Valo 1° Santa-Santa-Ancash
Valo 1° Santa-Santa-Ancash
Valo 1° Santa-Santa-Ancash
CONSORCIO BJ
I.- FICHA DE IDENTIFICACION DE LA OBRA
1 Obra :
MEJORAMIENTO DE ALAMEDA EN LA AV. PANAMERICANA, TRAMO JR. YAVARI
- JR ATUSPARIA, EN EL P.H.U. JAVIER HERAUD DEL DISTRITO DE SANTA -
PROVINCIA DE SANTA - DEPARTAMENTO DE ANCASH
GRAFICA DE 100.00%
AVANCE DE OBRA
% S/. 100.0%
% ACUM. PROG. 23.08% 415,200.00 97.89%
90.0%
80% ACUM. PROG. 18.46% 332,160.00
80.0%
60.0%
57.19%
50.0%
R ow 37
30.0% 23.08%
ATRASADA
20.0%
EN 23.08%
10.0%
0.00%
0.0% 0.00% 0.00%
% ACUM. EJEC. < 80% ACUM. PROG. INICIO Feb.-2020 Mar.-2020 Abr.-2020 May.-2020
04/12/18
MESES
HACER CALENDARIO ACELERADO
INICIO
MESES Feb.-2020 Mar.-2020 Abr.-2020 May.-2020
04/12/18
VALORIZACION N° 01
PRESUPUESTO TOTAL
ANTERIOR ACTUAL ACUMULADO SALDO
Item. DESCRIPCION Und. Metrado P. U. Total Metrado % Monto Metrado % Monto Metrado % Monto Metrado % Monto
ESTRUCTURAS ACTUAL
01 OBRAS PROVISIONALES
01.01 CARTEL DE OBRA EN MADERA DE 3.60m X4.80m (Gigantografia) und 1.00 864.36 864.36 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 1.00 100.00% 864.36
01.02 OFICINA, ALMACEN Y CASETA DE GUARDIANIA und 1.00 1,733.58 1,733.58 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 1.00 100.00% 1,733.58
01.03 CERCO PERIMETRICO PROVISIONAL m 1,537.89 11.61 17,854.90 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 1,537.89 100.00% 17,854.90
01.04 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIAS Y EQUIPOS glb 1.00 3,000.00 3,000.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 1.00 100.00% 3,000.00
01.05 AGUA PARA LA CONSTRUCCION glb 1.00 3,005.60 3,005.60 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 1.00 100.00% 3,005.60
01.06 SERVICIO HIGIENICO PORTATIL und 2.00 850.00 1,700.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 2.00 100.00% 1,700.00
01.07 EQUIPO DE PROTECCION INDIVIDUAL und 48.00 158.85 7,624.80 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 48.00 100.00% 7,624.80
01.08 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 2,512.40 2,512.40 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 1.00 100.00% 2,512.40
02 TRABAJOS PRELIMINARES
2.01 TALA DE ARBOLES INC. ELIMINACION und 49.00 76.15 3,731.35 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 49.00 100.00% 3,731.35
2.02 DEMOLICION DE ESTRUCTURAS EXISTENTES m3 202.62 28.41 5,756.43 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 202.62 100.00% 5,756.43
2.03 LIMPIEZA SUPERFICIAL DE TERRENO m2 6,110.29 0.53 3,238.45 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 6,110.29 100.00% 3,238.45
2.04 TRAZO, NIVELACION Y REPLANTEO FINAL DE LA OBRA m2 6,110.29 1.86 11,365.14 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 6,110.29 100.00% 11,365.14
03 MOVIMIENTO DE TIERRAS
03.01 CORTE DE TERRENO HASTA NIVEL DE SUBRASANTE m3 2,120.29 9.93 21,054.48 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 2,120.29 100.00% 21,054.48
03.02 EXCAVACION DE ZANJAS EN TERRENO NORMAL m3 303.72 37.15 11,283.20 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 303.72 100.00% 11,283.20
03.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 21.46 55.94 1,200.47 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 21.46 100.00% 1,200.47
03.04 CONFORMACION y COMPACTACION DE SUB RASANTE C/EQUIPO m2 2,891.46 2.67 7,720.20 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 2,891.46 100.00% 7,720.20
03.05 AFIRMADO E=0.10M COMPACTADO PARA PISOS m2 2,891.46 10.77 31,141.02 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 2,891.46 100.00% 31,141.02
03.06 ELIMINACION MATERIAL EXCEDENTE Y DE DEMOLICION C/MAQUINA DM=10KM m3 3,256.46 17.91 58,323.20 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 3,256.46 100.00% 58,323.20
04 OBRAS DE CONCRETO SIMPLE
04.01 VEREDA DE CONCRETO F'C=175KG/CM2 PULIDO Y BRUÑADO E=4" INC. ENCOFRADO Y DESENCOFRADO m2 2,478.43 62.05 153,786.58 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 2,478.43 100.00% 153,786.58
04.02 CONCRETO F'c=175 kg/cm2 EN RAMPAS Y GRADERIAS m3 17.32 402.43 6,970.09 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 17.32 100.00% 6,970.09
04.03 CONCRETO f'c=175 kg/cm2 EN UÑAS EN VEREDAS, RAMPAS Y GRADAS m3 61.82 386.65 23,902.70 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 61.82 100.00% 23,902.70
04.04 ENCOFRADO Y DESENCOFRADO EN RAMPAS Y GRADAS m2 74.61 65.57 4,892.18 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 74.61 100.00% 4,892.18
05 OBRAS DE CONCRETO ARMADO
05.01 SARDINELES PERALTADOS
05.01.01 CONCRETO f'c=175 kg/cm2 PARA SARDINELES PERALTADOS m3 195.75 395.39 77,397.59 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 195.75 100.00% 77,397.59
05.01.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN SARDINELES m2 1,475.50 77.28 114,026.64 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 1,475.50 100.00% 114,026.64
05.01.03 ACERO fy=4200 kg/cm2 GRADO 60 kg 4,494.83 4.55 20,451.48 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 4,494.83 100.00% 20,451.48
05.02 MURO DE CONTENCION
05.02.01 CONCRETO f'c=175 kg/cm2 EN MUROS DE CONTENCION m3 218.65 395.39 86,452.02 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 218.65 100.00% 86,452.02
05.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN MURO DE CONTENCION m2 1,967.71 77.28 152,064.63 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 1,967.71 100.00% 152,064.63
05.02.03 ACERO fy=4200 kg/cm2 GRADO 60 kg 7,875.00 4.55 35,831.25 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 7,875.00 100.00% 35,831.25
06 JUNTAS
06.01 JUNTAS ASFALTICAS DE DILATACION E=1" m 499.00 6.24 3,113.76 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 499.00 100.00% 3,113.76
06.02 JUNTAS EN SARDINELES CON MATERIAL ELASTOMERICO m 164.90 23.62 3,894.94 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 164.90 100.00% 3,894.94
ARQUITECTURA
01 PISOS Y PAVIMENTOS -
01.01 PISO DE ADOQUIN DE COLOR m2 506.77 68.33 34,627.59 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 506.77 100.00% 34,627.59
02 REVESTIMIENTOS
02.01 REVESTIMIENTO GRADAS CON MORTERO 1:4 X 1.5 cm PULIDO MEZCLA 1:2 m2 21.89 43.47 951.56 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 21.89 100.00% 951.56
CONSORCIO BJ
2.3.- VALORIZACION DE OBRA N° 1
Obra MEJORAMIENTO DE ALAMEDA EN LA AV. PANAMERICANA, TRAMO JR. YAVARI - JR ATUSPARIA, EN EL P.H.U. JAVIER HERAUD DEL DISTRITO DE SANTA - PROVINCIA DE SANTA - DEPARTAMENTO DE ANCASH
Propietario MUNICIPALIDAD DISTRITAL DE SANTA
Presupuesto S/. 1,799,144.48
Plazo de Obra180 Dias Calendarios
Residente ………………………………………..
Supervision ……………………………………….. -
Jefe Supervis……………………………………….
Fecha ……………………………………
VALORIZACION N° 01
PRESUPUESTO TOTAL
ANTERIOR ACTUAL ACUMULADO SALDO
Item. DESCRIPCION Und. Metrado P. U. Total Metrado % Monto Metrado % Monto Metrado % Monto Metrado % Monto
03 PINTURA
03.01 PINTURA CON ESMALTE 02 MANOS EN SARDINELES PERALTADOS Y DE CONTENCION m2 1,683.67 11.99 20,187.20 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 1,683.67 100.00% 20,187.20
04 CARPINTERIA DE MADERA
04.01 BANCAS ORNAMENTALES DE MADERA und 70.00 515.00 36,050.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 70.00 100.00% 36,050.00
05 EQUIPAMIENTO - -
05.01 SUMINISTRO E INSTALACION PAPELERA DE FIBRA DE VIDRIO und 18.00 279.33 5,027.94 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 18.00 100.00% 5,027.94
05.02 PARADEROS CON COBERTURA DE POLICARBONATO und 18.00 3008.93 54,160.74 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 18.00 100.00% 54,160.74
06 JARDINES
06.01 MOVIMIENTO DE TIERRAS
06.01.01 MEJORAMIENTO DE SUELO CON MATERIAL ORGANICO E=.20 M m2 2,438.45 7.8 19,019.91 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 2,438.45 100.00% 19,019.91
06.02 SUMINISTRO Y SEMBRADO DE PLANTAS -
06.02.01 SEMBRADO DE GRASS m2 2,438.45 12.46 30,383.09 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 2,438.45 100.00% 30,383.09
06.02.02 PLANTAS ORNAMENTALES und 76.00 44.43 3,376.68 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 76.00 100.00% 3,376.68
INSTALACIONES ELECTRICAS
01 MOVIMIENTO DE TIERRAS
01.01 EXCAVACION DE ZANJAS m 1,001.36 10.84 10,854.74 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 1,001.36 100.00% 10,854.74
01.02 RELLENO DE ZANJA CON MATERIAL PROPIO m 1001.36 13.15 13,167.88 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 1,001.36 100.00% 13,167.88
02 CAJAS, DUCTOS Y TUBERIAS
02.01 MANHOL DE DERIVACION DE C° 0.35X0.35M und 135.00 59.3 8,005.50 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 135.00 100.00% 8,005.50
02.02 TUBERIA DE PVC SAP 2" m 1,001.36 8.07 8,080.98 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 1,001.36 100.00% 8,080.98
03 CABLES Y/O CONDUCTORES
03.01 CABLE ELECTRICO NYY 3 X 1X10 mm2 m 1001.36 15.82 15,841.52 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 1,001.36 100.00% 15,841.52
04 TABLEROS
04.01 TABLERO GENERAL DE CONTROL und 1.00 287.13 287.13 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 1.00 100.00% 287.13
05 SUMINSTRO E INSTALACION DE POSTES ORNAMENTALES - -
05.01 POSTE DE FºGº D=4"X4.00M (Inc. Accesorios) und 99.00 576.13 57,036.87 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 99.00 100.00% 57,036.87
05.02 POSTE DE FºGº D=4"X4M (Inc. Soporte Tipo Brazo P/2 Farolas) und 18 674.91 12,148.38 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 18.00 100.00% 12,148.38
06 ARTEFACTOS ELECTRICOS - - -
06.01 FAROLA DE 70 WATTS und 135.00 225.44 30,434.40 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 135.00 100.00% 30,434.40
07 VARIOS
07.01 CORTE Y REPOSICION DE PAVIMENTO m2 62.36 52.56 3,277.64 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 62.36 100.00% 3,277.64
07.02 POZO CONEXION A TIERRA und 1.00 1106.91 1,106.91 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 1.00 100.00% 1,106.91
07.03 MURETE PORTAMEDIDOR und 1.00 571.41 571.41 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 1.00 100.00% 571.41
07.04 EMPALME A RED EXTERIOR und 1.00 1,366.90 1,366.90 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 1.00 100.00% 1,366.90
INSTALACIONES SANITARIAS
01 SISTEMA DE AGUA FRIA
01.01 EXCAVACION DE ZANJAS m 570.00 10.84 6,178.80 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 570.00 100.00% 6,178.80
01.02 RELLENO DE ZANJA MANUAL CON MATERIAL PROPIO COMPACT. EQUIPO LIVIANO m 570.00 13.15 7,495.50 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 570.00 100.00% 7,495.50
01.03 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 44.00 69.62 3,063.28 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 44.00 100.00% 3,063.28
01.04 RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP m 434.00 4.94 2,143.96 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 434.00 100.00% 2,143.96
01.05 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP m 136.40 4.56 621.98 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 136.40 100.00% 621.98
01.06 VALVULA COMPUERTA DE BRONCE ROSCADA DE 3/4" und 9.00 76.19 685.71 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 9.00 100.00% 685.71
01.07 CAJA DE CONCRETO 0.35X0.35M und 53.00 75.86 4,020.58 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 53.00 100.00% 4,020.58
01.08 ACCESORIOS SISTEMA DE AGUA glb 1.00 190.56 190.56 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 1.00 100.00% 190.56
01.09 EMPALME A RED EXISTENTE und 9.00 424.83 3,823.47 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 9.00 100.00% 3,823.47
01.10 PRUEBA HIDRAULICA glb 1.00 500.00 500.00 - 0.00% 0.00 - 0.00% 0.00 - 0.00% 0.00 1.00 100.00% 500.00
COSTO DIRECTO 1,270,582.25 0.00 0.00 0.00 1,270,582.25
GASTOS GENERALES 10.00% 127,058.23 0.00 0.00 0.00 127,058.23
UTILIDADES 10.00% 127,058.23 0.00 0.00 0.00 127,058.23
SUB-TOTAL 1,524,698.71 0.00 0.00 0.00 1,524,698.71
IGV 18.00% 274,445.77 0.00 0.00 0.00 274,445.77
CONSORCIO BJ
2.3.- VALORIZACION DE OBRA N° 1
Obra MEJORAMIENTO DE ALAMEDA EN LA AV. PANAMERICANA, TRAMO JR. YAVARI - JR ATUSPARIA, EN EL P.H.U. JAVIER HERAUD DEL DISTRITO DE SANTA - PROVINCIA DE SANTA - DEPARTAMENTO DE ANCASH
Propietario MUNICIPALIDAD DISTRITAL DE SANTA
Presupuesto S/. 1,799,144.48
Plazo de Obra180 Dias Calendarios
Residente ………………………………………..
Supervision ……………………………………….. -
Jefe Supervis……………………………………….
Fecha ……………………………………
VALORIZACION N° 01
PRESUPUESTO TOTAL
ANTERIOR ACTUAL ACUMULADO SALDO
Item. DESCRIPCION Und. Metrado P. U. Total Metrado % Monto Metrado % Monto Metrado % Monto Metrado % Monto
TOTAL VALORIZADO 1,799,144.48 0.00 0.00 0.00 1,799,144.48
PORCENTAJE DE AVANCE DE OBRA 100% 0.00% 0.00% 0.00% 100.00%
CONSORCIO BJ
MEJORAMIENTO DE ALAMEDA EN LA AV. PANAMERICANA, TRAMO JR. YAVARI - JR ATUSPARIA, EN EL P.H.U. JAVIER HERAUD DEL DISTRITO DE SANTA -
Obra
PROVINCIA DE SANTA - DEPARTAMENTO DE ANCASH
RESUMEN DE METRADOS
DIMENSIONES
Item. DESCRIPCION Und. METRADO CANT. PARCIAL
LARGO ANCHO ALTO ÁREA VOLUMEN
ESTRUCTURAS 0.00
01 OBRAS PROVISIONALES 0.00
01.01 CARTEL DE OBRA EN MADERA DE 3.60m X4.80m (Gigantografia) und 1.00 0.00
01.02 OFICINA, ALMACEN Y CASETA DE GUARDIANIA und 1.00 0.00
01.03 CERCO PERIMETRICO PROVISIONAL m 1,537.89 0.00
01.04 MOVILIZACION Y DESMOVILIZACION DE MAQUINARIAS Y EQUIPOS glb 1.00 0.00
01.05 AGUA PARA LA CONSTRUCCION glb 1.00 0.00
01.06 SERVICIO HIGIENICO PORTATIL und 2.00 0.00
01.07 EQUIPO DE PROTECCION INDIVIDUAL und 48.00 0.00
01.08 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 0.00
02 TRABAJOS PRELIMINARES
2.01 TALA DE ARBOLES INC. ELIMINACION und 49.00 0.00
2.02 DEMOLICION DE ESTRUCTURAS EXISTENTES m3 202.62 0.00
2.03 LIMPIEZA SUPERFICIAL DE TERRENO m2 6,110.29 0.00
2.04 TRAZO, NIVELACION Y REPLANTEO FINAL DE LA OBRA m2 6,110.29 0.00
03 MOVIMIENTO DE TIERRAS
03.01 CORTE DE TERRENO HASTA NIVEL DE SUBRASANTE m3 2,120.29 0.00
03.02 EXCAVACION DE ZANJAS EN TERRENO NORMAL m3 303.72 0.00
03.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 21.46 0.00
03.04 CONFORMACION y COMPACTACION DE SUB RASANTE C/EQUIPO m2 2,891.46 0.00
03.05 AFIRMADO E=0.10M COMPACTADO PARA PISOS m2 2,891.46 0.00
03.06 ELIMINACION MATERIAL EXCEDENTE Y DE DEMOLICION C/MAQUINA DM=10KM m3 3,256.46 0.00
04 OBRAS DE CONCRETO SIMPLE
04.01 VEREDA DE CONCRETO F'C=175KG/CM2 PULIDO Y BRUÑADO E=4" INC. ENCOFRADO Y DESENCOFRADO m2 2,478.43 0.00
04.02 CONCRETO F'c=175 kg/cm2 EN RAMPAS Y GRADERIAS m3 17.32 0.00
04.03 CONCRETO f'c=175 kg/cm2 EN UÑAS EN VEREDAS, RAMPAS Y GRADAS m3 61.82 0.00
04.04 ENCOFRADO Y DESENCOFRADO EN RAMPAS Y GRADAS m2 74.61 0.00
05 OBRAS DE CONCRETO ARMADO
05.01 SARDINELES PERALTADOS
05.01.01 CONCRETO f'c=175 kg/cm2 PARA SARDINELES PERALTADOS m3 195.75 0.00
05.01.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN SARDINELES m2 1,475.50 0.00
05.01.03 ACERO fy=4200 kg/cm2 GRADO 60 kg 4,494.83 0.00
05.02 MURO DE CONTENCION
05.02.01 CONCRETO f'c=175 kg/cm2 EN MUROS DE CONTENCION m3 218.65 0.00
05.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA EN MURO DE CONTENCION m2 1,967.71 0.00
05.02.03 ACERO fy=4200 kg/cm2 GRADO 60 kg 7,875.00 0.00
06 JUNTAS 0.00
06.01 JUNTAS ASFALTICAS DE DILATACION E=1" m 499.00 0.00
06.02 JUNTAS EN SARDINELES CON MATERIAL ELASTOMERICO m 164.90 0.00
ARQUITECTURA
01 PISOS Y PAVIMENTOS
01.01 PISO DE ADOQUIN DE COLOR m2 506.77 0.00
02 REVESTIMIENTOS
02.01 REVESTIMIENTO GRADAS CON MORTERO 1:4 X 1.5 cm PULIDO MEZCLA 1:2 m2 21.89 0.00
03 PINTURA
03.01 PINTURA CON ESMALTE 02 MANOS EN SARDINELES PERALTADOS Y DE CONTENC m2 1,683.67 0.00
04 CARPINTERIA DE MADERA
04.01 BANCAS ORNAMENTALES DE MADERA und 70.00 0.00
05 EQUIPAMIENTO
05.01 SUMINISTRO E INSTALACION PAPELERA DE FIBRA DE VIDRIO und 18.00 0.00
05.02 PARADEROS CON COBERTURA DE POLICARBONATO und 18.00 0.00
06 JARDINES
06.01 MOVIMIENTO DE TIERRAS
06.01.01 MEJORAMIENTO DE SUELO CON MATERIAL ORGANICO E=.20 M m2 2,438.45 0.00
CONSORCIO BJ
PROPIETARIO MUNICIPALIDAD DISTRITAL DE SANTA
CONTRATISTA ……………………………….
RESIDENTE ………………………………………..
SUPERVISION ………………………………………..
SUPERVISOR ……………………………………….
FECHA ……………………………………
RESUMEN DE METRADOS
DIMENSIONES
Item. DESCRIPCION Und. METRADO CANT. PARCIAL
LARGO ANCHO ALTO ÁREA VOLUMEN
06.02 SUMINISTRO Y SEMBRADO DE PLANTAS
06.02.01 SEMBRADO DE GRASS m2 2,438.45 0.00
06.02.02 PLANTAS ORNAMENTALES und 76.00 0.00
INSTALACIONES ELECTRICAS
01 MOVIMIENTO DE TIERRAS
01.01 EXCAVACION DE ZANJAS m 1,001.36 0.00
01.02 RELLENO DE ZANJA CON MATERIAL PROPIO m 1,001.36 0.00
02 CAJAS, DUCTOS Y TUBERIAS
02.01 MANHOL DE DERIVACION DE C° 0.35X0.35M und 135.00 0.00
02.02 TUBERIA DE PVC SAP 2" m 1,001.36 0.00
03 CABLES Y/O CONDUCTORES
03.01 CABLE ELECTRICO NYY 3 X 1X10 mm2 m 1,001.36 0.00
04 TABLEROS
04.01 TABLERO GENERAL DE CONTROL und 1.00 0.00
05 SUMINSTRO E INSTALACION DE POSTES ORNAMENTALES
05.01 POSTE DE FºGº D=4"X4.00M (Inc. Accesorios) und 99.00 0.00
05.02 POSTE DE FºGº D=4"X4M (Inc. Soporte Tipo Brazo P/2 Farolas) und 18.00 0.00
06 ARTEFACTOS ELECTRICOS
06.01 FAROLA DE 70 WATTS und 135.00 0.00
07 VARIOS
07.01 CORTE Y REPOSICION DE PAVIMENTO m2 62.36 0.00
07.02 POZO CONEXION A TIERRA und 1.00 0.00
07.03 MURETE PORTAMEDIDOR und 1.00 0.00
07.04 EMPALME A RED EXTERIOR und 1.00 0.00
INSTALACIONES SANITARIAS
01 SISTEMA DE AGUA FRIA
01.01 EXCAVACION DE ZANJAS m 570.00 0.00
01.02 RELLENO DE ZANJA MANUAL CON MATERIAL PROPIO COMPACT. EQUIPO LIVIAN m 570.00 0.00
01.03 SALIDA DE AGUA FRIA CON TUBERIA DE PVC-SAP 1/2" pto 44.00 0.00
01.04 RED DE DISTRIBUCION TUBERIA DE 3/4" PVC-SAP m 434.00 0.00
01.05 RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP m 136.40 0.00
01.06 VALVULA COMPUERTA DE BRONCE ROSCADA DE 3/4" und 9.00 0.00
01.07 CAJA DE CONCRETO 0.35X0.35M und 53.00 0.00
01.08 ACCESORIOS SISTEMA DE AGUA glb 1.00 0.00
01.09 EMPALME A RED EXISTENTE und 9.00 0.00
01.10 PRUEBA HIDRAULICA glb 1.00 0.00
CONSORCIO BJ
3. AVANCE FINANCIERO MENSUAL
3.1.-INDICES UNIFICADOS UTILIZADOS
AREA GEOGRAFICA1
INDICE DEL MES
IU BASE Dec-18
Jan-18
3 475.87 539.69
5 450.09 446.63
21 475.73 476.04
Pistas y 30 462.02 497.53
Veredas 32 468.42 468.39
andabamba 38 425.85 430.24
39 442.87 451.18
43 722.03 751.45
47 582.52 602.11
49 290.65 311.07
CONSORCIO BJ
3.4.-AMORTIZACION POR ADELANTO DE MATERIALES
CREACIÓN DE PISTAS Y VEREDAS EN LAS CALLES AURELIANO SANCHEZ, PILAR CHULES, EUGENIO, JOSE DE LOS ANGELES, JUAN DE DIOS , ANDABAMBA, SANTA ROSA, ELEODORO, PASAJE
Obra
CULTURA, BENIGNO TUCTO DE LA LOCALIDAD DE ANDABAMBA, DISTRITO ANDABAMBA - SANTA CRUZ - CAJAMARCA
RESUMEN VALORIZACION Nº 01
2.00.- AMORTIZACIONES
2.01 Por Adelanto directo S/.0.00 S/.0.00 S/.0.00
2.02 Por Adelanto para Materiales S/.0.00 S/.0.00 S/.0.00
TOTAL AMORTIZACIONES (A) S/.0.00 S/.0.00 S/.0.00
FACTURACION
- VALORIZACION NETA (VN) S/.0.00 S/.0.00 S/.0.00
- I.G.V. (18% VN) S/.0.00 S/.0.00 S/.0.00
TOTAL A FACTURAR S/.0.00 S/.0.00 S/.0.00
RESUMEN
EXIST. SP6 7.60 5.70 53.209 53.356 50.131 50.165 3.078 3.191 0.20 3.278 3.391 3.334 200 0.00 0.00 0.00 0.00 7.60 0.00 0.00 0.00 7.780
SP6 SP7 65.00 63.10 53.356 53.469 50.165 50.425 3.191 3.044 0.20 3.391 3.244 3.318 200 0.00 0.00 0.00 0.00 65.00 0.00 0.00 0.00 86.132
SP7 SP8 65.00 63.10 53.469 53.486 50.425 50.685 3.044 2.801 0.20 3.244 3.001 3.123 200 0.00 0.00 0.00 0.00 65.00 0.00 0.00 0.00 86.132
SP8 SP9 65.00 63.10 53.486 53.558 50.685 50.945 2.801 2.613 0.20 3.001 2.813 2.907 200 0.00 0.00 0.00 65.00 0.00 0.00 0.00 0.00 86.132
SP9 SP10 65.00 63.10 53.558 53.575 50.945 51.205 2.613 2.370 0.20 2.813 2.570 2.692 200 0.00 0.00 0.00 65.00 0.00 0.00 0.00 0.00 86.132
SP10 SP11 65.00 63.10 53.575 53.570 51.205 51.530 2.370 2.040 0.20 2.570 2.240 2.405 200 0.00 0.00 65.00 0.00 0.00 0.00 0.00 0.00 86.132
SP11 SP12 65.00 63.10 53.570 53.655 51.530 51.855 2.040 1.800 0.20 2.240 2.000 2.120 200 0.00 0.00 65.00 0.00 0.00 0.00 0.00 0.00 86.132
CANTIDAD ACUMULADA 0.00 0.00 130.00 130.00 137.60 0.00 0.00 0.00 524.57
TOTAL 397.60 384.30 BZ<3m 200 0.00 0.00 130.00 130.00 137.60 0.00 0.00 0.00
DIFERENCIADO POR
BZ>3m 315 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
DIAMETRO DE TUBERÍA