EXPEDIENTE TECNICO INICIAL CON RESOLCUCION GERENCIAL GENERAL .- 496 - 2016 GGR-
GR PUNO EN FECHA: 26 DE SETIEMBRE 2016
COSTO DIRECTO S/.34,868,246.24 S/.11,760,154.12 33.73% S/.178,751.24 0.51% S/.11,938,905.36 34.24% S/.22,929,340.88 65.76%
GASTOS GENERALES S/.2,940,948.13 S/.2,105,582.55 45.94% S/.0.00 0.00% S/.2,105,582.55 45.94% S/.835,365.58 18.23%
GASTOS DE SUPERVISION S/.1,230,852.96 S/.509,974.25 11.13% S/.23,426.00 0.51% S/.533,400.25 11.64% S/.697,452.71 15.22%
GASTOS DE EXPEDIENTE
S/.280,420.93 S/.232,117.45 5.06% S/.0.00 0.00% S/.232,117.45 5.06% S/.48,303.48 1.05%
TECNICO
GASTOS DE LIQUIDACION S/.53,413.51 S/.0.00 0.00% S/.0.00 0.00% S/.0.00 0.00% S/.53,413.51 1.17%
GASTOS DE MONITOREO Y
S/.29,377.43 S/.520.00 0.00% S/.0.00 0.00% S/.520.00 0.01% S/.28,857.43 0.63%
SEGUIMIENTO
GASTOS DE GESTION DE
S/.48,072.16 S/.0.00 0.00% S/.0.00 0.00% S/.0.00 0.00% S/.48,072.16 1.05%
PROYECTO
COSTO INDIRECTO S/.4,583,085.12 S/.2,848,194.25 62.15% S/.23,426.00 0.51% S/.2,871,620.25 62.66% S/.1,711,464.87 37.34%
PRESUPUESTO TOTAL S/.39,451,331.36 S/.14,608,348.37 37.03% S/.202,177.24 0.51% S/.14,810,525.61 37.54% S/.24,640,805.75 62.46%
AMPLIACION PRESUPUESTAL, POR EL DESFACE PRESUPUESTAL en los Gastos de COSTO DE CONSTRUCCION POR
ADMINISTRACION DIRECTA – PERSONAL EN COSTO DIRECTO.
Costo de mano de obra, de las partidas S/. 3´854,008.19
que faltan ejecutar INFORME N° 191-2019-
GRP/GRI/SGO/RO-RAC
Costo de mano de obra, que se ha S/. 888,746.98 RECIBIDO EN FECHA 27 DE
excedido de lo presupuestado MAYO A SUB GERENCIA
DE OBRAS
S/. 4´742,755.17
Los costos de mano de obra a nivel de Costo Directo de los adicionales de obra ejecutados hasta el 31 de
diciembre de 2018, sin aprobación resolutiva, asciende a la suma de S/. 708,733.34, el que se debe de tener
presente, debido a que estos gastos ya se han realizado.
TOTAL PRESUPUESTO SEGÚN S/. 39´451,331.36
EXPEDIENTE MODIFICADO
DESFASE PRESUPUESTAL POR MANO DE S/. 4´034,021.83
OBRA
TOTAL S/. 43´485,353.19 Gestión 2019 - 2022
GOBIERNO GERENCIA REGIONAL SUB GERENCIA DE
REQUERIMIENTOS
REGIONAL DE PUNO DE INFRAESTRUCTURA EJECUCIÓN DE PROYECTOS
BIENES
ITEM N° REQ. - O/C DESCRIPCION MONTO
1 O/C 1372 COMBUSTIBLE 31,869.00
2 2026 PIEDRA LAJA IRREGULAR 4,800.00
3 3166 CONCRETO PREMEZCLADO 28,125.00
4 2024 TUBERIA RIGIDA GALVANIZADA 105,000.00
5 3159 ACERO CORRUGADO 10,500.00
6 3332 LISTONES DE MADERA 11,520.00
TOTAL BIENES 191,814.00
SERVICIOS
ITEM N° REQ. - O/S DESCRIPCION MONTO
1 O/S 527 EQUIPOS LIVIANOS 9,772.00
2 O/S 1440 ESTUDIOS GEOFISICOS 8,400.00
3 O/S 1174 ALQUILER DE VOLQUETE 28,680.00
TOTAL SERVICIOS 46,852.00
PERSONAL
ITEM PLANILLA DESCRIPCION MONTO
1 PLANILLA GASTOS GENERALES SETIEMBRE 59,866.96
1 PLANILLA GASTOS GENERALES OCTUBRE 59,866.96
1 PLANILLA COSTO DIRECTO OCTUBRE 130,000.00
TOTAL PERSONAL 249,733.92
PANEL FOTOGRAFICO
PANEL FOTOGRAFICO
TARRAJEO EN LA CAJA DE
COLOCACION DE BANDEJAS ESCALERAS
MANTENIMIENTO EN LA PORTACABLES EN EL AREA
ANCHA DE GRASS NATURAL DE COMUNICACIONES
Se realiza la construcción del cerco perimétrico del componente 1 y se menciona que a la fecha ya se tiene casi al
100.00% aproximadamente de avance físico.
Se viene ejecutando el corte de material para la construcción de las plataformas y los jardines exteriores alrededor
de la infraestructura del estadio
Esta Residencia de obra deslinda responsabilidades por la falta de pago al personal que labora en esta presente
obra ya que se presento UNA AMPLIACION PRESUPUESTAL POR DESFASE EN GASTO EN PERSONAL la
misma que de no ser aprobada este desfase no se podrá cumplir con todas las metas programadas en este
presente año 2019.