Produktivitas Alat (11!13!20)
Produktivitas Alat (11!13!20)
Produktivitas Alat (11!13!20)
Umur Rencana
Pertumbuhan Kelas C
Kelas E
DATA MASUKAN
KELAS No Pesawat Gross Weight (ton)
1 A321-200std 89.4
C 2 A320-100 68.4
C 3 B737-800 79.243
C 4 B737-900ER 85.366
5 D-200 88.314
E 6 A330-300std 230.9
E 7 B787-9 (Preliminary) 251.744
8 A350-900 272.904
E 9 B777-300ER 352.441
E 10 B747-400 397.801
11 B747-400 (Belly) 397.801
12 A380 562
13 A380 (Belly) 562
HITUNGAN
No Pesawat Keberangkatan Tahunan 20 tahun
1 A321-200std 19.1428426871049
2 A320-100 19232.8140477343
3 B737-800 14182.932146876
4 B737-900ER 11522.0770133684
5 D-200 10656.8205239113
6 A330-300std 725.530772982443
7 B787-9 (Preliminary) 249.972787330085
8 A350-900 6.0968972519533
9 B777-300ER 2438.75890078132
10 B747-400 134.131739542973
11 B747-400 (Belly) 134.131739542973
12 A380 317.038657101572
13 A380 (Belly) 317.038657101572
KELUARAN
CBR
ACN RENCANA
EQUIVALENT RECOVERIES
FREQUENCY OF TRAFFICKING
Tebal Total
Lapis Permukaan+Pondasi Atas
Lapis Permukaan
Lapis Pondasi Atas
Lapis Pondasi Bawah
NTERNASIONAL YOGYAKARTA
6%
89.3 B777-300ER
196280.256342502
Lebih dari 100.000 = High
170 170
370 430
926.64 870
89.3
KONDISI EKSISTING
13
13
13
13
20
6
6
Produktivitas Alat
Permen PU No.11/M/PRT/2013
Produktivitas menggunakan hitungan Pedoman Bahan Konstruksi Bangunan dan Rekayasa Sipil
Bagian 3: Analisis Harga Satuan Pekerjaan (AHSP) Bidang Bina Marga
dengan beberapa penyesuaian
ASPHALT SPRAYER
Kapasitas tangki aspal Cp 850 liter
Tenaga penggerak Pw 4 HP
Kapasitas pompa asal pa 0.55 liter/menit
Faktor efisiensi alat Fa 0.83 Kondisi sangat baik
Pemakaian dalam liter tiap m2 lt 1
Kapasitas produksi/jam = pa x Fa x 60/lt Q 27.39 m2/jam
Koefisien alat E2 0.0365097 jam
COMPRESSOR
Kapasitas Udara Cp 5000 liter/menit
Tenaga penggerak Pw 75 HP
Faktor efsiensi alat Fa 0.83 Kondisi sangat baik
Kapasitas produksi/jam = (1,00 x Fa x 60)/5 Q 9.96 m2
Koefisien alat E3 0.1004016 jam
BULLDOZER
Tenaga penggerak Pw 130 hp
Kapasitas pisau q 3.36 m3
Faktor pisau Fb 1
Faktor efisiensi alat Fa 0.74
Grade faktor Fm 1 datar
Jarak perataan l 480 m
Kecepatan maju Vf 5 km/jam max 20
Kecepatan mundur Vr 5 km/jam max 30
Waktu siklus (T1 +T2 + ganti persneling) Ts 58.33 detik
Kapasitas produksi alat/jam Q 153.45 m3/jam
EXCAVATOR (TANAH)
Kapasitas bucket V 0.9 m3
Faktor bucket Fb 0.8
Faktor efisiensi alat Fa 0.6 sangat baik
Faktor konversi (kedalaman) Fv 0.9
Waktu siklus (menggali, memuat, lain-lain) T1 1 menit
Waktu siklus terkoreksi Ts1 0.9 m
Kapasitas produksi/jam = (V x Fb x Fa x 60)/(Ts1 x Fk) Q 24 m3/jam
DUMP TRUCK LPB
Jarak tempuh L 0.5 km
Kapasitas bak V 30 ton
Faktor efisiensi alat Fa 0.83 sangat baik
Berat jenis tanah BiL 1.4 ton/m3 sangat baik
Kecepatan rata-rata bermuatan v1 20 km/jam
Kecepatan rata-rata kosong v2 30 km/jam 2.18663271949405
Waktu muat T1 46.875 menit
Waktu tempuh isi T2 1.5 menit
Waktu menumpahkan T3 1 menit
Waktu tempuh kosong T4 1 menit
Waktu siklus Ts 50.375 menit
Kapasitas produksi/jam = (V x Fa x 60)/(Ts x BiL) Q 21.183977 m3/jam
TANDEM ROLLER
Kecepatan rata-rata V 4 km/jam km/jam
Lebar efektif pemadatan b 1.48 m meter
Jalur lintasan N 1 m meter
Jumlah lintasan n 2
Tebal pemadatan t 0.05 m meter
Lebar overlap bo 0.5 m meter
Faktor efisiensi alat Fa 0.83
Kapasitas Produksi/jam = (be x V x 1000 x Fa x t)/n Q 81.34 m3/jam m3/jam
Koefisien alat/m3 E2 0.0122941 jam jam
AMP
Kapasitas AMP (Plug Mill Size) v 3 ton
Lama loading material kering (agregat) t1 75 detik
Lama mixing dengan aspal t2 45 detik
Kapasitas produksi/jam = v/([t1+t2]/3600) Q 90 ton/jam
Breaker
Waktu Pekerjaan Breaking t1 10 detik
Waktu Pekerjaan Scraping t2 5 detik 1.18429457720588
Waktu Manuver Alat t3 5 detik
Breaking Length L 2.2 m
Width of Tool b 11.5 cm
Length of Tool d 0.5 m
Faktor Keadaan Alat F 0.9
Kapasitas produksi/jam Q 20.493 m3/jam
BLASTING
Quantity Pekerjaan
Jumlah lubang 90 bh
Panjang drilling 2 m
Rate Pekerjaan
Waktu drilling/lubang 2.5 menit
Waktu charging/lubang 1.2 menit
Cycle Time
Drilling 225 menit
Charging 108 menit
Blasting 60 menit
TOTAL 6.55 jam
CRD
Waktu Manuver + Ganti Rod + Drilling (4 m) t 12 menit
Kapasitas produksi/jam = 4/t Q 20 m/jam
SHOTCRETE
Tebal 15 cm Q 100 m3/jam
Tebal 10 cm Q 66.666667 m3/jam
BATCHING PLAN
Mixer Capacity q 2.2 m3
Job Management Factor E 1
Cycle Time CM 2.2 min
Hourly Production Q 60 m3/jam
CONCRETE PUMP
Batching Plan Production q 60 m3/jam
Job Management Factor E 0.5
Hourly Production Q 30 m3/jam
CONCRETE VIBRATOR
Hourly Production Q 6 s/d 20 m3/jam
Q 13 m3/jam
TRUCK MIXER
Mixer Capacity q 6 m3
Job Management Factor E 0.8
Charging Time From Mixer t1 3 min
Discharge Time From Agitator t2 5 min
Waiting and Position Time t3 2 min
Hauling Distance L 2 km
Hauling Speed V1 25 km/jam
Returning Speed V2 30 km/jam
Cycle Time t 18.8 min
Hourly Production Q 15.32 m3/jam
Asphalt mixing plant, Backhoe, dump truck, batching plant, tack coat, pekerja
selesai!!!!!
m3
LPA CTB
L 22 km L 3
V 10 ton V 10
Fa 0.83 sangat baik Fa 0.83
v1 20 km/jam v1 20
v2 30 km/jam v2 30
T1 3.6048935709 T1 3.6048935709
T2 66 menit T2 9
T3 1 menit T3 1
T4 44 menit T4 6
Ts 114.60489357 menit Ts 19.604893571
Q 3.1488146271 Q 18.40711677
Produktivitas
km/jam
meter
meter
meter
meter
Kondisi sangat baik
m3
jam
hauling 2km
1hari 2500 m3
8 jam
3
12/17/2020
12/31/2020
Lapis permukaan
km L 3.5 km
ton V 10 ton
sangat baik Fa 0.83 sangat baik
km/jam v1 20 km/jam
km/jam v2 30 km/jam
T1 3.6048936
menit T2 10.5 menit
menit T3 1 menit
menit T4 7 menit
menit Ts 22.104894 menit
Q 16.325325
E10 0.0612545
Schedule
No. Pekerjaan Vol
bulan hari
nd Grubbing
h kembali dipadatkan
Course /LPA
Base Course/LPB
7
Analisis Harga Satuan SHBJ Yogyakarta 2019
Pekerjaan Lapis Pondasi Bawah-tiap 1 m3 pekerjaan
Komponen Satuan Koefisien Harga dasar (Rp) Jumlah harga (Rp)
A. Tenaga
Tukang jam 0.08333 75,000.00 6,250.00
Mandor jam 0.04167 79,000.00 3,291.67
B. Bahan
Agregat halus (50%) m3 0.59140 100,000.00 59,140.00
Agregat kasar (50%) m3 0.59140 100,000.00 59,140.00
C. Alat
Excavator-backhoe m3 0.04167 405,000.00 16,875.00
Dump truck m3 0.04721 258,000.00 12,179.02
Bulldozer m3 0.01590 535,350.00 8,514.65
Motor grader jam 0.00691 385,000.00 2,662.14
Vibro Roller jam 0.01702 245,000.00 4,169.22
Total harga satuan 172,221.69
Kriteria bahan
Berat isi bahan T/m3
CTB D1 2.1
Agregat halus D2 1.38
Faktor kehilangan
Agregat Fh1 1.08
Semen Fh2 1.01
ANALISIS BATCHING PLANT
Analisa harga
tenaga didasarkan pada pekerjaan beton
karena produksi di batching plant beton
Faktor kehilangan
Agregat Fh1 1.08
24862.5
245100
Tribun 2 Juli 2018
KP 29
Manual
Undip
Priyo ILP
Permen
SHBJ JOGJA
SHBJ KULONPROGO
Tribun 2 Juli 2018 http://jogja.tribunnews.com/2018/07/02/daftar-harga-terbaru-bbm-non-subsidi-di-diy-yang-naik-per-1-juli-2018 PUKUL 14.4
Harga pekerjaan (Rp)
5,457,757,353.75
27,277,241,009.70
39,779,363,479.05
19,636,826,078.06
3,778,113,304.78
95,929,301,225.33
Lumpsum
Geotekstil
bekisting