16
Paku beton Putih Uk. 1" Ktk 1.400 Rp 42,548.16 Rp 59,567.42
Pekerja OH 0.300 Rp 99,000.00 Rp 29,700.00
Tukang batu OH 0.150 Rp 137,500.00 Rp 20,625.00
Tenaga kerja
Kepala tukang OH 0.015 Rp 148,500.00 Rp 2,227.50
Mandor OH 0.015 Rp 148,500.00 Rp 2,227.50
Jumlah Harga / Satuan Pekerjaan Rp 185,597.21
Dibulatkan Rp 185,597.00
Al. Tambahan 13
Memasang 1 m' acian
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Bahan Semen kg 0.325 Rp 2,149.06 Rp 698.44
Pekerja OH 0.020 Rp 99,000.00 Rp 1,980.00
Tukang batu OH 0.010 Rp 137,500.00 Rp 1,375.00
Tenaga kerja
Kepala tukang OH 0.001 Rp 148,500.00 Rp 148.50
Mandor OH 0.001 Rp 148,500.00 Rp 148.50
Jumlah Harga / Satuan Pekerjaan Rp 4,350.44
Dibulatkan Rp 4,350.00
Al. Tambahan 14
1 m' Membongkar Listplank
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Tenaga kerja Pekerja OH 0.030 Rp 99,000.00 Rp 2,970.00
Jumlah Harga / Satuan Pekerjaan Rp 2,970.00
Dibulatkan Rp 2,970.00
Al. Tambahan 15
1 m² Pengecatan Tembok ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup Pelapis anti bocor )
Harga Satuan Bahan / Jumlah
Kebutuhan Satuan Indeks
Upah (Rp.) (Rp.)
Cat Dasar Tembok Kg 0.100 Rp 41,448.16 Rp 4,144.82
Bahan
Cat Pelapis anti bocor (Aquaprooff) Kg 0.260 Rp 75,823.16 Rp 19,714.02
Page 28 of 35
Pekerja Oh 0.020 Rp 99,000.00 Rp 1,980.00
Tukang Cat Oh 0.063 Rp 137,500.00 Rp 8,662.50
Tenaga
Kepala tukang Oh 0.006 Rp 148,500.00 Rp 935.55
Mandor Oh 0.003 Rp 148,500.00 Rp 371.25
Jumlah Harga / Satuan Pekerjaan Rp 35,808.14
Dibulatkan Rp 35,808.00
Lotu, …………………….2017
Dibuat oleh
CV. DEVERIAN CONSULTANT
Page 29 of 35
DAFTAR HARGA BAHAN SAMPAI DILOKASI
Kegiatan :
PENGADAAN SARANA DAN PRASARANA PUSKESMAS
DINAS KESEHATAN KABUPATEN NIAS UTARA
SUMBER DANA : DAK
Pekerjaan :
BIAYA REHABILITASI GEDUNG LINGKUP PUSKESMAS ALASA (DAK AFIRMASI TAHUN 2017)
Harga / Satuan
Satuan Volume
No. Uraian
volume (Rp.)
1 Pasir pasangan M3 398,812.30
2 Pasir beton M3 402,549.80
3 Pasir urug M3 253,946.80
4 Krikil disaring Uk. 0,5 - 2 cm M3 421,984.80
5 Krikil tidak disaring M3 351,719.80
6 Batu belah uk. 10 - 15 cm M3 310,549.80
7 Batu utuh uk. 15 - 20 cm M3 290,309.80
8 Tanah timbunan setempat M3 203,634.00
9 Bukho M3 235,029.00
10 Sirtu M3 318,139.80
11 Kayu kelas I (Simalambuo) M3 4,410,642.50
12 Kayu Sembarang M3 2,307,580.00
13 Seng gel. bjls 0.20 mm pjng 6 kk; 11 b Lbr 52,448.16
14 Sement Porland Berat 50 Kg Zak 107,453.00
15 Semen putih 40 Kg Zak 216,628.00
16 Besi beton Kg 13,699.56
17 Kawat beton Kg 27,698.16
18 Batu Bata dari Tanah 5 Cm x 10 Cm x 20 Bh 2,139.50
Cm
19 Batako / Batu Lega Bh 7,014.65
20 Paku biasa Uk. 1" s/d 4" Kg 20,823.16
21 Paku beton Putih Uk. 1" Ktk 42,548.16
22 Triplex t = 6 mm Lbr 130,823.16
23 Lat plafond Btg 6,798.16
24 Cat tembok Kg 41,448.16
25 Keramik 20 x 25 Ktk 92,323.16
26 Keramik 20 x 20 Ktk 96,448.16
27 Keramik 30 x 30 Ktk 101,123.16
28 Keramik 40 x 40 Ktk 100,573.16
29 Rabung Atap Metal, t = 0.30 mm Lbr 62,073.16
30 Cat Meni Kg 30,448.16
31 Cat Kayu/Besi (Platone) Kg 75,823.16
32 Cat Pelapis anti bocor (Aquaprooff) Kg 75,823.16
33 Minyak silinder Ltr 41,034.56
34 Lem kayu Kg 12,298.16
35 Atap Genteng Metal, t = 0.30 mm Lbr 66,198.16
36 Kaca t = 5 mm (100 x 100 ) Lbr 133,600.66
37 Kawat Listrik Kg 27,500.00
38 Solar Ltr 5,665.00
39 Minyak Pelumas Ltr 42,985.80
40 Besi Hollow Kg 15,953.46
41 Paving Blok Bh 2,665.46
42 Kawat Nyamuk Logam / Aluminium M2 48,268.16
Lotu, …………………….2017
Dibuat oleh
CV. DEVERIAN CONSULTANT
Kegiatan :
PENGADAAN SARANA DAN PRASARANA PUSKESMAS
DINAS KESEHATAN KABUPATEN NIAS UTARA
SUMBER DANA : DAK
Pekerjaan :
Keterangan
1 zak = 50 kg
1 zak = 40 kg
Lotu, …………………….2017
Dibuat oleh
CV. DEVERIAN CONSULTANT
SYAHRUL, ST
Ahli Estimasi Biaya
DAFTAR HARGA UPAH TENAGA KERJA
Kegiatan :
PENGADAAN SARANA DAN PRASARANA PUSKESMAS
DINAS KESEHATAN KABUPATEN NIAS UTARA
SUMBER DANA : DAK
Pekerjaan :
BIAYA REHABILITASI GEDUNG LINGKUP PUSKESMAS ALASA (DAK AFIRMASI TAHUN 2017)
Orang/hari
No. Uraian Keterangan
(Rp.)
1 Pekerja 99,000.00
2Tukang 137,500.00
3 Kepala tukang 148,500.00
4Mandor 148,500.00
Lotu, …………………….2017
Dibuat oleh
CV. DEVERIAN CONSULTANT
DATAR BUKIT
TOTAL BIAYA
PAJAK MINERAL
SATUAN
HARGA DASAR BIAYA / ONGKOS HARGA SAMPAI DILOKASI
KEUNTUNGAN ( 4 BUKAN LOGAM KETERANGAN
NO. JENIS MATERIAL QUARRY / HARGA
x 10 % ) Rp. DAN BEBATUAN
BONGKAR MUAT BAIK BAIK PEKERJAAN
SUMBER BAHAN
TOKO (Rp.) TRUK (Rp.) ( 4+5+6+8+10+12+14+34 )
( 4 X 20 % ) RP.
JARAK ONGKOS JARAK ONGKOS ANGKUT TRUK
Lotu, …………………….2017
Dibuat oleh
CV. DEVERIAN CONSULTANT
Lotu, …………………….2017
Dibuat oleh
CV. DEVERIAN CONSULTANT