Val - 10 CONSORCIO NUEVO HORIZONTE - DHC - REV02
Val - 10 CONSORCIO NUEVO HORIZONTE - DHC - REV02
Val - 10 CONSORCIO NUEVO HORIZONTE - DHC - REV02
153+500
VALORIZACIÓN N° 10
PRESUPUESTO ORIGINAL (SIN IGV): S/.10,945,009.91
PERIODO Dec-19 N° DE CONTRATO / OS: 30530-0000003247 ORDENES DE CAMBIO: 0
PROVEEDOR: CONSORCIO NUEVO HORIZONTE PRESUPUESTO ACTUAL: 10945009.9094164
FECHAS Del 01.12.19 al 15.12.19
OPERADOR TRIBUTARIO: CONCRETE LOS ANDES S.A.C RUC: 20574719489
PRESUPUESTO ACUMULADO ANTERIOR PRESENTE PERIODO ACUMULADO ACTUAL SALDO ACTUAL
POS DESCRIPCION
UM CANT P.U S/. MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/.
28 EMBOQUILLADO DE PIEDRA E=0.50m m2 2,945.22 70.80 208,521.58 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 2,945.22 100% 208,521.58
29 EMBOQUILLADO DE PIEDRA E=0.15m m2 60.00 51.60 3,096.00 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 60.00 100% 3,096.00
30 EMBOQUILLADO DE PIEDRA E=0.30m m2 1,519.43 52.80 80,225.90 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 1,519.43 100% 80,225.90
31 SELECCIÓN DE PIEDRA MEDIANA m3 1,930.00 27.58 53,229.40 521.02 27% 10,862.44 0.00 0.0% 0.00 521.02 27% 10,862.44 1,408.98 73% 42,366.96
32 ACERO DE REFUERZO FY=4200 KG/CM2 kg 67,718.30 2.14 144,917.16 69,320.45 102% 105,151.60 0.00 0.0% 0.00 69,320.45 102% 105,151.60 -1,602.15 -2% 39,765.56
33 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 270,873.18 1.49 403,601.04 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 270,873.18 100% 403,601.04
34 TRANSPORTE DE CONCRETO <=1 KM m3-km 9,243.72 12.79 118,227.18 2,662.10 29% 27,701.20 292.74 3.2% 3,744.14 2,954.84 32% 31,445.34 6,288.88 68% 86,781.84
35 TRANSPORTE DE CONCRETO > 1KM m3-km 55,462.30 2.65 146,975.10 31,880.67 57% 75,872.68 0.00 0.0% 0.00 31,880.67 57% 75,872.68 23,581.63 43% 71,102.42
36 EJECUCION DE SUBDRENAJE m 3,378.94 51.23 173,103.10 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 3,378.94 100% 173,103.10
37 LAMINA FILTRANTE m2 1,903.80 1.28 2,436.86 871.26 46% 1,115.21 0.00 0.0% 0.00 871.26 46% 1,115.21 1,032.54 54% 1,321.65
0.00
ITEM PUENTES CONSTRUCCION 0.00
PUENTE JAHUAY CHICO 0.00
38 BARANDAS METALICAS m 35.40 44.51 1,575.65 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 35.40 100% 1,575.65
39 PUENTE PACHAS 0.00
40 OBRAS PRELIMINARES 0.00
41 RELLENO PARA ESTRUCTURAS m3 536.39 45.64 24,480.84 536.39 100% 24,480.84 0.00 0.0% 0.00 536.39 100% 24,480.84 0.00 0% 0.00
42 SUPERESTRUCTURA 0.00
43 LOSA DE CONCRETO ARMADO 0.00
44 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 52.04 52.77 2,746.15 52.04 100% 2,746.15 22.80 43.8% 1,203.16 74.84 144% 3,949.31 -22.80 -44% -1,203.16
45 ENCOFRADO Y DESENCOFRADO CARA NO VISTA m2 165.94 78.53 13,031.27 165.94 100% 13,031.27 0.00 0.0% 0.00 165.94 100% 13,031.27 0.00 0% 0.00
46 ACERO DE REFUERZO FY=4200 KG/CM2 kg 1,246.40 2.14 2,667.30 0.00 0% 0.00 0.00 0.0% 0.00 0% 0.00 1,246.40 100% 2,667.30
47 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 4,985.61 1.49 7,428.56 6,588.00 132% 9,816.12 0.00 0.0% 0.00 6,588.00 132% 9,816.12 -1,602.39 -32% -2,387.56
48 VIGAS PRINCIPALES 0.00
49 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 64.48 52.77 3,402.61 64.48 100% 3,402.61 0.00 0.0% 0.00 64.48 100% 3,402.61 0.00 0% 0.00
Página 1 de 665232415.xlsx
Proyecto: Mejoramiento Carretera Moquegua-Omate-Arequipa, Tramo II : Km. 35+000 al Km.
153+500
VALORIZACIÓN N° 10
PRESUPUESTO ORIGINAL (SIN IGV): S/.10,945,009.91
PERIODO Dec-19 N° DE CONTRATO / OS: 30530-0000003247 ORDENES DE CAMBIO: 0
PROVEEDOR: CONSORCIO NUEVO HORIZONTE PRESUPUESTO ACTUAL: 10945009.9094164
FECHAS Del 01.12.19 al 15.12.19
OPERADOR TRIBUTARIO: CONCRETE LOS ANDES S.A.C RUC: 20574719489
PRESUPUESTO ACUMULADO ANTERIOR PRESENTE PERIODO ACUMULADO ACTUAL SALDO ACTUAL
POS DESCRIPCION
UM CANT P.U S/. MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/.
50 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 303.68 78.53 23,847.99 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 303.68 100% 23,847.99
51 ACERO DE REFUERZO FY=4200 KG/CM2 kg 1,834.80 2.14 3,926.48 209.25 11% 447.80 0.00 0.0% 0.00 209.25 11% 447.80 1,625.55 89% 3,478.68
52 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 7,339.21 1.49 10,935.42 13,493.34 184% 20,105.08 0.00 0.0% 0.00 13,493.34 184% 20,105.08 -6,154.13 -84% -9,169.66
53 VIGAS DIAFRAGMA 0.00
54 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 11.47 52.77 605.27 11.47 100% 605.27 0.00 0.0% 0.00 11.47 100% 605.27 0.00 0% 0.00
55 ENCOFRADO Y DESENCOFRADO CARA NO VISTA m2 91.02 78.53 7,147.80 91.02 100% 7,147.80 0.00 0.0% 0.00 91.02 100% 7,147.80 0.00 0% 0.00
56 ACERO DE REFUERZO FY=4200 KG/CM2 kg 344.41 2.14 737.04 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 344.41 100% 737.04
57 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 1,377.64 1.49 2,052.68 1,794.09 130% 2,673.20 0.00 0.0% 0.00 1,794.09 130% 2,673.20 -416.45 -30% -620.52
58 LOSA DE APROXIMACION 0.00
59 CONCRETO CLASE H (f'c = 100 kg/cm2) m3 2.32 47.59 110.41 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 2.32 100% 110.41
60 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 18.30 52.77 965.69 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 18.30 100% 965.69
61 ENCOFRADO Y DESENCOFRADO m2 12.07 78.53 947.86 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 12.07 100% 947.86
62 ACERO DE REFUERZO FY=4200 KG/CM2 kg 545.04 2.14 1,166.39 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 545.04 100% 1,166.39
63 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 2,180.17 1.49 3,248.45 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 2,180.17 100% 3,248.45
64 VEREDAS DE CONCRETO ARMADO 0.00
65 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 7.15 52.77 377.31 7.15 100% 377.31 0.00 0.0% 0.00 7.15 100% 377.31 0.00 0% 0.00
66 ENCOFRADO Y DESENCOFRADO CARA NO VISTA m2 10.84 78.53 851.27 10.84 100% 851.27 0.00 0.0% 0.00 10.84 100% 851.27 0.00 0% 0.00
67 ACERO DE REFUERZO FY=4200 KG/CM2 kg 70.30 2.14 150.45 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 70.30 100% 150.45
68 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 281.22 1.49 419.01 737.15 262% 1,098.35 0.00 0.0% 0.00 737.15 262% 1,098.35 -455.93 -162% -679.34
69 TRANSPORTE 0.00
TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS MAYORES DE
70 1000M
m3k 1,332.77 1.26 1,679.29 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 1,332.77 100% 1,679.29
TRANSPORTE DE MATERIALES EXCEDENTES PARA DISTANCIAS MAYORES DE
71 1000M
m3k 14,299.56 1.26 18,017.45 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 14,299.56 100% 18,017.45
72 VARIOS 0.00
73 JUNTA DE DILATACION m 23.60 20.95 494.42 23.60 100% 494.42 0.00 0.0% 0.00 23.60 100% 494.42 0.00 0% 0.00
74 APOYOS DE NEOPRENO REFORZADO E=90 MM und 10.00 51.90 519.00 10.00 100% 519.00 0.00 0.0% 0.00 10.00 100% 519.00 0.00 0% 0.00
75 TOPES LATERALES und 4.00 21.23 84.92 4.00 100% 84.92 0.00 0.0% 0.00 4.00 100% 84.92 0.00 0% 0.00
76 BARANDAS METALICAS m 41.60 44.51 1,851.62 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 41.60 100% 1,851.62
77 GEOCOMPUESTO DE DRENAJE TRIDIMENSIONAL m2 164.15 2.36 387.39 72.54 44% 171.19 0.00 0.0% 0.00 72.54 44% 171.19 91.61 56% 216.20
78 FALSO PUENTE m 20.00 2,521.15 50,423.00 20.00 100% 50,423.00 0.00 0.0% 0.00 20.00 100% 50,423.00 0.00 0% 0.00
79 BRUÑA ROMPE AGUA m 41.60 10.30 428.48 41.60 100% 428.48 0.00 0.0% 0.00 41.60 100% 428.48 0.00 0% 0.00
80 IMPERMEABILIZACION CON PINTURA BITUMINOSA m2 442.93 9.47 4,194.55 72.53 16% 686.86 0.00 0.0% 0.00 72.53 16% 686.86 370.40 84% 3,507.69
81 PUENTE CHORRO II 0.00
82 OBRAS PRELIMINARES 0.00
83 DEMOLICION DE ESTRUCTURAS EN PUENTES m3 311.47 72.96 22,724.85 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 311.47 100% 22,724.85
84 MOVIMIENTO DE TIERRAS 0.00
85 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS EN SECO m3 481.38 23.95 11,529.05 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 481.38 100% 11,529.05
86 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS BAJO AGUA m3 481.37 23.95 11,528.81 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 481.37 100% 11,528.81
87 RELLENO PARA ESTRUCTURAS m3 312.83 45.64 14,277.56 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 312.83 100% 14,277.56
88 ESTRIBOS (Cimentación) 0.00
89 CONCRETO CLASE H (f'c = 100 kg/cm2) m3 8.40 47.59 399.76 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 8.40 100% 399.76
90 CONCRETO CLASE C (f´c = 280 kg/cm2 ) (cimentacion) m3 88.37 47.59 4,205.53 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 88.37 100% 4,205.53
91 ENCOFRADO Y DESENCOFRADO m2 62.88 78.53 4,937.97 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 62.88 100% 4,937.97
92 ACERO DE REFUERZO FY=4200 KG/CM2 kg 825.31 2.14 1,766.17 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 825.31 100% 1,766.17
93 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 3,301.25 1.49 4,918.86 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 3,301.25 100% 4,918.86
94 ESTRIBOS (Elevación) 0.00
95 CONCRETO CLASE D (f'c = 210kg/cm2) m3 77.45 52.77 4,087.04 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 77.45 100% 4,087.04
96 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 147.33 78.53 11,569.82 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 147.33 100% 11,569.82
97 ENCOFRADO Y DESENCOFRADO CARA NO VISTA m2 131.71 78.53 10,343.19 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 131.71 100% 10,343.19
98 ACERO DE REFUERZO FY=4200 KG/CM2 kg 1,487.36 2.14 3,182.94 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 1,487.36 100% 3,182.94
99 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 5,949.42 1.49 8,864.64 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 5,949.42 100% 8,864.64
100 LOSA DE CONCRETO ARMADO 0.00
101 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 70.77 52.77 3,734.53 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 70.77 100% 3,734.53
102 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 306.00 78.53 24,030.18 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 306.00 100% 24,030.18
103 ACERO DE REFUERZO FY=4200 KG/CM2 kg 1,901.16 2.14 4,068.47 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 1,901.16 100% 4,068.47
104 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 7,604.62 1.49 11,330.89 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 7,604.62 100% 11,330.89
Página 2 de 665232415.xlsx
Proyecto: Mejoramiento Carretera Moquegua-Omate-Arequipa, Tramo II : Km. 35+000 al Km.
153+500
VALORIZACIÓN N° 10
PRESUPUESTO ORIGINAL (SIN IGV): S/.10,945,009.91
PERIODO Dec-19 N° DE CONTRATO / OS: 30530-0000003247 ORDENES DE CAMBIO: 0
PROVEEDOR: CONSORCIO NUEVO HORIZONTE PRESUPUESTO ACTUAL: 10945009.9094164
FECHAS Del 01.12.19 al 15.12.19
OPERADOR TRIBUTARIO: CONCRETE LOS ANDES S.A.C RUC: 20574719489
PRESUPUESTO ACUMULADO ANTERIOR PRESENTE PERIODO ACUMULADO ACTUAL SALDO ACTUAL
POS DESCRIPCION
UM CANT P.U S/. MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/.
Página 3 de 665232415.xlsx
Proyecto: Mejoramiento Carretera Moquegua-Omate-Arequipa, Tramo II : Km. 35+000 al Km.
153+500
VALORIZACIÓN N° 10
PRESUPUESTO ORIGINAL (SIN IGV): S/.10,945,009.91
PERIODO Dec-19 N° DE CONTRATO / OS: 30530-0000003247 ORDENES DE CAMBIO: 0
PROVEEDOR: CONSORCIO NUEVO HORIZONTE PRESUPUESTO ACTUAL: 10945009.9094164
FECHAS Del 01.12.19 al 15.12.19
OPERADOR TRIBUTARIO: CONCRETE LOS ANDES S.A.C RUC: 20574719489
PRESUPUESTO ACUMULADO ANTERIOR PRESENTE PERIODO ACUMULADO ACTUAL SALDO ACTUAL
POS DESCRIPCION
UM CANT P.U S/. MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/.
160 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 466.35 1.49 694.86 583.73 125% 869.76 0.00 0.0% 0.00 583.73 125% 869.76 -117.38 -25% -174.90
161 LOSA DE APROXIMACION 0.00
162 CONCRETO CLASE H (f'c = 100 kg/cm2) m3 2.45 47.59 116.60 2.45 100% 0.00 0.00 0.0% 0.00 2.45 100% 0.00 0.00 0% 116.60
163 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 17.91 52.77 945.11 17.91 100% 0.00 0.00 0.0% 0.00 17.91 100% 0.00 0.00 0% 945.11
164 ENCOFRADO Y DESENCOFRADO m2 8.89 78.53 698.13 8.89 100% 0.00 0.00 0.0% 0.00 8.89 100% 0.00 0.00 0% 698.13
165 ACERO DE REFUERZO FY=4200 KG/CM2 kg 477.77 2.14 1,022.44 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 477.77 100% 1,022.44
166 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 1,911.10 1.49 2,847.53 1,911.10 100% 0.00 0.00 0.0% 0.00 1,911.10 100% 0.00 0.00 0% 2,847.53
167 VEREDAS DE CONCRETO ARMADO 0.00
168 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 5.40 52.77 284.96 5.66 105% 298.83 0.00 0.0% 0.00 5.66 105% 298.83 -0.26 -5% -13.87
169 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 16.60 78.53 1,303.60 17.66 106% 1,386.58 0.00 0.0% 0.00 17.66 106% 1,386.58 -1.06 -6% -82.98
170 ACERO DE REFUERZO FY=4200 KG/CM2 kg 53.76 2.14 115.04 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 53.76 100% 115.04
171 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 215.03 1.49 320.40 537.57 250% 800.98 0.00 0.0% 0.00 537.57 250% 800.98 -322.54 -150% -480.58
172 TRANSPORTE 0.00
TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS MAYORES DE
173 1000M
m3k 13,912.57 1.26 17,529.83 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 13,912.57 100% 17,529.83
TRANSPORTE DE MATERIALES EXCEDENTES PARA DISTANCIAS MAYORES DE
174 1000M
m3k 32,504.34 1.26 40,955.47 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 32,504.34 100% 40,955.47
Página 4 de 665232415.xlsx
Proyecto: Mejoramiento Carretera Moquegua-Omate-Arequipa, Tramo II : Km. 35+000 al Km.
153+500
VALORIZACIÓN N° 10
PRESUPUESTO ORIGINAL (SIN IGV): S/.10,945,009.91
PERIODO Dec-19 N° DE CONTRATO / OS: 30530-0000003247 ORDENES DE CAMBIO: 0
PROVEEDOR: CONSORCIO NUEVO HORIZONTE PRESUPUESTO ACTUAL: 10945009.9094164
FECHAS Del 01.12.19 al 15.12.19
OPERADOR TRIBUTARIO: CONCRETE LOS ANDES S.A.C RUC: 20574719489
PRESUPUESTO ACUMULADO ANTERIOR PRESENTE PERIODO ACUMULADO ACTUAL SALDO ACTUAL
POS DESCRIPCION
UM CANT P.U S/. MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/.
Página 5 de 665232415.xlsx
Proyecto: Mejoramiento Carretera Moquegua-Omate-Arequipa, Tramo II : Km. 35+000 al Km.
153+500
VALORIZACIÓN N° 10
PRESUPUESTO ORIGINAL (SIN IGV): S/.10,945,009.91
PERIODO Dec-19 N° DE CONTRATO / OS: 30530-0000003247 ORDENES DE CAMBIO: 0
PROVEEDOR: CONSORCIO NUEVO HORIZONTE PRESUPUESTO ACTUAL: 10945009.9094164
FECHAS Del 01.12.19 al 15.12.19
OPERADOR TRIBUTARIO: CONCRETE LOS ANDES S.A.C RUC: 20574719489
PRESUPUESTO ACUMULADO ANTERIOR PRESENTE PERIODO ACUMULADO ACTUAL SALDO ACTUAL
POS DESCRIPCION
UM CANT P.U S/. MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/.
Página 6 de 665232415.xlsx
Proyecto: Mejoramiento Carretera Moquegua-Omate-Arequipa, Tramo II : Km. 35+000 al Km.
153+500
VALORIZACIÓN N° 10
PRESUPUESTO ORIGINAL (SIN IGV): S/.10,945,009.91
PERIODO Dec-19 N° DE CONTRATO / OS: 30530-0000003247 ORDENES DE CAMBIO: 0
PROVEEDOR: CONSORCIO NUEVO HORIZONTE PRESUPUESTO ACTUAL: 10945009.9094164
FECHAS Del 01.12.19 al 15.12.19
OPERADOR TRIBUTARIO: CONCRETE LOS ANDES S.A.C RUC: 20574719489
PRESUPUESTO ACUMULADO ANTERIOR PRESENTE PERIODO ACUMULADO ACTUAL SALDO ACTUAL
POS DESCRIPCION
UM CANT P.U S/. MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/.
(A) TOTAL
(F) RETENCIONES
+ = =
FECHA FECHA (G) OTRAS DEDUCCIONES 0.00
Página 7 de 665232415.xlsx
Proyecto: Mejoramiento Carretera Moquegua-Omate-Arequipa, Tramo II : Km. 35+000 al Km. 153+500
Desde: 26-06-19
Hasta: 25-07-19
N° Dias: 30
MES FECHA N° VALE CODIGO PLACA EMPRESA EQUIPO MARCA MODELO CANTIDAD COSTO UNITARIO S/. COSTO TOTAL S/. COMENTARIOS
SUBTOTAL 0.00 S/0.00
IGV (18%) S/0.00
TOTAL S/0.00
M: M: M:
A: A: A:
Desde: 15-07-19
8/1/2018 Proyecto: Mejoramiento Carretera Moquegua-Omate-Arequipa, Tramo II : Km. 35+000 al Km. 153+500 Hasta: 31-07-19
Del 26.07.18 al 25.08.18 N° Dias: 17
VALORIZACIÓN N° 01 - PUENTES
PRECIO UNITARIO
PARTIDA PARTIDA FASE ORACLE UNIDAD MEDICIÓN ACUMULADA DESCRIPCIÓN PARTIDA OBSERVACIÓN
(S/.)
M: M: M:
A: A: A:
Desde: 15-07-19
8/1/2018 Proyecto: Mejoramiento Carretera Moquegua-Omate-Arequipa, Tramo II : Km. 35+000 al Km. 153+500 Hasta: 31-07-19
Del 26.07.18 al 25.08.18 N° Dias: 17
PRECIO UNITARIO
PARTIDA PARTIDA FASE ORACLE UNIDAD MEDICIÓN ACUMULADA DESCRIPCIÓN PARTIDA OBSERVACIÓN
(S/.)
M: M: M:
A: A: A:
Desde: 15-07-19
Proyecto: Mejoramiento Carretera Moquegua-Omate-Arequipa, Tramo II : Km. 35+000 al Km.
8/1/2018 Hasta: 31-07-19
153+500
Del 26.07.18 al 25.08.18 N° Dias: 17
MEDICIÓN
PARTIDA PARTIDA FASE ORACLE UNIDAD PRECIO UNITARIO (S/.) DESCRIPCIÓN PARTIDA OBSERVACIÓN
ACUMUALDA
- - - - - - - -
DIAS CONTIENE EL PRESETE PERIODO: 17.00 DIAS EFECTIVOS PRESENTE PERIODO: 0.00 OBSERVACIONES:
M: M: M:
A: A: A:
Desde: 15-07-19
8/1/2018 Proyecto: Mejoramiento Carretera Moquegua-Omate-Arequipa, Tramo II : Km. 35+000 al Km. 153+500 Hasta: 31-07-19
Del 26.07.18 al 25.08.18 N° Dias: 17
PRECIO UNITARIO
PARTIDA PARTIDA FASE ORACLE UNIDAD MEDICIÓN ACUMULADA DESCRIPCIÓN PARTIDA OBSERVACIÓN
(S/.)
M: M: M:
A: A: A:
Desde: 15-07-19
Proyecto: Mejoramiento Carretera Moquegua-Omate-Arequipa, Tramo II : Km. 35+000 al Km. 153+500 Hasta: 31-07-19
N° Dias: 17
CÓDIGO EQUIPO DESCRIPCIÓN OPERADOR FECHA TURNO FASE HM DESCONTAR (APOYO) TARIFA (S/HM) COSTO TOTAL (S/.) DESCRIPCIÓN ACTIVIDAD APOYO
0.00
TOTAL S/0.00
GASTOS
S/0.00
ADMINISTRATIVOS
M: M: M:
A: A: A: