Cronograma de Adquisicion de Materiales

Descargar como xlsx, pdf o txt
Descargar como xlsx, pdf o txt
Está en la página 1de 23

MES 1 MES 2 MES 3

DESCRIPCION UND CANTIDAD PRECIO PRESUPUESTO CANTIDAD PRECIO CANTIDAD PRECIO CANTIDAD PRECIO PRESUPUESTO
COSTOS AMBIENTALES GLB 1.00 S/. 2,000.00 S/. 2,000.00 0.00 S/. - 0.00 S/. - 1.00 S/. 2,000.00 S/. 2,000.00
PLACA RECORDATORIA und 1.00 S/. 296.61 S/. 296.61 0.00 S/. - 0.00 S/. - 1.00 S/. 296.61 S/. 296.61
LUBRICANTE PARA TUBERIA PVC-UF gln 47.61 S/. 38.14 S/. 1,815.73 25.88 S/. 987.06 21.73 S/. 828.66 0.00 S/. - S/. 1,815.73
CLAVOS PARA MADERA C/C 2" kg 49.65 S/. 3.39 S/. 168.31 30.34 S/. 102.85 19.31 S/. 65.46 0.00 S/. - S/. 168.31
CLAVOS PARA MADERA C/C 3" kg 8.00 S/. 3.39 S/. 27.12 5.60 S/. 18.98 2.40 S/. 8.14 S/. - S/. 27.12
ALAMBRE NEGRO N°16 kg 13.72 S/. 3.39 S/. 46.51 6.76 S/. 22.92 6.96 S/. 23.59 0.00 S/. - S/. 46.51
ALAMBRE NEGRO N°8 kg 18.02 S/. 3.39 S/. 61.09 0.00 S/. - 18.02 S/. 61.09 0.00 S/. - S/. 61.09
GIGANTOGRAFIAS 2.4 X 3.6 ML (INC.ARMAD) und 1.00 S/. 889.83 S/. 889.83 1.00 S/. 889.83 0.00 S/. - 0.00 S/. - S/. 889.83
ACERO GRADO 60 CORRUGADO Ø 3/8" kg 777.20 S/. 0.85 S/. 660.62 365.43 S/. 310.62 411.77 S/. 350.00 S/. - S/. 660.62
ACERO GRADO 60 CORRUGADO Ø 1/2" kg 1034.60 S/. 2.58 S/. 2,669.27 724.00 S/. 1,867.92 310.60 S/. 801.35 0.00 S/. - S/. 2,669.27
ACERO LISO 3/8". kg 170.00 S/. 1.44 S/. 244.80 0.00 S/. - 169.91 S/. 244.67 0.09 S/. 0.13 S/. 244.80
ARENA FINA m3 3.86 S/. 81.36 S/. 313.70 0.60 S/. 48.82 3.26 S/. 264.88 0.00 S/. - S/. 313.70
FILLER kg 168.15 S/. 2.37 S/. 398.51 168.15 S/. 398.51 S/. 398.51
PIEDRA CHANCADA DE 1/2" m3 35.68 S/. 55.08 S/. 1,965.27 13.02 S/. 717.14 22.66 S/. 1,248.13 S/. - S/. 1,965.27
PIEDRA CHANCADA DE 1/4" Y 1/2" m3 1.65 S/. 57.20 S/. 94.60 1.65 S/. 94.60 S/. 94.60
ARENA GRUESA m3 148.58 S/. 55.93 S/. 8,310.07 106.98 S/. 5,983.39 36.34 S/. 2,032.50 5.26 S/. 294.18 S/. 8,310.07
MATERIAL CLASIFICADO PARA BASE m3 19.10 S/. 38.14 S/. 728.57 0.00 S/. - 0.00 S/. - 19.10 S/. 728.57 S/. 728.57
MATERIAL CLASIFICADO PARA SUB BASE m3 14.89 S/. 38.14 S/. 567.92 14.89 S/. 567.92 S/. 567.92
MATERIAL DE RELLENO CLASIFICADO (CALICHE) m3 852.64 S/. 30.51 S/. 26,013.93 0.00 S/. - 580.47 S/. 17,710.14 272.17 S/. 8,303.79 S/. 26,013.93
CACHIMBA DE 200 MM A 600MM und 4.00 S/. 318.00 S/. 1,272.00 7.00 S/. 2,226.00 0.00 S/. - 0.00 S/. - S/. 2,226.00
CACHIMBA DE 200 MM A 500MM und 16.00 S/. 264.00 S/. 4,224.00 6.00 S/. 1,584.00 0.00 S/. - 0.00 S/. - S/. 1,584.00
CACHIMBA DE 200 MM A 750MM und 8.00 S/. 516.00 S/. 4,128.00 2.49 S/. 1,284.84 12.51 S/. 6,455.16 0.00 S/. - S/. 7,740.00
CACHIMBA DE 200 MM A 550MM und 6.00 S/. 291.60 S/. 1,749.60
CEMENTO PORTLAND TIPO I (42.5KG). BOL 678.52 S/. 19.92 S/. 13,516.11 292.53 S/. 5,827.20 385.99 S/. 7,688.91 S/. - S/. 13,516.11
PEDESTAL DE CONCRETO DE 0.20 X 0.80 X 1.00 M. und 1.00 S/. 380.00 S/. 380.00 0.00 S/. - 0.00 S/. - 1.00 S/. 380.00 S/. 380.00
CEMENTO ASFALTICO DE PENETRACION 85/100 gln 165.39 S/. 8.33 S/. 1,377.70 165.39 S/. 1,377.70 S/. 1,377.70
YESO EN BOLSAS DE 28 KG. BOL 48.73 S/. 10.17 S/. 495.54 48.73 S/. 495.54 0.00 S/. - 0.00 S/. - S/. 495.54
SEGURIDAD Y SALUD EN OBRA GLB 1.00 S/. 5,000.00 S/. 5,000.00 1.00 S/. 5,000.00 S/. - S/. - S/. 5,000.00
CINTA PLASTICA DE SEÑAL DE SEGURIDAD m. 264.48 S/. 1.02 S/. 269.77 264.48 S/. 269.77 0.00 S/. - 0.00 S/. - S/. 269.77
CUARTONES 2" X 2" X 10' (SEÑALIZACION LIMITE SEGURIDAD VIAL) und 31.74 S/. 8.47 S/. 268.82 31.74 S/. 268.82 0.00 S/. - 0.00 S/. - S/. 268.82
SOLDADURA ELECTRICA CELLOCORD. kg 10.20 S/. 14.41 S/. 146.98 0.00 S/. - 10.19 S/. 146.84 0.01 S/. 0.14 S/. 146.98
HORMIGON. m3 22.25 S/. 52.54 S/. 1,168.89 12.23 S/. 642.56 10.02 S/. 526.32 0.00 S/. - S/. 1,168.89
ALQUILER DE CASA PARA GUARDIANIA Y/O ALMACEN mes. 3.00 S/. 381.36 S/. 1,144.08 0.69 S/. 263.14 0.67 S/. 255.51 1.64 S/. 625.43 S/. 1,144.08
AGUA. m3 87.98 S/. 0.42 S/. 36.95 0.00 S/. - 87.98 S/. 36.95 0.00 S/. - S/. 36.95
MADERA NACIONAL P/ENCOFRADO-CARP p2 639.00 S/. 2.97 S/. 1,897.83 447.17 S/. 1,328.09 191.83 S/. 569.74 S/. - S/. 1,897.83
MADERA TORNILLO p2 669.40 S/. 2.97 S/. 1,988.11 20.02 S/. 59.46 649.32 S/. 1,928.48 0.06 S/. 0.17 S/. 1,988.11
TAPA Y MARCO F.FDO. DIAM. 0.60 M. und 20.00 S/. 381.36 S/. 7,627.20 14.00 S/. 5,339.04 6.00 S/. 2,288.16 0.00 S/. - S/. 7,627.20
ASFALTO LIQUIDO MC-30 gln 24.81 S/. 9.08 S/. 225.26 24.81 S/. 225.26 S/. 225.26
PINTURA ESMALTE gln 1.95 S/. 34.75 S/. 67.72 1.95 S/. 67.72 0.00 S/. - 0.00 S/. - S/. 67.72
PETROLEO BIO DIESEL 5 gln 27.57 S/. 10.44 S/. 287.78 27.57 S/. 287.78 S/. 287.78
TUBERIA PERFILADA PVC RIB, D=200MM m. 264.10 S/. 69.60 S/. 18,381.52 0.00 S/. - 264.10 S/. 18,381.52 0.00 S/. - S/. 18,381.52
TUBERIA PERFILADA PVC RIB, D=600MM m. 198.31 S/. 318.00 S/. 63,061.28
TUBERIA PERFILADA PVC RIB, D=500MM m. 234.94 S/. 264.00 S/. 62,024.95 234.94 S/. 62,024.95 0.00 S/. - 0.00 S/. - S/. 62,024.95
TUBERIA PERFILADA PVC RIB, D=750MM m. 177.47 S/. 516.00 S/. 91,574.00
TUBERIA PERFILADA PVC RIB, D=650MM m. 109.84 S/. 420.00 S/. 46,132.46 109.84 S/. 46,132.46 0.00 S/. - 0.00 S/. - S/. 46,132.46
TUBERIA PERFILADA PVC RIB, D=550MM m. 105.01 S/. 291.60 S/. 30,620.48 53.52 S/. 15,606.43 51.49 S/. 15,014.05 0.00 S/. - S/. 30,620.48
TOTAL PRESUPUESTO 331.4437 132.5 S/. 406,339.52 S/. 159,369.57 S/. 76,930.25 S/. 15,580.80 S/. 406,339.52
AVANCE PROGRAMADO MENSUAL (%) 100.00% 39.22% 18.93% 3.83% 100.00%
AVANCE ACUMULADO (%) 39.22% 58.15% 61.99%
» ¤ Código Código Alterno Descripción Und. Cantidad
1 0 0147010002 470102001 OPERARIO hh 1,454.4101
1 0 0147010003 470103001 OFICIAL hh 994.0206
1 0 0147010004 470104001 PEON hh 7,438.9949
0 0201010015 COSTOS AMBIENTALES GLB 1.0000
0 0201050003 PLACA RECORDATORIA und 1.0000
0 0201800002 018002001 LUBRICANTE PARA TUBERIA PVC-UF gln 49.4887
0 0202010003 020103001 CLAVOS PARA MADERA C/C 2" kg 50.3451
0 0202010005 020105001 CLAVOS PARA MADERA C/C 3" kg 9.7345
0 0202040009 020409001 ALAMBRE NEGRO N°16 kg 13.0118
0 0202040010 020410001 ALAMBRE NEGRO N°8 kg 19.8938
0 0202810007 028105001 GIGANTOGRAFIAS 2.4 X 3.6 ML (INC.ARMAD) und 1.0000
0 0203020004 030204001 ACERO GRADO 60 CORRUGADO Ø 3/8" kg 829.4200
0 0203020005 030205001 ACERO GRADO 60 CORRUGADO Ø 1/2" kg 1,138.0600
0 0203020010 030201001 ACERO LISO 3/8". kg 170.0000
0 0204000000 040000001 ARENA FINA m3 3.6660
0 0205000003 050003001 PIEDRA CHANCADA DE 1/2" m3 51.9003
0 0205010004 050104001 ARENA GRUESA m3 153.7395
0 0205010013 050113001 MATERIAL CLASIFICADO PARA BASE m3 24.2325
0 0205300084 053084001 MATERIAL DE RELLENO CLASIFICADO (CALICHE)m3 775.5692
0 0210140086 101478001 CACHIMBA DE 8" A 24" und 7.0000
0 0210140087 101478001 CACHIMBA DE 8" A 20" und 6.0000
0 0210140092 101478001 CACHIMBA DE 8" A 18" und 15.0000
0 0221000000 210000001 CEMENTO PORTLAND TIPO I (42.5KG). BOL 892.5201
0 0221000001 PEDESTAL DE CONCRETO DE 0.20 X 0.80 X 1.00 und 1.0000
0 0229030003 290302001 YESO EN BOLSAS DE 28 KG. BOL 48.7256
0 0230480034 304834001 CINTA PLASTICA DE SEÑAL DE SEGURIDAD m. 274.9375
0 0230750103 307512001 CUARTONES 2" X 2" X 10' (SEÑALIZACION LIMI und 32.9925
0 0230990058 309958001 SOLDADURA ELECTRICA CELLOCORD. kg 10.2000
0 0238000000 380000001 HORMIGON. m3 22.4985
0 023901003 39013001 ALQUILER DE CASA PARA GUARDIANIA Y/O AL mes. 2.0000
0 0239050000 390500001 AGUA. m3 87.9800
0 0243000025 430025001 MADERA NACIONAL P/ENCOFRADO-CARP p2 722.3400
0 0243010003 430103001 MADERA TORNILLO p2 669.3963
0 0250030082 500382001 TAPA Y MARCO F.FDO. DIAM. 0.60 M. und 22.0000
0 0254110090 541190001 PINTURA ESMALTE gln 1.9488
0 0272130167 721373001 TUBERIA PVC UF S-25 DN 200 MM NTP ISO 4435 m. 256.4100
0 0272130171 721373001 TUBERIA PVC UF S-25 DN 24" NTP ISO 4435 I/ m. 278.9400
0 0272130172 721373001 TUBERIA PVC UF S-25 DN 20" NTP ISO 4435 I/ m. 242.6100
0 0272130173 721373001 TUBERIA PVC UF S-25 DN 18" NTP ISO 4435 I/ m. 321.7900
0 0 0337010001 370101001 HERRAMIENTAS MANUALES %MO
0 0337010071 370171001 JALONES día 2.2414
0 0348010007 480107001 MEZCLADORA DE CONCRETO DE 11 P3-23HP hm 239.2811
0 0348010009 SOLDADORA ELECTRICA MONOFASICA ALTERNAhm 27.2000
0 0348010010 ROTOMARTILLO hm 3.5658
0 0348040038 480434001 CAMION VOLQUETE 15 M3. hm 158.4080
0 0348090001 480901001 MOLDE METALICO PARA BUZON . und 2.2000
0 0348130002 481302001 CAMION PLATAFORMA 4X2 ,178-210 HP, 12 TNhm 16.0000
0 0349030074 490373001 COMPACTADOR VIBRATORIO TIPO PLANCHA 7 hm 340.6433
0 0349040011 490411001 CARGADOR S/LLANTAS 125-135 HP 3.5 YD3. hm 75.1961
0 0349040092 490491001 CARGADOR RETROEXCAVADOR 96 HP 7.5 PIE3-1hm 128.3030
0 0349070006 490706001 VIBRADOR DE 3/4" - 2" CONCRETO hm 119.0419
0 0349080101 490812001 ZARANDA METALIA HE 13.9941
0 0349880004 ESTACION TOTAL hm 18.2242
0 0349880005 PRISMAS HE 36.3493
0 0388010004 880101001 CORTADOR DE PAVIMENTO I/DISCO DIAMANT hm 23.9310
Precio S/. Parcial S/ Auxiliar1 S/. Auxiliar2 S/. Auxiliar3 S/. Parcial Auxiliar1 Parcial Auxiliar2
21.86 31,793.40
17.51 17,405.30
15.78 117,387.34
2,000.00 2,000.00
296.61 296.61
38.14 1,887.50
3.39 170.67
3.39 33.00
3.39 44.11
3.39 67.44
889.83 889.83
0.85 705.01
2.58 2,936.19
1.44 244.80
81.36 298.27
55.08 2,858.67
55.93 8,598.65
31.36 759.93
30.51 23,662.62
186.44 1,305.08
152.54 915.24
127.12 1,906.80
19.92 17,779.00
380.00 380.00
10.17 495.54
1.02 280.44
8.47 279.45
14.41 146.98
52.54 1,182.07
381.36 762.72
0.42 36.95
2.97 2,145.35
2.97 1,988.11
381.36 8,389.92
34.75 67.72
24.17 6,197.43
249.17 69,503.48
163.33 39,625.49
132.50 42,637.18
6,940.52
6.78 15.20
25.42 6,082.53
21.19 576.37
18.64 66.47
118.64 18,793.53
381.36 838.99
110.17 1,762.72
18.64 6,349.59
169.49 12,744.99
135.59 17,396.60
16.95 2,017.76
3.39 47.44
10.17 185.34
8.47 307.88
29.66 709.79
Parcial Auxiliar3 % IncidenciaIncidencia Acumulada Principal
0.0000
0.0000
0.0000
0.0000 0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000 0.0000
0.0000
0.0000 0.0000
0.0000 0.0000
0.0000 0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000 0.0000
0.0000 0.0000
0.0000 0.0000

0.0000
0.0000
0.0000
0.0000 0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
EXPORTANDO DEL PROJECT DEL USO DE TAREAS

UNIDADES DE
DESCRIPCION TRABAJO
ASIGNACION
Nombre de tarea Trabajo Unidades de asignación
"CREACIÓN DEL SERVICIO DE DRENAJE PLUVIAL DE LA AV 8,556.03
OBRAS PROVISIONALES 167.68
CARTEL DE IDENTIFICACION DE OBRA 10
CEMENTO PORTLAND TIPO I (42.5KG). 0 120.00
OPERARIO 2 25.00
PEON 8 100.00
HORMIGON. 0 50.00
GIGANTOGRAFIAS 2.4 X 3.6 ML (INC.ARMAD) 0 100.00
ALQUILER DE LOCAL PARA GUARDIANIA Y/O ALMACE 0
ALQUILER DE CASA PARA GUARDIANIA Y/O ALMAC 0 200.00
MOVILIZACION Y DESMOVILIZACION DE EQUIPO 24
OFICIAL 8 100.00
CAMION PLATAFORMA 4X2 178-210 HP 12 TN 16 200.00
CORTE DE PAVIMENTO FLEXIBLE 101.6
OPERARIO 24 100.00
OFICIAL 24 100.00
PEON 47.85 199.00
CORTADOR DE PAVIMENTO I/DISCO DIAMANTADO 5.75 24.00
DEMOLICION DE ELEMNTOS DE CONCRETO 32.1
OPERARIO 10.7 45.00
PEON 10.7 45.00
ROTOMARTILLO 10.7 45.00
OBRAS PRELIMINARES 1,401.37
TRABAJOS PRELIMINARES 1,401.37
TRAZO Y REPLANTEO INICIAL. 63.63
YESO EN BOLSAS DE 28 KG. 0 2436.00
JALONES 1.27 8.00
PINTURA ESMALTE 0 97.00
PRISMAS 20.75 130.00
PEON 31.18 195.00
ESTACION TOTAL 10.43 65.00
CLAVOS PARA MADERA C/C 2" 0 487.00
MADERA TORNILLO 0 195.00
TRAZO Y REPLANTEO DE NIVELES DURANTE EL PRO 955.02
YESO EN BOLSAS DE 28 KG. 0 2436.00
JALONES 19.48 12.00
PINTURA ESMALTE 0 97.00
PRISMAS 311.85 195.00
PEON 467.77 292.00
ESTACION TOTAL 155.92 97.00
CLAVOS PARA MADERA C/C 2" 0 487.00
MADERA TORNILLO 0 195.00
SEÑALIZACION PARA LIMITE DE SEGURIDAD VIAL (4 382.72
CEMENTO PORTLAND TIPO I (42.5KG). 0 440.00
PEON 382.72 191.00
CLAVOS PARA MADERA C/C 2" 0 1826.00
CINTA PLASTICA DE SEÑAL DE SEGURIDAD 0 27494.00
HORMIGON. 0 660.00
CUARTONES 2" X 2" X 10' (SEÑALIZACION LIMIT 0 3299.00
MOVIMIENTO DE TIERRAS 3,040.90
EXCAVACION DE ZANJAS CON MAQUINARIA PARA TU 226.42
PEON 150.95 189.00
CARGADOR RETROEXCAVADOR 96 HP 7.5 PIE3-1.5 75.47 94.00
EXCAVACION DE ZANJA, MANUAL EN TERRENO NOR 120
PEON 120 100.00
ACARREO DE MAT. DE PRESTAMO P/RELLENO 56
PEON 56 100.00
REFINE Y NIVEL DE ZANJA P/TUBERIA 187.72
OFICIAL 62.57 98.00
PEON 125.15 196.00
PREPARACION DE CAMA DE APOYO e=0.10m ARENA 59.5
OFICIAL 29.75 93.00
PEON 29.75 93.00
ARENA GRUESA 0 3347.00
PREPARACION DE CAMA DE APOYO e=0.10m ARENA 48.52
OFICIAL 24.27 76.00
PEON 24.27 76.00
ARENA GRUESA 0 2620.00
PREPARACION DE CAMA DE APOYO e=0.10m ARENA 51.48
OFICIAL 25.75 80.00
PEON 25.75 80.00
ARENA GRUESA 0 3089.00
PREPARACION DE CAMA DE APOYO e=0.10m ARENA 34.2
OFICIAL 17.1 71.00
PEON 17.1 71.00
ARENA GRUESA 0 1846.00
PRIMER RELLENO Y COMP. DE ZANJA (PULSO) H= 0. 119.7
OPERARIO 40 100.00
PEON 79.7 199.00
MATERIAL DE RELLENO CLASIFICADO (CALICHE) 0 10622.00
PRIMER RELLENO Y COMP. DE ZANJA (PULSO) H= 0. 116.45
OPERARIO 38.82 97.00
PEON 77.63 194.00
MATERIAL DE RELLENO CLASIFICADO (CALICHE) 0 7385.00
PRIMER RELLENO Y COMP. DE ZANJA (PULSO) H= 0. 107.27
OPERARIO 35.75 89.00
PEON 71.52 179.00
MATERIAL DE RELLENO CLASIFICADO (CALICHE) 0 7762.00
PRIMER RELLENO Y COMP. DE ZANJA (PULSO) H= 0. 91.17
OPERARIO 30.38 95.00
PEON 60.78 190.00
MATERIAL DE RELLENO CLASIFICADO (CALICHE) 0 2726.00
SEGUNDO RELLENO Y COMPACTACION DE ZANJA M 159.7
OPERARIO 40 100.00
PEON 79.7 199.00
COMPACTADOR VIBRATORIO TIPO PLANCHA 7HP 40 100.00
MATERIAL DE RELLENO CLASIFICADO (CALICHE) 0 10042.00
SEGUNDO RELLENO Y COMPACTACION DE ZANJA M 155.27
OPERARIO 38.82 97.00
PEON 77.63 194.00
COMPACTADOR VIBRATORIO TIPO PLANCHA 7HP 38.82 97.00
MATERIAL DE RELLENO CLASIFICADO (CALICHE) 0 7861.00
SEGUNDO RELLENO Y COMPACTACION DE ZANJA M 143.02
OPERARIO 35.75 89.00
PEON 71.52 179.00
COMPACTADOR VIBRATORIO TIPO PLANCHA 7HP 35.75 89.00
MATERIAL DE RELLENO CLASIFICADO (CALICHE) 0 9268.00
SEGUNDO RELLENO Y COMPACTACION DE ZANJA M 102.57
OPERARIO 25.63 80.00
PEON 51.28 160.00
COMPACTADOR VIBRATORIO TIPO PLANCHA 7HP 25.63 80.00
MATERIAL DE RELLENO CLASIFICADO (CALICHE) 0 5538.00
TERCER RELLENO Y COMPACTADO DE ZANJA CON 5 161.68
ZARANDA METALIA 2 5.00
OPERARIO 40 100.00
PEON 79.7 199.00
COMPACTADOR VIBRATORIO TIPO PLANCHA 7HP 40 100.00
MATERIAL DE RELLENO CLASIFICADO (CALICHE) 0 5021.00
TERCER RELLENO Y COMPACTADO DE ZANJA CON 5 157.22
ZARANDA METALIA 1.93 5.00
OPERARIO 38.82 97.00
PEON 77.63 194.00
COMPACTADOR VIBRATORIO TIPO PLANCHA 7HP 38.82 97.00
MATERIAL DE RELLENO CLASIFICADO (CALICHE) 0 3930.00
TERCER RELLENO Y COMPACTADO DE ZANJA CON 5 144.8
ZARANDA METALIA 1.8 4.00
OPERARIO 35.75 89.00
PEON 71.52 179.00
COMPACTADOR VIBRATORIO TIPO PLANCHA 7HP 35.75 89.00
MATERIAL DE RELLENO CLASIFICADO (CALICHE) 0 4634.00
TERCER RELLENO Y COMPACTADO DE ZANJA CON 5 103.85
ZARANDA METALIA 1.28 4.00
OPERARIO 25.63 80.00
PEON 51.28 160.00
COMPACTADOR VIBRATORIO TIPO PLANCHA 7HP 25.63 80.00
MATERIAL DE RELLENO CLASIFICADO (CALICHE) 0 2769.00
RELLENO COMPACTADO A MANO 354.72
ZARANDA METALIA 5.82 5.00
OPERARIO 116.28 97.00
PEON 232.6 194.00
ELIMINACION DE MATERIAL EXCEDENTE 339.68
ACARREO DE MAT. P/ELIMINACION 71.18
PEON 35.6 89.00
CARGADOR S/LLANTAS 125-135 HP 3.5 YD3. 35.6 89.00
CARGUIO DE MATERIAL P/ELIMINACION 70.08
PEON 40 100.00
CARGADOR S/LLANTAS 125-135 HP 3.5 YD3. 30.08 75.00
TRANSPORTE DE MAT. P/ELIMINACION 198.4
PEON 40 100.00
CAMION VOLQUETE 15 M3. 158.4 396.00
SUMINISTRO E INSTALACION DE TUBERIAS 598.98
SUMINISTRO E INSTALACION DE TUBERIA PVC UF DN 123.98
LUBRICANTE PARA TUBERIA PVC-UF 0 1255.00
OPERARIO 24.8 77.00
OFICIAL 24.8 77.00
PEON 74.4 232.00
TUBERIA PVC UF S-25 DN 24" NTP ISO 4435 I/ ANIL 0 27894.00
SUMINISTRO E INSTALACION DE TUBERIA PVC UF DN 129.4
LUBRICANTE PARA TUBERIA PVC-UF 0 1092.00
OPERARIO 25.88 81.00
OFICIAL 25.88 81.00
PEON 77.63 243.00
TUBERIA PVC UF S-25 DN 20" NTP ISO 4435 I/ ANIL 0 24261.00
SUMINISTRO E INSTALACION DE TUBERIA PVC UF DN 143.05
LUBRICANTE PARA TUBERIA PVC-UF 0 1448.00
OPERARIO 28.62 89.00
OFICIAL 28.62 89.00
PEON 85.82 268.00
TUBERIA PVC UF S-25 DN 18" NTP ISO 4435 I/ ANIL 0 32179.00
SUMINISTRO E INSTALACION DE TUBERIA PVC UF DN 64.1
LUBRICANTE PARA TUBERIA PVC-UF 0 1154.00
OPERARIO 12.82 80.00
OFICIAL 12.82 80.00
PEON 38.47 240.00
TUBERIA PVC UF S-25 DN 200 MM NTP ISO 4435 I/ 0 25641.00
CACHIMBAS DE 8" A 18" P/TUB. 13.13
OPERARIO 6.57 94.00
OFICIAL 6.57 94.00
ALAMBRE NEGRO N°16 0 300.00
CACHIMBA DE 8" A 18" 0 1500.00
CACHIMBAS DE 8" A 20" P/TUB. 24
OPERARIO 12 75.00
OFICIAL 12 75.00
ALAMBRE NEGRO N°16 0 120.00
CACHIMBA DE 8" A 20" 0 600.00
CACHIMBAS DE 8" A 24" P/TUB. 28
OPERARIO 14 88.00
OFICIAL 14 88.00
ALAMBRE NEGRO N°16 0 140.00
CACHIMBA DE 8" A 24" 0 700.00
PRUEBA HIDRÁULICA DE ALCANTARILLADO 73.33
OPERARIO 14.65 92.00
OFICIAL 29.33 183.00
PEON 29.33 183.00
AGUA. 0 8798.00
OBRAS DE CONCRETO 3,267.90
BUZONES 1,146.20
CONSTRUCCION DE BUZON ESTANDAR TIPO I F'C=1 1,014.20
CEMENTO PORTLAND TIPO I (42.5KG). 0 43098.00
OPERARIO 176 200.00
OFICIAL 176 200.00
PEON 528 600.00
MEZCLADORA DE CONCRETO DE 11 P3-23HP 88 100.00
VIBRADOR DE 3/4" - 2" CONCRETO 44 50.00
CLAVOS PARA MADERA C/C 3" 0 880.00
ALAMBRE NEGRO N°16 0 537.00
ACERO GRADO 60 CORRUGADO Ø 3/8" 0 57442.00
ACERO GRADO 60 CORRUGADO Ø 1/2" 0 113806.00
ARENA FINA 0 95.00
PIEDRA CHANCADA DE 1/2" 0 2046.00
ARENA GRUESA 0 2002.00
MADERA NACIONAL P/ENCOFRADO-CARP 0 70290.00
TAPA Y MARCO F.FDO. DIAM. 0.60 M. 0 2200.00
MOLDE METALICO PARA BUZON . 2.2 3.00
DADOS DE CONCRETO 132
CEMENTO PORTLAND TIPO I (42.5KG). 0 3828.00
OFICIAL 44 92.00
PEON 88 183.00
CLAVOS PARA MADERA C/C 2" 0 704.00
HORMIGON. 0 1540.00
MADERA TORNILLO 0 4840.00
SUMIDEROS PLUVIALES 1,642.20
CONSTRUCCION DE SUMIDEROS 1,428
CEMENTO PORTLAND TIPO I (42.5KG). 0 19890.00
OPERARIO 272 200.00
OFICIAL 136 100.00
PEON 816 600.00
MEZCLADORA DE CONCRETO DE 11 P3-23HP 136 100.00
VIBRADOR DE 3/4" - 2" CONCRETO 68 50.00
CLAVOS PARA MADERA C/C 2" 0 1428.00
ALAMBRE NEGRO N°8 0 1802.00
ARENA FINA 0 272.00
PIEDRA CHANCADA DE 1/2" 0 1360.00
ARENA GRUESA 0 1258.00
MADERA TORNILLO 0 43520.00
TAPA DE INSPECCION PARA REJILLA DE SUMIDERO 132.6
CEMENTO PORTLAND TIPO I (42.5KG). 0 1700.00
OPERARIO 20.4 43.00
OFICIAL 40.8 85.00
PEON 40.8 85.00
MEZCLADORA DE CONCRETO DE 11 P3-23HP 20.4 43.00
VIBRADOR DE 3/4" - 2" CONCRETO 10.2 21.00
CLAVOS PARA MADERA C/C 2" 0 102.00
ALAMBRE NEGRO N°16 0 204.00
ACERO GRADO 60 CORRUGADO Ø 3/8" 0 25500.00
PIEDRA CHANCADA DE 1/2" 0 170.00
ARENA GRUESA 0 170.00
MADERA TORNILLO 0 18190.00
VENTANA SUMIDERO 0.60X0.30 m 81.6
OPERARIO 27.2 85.00
OFICIAL 27.2 85.00
SOLDADORA ELECTRICA MONOFASICA ALTERNA 27.2 85.00
ACERO LISO 3/8". 0 17000.00
SOLDADURA ELECTRICA CELLOCORD. 0 1020.00
REPOSICION DE PAVIMENTO 335.83
REPOSICION DE PAVIMENTO RIGIDOF'C=210 KG/CM 227.97
CEMENTO PORTLAND TIPO I (42.5KG). 0 17465.00
OPERARIO 35.9 150.00
OFICIAL 35.9 150.00
PEON 143.60 598.00
MEZCLADORA DE CONCRETO DE 11 P3-23HP 8.97 37.00
VIBRADOR DE 3/4" - 2" CONCRETO 3.58 15.00
PIEDRA CHANCADA DE 1/2" 0 1436.00
ARENA GRUESA 0 898.00
ENCOFRADO Y DESENCOFRADO DE PAVIMENTO RI 64.8
OPERARIO 21.6 90.00
OFICIAL 21.6 90.00
PEON 21.6 90.00
CLAVOS PARA MADERA C/C 3" 0 94.00
ALAMBRE NEGRO N°8 0 187.00
MADERA NACIONAL P/ENCOFRADO-CARP 0 1944.00
REPOSICION DE MATERIAL CLASIFICADO PARA BASE 43.08
OPERARIO 14.37 90.00
PEON 14.37 90.00
COMPACTADOR VIBRATORIO TIPO PLANCHA 7HP 14.37 90.00
MATERIAL CLASIFICADO PARA BASE 0 2423.00
REPOSICION DE ELEMENTOS DE CONCRETO 143.65
REPOSICION DE VEREDA F'C=175KG/CM2 143.65
CEMENTO PORTLAND TIPO I (42.5KG). 0 2711.00
OPERARIO 37.48 94.00
OFICIAL 12.5 31.00
PEON 74.95 187.00
MEZCLADORA DE CONCRETO DE 11 P3-23HP 12.5 31.00
VIBRADOR DE 3/4" - 2" CONCRETO 6.25 16.00
PIEDRA CHANCADA DE 1/2" 0 178.00
ARENA GRUESA 0 144.00
VARIOS 79.18
LIMPIEZA FINAL DE OBRA 31.18
PEON 31.18 195.00
PLACA RECORDATORIA 48
OPERARIO 16 100.00
OFICIAL 16 100.00
PEON 16 100.00
PLACA RECORDATORIA 0 100.00
PEDESTAL DE CONCRETO DE 0.20 X 0.80 X 1.00 M. 0 100.00
IMPACTO AMBIENTAL 0
MITIGACION DEL IMPACTO AMBIENTAL 0
COSTOS AMBIENTALES 0 100.00
OJECT DEL USO DE TAREAS

TRABAJO PARA
PROJECT

1.2

0.5
1
0
2

24.36

0.97

4.87
1.95

24.36

0.97
4.87
1.95

4.4

18.26
274.94
6.6
32.99

33.47

26.2

30.89

18.46

106.22

73.85
77.62

27.26

100.42

78.61

92.68

55.38

50.21

39.3
46.34

27.69

12.55

278.94

10.92

242.61

14.48

321.79

11.54
256.41

3
15

1.2
6

1.4
7

87.98

430.98

8.8
5.37
574.42
1138.06
0.95
20.46
20.02
702.9
22

38.28

7.04
15.4
48.4

198.9

14.28
18.02
2.72
13.6
12.58
435.2

17

1.02
2.04
255
1.7
1.7
181.9

170
10.2

174.65

14.36
8.98
0.94
1.87
19.44

24.23

27.11

1.78
1.44

1
1
0
0
1
0 0 0
0 0 0
0 0 0
1
1
25.88 23.61
30.34 20 0
5.6 3.2 0.94
6.76 6.24 0
18.02 1.87
1
365.43 463.9 0.09
724.00 414.06
169.91 0.09
0.6 3.07
13.02 22.74 16.14
106.98 36.34 10.42
24.23
580.47 195.11
7
6
2.49 12.51
292.53 398.23 201.77
1
48.72
274.94
32.99
10.19 0.01
12.23 10.27
0.69 0.67 0.64
87.98
447.17 255.73 19.44
20.02 649.32 0.06
14 8
1.94
256.41
278.94
242.61
53.52 268.27
0
0 0 0
0
0
0
0
0.00
0 0
0
0
0 0 0
0 0
0
0
0