19-04-24coating Rejection Report April 2024 Gmail
19-04-24coating Rejection Report April 2024 Gmail
19-04-24coating Rejection Report April 2024 Gmail
Tower No:-1
Total OK
Production Production OK QTY OK Production in Rejection NC in NC in
P.D Date Production in
Date in (KG) ( in KG) (Meter) in (Kg) Meter Kg
(Meter)
4/1/2024 4/2/2024 145.5 9100 129.2 8000 16.3 1100 0
4/2/2024 4/3/2024 116.4 6980 100.7 6980 15.7 0 0
4/3/2024 4/4/2024 130.9 8100 113.9 7500 17 600 0
4/4/2024 4/5/2024 133.1 9400 121.7 8900 11.4 500 0
4/5/2024 4/6/2024 139.2 9600 127.9 9300 11.3 300 0
4/6/2024 4/7/2024 138.4 10100 124.8 9500 13.6 600 0
4/7/2024 4/8/2024 0 0 0 0 0 0 0
4/8/2024 4/9/2024 101.6 7400 84.4 6200 17.2 1200 0
4/9/2024 4/10/2024 144.3 7100 118 5500 26.3 1600 0
4/10/2024 4/11/2024 124.6 7300 100.4 6200 24.2 1100 0
4/11/2024 4/12/2024 123.3 6900 102.1 6000 21.2 900 0
4/12/2024 4/13/2024 151.5 8300 132.4 7700 19.1 600 0
4/13/2024 4/14/2024 126.2 7700 112.1 6400 14.1 1300 0
4/14/2024 4/15/2024 0 0 0 0 0 0 0
4/15/2024 4/16/2024 104.7 6000 87.3 4700 17.4 1300 0
4/16/2024 4/17/2024 141.8 8500 126.6 7300 15.2 1200 0
4/17/2024 4/18/2024 132.9 7100 121.8 6500 11.1 600 0
4/18/2024 4/19/2024 138.3 8700 126.7 7700 11.6 1000 0
4/19/2024 4/20/2024 149.2 8100 135.7 7400 13.5 700 0
4/20/2024 4/21/2024 160.2 9200 141 7900 19.2 1300 0
4/21/2024 4/22/2024 0 0 0 0 0 0 0
4/22/2024 4/23/2024 112.3 6700 93.3 6200 19 500 0
4/23/2024 4/24/2024 126.2 8000 108.6 7200 17.6 800 0
4/24/2024 4/25/2024 119.5 7300 103 7000 16.5 300 0
4/25/2024 4/26/2024 162.4 10300 144.1 8300 18.3 2000 0
4/26/2024 4/27/2024 122.6 8800 109.5 8200 13.1 600 0
4/27/2024 4/28/2024 123.1 8500 103.9 7500 19.2 1000 0
4/28/2024 4/29/2024 0 0 0 0 0 0 0
4/29/2024 4/30/2024 0 0 0 0 0 0 0
4/30/2024 5/1/2024 0 0 0 0 0 0 0
5/1/2024 5/2/2024
11.2 13.750
13.5 0.000
13.0 8.000
8.6 5.618
8.1 3.226
9.8 6.316
#DIV/0! #DIV/0!
16.9 19.355
18.2 29.091
19.4 17.742
17.2 15.000
12.6 7.792
11.2 20.313
#DIV/0! #DIV/0!
16.6 27.660
10.7 16.438
8.4 9.231
8.4 12.987
9.0 9.459
12.0 16.456
#DIV/0! #DIV/0!
16.9 8.065
13.9 11.111
13.8 4.286
11.3 24.096
10.7 7.317
15.6 13.333
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
12.60 12.12
KIRAN UDYOG , Naubad, Bidar, Karnataka
Tower No:-2
Total OK
Production Production OK QTY OK Production in Rejection NC in
P.D Date Production in
Date in (KG) ( in KG) (Meter) in (Kg) Meter
(Meter)
0 12.1 63.265
0 12.1 44.262
0 14.0 56.667
0 12.4 36.364
0 9.0 41.379
0 11.5 47.541
0 #DIV/0! #DIV/0!
0 21.0 925.000
0 18.4 74.359
0 15.1 95.000
0 16.2 129.032
0 15.6 128.571
0 16.4 78.947
0 #DIV/0! #DIV/0!
0 18.5 87.500
0 16.8 70.000
0 10.7 63.043
0 8.1 21.053
0 10.2 61.364
0 11.2 76.923
0 #DIV/0! #DIV/0!
0 11.2 118.750
0 13.8 27.273
0 13.2 123.077
0 12.7 27.273
0 6.0 57.143
0 7.1 17.582
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
0 #DIV/0! #DIV/0!
#DIV/0! #DIV/0!
0 12.68 61.62
KIRAN UDYOG , Naubad, Bidar, Karnataka
Tower No:-3
Total OK
Production Production OK QTY OK Production in Rejection NC in NC in
P.D Date Production in Wastage % NC %
Date in (KG) ( in KG) (Meter) in (Kg) Meter Kg
(Meter)
Tower No:- 4
Total OK
Production Production OK QTY OK Production in Rejection NC in NC in
P.D Date Production in Wastage % NC %
Date in (KG) ( in KG) (Meter) in (Kg) Meter Kg
(Meter)
Total OK
Production Production OK QTY OK Production in
P.D Date Production in
Date in (KG) ( in KG) (Meter)
(Meter)
Rejection NC in NC in
Wastage % NC %
in (Kg) Meter Kg
0 0 0 0.0 0.000
0 0 0 0.0 0.000
0 0 0 0.0 0.000
0 0 0 0.0 0.000
0 0 0 0.0 0.000
0 0 0 0.0 0.000
0 0 0 #DIV/0! #DIV/0!
0 0 0 0.0 0.000
0 0 0 0.0 0.000
0 0 0 0.0 0.000
0 0 0 0.0 0.000
0 0 0 0.0 0.000
0 0 0 0.0 0.000
0 0 0 #DIV/0! #DIV/0!
0 0 0 0.0 0.000
0 0 0 0.0 0.000
0 0 0 0.0 0.000
0 0 0 0.0 0.000
0 0 0 0.0 0.000
0 0 0 0.0 0.000
0 0 0 0.0 0.000
0 0 0 #DIV/0! #DIV/0!
0 0 0 0.0 0.000
0 0 0 0.0 0.000
0 0 0 0.0 0.000
0 0 0 0.0 0.000
0 0 0 0.0 0.000
0 0 0 #DIV/0! #DIV/0!
0 0 0 #DIV/0! #DIV/0!
0 0 0 #DIV/0! #DIV/0!
#DIV/0! #DIV/0!
0 0 0 0.00 0.00
KIRAN UDYOG , Naubad, Bidar, Karnataka
Tower No:- 5
Total OK
Production Production OK QTY OK Production in Rejection NC in NC in
P.D Date Production in Wastage % NC %
Date in (KG) ( in KG) (Meter) in (Kg) Meter Kg
(Meter)
Tower No:- 6
Total OK
Production Production OK QTY OK Production in Rejection NC in NC in
P.D Date Production in Wastage % NC %
Date in (KG) ( in KG) (Meter) in (Kg) Meter Kg
(Meter)
Tower No:- 7
Total OK
Production Production OK QTY OK Production in Rejection NC in NC in
P.D Date Production in Wastage % NC %
Date in (KG) ( in KG) (Meter) in (Kg) Meter Kg
(Meter)
Tower No:- 8
Total OK
Production Production OK QTY OK Production in Rejection NC in NC in
P.D Date Production in Wastage % NC %
Date in (KG) ( in KG) (Meter) in (Kg) Meter Kg
(Meter)
Tower No:- 9
Total OK
Production Production OK QTY OK Production in Rejection NC in NC in
P.D Date Production in Wastage % NC %
Date in (KG) ( in KG) (Meter) in (Kg) Meter Kg
(Meter)
4/1/2024 4/2/2024 79.74 1700 69.3 1250 10.44 450 0 13.1 36.000
4/2/2024 4/3/2024 95.5 1900 85.5 1350 10 550 0 10.5 40.741
4/3/2024 4/4/2024 93.1 2050 87.6 1750 5.5 300 0 5.9 17.143
4/4/2024 4/5/2024 100.2 2050 89.7 1600 10.5 450 0 10.5 28.125
4/5/2024 4/6/2024 88 1550 80 1450 8 100 0 9.1 6.897
4/6/2024 4/7/2024 58.4 1700 48.2 1150 10.2 550 0 17.5 47.826
4/7/2024 4/8/2024 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
4/8/2024 4/9/2024 88.7 1250 77.3 1050 11.4 200 0 12.9 19.048
4/9/2024 4/10/2024 155.2 1760 138.7 1760 16.5 0 0 10.6 0.000
4/10/2024 4/11/2024 107.9 1950 101.8 1650 6.1 300 0 5.7 18.182
4/11/2024 4/12/2024 70.8 900 62.6 800 8.2 100 0 11.6 12.500
4/12/2024 4/13/2024 69.4 1200 62.4 850 7 350 0 10.1 41.176
4/13/2024 4/14/2024 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
4/14/2024 4/15/2024 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
4/15/2024 4/16/2024 132.9 2300 118.3 1700 14.6 600 0 11.0 35.294
4/16/2024 4/17/2024 126.1 2150 112.9 1850 13.2 300 0 10.5 16.216
4/17/2024 4/18/2024 130.2 2500 119.7 2000 10.5 500 0 8.1 25.000
4/18/2024 4/19/2024 116 2400 104.1 1950 11.9 450 0 10.3 23.077
4/19/2024 4/20/2024 121.1 2250 108.9 1700 12.2 550 0 10.1 32.353
4/20/2024 4/21/2024 102.6 1800 92.8 1650 9.8 150 0 9.6 9.091
4/21/2024 4/22/2024 107.6 2200 100.1 1900 7.5 300 0 7.0 15.789
4/22/2024 4/23/2024 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
4/23/2024 4/24/2024 126.7 2300 116.7 2150 10 150 0 7.9 6.977
4/24/2024 4/25/2024 15 2000 7.5 1650 7.5 350 0 50.0 21.212
4/25/2024 4/26/2024 186.7 3275 173.2 2850 13.5 425 0 7.2 14.912
4/26/2024 4/27/2024 121.9 2450 113.5 2225 8.4 225 0 6.9 10.112
4/27/2024 4/28/2024 133.7 2625 128.7 2450 5 175 0 3.7 7.143
4/28/2024 4/29/2024 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
4/29/2024 4/30/2024 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
4/30/2024 5/1/2024 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
5/1/2024 5/2/2024 #DIV/0! #DIV/0!
Tower No:- 10 KEI And KU All Towers Single Head Production And Rejection Add In Single T-10
Total OK
Production Production OK QTY OK Production in Rejection NC in NC in
P.D Date Production in Wastage % NC %
Date in (KG) ( in KG) (Meter) in (Kg) Meter Kg
(Meter)
Total Production
Total Production OK Production in Rejection in
Tower NAME Production in in( KG) OK NC In Meters NC in KG Wastage % NC %
in ( KG) (Meter) (Kg)
(Meter) Qty
Production In Rejection in
Production In Kg Rejection %
Meter Kg
18564.29 765430 2021.6 10.8897243040267
227.069999999996
KIRAN UDYOG , Naubad, Bidar, Karnataka
Tower No:- 01 - 10 KEI All Towers
Total OK
Production Production OK QTY OK Production in Rejection NC in NC in
Production in Wastage % NC %
Date in (KG) ( in KG) (Meter) in (Kg) Meter Kg
(Meter)
4/1/2024 4/2/2024 11.2 12.1 6.1 9.6 4.8 0.0 0.0 9.1 13.1 43.2 81.3 0.000
4/2/2024 4/3/2024 13.5 12.1 0.0 7.2 5.8 0.0 0.0 0.0 10.5 16.5 0.0 0.000
4/3/2024 4/4/2024 13.0 14.0 5.8 7.6 25.5 0.0 0.0 11.9 5.9 42.8 91.5 0.000
4/4/2024 4/5/2024 8.6 12.4 5.4 6.2 5.8 0.0 0.0 18.6 10.5 50.4 216.7 0.000
4/5/2024 4/6/2024 8.1 9.0 11.0 7.4 18.2 0.0 0.0 9.3 9.1 0.0 114.3 0.000
4/6/2024 4/7/2024 9.8 11.5 7.3 10.8 14.9 7.1 0.0 16.3 17.5 16.3 165.9 0.000
4/7/2024 4/8/2024 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 14.0 #DIV/0! 0.000
4/8/2024 4/9/2024 16.9 21.0 6.8 18.0 0.0 0.0 0.0 20.7 12.9 16.1 122.1 0.000
4/9/2024 4/10/2024 18.2 18.4 10.0 26.4 21.2 5.1 0.0 10.8 10.6 19.7 59.2 0.000
4/10/2024 4/11/2024 19.4 15.1 10.3 17.6 0.0 0.0 0.0 17.2 5.7 0.0 88.6 0.000
4/11/2024 4/12/2024 17.2 16.2 13.6 9.3 8.5 22.4 0.0 0.0 11.6 5.9 0.0 0.000
4/12/2024 4/13/2024 12.6 15.6 11.5 10.4 0.0 0.0 0.0 12.3 10.1 5.0 97.9 0.000
4/13/2024 4/14/2024 11.2 16.4 16.3 9.2 0.0 3.3 0.0 12.8 0.0 0.0 114.7 0.000
4/14/2024 4/15/2024 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.3 #DIV/0! 0.000
4/15/2024 4/16/2024 16.6 18.5 0.0 7.5 22.3 0.0 0.0 14.9 11.0 7.3 89.6 0.000
4/16/2024 4/17/2024 10.7 16.8 13.5 12.7 0.0 10.6 30.0 14.9 10.5 7.8 139.2 0.000
4/17/2024 4/18/2024 8.4 10.7 14.2 14.4 0.0 0.0 7.0 10.5 8.1 14.9 125.9 0.000
4/18/2024 4/19/2024 8.4 8.1 15.0 10.2 0.0 4.1 68.7 11.5 10.3 14.0 137.7 0.000
4/19/2024 4/20/2024 9.0 10.2 17.3 13.3 0.0 0.0 36.7 15.8 10.1 0.0 174.4 0.000
4/20/2024 4/21/2024 12.0 11.2 16.4 10.9 0.0 0.0 0.0 23.8 9.6 0.0 198.7 0.000
4/21/2024 4/22/2024 0.0 0.0 0.0 14.5 0.0 0.0 0.0 0.0 7.0 0.0 #DIV/0! 0.000
4/22/2024 4/23/2024 16.9 11.2 17.0 0.0 0.0 0.0 0.0 16.6 0.0 0.0 98.0 0.000
4/23/2024 4/24/2024 13.9 13.8 14.8 11.2 23.5 0.0 0.0 11.3 7.9 0.0 81.3 0.000
4/24/2024 4/25/2024 13.8 13.2 12.7 18.3 0.0 0.0 0.0 9.3 50.0 12.0 67.5 0.000
4/25/2024 4/26/2024 11.3 12.7 9.9 14.9 0.0 7.0 56.8 10.3 7.2 0.0 91.0 0.000
4/26/2024 4/27/2024 10.7 6.0 10.3 13.4 0.0 27.8 17.3 14.5 6.9 0.0 135.4 0.000
4/27/2024 4/28/2024 15.6 7.1 14.0 12.2 37.5 0.0 0.0 27.6 3.7 0.0 176.9 0.000
4/28/2024 4/29/2024 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 #DIV/0! 0.000
4/29/2024 4/30/2024 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 #DIV/0! 0.000
4/30/2024 5/1/2024 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 #DIV/0! 0.000
5/1/2024 5/2/2024 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 #DIV/0! 0.000
Total 9.6 9.8 8.1 9.2 5.9 2.7 6.8 10.0 8.1 9.2 #DIV/0! 0.0
REJECTION & NC % FOR THE MONTH OF APRIL-2024 PRD Dt:- 02.04.2024
Total
Total Production Production OK Production Rejection NC NC Wastage NC
Tower Name Production
(in Meter) (in KG) OK Qty (in Meter) (in Kg) (In Meter) (in KG) % %
(in KG)
Tower No 1 145.5 9100 129.2 8000 16.3 1100 0 11.2 13.8
Tower No 2 119.9 8000 105.4 4900 14.5 3100 0 12.1 63.3
Tower No 3 48.9 6200 45.9 5500 3 700 0 6.1 12.7
Tower No 4 57.1 1150 51.6 1150 5.5 0 0 9.6 0.0
Tower No 4 (Kits) 87.2 1187 87.2 1187 0 0 0 0.0 0.0
Tower No 5 Mtr Length 51.8 7400 49.3 7400 2.5 0 0 4.8 0.0
( Alstom)
Tower No 6 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
Tower No 7 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
Tower No 8 54.9 4500 49.9 4200 5 300 0 9.1 7.1
Tower No 9 79.74 1700 69.3 1250 10.44 450 0 13.1 36.0
Tower No 10 Fire Sleeve 49.9 100 46.1 100 3.8 0 0 7.6 0.0
Total
Total Production Production OK Production Rejection NC NC Wastage NC
Tower Name Production
(in Meter) (in KG) OK Qty (in Meter) (in Kg) (In Meter) (in KG) % %
(in KG)
Total
Total Production Production OK Production Rejection NC NC Wastage NC
Tower Name Production
(in Meter) (in KG) OK Qty (in Meter) (in Kg) (In Meter) (in KG) % %
(in KG)
Tower No 1 123.3 6900 102.1 6000 21.2 900 0 17.2 15.0
Tower No 2 138.9 7100 116.4 3100 22.5 4000 0 16.2 129.0
Tower No 3 51.3 5800 44.3 5800 7 0 0 13.6 0.0
Tower No 4 54.6 600 49.5 425 5.1 175 0 9.3 41.2
Tower No 4 (Kits) 46.3 636 46.3 636 0 0 0 0.0 0.0
Tower No 5 Mtr Length 65.59 1100 60 1100 5.59 0 0 8.5 0.0
( Alstom)
Tower No 6 55.3 3600 42.9 3600 12.4 0 0 22.4 0.0
Tower No 7 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
Tower No 8 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
Tower No 9 70.8 900 62.6 800 8.2 100 0 11.6 12.5
Tower No 10 Fire Sleeve 158.93 200 132.73 150 26.2 50 0 16.5 33.3
Wastage NC
% %
12.6 7.8
15.6 128.6
11.5 0.0
10.4 0.0
0.0 0.0
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
#DIV/0! #DIV/0!
12.3 0.0
10.1 41.2
42.8 50.0
13.4 22.37
Quality Inspectors
3) SANTHOSH
REJECTION & NC % FOR THE MONTH OF APRIL-2024 PRD Dt:- 15-04-2024
Total
Total Production Production OK Production Rejection NC NC Wastage NC
Tower Name Production
(in Meter) (in KG) OK Qty (in Meter) (in Kg) (In Meter) (in KG) % %
(in KG)
Tower No 1 126.2 7700 112.1 6400 14.1 1300 0 11.2 20.3
Tower No 2 129 6800 107.8 3800 21.2 3000 0 16.4 78.9
Tower No 3 42.9 4900 35.9 4900 7 0 0 16.3 0.0
Tower No 4 95.3 950 86.5 475 8.8 475 0 9.2 100.0
Tower No 4 (Kits) 82.1 1115 82.1 1115 0 0 0 0.0 0.0
Tower No 5 Mtr Length 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
( Alstom)
Tower No 6 45.1 3675 43.6 3675 1.5 0 0 3.3 0.0
Tower No 7 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
Tower No 8 31.2 3600 27.2 3400 4 200 0 12.8 5.9
Tower No 9 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
Tower No 10 Fire Sleeve 37.7 50 18.7 25 19 25 0 50.4 100.0
2) Yeshappa
2) Parmesh
3) Khudos 3) shivkimar
4) Vijaykumar 4) vishal
REJECTION & NC % FOR THE MONTH OF APRIL-2024 PRD Dt:- 17.04.2024
Total
Total Production Production OK Production Rejection NC NC Wastage NC
Tower Name Production
(in Meter) (in KG) OK Qty (in Meter) (in Kg) (In Meter) (in KG) % %
(in KG)
Tower No 1 141.8 8500 126.6 7300 15.2 1200 0 10.7 16.4
2) Yeshappa
2) Parmesh
3) Khudos 3) shivkimar
4) Vijaykumar 4) vishal
REJECTION & NC % FOR THE MONTH OF APRIL-2024 PRD Dt:-18.04.2024
Total
Total Production Production OK Production Rejection NC NC Wastage NC
Tower Name Production
(in Meter) (in KG) OK Qty (in Meter) (in Kg) (In Meter) (in KG) % %
(in KG)
Tower No 1 132.9 7100 121.8 6500 11.1 600 0 8.4 9.2
Tower No 2 182.6 7500 163.1 4600 19.5 2900 0 10.7 63.0
Tower No 3 162.4 7900 139.4 6800 23 1100 0 14.2 16.2
Tower No 4 29.1 300 24.9 100 4.2 200 0 14.4 200.0
Tower No 4 (Kits) 22.5 360 22.5 360 0 0 0 0.0 0.0
Tower No 5 Mtr Length 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
( Alstom)
Tower No 6 9.4 1900 9.4 1900 0 0 0 0.0 0.0
Tower No 7 122.1 1200 113.6 1200 8.5 0 0 7.0 0.0
Tower No 8 42.8 3700 38.3 3700 4.5 0 0 10.5 0.0
Tower No 9 130.2 2500 119.7 2000 10.5 500 0 8.1 25.0
Tower No 10 Fire Sleeve 6.2 25 5.2 25 1 0 0 16.1 0.0
1) Vishwanth Rao
1) Nirupam
2) Yeshappa 2) Parmesh
3) Ali 3) Fayaz
4) Vijaykumar 4) Ambrish
REJECTION & NC % FOR THE MONTH OF APRIL-2024 PRD Dt:- 19.04.2024
Total
Total Production Production OK Production Rejection NC NC Wastage NC
Tower Name Production
(in Meter) (in KG) OK Qty (in Meter) (in Kg) (In Meter) (in KG) % %
(in KG)
Tower No 1 138.3 8700 126.7 7700 11.6 1000 0 8.4 13.0
Tower No 2 173.9 6900 159.8 5700 14.1 1200 0 8.1 21.1
Tower No 3 159.9 8600 135.9 6600 24 2000 0 15.0 30.3
Tower No 4 67.7 1050 60.8 550 6.9 500 0 10.2 90.9
Tower No 4 (Kits) 64.8 983 64.8 983 0 0 0 0.0 0.0
Tower No 5 Mtr Length 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
( Alstom)
Tower No 6 48.8 3725 46.8 3725 2 0 0 4.1 0.0
Tower No 7 9.9 400 3.1 400 6.8 0 0 68.7 0.0
Tower No 8 43.3 4300 38.3 4300 5 0 0 11.5 0.0
Tower No 9 116 2400 104.1 1950 11.9 450 0 10.3 23.1
Tower No 10 Fire Sleeve 12.7 75 10.2 50 2.5 25 0 19.7 50.0
1) Vishwanth Rao
1) Nirupam
2) Yeshappa 2) Parmesh
3) Ali 3) Fayaz
4) Vijaykumar 4) Ambrish
REJECTION & NC % FOR THE MONTH OF APRIL-2024 PRD Dt:- 20.04.2024
Total
Total Production Production OK Production Rejection NC NC Wastage NC
Tower Name Production
(in Meter) (in KG) OK Qty (in Meter) (in Kg) (In Meter) (in KG) % %
(in KG)
Tower No 1 149.2 8100 135.7 7400 13.5 700 0 9.0 9.5
Tower No 2 172.4 7100 154.9 4400 17.5 2700 0 10.2 61.4
Tower No 3 144.2 6800 119.2 4900 25 1900 0 17.3 38.8
Tower No 4 41.3 700 35.8 700 5.5 0 0 13.3 0.0
Tower No 4 (Kits) 93.9 1489 93.9 1489 0 0 0 0.0 0.0
Tower No 5 Mtr Length 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
( Alstom)
Tower No 6 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
Tower No 7 10.9 800 6.9 800 4 0 0 36.7 0.0
Tower No 8 50.7 4500 42.7 4500 8 0 0 15.8 0.0
Tower No 9 121.1 2250 108.9 1700 12.2 550 0 10.1 32.4
Tower No 10 Fire Sleeve 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
1) Vishwanth Rao
1) Nirupam
2) Yeshappa 2) Parmesh
3) Ali 3) Fayaz
4) Vijaykumar 4) Ambrish
REJECTION & NC % FOR THE MONTH OF APRIL-2024 PRD Dt:- 21.04.2024
Total
Total Production Production OK Production Rejection NC NC Wastage NC
Tower Name Production
(in Meter) (in KG) OK Qty (in Meter) (in Kg) (In Meter) (in KG) % %
(in KG)
Tower No 1 160.2 9200 141 7900 19.2 1300 0 12.0 16.5
Tower No 2 102 4600 90.6 2600 11.4 2000 0 11.2 76.9
Tower No 3 158.8 8000 132.8 7100 26 900 0 16.4 12.7
Tower No 4 43.3 700 38.6 700 4.7 0 0 10.9 0.0
Tower No 4 (Kits) 94.4 1421 94.4 1421 0 0 0 0.0 0.0
Tower No 5 Mtr Length 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
( Alstom)
Tower No 6 15.9 2700 15.9 2700 0 0 0 0.0 0.0
Tower No 7 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
Tower No 8 29.4 2500 22.4 2500 7 0 0 23.8 0.0
Tower No 9 102.6 1800 92.8 1650 9.8 150 0 9.6 9.1
Tower No 10 Fire Sleeve 217.93 790 205.13 740 12.8 50 0 5.9 6.8
1) Vishwanth Rao
1) Nirupam
2) Yeshappa 2) Parmesh
3) Ali 3) Fayaz
4) Vijaykumar 4) Ambrish
REJECTION & NC % FOR THE MONTH OF APRIL-2024 PRD Dt:- 22.04.2024
Total
Total Production Production OK Production Rejection NC NC Wastage NC
Tower Name Production
(in Meter) (in KG) OK Qty (in Meter) (in Kg) (In Meter) (in KG) % %
(in KG)
Tower No 1 0 0 #DIV/0! #DIV/0!
Tower No 2 0 0 #DIV/0! #DIV/0!
Tower No 3 0 0 #DIV/0! #DIV/0!
Tower No 4 0 0 #DIV/0! #DIV/0!
Tower No 4 (Kits) 0 0 #DIV/0! #DIV/0!
Tower No 5 Mtr Length 0 0 #DIV/0! #DIV/0!
( Alstom)
Tower No 6 0 0 #DIV/0! #DIV/0!
Tower No 7 0 0 #DIV/0! #DIV/0!
Tower No 8 0 0 #DIV/0! #DIV/0!
Tower No 9 0 0 #DIV/0! #DIV/0!
Tower No 10 Fire Sleeve 0 0 #DIV/0! #DIV/0!
1) Vishwanth Rao
1) Nirupam
2) Yeshappa 2) Parmesh
3) Ali 3) Fayaz
4) Vijaykumar 4) Ambrish
REJECTION & NC % FOR THE MONTH OF APRIL-2024 PRD Dt:- 23.04.2024
Total
Total Production Production OK Production Rejection NC NC Wastage NC
Tower Name Production
(in Meter) (in KG) OK Qty (in Meter) (in Kg) (In Meter) (in KG) % %
(in KG)
Tower No 1 112.3 6700 93.3 6200 19 500 0 16.9 8.1
Tower No 2 91.2 3500 81 1600 10.2 1900 0 11.2 118.8
Tower No 3 141.5 7400 117.5 5300 24 2100 0 17.0 39.6
Tower No 4 43.3 600 37 550 6.3 50 0 14.5 9.1
Tower No 4 (Kits) 44.5 555 44.5 555 0 0 0 0.0 0.0
Tower No 5 Mtr Length 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
( Alstom)
Tower No 6 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
Tower No 7 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
Tower No 8 36.2 3600 30.2 3600 6 0 0 16.6 0.0
Tower No 9 107.6 2200 100.1 1900 7.5 300 0 7.0 15.8
Tower No 10 Fire Sleeve 104.97 425 99.67 400 5.3 25 0 5.0 6.3
1) Vishwanth Rao
1) Nirupam
2) Yeshappa 2) Parmesh
3) Ali 3) Fayaz
4) Vijaykumar 4) Ambrish
REJECTION & NC % FOR THE MONTH OF APRIL-2024 PRD Dt:- 24.04.2024
Total
Total Production Production OK Production Rejection NC NC Wastage NC
Tower Name Production
(in Meter) (in KG) OK Qty (in Meter) (in Kg) (In Meter) (in KG) % %
(in KG)
Tower No 1 126.2 8000 108.6 7200 17.6 800 0 13.9 11.1
Tower No 2 146 5600 125.8 4400 20.2 1200 0 13.8 27.3
Tower No 3 143.5 6700 122.3 5300 21.2 1400 0 14.8 26.4
Tower No 4 62.3 900 55.3 800 7 100 0 11.2 12.5
Tower No 4 (Kits) 56.4 858 56.4 858 0 0 0 0.0 0.0
Tower No 5 Mtr Length 44.2 550 33.8 550 10.4 0 0 23.5 0.0
( Alstom)
Tower No 6 8.8 1900 8.8 1900 0 0 0 0.0 0.0
Tower No 7 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
Tower No 8 52.9 5700 46.9 5700 6 0 0 11.3 0.0
Tower No 9 126.7 2300 116.7 2150 10 150 0 7.9 7.0
Tower No 10 Fire Sleeve 123.5 425 113.3 375 10.2 50 0 8.3 13.3
1) Vishwanth Rao
1) Nirupam
2) Yeshappa 2) Parmesh
3) Ali 3) Fayaz
4) Vijaykumar 4) Ambrish
REJECTION & NC % FOR THE MONTH OF APRIL-2024 PRD Dt:- 25.04.2024
Total
Total Production Production OK Production Rejection NC NC Wastage NC
Tower Name Production
(in Meter) (in KG) OK Qty (in Meter) (in Kg) (In Meter) (in KG) % %
(in KG)
Tower No 1 119.5 7300 103 7000 16.5 300 0 13.8 4.3
Tower No 2 72.2 2900 62.7 1300 9.5 1600 0 13.2 123.1
Tower No 3 141.7 8900 123.7 7000 18 1900 0 12.7 27.1
Tower No 4 86.4 650 70.6 550 15.8 100 0 18.3 18.2
Tower No 4 (Kits) 66.4 950 66.4 950 0 0 0 0.0 0.0
Tower No 5 Mtr Length 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
( Alstom)
Tower No 6 5.4 1300 5.4 1300 0 0 0 0.0 0.0
Tower No 7 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
Tower No 8 42.9 4000 38.9 4000 4 0 0 9.3 0.0
Tower No 9 15 2000 7.5 1650 7.5 350 0 50.0 21.2
Tower No 10 Fire Sleeve 177.1 675 164.2 450 12.9 225 0 7.3 50.0
1) Vishwanth Rao
1) Nirupam
2) Yeshappa 2) Parmesh
3) Ali 3) Fayaz
4) Vijaykumar 4) Ambrish
REJECTION & NC % FOR THE MONTH OF APRIL-2024 PRD Dt:-26.04.2024
Total
Total Production Production OK Production Rejection NC NC Wastage NC
Tower Name Production
(in Meter) (in KG) OK Qty (in Meter) (in Kg) (In Meter) (in KG) % %
(in KG)
Tower No 1 162.4 10300 144.1 8300 18.3 2000 0 11.3 24.1
Tower No 2 137.9 5600 120.4 4400 17.5 1200 0 12.7 27.3
Tower No 3 136.1 8000 122.6 6600 13.5 1400 0 9.9 21.2
Tower No 4 96.6 1300 82.2 1000 14.4 300 0 14.9 30.0
Tower No 4 (Kits) 68.7 1000 68.7 1000 0 0 0 0.0 0.0
Tower No 5 Mtr Length 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
( Alstom)
Tower No 6 42.9 4345 39.9 4345 3 0 0 7.0 0.0
Tower No 7 8.8 200 3.8 200 5 0 0 56.8 0.0
Tower No 8 19.5 1500 17.5 1500 2 0 0 10.3 0.0
Tower No 9 186.7 3275 173.2 2850 13.5 425 0 7.2 14.9
Tower No 10 Fire Sleeve 148.75 350 137.15 325 11.6 25 0 7.8 7.7
1) Vishwanth Rao
1) Nirupam
2) Yeshappa 2) Parmesh
3) Ali 3) Fayaz
4) Vijaykumar 4) Ambrish
REJECTION & NC % FOR THE MONTH OF APRIL-2024 PRD Dt:- 27.04.2024
Total
Total Production Production OK Production Rejection NC NC Wastage NC
Tower Name Production
(in Meter) (in KG) OK Qty (in Meter) (in Kg) (In Meter) (in KG) % %
(in KG)
Tower No 1 122.6 8800 109.5 8200 13.1 600 0 10.7 7.3
Tower No 2 159.6 7700 150.1 4900 9.5 2800 0 6.0 57.1
Tower No 3 157.4 9100 141.2 7700 16.2 1400 0 10.3 18.2
Tower No 4 94.3 950 81.7 775 12.6 175 0 13.4 22.6
Tower No 4 (Kits) 70.5 996 70.5 996 0 0 0 0.0 0.0
Tower No 5 Mtr Length 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
( Alstom)
Tower No 6 25.2 470 18.2 470 7 0 0 27.8 0.0
Tower No 7 11 1200 9.1 1200 1.9 0 0 17.3 0.0
Tower No 8 62.2 4600 53.2 4600 9 0 0 14.5 0.0
Tower No 9 121.9 2450 113.5 2225 8.4 225 0 6.9 10.1
Tower No 10 Fire Sleeve 17.5 300 14.9 250 2.6 50 0 14.9 20.0
36566
1) Vishwanth Rao
1) Nirupam
2) Yeshappa 2) Parmesh
3) Ali 3) Fayaz
4) Vijaykumar 4) Ambrish
REJECTION & NC % FOR THE MONTH OF APRIL-2024 PRD Dt:- 28.04.2024
Total
Total Production Production OK Production Rejection NC NC Wastage NC
Tower Name Production
(in Meter) (in KG) OK Qty (in Meter) (in Kg) (In Meter) (in KG) % %
(in KG)
Tower No 1 123.1 6500 103.9 7500 19.2 1000 0 15.6 13.3
Tower No 2 161.3 7500 149.8 9100 11.5 1600 0 7.1 17.6
Tower No 3 136.9 9100 117.8 11300 19.1 2200 0 14.0 19.5
Tower No 4 94.8 1075 83.2 1225 11.6 150 0 12.2 12.2
Tower No 4 (Kits) 67.2 784 67.2 784 0 0 0 0.0 0.0
Tower No 5 Mtr Length 19.2 200 12 350 7.2 150 0 37.5 42.9
( Alstom)
Tower No 6 0 0 0 0 0 0 0 #DIV/0! #DIV/0!
Tower No 7 19.8 1825 19.8 1825 0 0 0 0.0 0.0
Tower No 8 14.5 400 10.5 400 4 0 0 27.6 0.0
Tower No 9 133.7 2275 128.7 2450 5 175 0 3.7 7.1
Tower No 10 Fire Sleeve 95.55 200 82.15 225 13.4 25 0 14.0 11.1
1) Vishwanth Rao
1) Nirupam
2) Yeshappa 2) Parmesh
3) Ali 3) Fayaz
4) Vijaykumar 4) Ambrish
REJECTION & NC % FOR THE MONTH OF APRIL-2024 PRD Dt:- 29.04.2024
Total
Total Production Production OK Production Rejection NC NC Wastage NC
Tower Name Production
(in Meter) (in KG) OK Qty (in Meter) (in Kg) (In Meter) (in KG) % %
(in KG)
Tower No 1 0 0 #DIV/0! #DIV/0!
Tower No 2 0 0 #DIV/0! #DIV/0!
Tower No 3 0 0 #DIV/0! #DIV/0!
Tower No 4 0 0 #DIV/0! #DIV/0!
Tower No 4 (Kits) 0 0 #DIV/0! #DIV/0!
Tower No 5 Mtr Length 0 0 #DIV/0! #DIV/0!
( Alstom)
Tower No 6 0 0 #DIV/0! #DIV/0!
Tower No 7 0 0 #DIV/0! #DIV/0!
Tower No 8 0 0 #DIV/0! #DIV/0!
Tower No 9 0 0 #DIV/0! #DIV/0!
Tower No 10 Fire Sleeve 0 0 #DIV/0! #DIV/0!
1) Vishwanth Rao
1) Nirupam
2) Yeshappa 2) Parmesh
3) Ali 3) Fayaz
4) Vijaykumar 4) Ambrish
REJECTION & NC % FOR THE MONTH OF APRIL-2024 PRD Dt:- 30.04.2024
Total
Total Production Production OK Production Rejection NC NC Wastage NC
Tower Name Production
(in Meter) (in KG) OK Qty (in Meter) (in Kg) (In Meter) (in KG) % %
(in KG)
Tower No 1 0 0 #DIV/0! #DIV/0!
Tower No 2 0 0 #DIV/0! #DIV/0!
Tower No 3 0 0 #DIV/0! #DIV/0!
Tower No 4 0 0 #DIV/0! #DIV/0!
Tower No 4 (Kits) 0 0 #DIV/0! #DIV/0!
Tower No 5 Mtr Length 0 0 #DIV/0! #DIV/0!
( Alstom)
Tower No 6 0 0 #DIV/0! #DIV/0!
Tower No 7 0 0 #DIV/0! #DIV/0!
Tower No 8 0 0 #DIV/0! #DIV/0!
Tower No 9 0 0 #DIV/0! #DIV/0!
Tower No 10 Fire Sleeve 0 0 #DIV/0! #DIV/0!
1) Vishwanth Rao
1) Nirupam
2) Yeshappa 2) Parmesh
3) Ali 3) Fayaz
4) Vijaykumar 4) Ambrish
REJECTION & NC % FOR THE MONTH OF APRIL-2024 PRD Dt:- 31.01.2024
Total
Total Production Production OK Production Rejection NC NC Wastage NC
Tower Name Production
(in Meter) (in KG) OK Qty (in Meter) (in Kg) (In Meter) (in KG) % %
(in KG)
Tower No 1 0 0 #DIV/0! #DIV/0!
Tower No 2 0 0 #DIV/0! #DIV/0!
Tower No 3 0 0 #DIV/0! #DIV/0!
Tower No 4 0 0 #DIV/0! #DIV/0!
Tower No 4 (Kits) 0 0 #DIV/0! #DIV/0!
Tower No 5 Mtr Length 0 0 #DIV/0! #DIV/0!
( Alstom)
Tower No 6 0 0 #DIV/0! #DIV/0!
Tower No 7 0 0 #DIV/0! #DIV/0!
Tower No 8 0 0 #DIV/0! #DIV/0!
Tower No 9 0 0 #DIV/0! #DIV/0!
Tower No 10 Fire Sleeve 0 0 #DIV/0! #DIV/0!
1) Vishwanth Rao
1) Nirupam
2) Yeshappa 2) Parmesh
3) Ali 3) Fayaz
4) Vijaykumar 4) Ambrish