Val - 10 CONSORCIO NUEVO HORIZONTE - DHC - REV02

Descargar como xlsx, pdf o txt
Descargar como xlsx, pdf o txt
Está en la página 1de 16

Proyecto: Mejoramiento Carretera Moquegua-Omate-Arequipa, Tramo II : Km. 35+000 al Km.

153+500

VALORIZACIÓN N° 10
PRESUPUESTO ORIGINAL (SIN IGV): S/.10,945,009.91
PERIODO Dec-19 N° DE CONTRATO / OS: 30530-0000003247 ORDENES DE CAMBIO: 0
PROVEEDOR: CONSORCIO NUEVO HORIZONTE PRESUPUESTO ACTUAL: 10945009.9094164
FECHAS Del 01.12.19 al 15.12.19
OPERADOR TRIBUTARIO: CONCRETE LOS ANDES S.A.C RUC: 20574719489
PRESUPUESTO ACUMULADO ANTERIOR PRESENTE PERIODO ACUMULADO ACTUAL SALDO ACTUAL
POS DESCRIPCION
UM CANT P.U S/. MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/.

ITEM PUENTES Y OBRAS DE ARTE Y DRENAJE


OBRAS PRELIMINARES
1 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS glb 1.00 68,675.89 68,675.89 0.45 45% 30,904.15 0.00 0.0% 0.00 0.45 45% 30,904.15 0.55 55% 37,771.74
OBRAS DE ARTE Y DRENAJE 0.00
2 DEMOLICION DE ESTRUCTURAS m3 10.00 72.96 729.60 259.50 2595% 18,933.12 0.00 0.0% 0.00 0.00 0% 18,933.12 10.00 100% -18,203.52
3 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS m3 38,716.69 21.64 837,829.19 14,305.67 37% 273,922.58 0.00 0.0% 0.00 14,305.67 37% 273,922.58 24,411.02 63% 563,906.61
4 RELLENO PARA ESTRUCTURAS m3 17,836.19 45.64 814,043.64 564.30 3% 23,792.59 Err:522 Err:522 0.00 Err:522 Err:522 23,792.59 Err:522 Err:522 790,251.05
5 FILTRO DRENANTE m3 7,046.08 26.18 184,466.46 304.84 4% 7,980.71 -304.84 -4.3% -7,980.71 0.00 0% 0.00 7,046.08 100% 184,466.46
6 CONCRETO CLASE H (f'c = 100 kg/cm2) m3 296.38 47.59 14,104.62 91.36 31% 4,075.61 23.80 8.0% 1,132.64 115.16 39% 5,208.25 181.22 61% 8,896.37
7 CONCRETO CLASE G (f'c = 140 kg/cm2 + 30% PM) m3 2,899.31 62.40 180,917.19 2,122.10 73% 102,450.81 165.20 5.7% 10,308.48 2,287.30 79% 112,759.29 612.01 21% 68,157.90
8 CONCRETO CLASE E (f'c = 175 kg/cm2) m3 398.74 52.77 21,041.44 87.29 22% 3,892.31 31.30 7.8% 1,651.70 118.59 30% 5,544.01 280.15 70% 15,497.43
9 CONCRETO CLASE D (f'c = 210kg/cm2) m3 4,972.64 52.77 262,406.35 561.71 11% 29,641.43 0.00 0.0% 0.00 561.71 11% 29,641.43 4,410.93 89% 232,764.92
10 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 676.64 52.77 35,706.50 436.27 64% 15,590.89 122.00 18.0% 6,437.94 558.27 83% 22,028.83 118.37 17% 13,677.67
11 ENCOFRADO Y DESENCOFRADO m2 24,262.82 69.96 1,697,426.65 6,652.28 27% 362,423.57 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522
12 DOWELLS m 308.01 3.24 997.95 868.46 282% 2,394.85 0.00 0.0% 0.00 868.46 282% 2,394.85 -560.45 -182% -1,396.90
13 TUBERIA CORRUGADA DE ACERO GALVANIZADO DE D=36" m 390.34 84.00 32,788.22 73.76 19% 6,195.84 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522 Err:522
14 TUBERIA CORRUGADA DE ACERO GALVANIZADO DE D=48" m 35.92 96.00 3,448.08 38.25 106% 2,655.36 0.00 0.0% 0.00 38.25 106% 2,655.36 -2.33 -6% 792.72
15 TUBERIA CORRUGADA DE ACERO GALVANIZADO DE D=60" m 9.72 122.40 1,189.73 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 9.72 100% 1,189.73
16 CUNETAS TRIANGULAR m 16,814.70 47.40 797,016.78 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 16,814.70 100% 797,016.78
17 CUNETAS RECTANGULARES m 2,066.48 236.09 487,875.26 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 2,066.48 100% 487,875.26
18 CUNETAS DE BANQUETAS m 465.00 81.10 37,711.50 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 465.00 100% 37,711.50
19 GAVION CAJA TIPO A m3 289.50 81.60 23,623.20 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 289.50 100% 23,623.20
20 GAVION CAJA TIPO B m3 497.25 81.60 40,575.60 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 497.25 100% 40,575.60
21 GAVION CAJA TIPO C m3 186.30 81.60 15,202.08 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 186.30 100% 15,202.08
22 GAVION CAJA TIPO CFA m3 271.50 81.60 22,154.40 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 271.50 100% 22,154.40
23 GAVION CAJA TIPO CFB m3 155.25 81.60 12,668.40 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 155.25 100% 12,668.40
24 JUNTA PARA MURO m2 1,150.64 4.28 4,924.72 65.17 6% 278.93 0.00 0.0% 0.00 65.17 6% 278.93 1,085.47 94% 4,645.79
25 JUNTA EN BADENES m 494.36 8.22 4,063.60 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 494.36 100% 4,063.60
26 TRANSPORTES 0.00
TRANSPORTE DE MATERIALES EXCEDENTES PARA DISTANCIAS MAYORES DE
27 1000M
m3k 278,197.93 1.26 350,529.39 61,819.42 22% 70,457.93 0.00 0.0% 0.00 61,819.42 22% 70,457.93 216,378.51 78% 280,071.46

28 EMBOQUILLADO DE PIEDRA E=0.50m m2 2,945.22 70.80 208,521.58 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 2,945.22 100% 208,521.58
29 EMBOQUILLADO DE PIEDRA E=0.15m m2 60.00 51.60 3,096.00 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 60.00 100% 3,096.00
30 EMBOQUILLADO DE PIEDRA E=0.30m m2 1,519.43 52.80 80,225.90 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 1,519.43 100% 80,225.90
31 SELECCIÓN DE PIEDRA MEDIANA m3 1,930.00 27.58 53,229.40 521.02 27% 10,862.44 0.00 0.0% 0.00 521.02 27% 10,862.44 1,408.98 73% 42,366.96
32 ACERO DE REFUERZO FY=4200 KG/CM2 kg 67,718.30 2.14 144,917.16 69,320.45 102% 105,151.60 0.00 0.0% 0.00 69,320.45 102% 105,151.60 -1,602.15 -2% 39,765.56
33 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 270,873.18 1.49 403,601.04 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 270,873.18 100% 403,601.04
34 TRANSPORTE DE CONCRETO <=1 KM m3-km 9,243.72 12.79 118,227.18 2,662.10 29% 27,701.20 292.74 3.2% 3,744.14 2,954.84 32% 31,445.34 6,288.88 68% 86,781.84
35 TRANSPORTE DE CONCRETO > 1KM m3-km 55,462.30 2.65 146,975.10 31,880.67 57% 75,872.68 0.00 0.0% 0.00 31,880.67 57% 75,872.68 23,581.63 43% 71,102.42
36 EJECUCION DE SUBDRENAJE m 3,378.94 51.23 173,103.10 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 3,378.94 100% 173,103.10
37 LAMINA FILTRANTE m2 1,903.80 1.28 2,436.86 871.26 46% 1,115.21 0.00 0.0% 0.00 871.26 46% 1,115.21 1,032.54 54% 1,321.65
0.00
ITEM PUENTES CONSTRUCCION 0.00
PUENTE JAHUAY CHICO 0.00
38 BARANDAS METALICAS m 35.40 44.51 1,575.65 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 35.40 100% 1,575.65
39 PUENTE PACHAS 0.00
40 OBRAS PRELIMINARES 0.00
41 RELLENO PARA ESTRUCTURAS m3 536.39 45.64 24,480.84 536.39 100% 24,480.84 0.00 0.0% 0.00 536.39 100% 24,480.84 0.00 0% 0.00
42 SUPERESTRUCTURA 0.00
43 LOSA DE CONCRETO ARMADO 0.00
44 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 52.04 52.77 2,746.15 52.04 100% 2,746.15 22.80 43.8% 1,203.16 74.84 144% 3,949.31 -22.80 -44% -1,203.16
45 ENCOFRADO Y DESENCOFRADO CARA NO VISTA m2 165.94 78.53 13,031.27 165.94 100% 13,031.27 0.00 0.0% 0.00 165.94 100% 13,031.27 0.00 0% 0.00
46 ACERO DE REFUERZO FY=4200 KG/CM2 kg 1,246.40 2.14 2,667.30 0.00 0% 0.00 0.00 0.0% 0.00 0% 0.00 1,246.40 100% 2,667.30
47 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 4,985.61 1.49 7,428.56 6,588.00 132% 9,816.12 0.00 0.0% 0.00 6,588.00 132% 9,816.12 -1,602.39 -32% -2,387.56
48 VIGAS PRINCIPALES 0.00
49 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 64.48 52.77 3,402.61 64.48 100% 3,402.61 0.00 0.0% 0.00 64.48 100% 3,402.61 0.00 0% 0.00

Página 1 de 665232415.xlsx
Proyecto: Mejoramiento Carretera Moquegua-Omate-Arequipa, Tramo II : Km. 35+000 al Km.
153+500

VALORIZACIÓN N° 10
PRESUPUESTO ORIGINAL (SIN IGV): S/.10,945,009.91
PERIODO Dec-19 N° DE CONTRATO / OS: 30530-0000003247 ORDENES DE CAMBIO: 0
PROVEEDOR: CONSORCIO NUEVO HORIZONTE PRESUPUESTO ACTUAL: 10945009.9094164
FECHAS Del 01.12.19 al 15.12.19
OPERADOR TRIBUTARIO: CONCRETE LOS ANDES S.A.C RUC: 20574719489
PRESUPUESTO ACUMULADO ANTERIOR PRESENTE PERIODO ACUMULADO ACTUAL SALDO ACTUAL
POS DESCRIPCION
UM CANT P.U S/. MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/.

50 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 303.68 78.53 23,847.99 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 303.68 100% 23,847.99
51 ACERO DE REFUERZO FY=4200 KG/CM2 kg 1,834.80 2.14 3,926.48 209.25 11% 447.80 0.00 0.0% 0.00 209.25 11% 447.80 1,625.55 89% 3,478.68
52 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 7,339.21 1.49 10,935.42 13,493.34 184% 20,105.08 0.00 0.0% 0.00 13,493.34 184% 20,105.08 -6,154.13 -84% -9,169.66
53 VIGAS DIAFRAGMA 0.00
54 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 11.47 52.77 605.27 11.47 100% 605.27 0.00 0.0% 0.00 11.47 100% 605.27 0.00 0% 0.00
55 ENCOFRADO Y DESENCOFRADO CARA NO VISTA m2 91.02 78.53 7,147.80 91.02 100% 7,147.80 0.00 0.0% 0.00 91.02 100% 7,147.80 0.00 0% 0.00
56 ACERO DE REFUERZO FY=4200 KG/CM2 kg 344.41 2.14 737.04 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 344.41 100% 737.04
57 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 1,377.64 1.49 2,052.68 1,794.09 130% 2,673.20 0.00 0.0% 0.00 1,794.09 130% 2,673.20 -416.45 -30% -620.52
58 LOSA DE APROXIMACION 0.00
59 CONCRETO CLASE H (f'c = 100 kg/cm2) m3 2.32 47.59 110.41 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 2.32 100% 110.41
60 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 18.30 52.77 965.69 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 18.30 100% 965.69
61 ENCOFRADO Y DESENCOFRADO m2 12.07 78.53 947.86 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 12.07 100% 947.86
62 ACERO DE REFUERZO FY=4200 KG/CM2 kg 545.04 2.14 1,166.39 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 545.04 100% 1,166.39
63 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 2,180.17 1.49 3,248.45 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 2,180.17 100% 3,248.45
64 VEREDAS DE CONCRETO ARMADO 0.00
65 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 7.15 52.77 377.31 7.15 100% 377.31 0.00 0.0% 0.00 7.15 100% 377.31 0.00 0% 0.00
66 ENCOFRADO Y DESENCOFRADO CARA NO VISTA m2 10.84 78.53 851.27 10.84 100% 851.27 0.00 0.0% 0.00 10.84 100% 851.27 0.00 0% 0.00
67 ACERO DE REFUERZO FY=4200 KG/CM2 kg 70.30 2.14 150.45 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 70.30 100% 150.45
68 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 281.22 1.49 419.01 737.15 262% 1,098.35 0.00 0.0% 0.00 737.15 262% 1,098.35 -455.93 -162% -679.34
69 TRANSPORTE 0.00
TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS MAYORES DE
70 1000M
m3k 1,332.77 1.26 1,679.29 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 1,332.77 100% 1,679.29
TRANSPORTE DE MATERIALES EXCEDENTES PARA DISTANCIAS MAYORES DE
71 1000M
m3k 14,299.56 1.26 18,017.45 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 14,299.56 100% 18,017.45

72 VARIOS 0.00
73 JUNTA DE DILATACION m 23.60 20.95 494.42 23.60 100% 494.42 0.00 0.0% 0.00 23.60 100% 494.42 0.00 0% 0.00
74 APOYOS DE NEOPRENO REFORZADO E=90 MM und 10.00 51.90 519.00 10.00 100% 519.00 0.00 0.0% 0.00 10.00 100% 519.00 0.00 0% 0.00
75 TOPES LATERALES und 4.00 21.23 84.92 4.00 100% 84.92 0.00 0.0% 0.00 4.00 100% 84.92 0.00 0% 0.00
76 BARANDAS METALICAS m 41.60 44.51 1,851.62 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 41.60 100% 1,851.62
77 GEOCOMPUESTO DE DRENAJE TRIDIMENSIONAL m2 164.15 2.36 387.39 72.54 44% 171.19 0.00 0.0% 0.00 72.54 44% 171.19 91.61 56% 216.20
78 FALSO PUENTE m 20.00 2,521.15 50,423.00 20.00 100% 50,423.00 0.00 0.0% 0.00 20.00 100% 50,423.00 0.00 0% 0.00
79 BRUÑA ROMPE AGUA m 41.60 10.30 428.48 41.60 100% 428.48 0.00 0.0% 0.00 41.60 100% 428.48 0.00 0% 0.00
80 IMPERMEABILIZACION CON PINTURA BITUMINOSA m2 442.93 9.47 4,194.55 72.53 16% 686.86 0.00 0.0% 0.00 72.53 16% 686.86 370.40 84% 3,507.69
81 PUENTE CHORRO II 0.00
82 OBRAS PRELIMINARES 0.00
83 DEMOLICION DE ESTRUCTURAS EN PUENTES m3 311.47 72.96 22,724.85 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 311.47 100% 22,724.85
84 MOVIMIENTO DE TIERRAS 0.00
85 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS EN SECO m3 481.38 23.95 11,529.05 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 481.38 100% 11,529.05
86 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS BAJO AGUA m3 481.37 23.95 11,528.81 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 481.37 100% 11,528.81
87 RELLENO PARA ESTRUCTURAS m3 312.83 45.64 14,277.56 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 312.83 100% 14,277.56
88 ESTRIBOS (Cimentación) 0.00
89 CONCRETO CLASE H (f'c = 100 kg/cm2) m3 8.40 47.59 399.76 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 8.40 100% 399.76
90 CONCRETO CLASE C (f´c = 280 kg/cm2 ) (cimentacion) m3 88.37 47.59 4,205.53 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 88.37 100% 4,205.53
91 ENCOFRADO Y DESENCOFRADO m2 62.88 78.53 4,937.97 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 62.88 100% 4,937.97
92 ACERO DE REFUERZO FY=4200 KG/CM2 kg 825.31 2.14 1,766.17 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 825.31 100% 1,766.17
93 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 3,301.25 1.49 4,918.86 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 3,301.25 100% 4,918.86
94 ESTRIBOS (Elevación) 0.00
95 CONCRETO CLASE D (f'c = 210kg/cm2) m3 77.45 52.77 4,087.04 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 77.45 100% 4,087.04
96 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 147.33 78.53 11,569.82 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 147.33 100% 11,569.82
97 ENCOFRADO Y DESENCOFRADO CARA NO VISTA m2 131.71 78.53 10,343.19 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 131.71 100% 10,343.19
98 ACERO DE REFUERZO FY=4200 KG/CM2 kg 1,487.36 2.14 3,182.94 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 1,487.36 100% 3,182.94
99 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 5,949.42 1.49 8,864.64 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 5,949.42 100% 8,864.64
100 LOSA DE CONCRETO ARMADO 0.00
101 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 70.77 52.77 3,734.53 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 70.77 100% 3,734.53
102 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 306.00 78.53 24,030.18 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 306.00 100% 24,030.18
103 ACERO DE REFUERZO FY=4200 KG/CM2 kg 1,901.16 2.14 4,068.47 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 1,901.16 100% 4,068.47
104 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 7,604.62 1.49 11,330.89 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 7,604.62 100% 11,330.89

Página 2 de 665232415.xlsx
Proyecto: Mejoramiento Carretera Moquegua-Omate-Arequipa, Tramo II : Km. 35+000 al Km.
153+500

VALORIZACIÓN N° 10
PRESUPUESTO ORIGINAL (SIN IGV): S/.10,945,009.91
PERIODO Dec-19 N° DE CONTRATO / OS: 30530-0000003247 ORDENES DE CAMBIO: 0
PROVEEDOR: CONSORCIO NUEVO HORIZONTE PRESUPUESTO ACTUAL: 10945009.9094164
FECHAS Del 01.12.19 al 15.12.19
OPERADOR TRIBUTARIO: CONCRETE LOS ANDES S.A.C RUC: 20574719489
PRESUPUESTO ACUMULADO ANTERIOR PRESENTE PERIODO ACUMULADO ACTUAL SALDO ACTUAL
POS DESCRIPCION
UM CANT P.U S/. MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/.

105 VIGAS METALICAS 0.00


106 MONTAJE Y LANZAMIENTO DE ESTRUCTURA METÁLICA ton 91.07 2,537.55 231,094.68 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 91.07 100% 231,094.68
107 LOSA DE APROXIMACION 0.00 0.00
108 CONCRETO CLASE H (f'c = 100 kg/cm2) m3 1.67 47.59 79.48 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 1.67 100% 79.48
109 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 13.84 52.77 730.34 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 13.84 100% 730.34
110 ENCOFRADO Y DESENCOFRADO m2 8.98 78.53 705.20 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 8.98 100% 705.20
111 ACERO DE REFUERZO FY=4200 KG/CM2 kg 382.03 2.14 817.55 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 382.03 100% 817.55
112 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 1,528.14 1.49 2,276.92 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 1,528.14 100% 2,276.92
113 VEREDAS DE CONCRETO ARMADO 0.00
114 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 13.68 52.77 721.89 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 13.68 100% 721.89
115 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 40.70 78.53 3,196.17 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 40.70 100% 3,196.17
116 ACERO DE REFUERZO FY=4200 KG/CM2 kg 137.62 2.14 294.50 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 137.62 100% 294.50
117 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 550.47 1.49 820.20 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 550.47 100% 820.20
118 TRANSPORTE 0.00
TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS MAYORES DE
119 1000M
m3k 5,682.02 1.26 7,159.35 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 5,682.02 100% 7,159.35
TRANSPORTE DE MATERIALES EXCEDENTES PARA DISTANCIAS MAYORES DE
120 1000M
m3k 28,784.24 1.26 36,268.14 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 28,784.24 100% 36,268.14

121 VARIOS 0.00


122 JUNTA DE DILATACION m 17.60 20.95 368.72 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 17.60 100% 368.72
123 APOYOS DE NEOPRENO PARA PUENTES E=105 MM und 8.00 51.90 415.20 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 8.00 100% 415.20
124 BARANDAS METALICAS m 79.60 44.51 3,543.00 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 79.60 100% 3,543.00
125 GEOCOMPUESTO DE DRENAJE TRIDIMENSIONAL m2 125.90 2.36 297.12 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 125.90 100% 297.12
126 BRUÑA ROMPE AGUA m 79.60 10.30 819.88 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 79.60 100% 819.88
127 IMPERMEABILIZACION CON PINTURA BITUMINOSA m2 242.68 9.47 2,298.18 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 242.68 100% 2,298.18
128 PUENTE MORO MORO 0.00
129 MOVIMIENTO DE TIERRAS 0.00
130 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS EN SECO m3 179.90 23.95 4,308.61 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 179.90 100% 4,308.61
131 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS BAJO AGUA m3 179.90 23.95 4,308.61 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 179.90 100% 4,308.61
132 RELLENO PARA ESTRUCTURAS m3 1,192.85 45.64 54,441.67 1,192.85 100% 54,441.68 0.00 0.0% 0.00 1,192.85 100% 54,441.68 0.00 0% -0.01
133 ESTRIBOS (Cimentacion) 0.00
134 CONCRETO CLASE H (f'c = 100 kg/cm2) m3 7.32 47.59 348.36 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 7.32 100% 348.36
135 CONCRETO CLASE C (f´c = 280 kg/cm2 ) (cimentacion) m3 190.82 47.59 9,081.12 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 190.82 100% 9,081.12
136 ENCOFRADO Y DESENCOFRADO m2 91.60 78.53 7,193.35 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 91.60 100% 7,193.35
137 ACERO DE REFUERZO FY=4200 KG/CM2 kg 2,930.60 2.14 6,271.48 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 2,930.60 100% 6,271.48
138 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 11,722.39 1.49 17,466.36 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 11,722.39 100% 17,466.36
139 ESTRIBOS (Elevacion) 0.00
140 CONCRETO CLASE D (f'c = 210kg/cm2) m3 288.52 52.77 15,225.20 337.50 117% 17,809.88 0.00 0.0% 0.00 337.50 117% 17,809.88 -48.98 -17% -2,584.68
141 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 363.39 78.53 28,537.02 460.71 127% 36,179.44 0.00 0.0% 0.00 460.71 127% 36,179.44 -97.32 -27% -7,642.42
142 ENCOFRADO Y DESENCOFRADO CARA NO VISTA m2 328.17 78.53 25,771.19 350.40 107% 27,516.58 0.00 0.0% 0.00 350.40 107% 27,516.58 -22.23 -7% -1,745.39
143 ACERO DE REFUERZO FY=4200 KG/CM2 kg 7,894.39 2.14 16,894.00 877.60 11% 1,878.06 0.00 0.0% 0.00 877.60 11% 1,878.06 7,016.79 89% 15,015.94
144 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 31,577.58 1.49 47,050.59 31,577.58 100% 47,050.59 0.00 0.0% 0.00 31,577.58 100% 47,050.59 0.00 0% 0.00
145 SUPERESTRUCTURA 0.00
146 LOSA DE CONCRETO ARMADO 0.00
147 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 27.96 52.77 1,475.45 28.05 100% 1,480.16 0.00 0.0% 0.00 28.05 100% 1,480.16 -0.09 0% -4.71
148 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 99.16 78.53 7,787.03 93.63 94% 3,926.50 0.00 0.0% 0.00 93.63 94% 3,926.50 5.53 6% 3,860.53
149 ACERO DE REFUERZO FY=4200 KG/CM2 kg 695.02 2.14 1,487.35 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 695.02 100% 1,487.35
150 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 2,780.10 1.49 4,142.34 3,475.12 125% 5,177.92 0.00 0.0% 0.00 3,475.12 125% 5,177.92 -695.02 -25% -1,035.58
151 VIGAS PRINCIPALES 0.00
152 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 32.03 52.77 1,690.22 32.10 100% 1,693.78 0.00 0.0% 0.00 32.10 100% 1,693.78 -0.07 0% -3.56
153 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 15.78 78.53 1,239.20 156.18 990% 12,264.87 0.00 0.0% 0.00 156.18 990% 12,264.87 -140.40 -890% -11,025.67
154 ACERO DE REFUERZO FY=4200 KG/CM2 kg 1,466.16 2.14 3,137.58 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 1,466.16 100% 3,137.58
155 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 5,864.63 1.49 8,738.30 7,348.00 125% 10,948.52 0.00 0.0% 0.00 7,348.00 125% 10,948.52 -1,483.37 -25% -2,210.22
156 VIGAS DIAFRAGMA 0.00
157 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 4.23 52.77 223.22 4.39 104% 231.70 0.00 0.0% 0.00 4.39 104% 231.70 -0.16 -4% -8.48
158 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 32.42 78.53 2,545.94 33.00 102% 2,591.82 0.00 0.0% 0.00 33.00 102% 2,591.82 -0.58 -2% -45.88
159 ACERO DE REFUERZO FY=4200 KG/CM2 kg 116.59 2.14 249.50 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 116.59 100% 249.50

Página 3 de 665232415.xlsx
Proyecto: Mejoramiento Carretera Moquegua-Omate-Arequipa, Tramo II : Km. 35+000 al Km.
153+500

VALORIZACIÓN N° 10
PRESUPUESTO ORIGINAL (SIN IGV): S/.10,945,009.91
PERIODO Dec-19 N° DE CONTRATO / OS: 30530-0000003247 ORDENES DE CAMBIO: 0
PROVEEDOR: CONSORCIO NUEVO HORIZONTE PRESUPUESTO ACTUAL: 10945009.9094164
FECHAS Del 01.12.19 al 15.12.19
OPERADOR TRIBUTARIO: CONCRETE LOS ANDES S.A.C RUC: 20574719489
PRESUPUESTO ACUMULADO ANTERIOR PRESENTE PERIODO ACUMULADO ACTUAL SALDO ACTUAL
POS DESCRIPCION
UM CANT P.U S/. MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/.

160 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 466.35 1.49 694.86 583.73 125% 869.76 0.00 0.0% 0.00 583.73 125% 869.76 -117.38 -25% -174.90
161 LOSA DE APROXIMACION 0.00
162 CONCRETO CLASE H (f'c = 100 kg/cm2) m3 2.45 47.59 116.60 2.45 100% 0.00 0.00 0.0% 0.00 2.45 100% 0.00 0.00 0% 116.60
163 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 17.91 52.77 945.11 17.91 100% 0.00 0.00 0.0% 0.00 17.91 100% 0.00 0.00 0% 945.11
164 ENCOFRADO Y DESENCOFRADO m2 8.89 78.53 698.13 8.89 100% 0.00 0.00 0.0% 0.00 8.89 100% 0.00 0.00 0% 698.13
165 ACERO DE REFUERZO FY=4200 KG/CM2 kg 477.77 2.14 1,022.44 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 477.77 100% 1,022.44
166 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 1,911.10 1.49 2,847.53 1,911.10 100% 0.00 0.00 0.0% 0.00 1,911.10 100% 0.00 0.00 0% 2,847.53
167 VEREDAS DE CONCRETO ARMADO 0.00
168 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 5.40 52.77 284.96 5.66 105% 298.83 0.00 0.0% 0.00 5.66 105% 298.83 -0.26 -5% -13.87
169 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 16.60 78.53 1,303.60 17.66 106% 1,386.58 0.00 0.0% 0.00 17.66 106% 1,386.58 -1.06 -6% -82.98
170 ACERO DE REFUERZO FY=4200 KG/CM2 kg 53.76 2.14 115.04 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 53.76 100% 115.04
171 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 215.03 1.49 320.40 537.57 250% 800.98 0.00 0.0% 0.00 537.57 250% 800.98 -322.54 -150% -480.58
172 TRANSPORTE 0.00
TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS MAYORES DE
173 1000M
m3k 13,912.57 1.26 17,529.83 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 13,912.57 100% 17,529.83
TRANSPORTE DE MATERIALES EXCEDENTES PARA DISTANCIAS MAYORES DE
174 1000M
m3k 32,504.34 1.26 40,955.47 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 32,504.34 100% 40,955.47

175 VARIOS 0.00


176 JUNTA DE DILATACION m 17.60 20.95 368.72 17.60 100% 368.72 0.00 0.0% 0.00 17.60 100% 368.72 0.00 0% 0.00
177 APOYOS DE NEOPRENO REFORZADO E=90 MM und 8.00 51.90 415.20 8.00 100% 415.20 0.00 0.0% 0.00 8.00 100% 415.20 0.00 0% 0.00
178 TOPES LATERALES und 4.00 21.23 84.92 4.00 100% 84.92 0.00 0.0% 0.00 4.00 100% 84.92 0.00 0% 0.00
179 BARANDAS METALICAS m 31.40 44.51 1,397.61 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 31.40 100% 1,397.61
180 GEOCOMPUESTO DE DRENAJE TRIDIMENSIONAL m2 347.06 2.36 819.06 307.91 89% 726.67 0.00 0.0% 0.00 307.91 89% 726.67 39.15 11% 92.39
181 FALSO PUENTE m 15.00 2,521.15 37,817.25 15.00 100% 37,817.25 0.00 0.0% 0.00 15.00 100% 37,817.25 0.00 0% 0.00
182 BRUÑA ROMPE AGUA m 31.40 10.30 323.42 31.40 100% 323.42 0.00 0.0% 0.00 31.40 100% 323.42 0.00 0% 0.00
183 IMPERMEABILIZACION CON PINTURA BITUMINOSA m2 621.32 9.47 5,883.90 362.57 58% 3,433.53 0.00 0.0% 0.00 362.57 58% 3,433.53 258.75 42% 2,450.37
184 PONTON TAMAÑA 0.00
185 OBRAS PRELIMINARES 0.00
186 DEMOLICION DE ESTRUCTURAS EN PUENTES m3 603.11 72.96 44,002.91 309.33 51% 22,568.72 0.00 0.0% 0.00 309.33 51% 22,568.72 293.78 49% 21,434.19
187 MOVIMIENTO DE TIERRAS 0.00
188 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS EN SECO m3 1,079.19 23.95 25,846.60 1,270.43 118% 30,426.80 0.00 0.0% 0.00 1,270.43 118% 30,426.80 -191.24 -18% -4,580.20
189 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS BAJO AGUA m3 1,079.18 23.95 25,846.36 1,270.43 118% 30,426.80 0.00 0.0% 0.00 1,270.43 118% 30,426.80 -191.25 -18% -4,580.44
190 RELLENO PARA ESTRUCTURAS m3 1,170.00 45.64 53,398.80 850.00 73% 38,794.00 0.00 0.0% 0.00 850.00 73% 38,794.00 320.00 27% 14,604.80
191 ESTRIBOS (Cimentacion) 0.00
192 CONCRETO CLASE H (f'c = 100 kg/cm2) m3 14.08 47.59 670.07 14.08 100% 670.07 0.00 0.0% 0.00 14.08 100% 670.07 0.00 0% 0.00
193 CONCRETO CLASE C (f´c = 280 kg/cm2 ) (cimentacion) m3 133.86 47.59 6,370.40 133.86 100% 6,370.40 0.00 0.0% 0.00 133.86 100% 6,370.40 0.00 0% 0.00
194 ENCOFRADO Y DESENCOFRADO m2 70.24 78.53 5,515.95 70.24 100% 5,515.95 0.00 0.0% 0.00 70.24 100% 5,515.95 0.00 0% 0.00
195 ACERO DE REFUERZO FY=4200 KG/CM2 kg 2,717.54 2.14 5,815.54 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 2,717.54 100% 5,815.54
196 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 10,870.17 1.49 16,196.55 13,587.71 125% 20,245.69 0.00 0.0% 0.00 13,587.71 125% 20,245.69 -2,717.54 -25% -4,049.14
197 ESTRIBOS (Elevacion) 0.00
198 CONCRETO CLASE D (f'c = 210kg/cm2) m3 273.72 52.77 14,444.20 268.91 98% 14,190.38 0.00 0.0% 0.00 268.91 98% 14,190.38 4.81 2% 253.82
199 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 390.89 78.53 30,696.43 390.89 100% 30,696.59 0.00 0.0% 0.00 390.89 100% 30,696.59 0.00 0% -0.16
200 ENCOFRADO Y DESENCOFRADO CARA NO VISTA m2 296.34 78.53 23,271.56 296.34 100% 23,271.58 0.00 0.0% 0.00 296.34 100% 23,271.58 0.00 0% -0.02
201 ACERO DE REFUERZO FY=4200 KG/CM2 kg 6,578.48 2.14 14,077.94 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 6,578.48 100% 14,077.94
202 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 26,313.91 1.49 39,207.73 31,497.29 120% 46,930.96 0.00 0.0% 0.00 31,497.29 120% 46,930.96 -5,183.38 -20% -7,723.23
203 SUPERESTRUCTURA 0.00
204 LOSA DE CONCRETO ARMADO 0.00
205 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 40.23 52.77 2,122.94 40.32 100% 2,127.69 0.00 0.0% 0.00 40.32 100% 2,127.69 -0.09 0% -4.75
206 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 98.62 78.53 7,744.63 98.72 100% 7,752.31 0.00 0.0% 0.00 98.72 100% 7,752.31 -0.10 0% -7.68
207 ACERO DE REFUERZO FY=4200 KG/CM2 kg 1,204.47 2.14 2,577.57 6,022.63 500% 12,888.42 0.00 0.0% 0.00 6,022.63 500% 12,888.42 -4,818.16 -400% -10,310.85
208 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 4,817.89 1.49 7,178.65 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 4,817.89 100% 7,178.65
209 LOSA DE APROXIMACION 0.00
210 CONCRETO CLASE H (f'c = 100 kg/cm2) m3 2.59 47.59 123.26 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 2.59 100% 123.26
211 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 18.92 52.77 998.41 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 18.92 100% 998.41
212 ENCOFRADO Y DESENCOFRADO m2 9.39 78.53 737.40 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 9.39 100% 737.40
213 ACERO DE REFUERZO FY=4200 KG/CM2 kg 518.90 2.14 1,110.45 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 518.90 100% 1,110.45
214 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 2,075.61 1.49 3,092.66 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 2,075.61 100% 3,092.66

Página 4 de 665232415.xlsx
Proyecto: Mejoramiento Carretera Moquegua-Omate-Arequipa, Tramo II : Km. 35+000 al Km.
153+500

VALORIZACIÓN N° 10
PRESUPUESTO ORIGINAL (SIN IGV): S/.10,945,009.91
PERIODO Dec-19 N° DE CONTRATO / OS: 30530-0000003247 ORDENES DE CAMBIO: 0
PROVEEDOR: CONSORCIO NUEVO HORIZONTE PRESUPUESTO ACTUAL: 10945009.9094164
FECHAS Del 01.12.19 al 15.12.19
OPERADOR TRIBUTARIO: CONCRETE LOS ANDES S.A.C RUC: 20574719489
PRESUPUESTO ACUMULADO ANTERIOR PRESENTE PERIODO ACUMULADO ACTUAL SALDO ACTUAL
POS DESCRIPCION
UM CANT P.U S/. MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/.

215 VEREDAS DE CONCRETO ARMADO 0.00


216 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 3.19 52.77 168.34 3.19 100% 168.34 0.00 0.0% 0.00 3.19 100% 168.34 0.00 0% 0.00
217 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 10.52 78.53 826.14 10.52 100% 826.14 0.00 0.0% 0.00 10.52 100% 826.14 0.00 0% 0.00
218 ACERO DE REFUERZO FY=4200 KG/CM2 kg 75.06 2.14 160.62 375.29 500% 803.12 0.00 0.0% 0.00 375.29 500% 803.12 -300.23 -400% -642.50
219 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 300.23 1.49 447.34 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 300.23 100% 447.34
220 TRANSPORTE 0.00
TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS MAYORES DE
221 1000M
m3k 36,924.27 1.26 46,524.57 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 36,924.27 100% 46,524.57
TRANSPORTE DE MATERIALES EXCEDENTES PARA DISTANCIAS MAYORES DE
222 1000M
m3k 4,890.88 1.26 6,162.51 4,890.88 100% 6,162.51 0.00 0.0% 0.00 4,890.88 100% 6,162.51 0.00 0% 0.00

223 VARIOS 0.00


224 JUNTA DE DILATACION m 18.72 20.95 392.18 18.72 100% 392.18 0.00 0.0% 0.00 18.72 100% 392.18 0.00 0% 0.00
225 APOYOS DE NEOPRENO PARA PUENTES E=25 MM m2 5.60 51.90 290.64 5.60 100% 290.64 0.00 0.0% 0.00 5.60 100% 290.64 0.00 0% 0.00
226 BARANDAS METALICAS m 18.72 44.51 833.23 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 18.72 100% 833.23
227 GEOCOMPUESTO DE DRENAJE TRIDIMENSIONAL m2 260.29 2.36 614.28 260.29 100% 436.60 0.00 0.0% 0.00 260.29 100% 436.60 0.00 0% 177.68
228 FALSO PUENTE m 8.54 2,521.15 21,530.62 8.54 100% 21,530.62 0.00 0.0% 0.00 8.54 100% 21,530.62 0.00 0% 0.00
229 BRUÑA ROMPE AGUA m 18.72 10.30 192.82 18.72 100% 191.37 0.00 0.0% 0.00 18.72 100% 191.37 0.00 0% 1.45
230 IMPERMEABILIZACION CON PINTURA BITUMINOSA m2 517.93 9.47 4,904.80 517.93 100% 3,788.00 0.00 0.0% 0.00 517.93 100% 3,788.00 0.00 0% 1,116.80
231 PUENTE SALADO 0.00
232 OBRAS PRELIMINARES 0.00
233 DEMOLICION DE ESTRUCTURAS EN PUENTES m3 167.29 72.96 12,205.48 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 167.29 100% 12,205.48
234 MOVIMIENTO DE TIERRAS 0.00
235 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS EN SECO m3 915.48 23.95 21,925.75 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 915.48 100% 21,925.75
236 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS BAJO AGUA m3 915.47 23.95 21,925.51 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 915.47 100% 21,925.51
237 RELLENO PARA ESTRUCTURAS m3 867.21 45.64 39,579.46 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 867.21 100% 39,579.46
238 ESTRIBOS (Cimentacion) 0.00
239 CONCRETO CLASE H (f'c = 100 kg/cm2) m3 16.43 47.59 781.90 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 16.43 100% 781.90
240 CONCRETO CLASE C (f´c = 280 kg/cm2 ) (cimentacion) m3 249.87 47.59 11,891.31 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 249.87 100% 11,891.31
241 ENCOFRADO Y DESENCOFRADO m2 116.94 78.53 9,183.30 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 116.94 100% 9,183.30
242 ACERO DE REFUERZO FY=4200 KG/CM2 kg 825.31 2.14 1,766.17 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 825.31 100% 1,766.17
243 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 3,301.25 1.49 4,918.86 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 3,301.25 100% 4,918.86
244 ESTRIBOS (Elevacion) 0.00
245 CONCRETO CLASE D (f'c = 210kg/cm2) m3 198.81 52.77 10,491.20 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 198.81 100% 10,491.20
246 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 278.36 78.53 21,859.61 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 278.36 100% 21,859.61
247 ENCOFRADO Y DESENCOFRADO CARA NO VISTA m2 236.41 78.53 18,565.28 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 236.41 100% 18,565.28
248 ACERO DE REFUERZO FY=4200 KG/CM2 kg 3,642.65 2.14 7,795.28 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 3,642.65 100% 7,795.28
249 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 14,570.61 1.49 21,710.21 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 14,570.61 100% 21,710.21
250 SUPERESTRUCTURA 0.00
251 LOSA DE CONCRETO ARMADO 0.00
252 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 45.73 52.77 2,413.17 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 45.73 100% 2,413.17
253 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 199.60 78.53 15,674.59 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 199.60 100% 15,674.59
254 ACERO DE REFUERZO FY=4200 KG/CM2 kg 1,241.72 2.14 2,657.28 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 1,241.72 100% 2,657.28
255 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 4,966.87 1.49 7,400.64 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 4,966.87 100% 7,400.64
256 VIGAS METALICAS 0.00
257 MONTAJE Y LANZAMIENTO DE ESTRUCTURA METALICA ton 40.75 2,537.55 103,405.16 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 40.75 100% 103,405.16
258 LOSA DE APROXIMACION 0.00
259 CONCRETO CLASE H (f'c = 100 kg/cm2) m3 2.45 47.59 116.60 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 2.45 100% 116.60
260 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 17.91 52.77 945.11 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 17.91 100% 945.11
261 ENCOFRADO Y DESENCOFRADO m2 9.02 78.53 708.34 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 9.02 100% 708.34
262 ACERO DE REFUERZO FY=4200 KG/CM2 kg 477.37 2.14 1,021.58 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 477.37 100% 1,021.58
263 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 1,909.49 1.49 2,845.14 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 1,909.49 100% 2,845.14
264 VEREDAS DE CONCRETO ARMADO 0.00
265 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 8.87 52.77 468.07 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 8.87 100% 468.07
266 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 26.70 78.53 2,096.75 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 26.70 100% 2,096.75
267 ACERO DE REFUERZO FY=4200 KG/CM2 kg 44.79 2.14 95.85 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 44.79 100% 95.85
268 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 179.17 1.49 266.96 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 179.17 100% 266.96
269 TRANSPORTE 0.00

Página 5 de 665232415.xlsx
Proyecto: Mejoramiento Carretera Moquegua-Omate-Arequipa, Tramo II : Km. 35+000 al Km.
153+500

VALORIZACIÓN N° 10
PRESUPUESTO ORIGINAL (SIN IGV): S/.10,945,009.91
PERIODO Dec-19 N° DE CONTRATO / OS: 30530-0000003247 ORDENES DE CAMBIO: 0
PROVEEDOR: CONSORCIO NUEVO HORIZONTE PRESUPUESTO ACTUAL: 10945009.9094164
FECHAS Del 01.12.19 al 15.12.19
OPERADOR TRIBUTARIO: CONCRETE LOS ANDES S.A.C RUC: 20574719489
PRESUPUESTO ACUMULADO ANTERIOR PRESENTE PERIODO ACUMULADO ACTUAL SALDO ACTUAL
POS DESCRIPCION
UM CANT P.U S/. MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/.

TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS MAYORES DE


270 1000M
m3k 47,577.50 1.26 59,947.65 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 47,577.50 100% 59,947.65
TRANSPORTE DE MATERIALES EXCEDENTES PARA DISTANCIAS MAYORES DE
271 1000M
m3k 6,555.39 1.26 8,259.80 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 6,555.39 100% 8,259.80

272 VARIOS 0.00


273 JUNTA DE DILATACION m 17.60 20.95 368.72 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 17.60 100% 368.72
274 APOYOS DE NEOPRENO PARA PUENTES E=105 MM und 8.00 51.90 415.20 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 8.00 100% 415.20
275 BARANDAS METALICAS m 51.60 44.51 2,296.72 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 51.60 100% 2,296.72
276 GEOCOMPUESTO DE DRENAJE TRIDIMENSIONAL m2 215.91 2.36 509.55 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 215.91 100% 509.55
277 BRUÑA ROMPE AGUA m 51.60 10.30 531.48 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 51.60 100% 531.48
278 IMPERMEABILIZACION CON PINTURA BITUMINOSA m2 205.85 9.47 1,949.40 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 205.85 100% 1,949.40
279 PUENTE AMARILLO 0.00
280 OBRAS PRELIMINARES 0.00
281 DEMOLICION DE ESTRUCTURAS EN PUENTES m3 208.50 72.96 15,212.16 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 208.50 100% 15,212.16
282 MOVIMIENTO DE TIERRAS 0.00
283 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS EN SECO m3 1,726.14 23.95 41,341.05 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 1,726.14 100% 41,341.05
284 EXCAVACION NO CLASIFICADA PARA ESTRUCTURAS BAJO AGUA m3 1,726.14 23.95 41,341.05 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 1,726.14 100% 41,341.05
285 RELLENO PARA ESTRUCTURAS m3 1,972.80 45.64 90,038.59 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 1,972.80 100% 90,038.59
286 ESTRIBOS (Cimentacion) 0.00
287 CONCRETO CLASE H (f'c = 100 kg/cm2) m3 20.35 47.59 968.46 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 20.35 100% 968.46
288 CONCRETO CLASE C (f´c = 280 kg/cm2 ) (cimentacion) m3 234.07 47.59 11,139.39 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 234.07 100% 11,139.39
289 ENCOFRADO Y DESENCOFRADO m2 102.61 78.53 8,057.96 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 102.61 100% 8,057.96
290 ACERO DE REFUERZO FY=4200 KG/CM2 kg 4,836.83 2.14 10,350.82 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 4,836.83 100% 10,350.82
291 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 19,347.32 1.49 28,827.51 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 19,347.32 100% 28,827.51
292 ESTRIBOS (Elevacion) 0.00
293 CONCRETO CLASE D (f'c = 210kg/cm2) m3 349.75 52.77 18,456.31 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 349.75 100% 18,456.31
294 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 484.66 78.53 38,060.35 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 484.66 100% 38,060.35
295 ENCOFRADO Y DESENCOFRADO CARA NO VISTA m2 434.34 78.53 34,108.72 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 434.34 100% 34,108.72
296 ACERO DE REFUERZO FY=4200 KG/CM2 kg 7,891.41 2.14 16,887.62 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 7,891.41 100% 16,887.62
297 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 31,565.65 1.49 47,032.82 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 31,565.65 100% 47,032.82
298 SUPERESTRUCTURA 0.00
299 LOSA DE CONCRETO ARMADO 0.00
300 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 41.88 52.77 2,210.01 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 41.88 100% 2,210.01
301 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 154.86 78.53 12,161.16 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 154.86 100% 12,161.16
302 ACERO DE REFUERZO FY=4200 KG/CM2 kg 1,041.34 2.14 2,228.47 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 1,041.34 100% 2,228.47
303 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 4,165.37 1.49 6,206.40 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 4,165.37 100% 6,206.40
304 VIGAS PRINCIPALES 0.00
305 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 42.59 52.77 2,247.47 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 42.59 100% 2,247.47
306 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 4.70 78.53 369.09 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 4.70 100% 369.09
307 ACERO DE REFUERZO FY=4200 KG/CM2 kg 1,961.01 2.14 4,196.57 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 1,961.01 100% 4,196.57
308 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 7,844.05 1.49 11,687.63 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 7,844.05 100% 11,687.63
309 VIGAS DIAFRAGMA 0.00
310 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 7.40 52.77 390.50 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 7.40 100% 390.50
311 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 58.61 78.53 4,602.64 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 58.61 100% 4,602.64
312 ACERO DE REFUERZO FY=4200 KG/CM2 kg 207.14 2.14 443.28 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 207.14 100% 443.28
313 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 828.56 1.49 1,234.55 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 828.56 100% 1,234.55
314 LOSA DE APROXIMACION 0.00
315 CONCRETO CLASE H (f'c = 100 kg/cm2) m3 3.50 47.59 166.57 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 3.50 100% 166.57
316 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 24.36 52.77 1,285.48 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 24.36 100% 1,285.48
317 ENCOFRADO Y DESENCOFRADO m2 12.70 78.53 997.33 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 12.70 100% 997.33
318 ACERO DE REFUERZO FY=4200 KG/CM2 kg 668.40 2.14 1,430.37 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 668.40 100% 1,430.37
319 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 2,673.59 1.49 3,983.65 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 2,673.59 100% 3,983.65
320 VEREDAS DE CONCRETO ARMADO 0.00
321 CONCRETO CLASE C (f´c = 280 kg/cm2 ) m3 5.74 52.77 302.90 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 5.74 100% 302.90
322 ENCOFRADO Y DESENCOFRADO CARAVISTA m2 17.03 78.53 1,337.37 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 17.03 100% 1,337.37
323 ACERO DE REFUERZO FY=4200 KG/CM2 kg 58.08 2.14 124.29 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 58.08 100% 124.29
324 ACERO DE REFUERZO FY=4200 KG/CM2 (SOLO COLOCACION) kg 232.32 1.49 346.16 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 232.32 100% 346.16

Página 6 de 665232415.xlsx
Proyecto: Mejoramiento Carretera Moquegua-Omate-Arequipa, Tramo II : Km. 35+000 al Km.
153+500

VALORIZACIÓN N° 10
PRESUPUESTO ORIGINAL (SIN IGV): S/.10,945,009.91
PERIODO Dec-19 N° DE CONTRATO / OS: 30530-0000003247 ORDENES DE CAMBIO: 0
PROVEEDOR: CONSORCIO NUEVO HORIZONTE PRESUPUESTO ACTUAL: 10945009.9094164
FECHAS Del 01.12.19 al 15.12.19
OPERADOR TRIBUTARIO: CONCRETE LOS ANDES S.A.C RUC: 20574719489
PRESUPUESTO ACUMULADO ANTERIOR PRESENTE PERIODO ACUMULADO ACTUAL SALDO ACTUAL
POS DESCRIPCION
UM CANT P.U S/. MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/. CANT % MONTO S/.

325 TRANSPORTE 0.00


TRANSPORTE DE MATERIALES GRANULARES PARA DISTANCIAS MAYORES DE
326 1000M
m3k 102,633.48 1.26 129,318.18 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 102,633.48 100% 129,318.18
TRANSPORTE DE MATERIALES EXCEDENTES PARA DISTANCIAS MAYORES DE
327 1000M
m3k 27,034.98 1.26 34,064.07 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 27,034.98 100% 34,064.07

328 VARIOS 0.00


329 JUNTA DE DILATACION m 23.60 20.95 494.42 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 23.60 100% 494.42
330 APOYOS DE NEOPRENO REFORZADO E=90 MM und 10.00 51.90 519.00 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 10.00 100% 519.00
331 TOPES LATERALES und 4.00 21.23 84.92 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 4.00 100% 84.92
332 BARANDAS METALICAS m 33.40 44.51 1,486.63 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 33.40 100% 1,486.63
333 GEOCOMPUESTO DE DRENAJE TRIDIMENSIONAL m2 385.55 2.36 909.90 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 385.55 100% 909.90
334 FALSO PUENTE m 16.00 2,521.15 40,338.40 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 16.00 100% 40,338.40
335 BRUÑA ROMPE AGUA m 33.40 10.30 344.02 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 33.40 100% 344.02
336 IMPERMEABILIZACION CON PINTURA BITUMINOSA m2 205.85 9.47 1,949.40 0.00 0% 0.00 0.00 0.0% 0.00 0.00 0% 0.00 205.85 100% 1,949.40
0.00
337 TRANSPORTE DE CONCRETO <=1 KM m3-km 2,762.88 12.79 35,337.24 1,023.56 37% 12,274.44 22.80 0.8% 291.61 1,046.36 38% 12,566.05 1,716.52 62% 22,771.19
338 TRANSPORTE DE CONCRETO > 1KM m3-km 33,154.56 2.65 87,859.58 13,282.90 40% 34,908.73 0.00 0.0% 0.00 13,282.90 40% 34,908.73 19,871.66 60% 52,950.85
0.00
339 FABRICACION DE CONCRETO m3 25,000.00 40.37 1,009,125.00 4,277.71 17% 151,659.79 0.00 0.0% 0.00 4,277.71 17% 151,659.79 20,722.29 83% 857,465.21

TOTAL PRESUPUESTO 10,945,009.91 2,111,910.95 19,835.16 2,131,746.11 1,159,131.29 8,813,263.80

PROPIERTARIO O PROVEEDOR: ADMINISTRACION:

Cesar Barrezueta Morán


2,111,910.95 + 19,835.16 = 2,131,746.11 = 8,813,263.80

(A) TOTAL

0.00 + 0.00 = 0.00 = 0.00

FECHA FECHA (B) MENOS: ADELANTOS


GERENCIA DE PROYECTO : GERENTE DE CONSTRUCCIÓN:

Hilario Roig Bosch José Sucapuca Ardiles


2,111,910.95 + 19,835.16 = 2,131,746.11 = 8,813,263.80

(C) SUBTOTAL (A+B)

380,143.97 + 3,570.33 = 383,714.30 = 1,586,387.48

FECHA FECHA (D) IGV [18% of (C)]


ADMINISTRADOR DE CONTRATOS : CONTROL DE PROYECTOS:

Enrique Espinoza Genaro Hidalgo Morán 2,492,054.92 + 23,405.49 = 2,515,460.41 = 10,399,651.28


(E) TOTAL (C+D)

211,191.10 - 1,983.52 = 213,174.61 = 0.00

(F) RETENCIONES

+ = =
FECHA FECHA (G) OTRAS DEDUCCIONES 0.00

(H) MONTO A PAGAR (E+F) S/.2,280,863.83 + S/.21,421.97 = S/.2,302,285.80 = S/.10,399,651.28

Página 7 de 665232415.xlsx
Proyecto: Mejoramiento Carretera Moquegua-Omate-Arequipa, Tramo II : Km. 35+000 al Km. 153+500
Desde: 26-06-19
Hasta: 25-07-19
N° Dias: 30

VALORIZACIÓN N° 02 - DESCUENTO ABASTECIMIENTO COMBUSTIBLE

MES FECHA N° VALE CODIGO PLACA EMPRESA EQUIPO MARCA MODELO CANTIDAD COSTO UNITARIO S/. COSTO TOTAL S/. COMENTARIOS
SUBTOTAL 0.00 S/0.00
IGV (18%) S/0.00
TOTAL S/0.00

ELABORADO POR REVISADO POR PROPIETARIO/PROVEEDOR

Nombre: D: Nombre: Nombre: D:


CRISTIAN CUETO ANUARBE GENARO HIDALGO MORAN
M: M: M:
Firma: Firma: Firma:
A: A: A:
Desde: 26-06-19
Proyecto: Mejoramiento Carretera Moquegua-Omate-Arequipa, Tramo II : Km. 35+000 al Km.
8/1/2018 Hasta: 25-07-19
153+500
Del 26.07.18 al 25.08.18 N° Dias: 30

VALORIZACIÓN N° 02 - DESCUENTO MATERIALES

RAZON SOCIAL: CONCRETE LOS ANDES TIPO DE TARIFA: PU


N° DE R.U.C.: 20574719489

Fecha Salida Documento Costo Cantidad Costo Total


Artículo Descripción Fecha Transaccion UM Fase Entregado a Número Documento Transacción
Doc Procesado Unitario Salida Salidas
TOTAL S/0.00
IGV (18%) S/0.00
TOTAL S/0.00

ELABORADO POR REVISADO POR PROPIETARIO/PROVEEDOR

Nombre: D: Nombre: Nombre: D:

CRISTIAN CUETO ANUARBE GENARO HIDALGO MORAN

M: M: M:

Firma: Firma: Firma:

A: A: A:
Desde: 15-07-19
8/1/2018 Proyecto: Mejoramiento Carretera Moquegua-Omate-Arequipa, Tramo II : Km. 35+000 al Km. 153+500 Hasta: 31-07-19
Del 26.07.18 al 25.08.18 N° Dias: 17

VALORIZACIÓN N° 01 - PUENTES

RAZON SOCIAL: CONSORCIO NUEVO HORIZONTE TIPO DE TARIFA: PU


N° DE R.U.C.: 20574719489 INCLUYE MATERIALES DE FABRICACIÓN: NO
CIUDAD: Moquegua INCLUYE COMBUSTIBLE: SI
REPRESENTANTE: Arcadio Galindo Aguirre
N° DE D.N.I.: 28293096

PRECIO UNITARIO
PARTIDA PARTIDA FASE ORACLE UNIDAD MEDICIÓN ACUMULADA DESCRIPCIÓN PARTIDA OBSERVACIÓN
(S/.)

10 DEMOLICIÓN DE ESTRUCTURAS EN PUENTES M3


20 EXCAVACIÓN NO CLASIFICADA PARA ESTRUCTURAS EN SECO O BAJO AGUA M3
30 RELLENO PARA ESTRUCTURAS M3
40-1 SUPLEMENTO DE TRANSPORTE (> 1 Km) M3-KM
50-1 CONCRETO EN SOLADOS Y CIMENTACIONES DE CUALQUIER CLASE M3
60 CONCRETO EN ELEVACIONES M3

70 CONCRETO EN VIGAS PRINCIPALES Y DIAFRAGMA M3

80 CONCRETO EN LOSA DE COMPRESIÓN Y VEREDAS M3


90 TRANSPORTE DE CONCRETO M3.KM

100 ENCOFRADO Y DESENCOFRADO M2

110 ACERO DE REFUERZO Fy= 4200 KG/CM2 KG

120 ACERO DE REFUERZO Fy= 4200 KG/CM2 (SOLO COLOCACIÓN) KG


130 MONTAJE Y LANZAMIENTO DE ESTRUCTURA METÁLICA Tn
140 JUNTA DE DILATACIÓN ML
150 APOYOS DE NEOPRENO REFORZADO Ud
160 TOPES LATERALES Ud
170 APOYOS DE NEOPRENO PARA PUENTES E=25 MM M2
180 BARANDAS METÁLICAS ML
190 GEOCOMPUESTO DE DRENAJE TRIDIMENSIONAL M2
200 FALSO PUENTE ML
210 BRUÑA ROMPE AGUA ML
220 IMPERMEABILIZACIÓN CON PINTURA BITUMINOSA M2

ELABORADO POR REVISADO POR PROPIETARIO/PROVEEDOR

Nombre: D: Nombre: D: Nombre: D:

CRISTIAN CUETO ANUARBE GENARO HIDALGO MORAN

M: M: M:

Firma: Firma: Firma:

A: A: A:
Desde: 15-07-19
8/1/2018 Proyecto: Mejoramiento Carretera Moquegua-Omate-Arequipa, Tramo II : Km. 35+000 al Km. 153+500 Hasta: 31-07-19
Del 26.07.18 al 25.08.18 N° Dias: 17

VALORIZACIÓN N° 01 - OBRAS DE ARTE Y DRENAJE

RAZON SOCIAL: CONSORCIO NUEVO HORIZONTE TIPO DE TARIFA: PU


N° DE R.U.C.: 20574719489 INCLUYE MATERIALES DE FABRICACIÓN: NO
CIUDAD: Moquegua INCLUYE COMBUSTIBLE: SI
REPRESENTANTE: Arcadio Galindo Aguirre
N° DE D.N.I.: 28293096

PRECIO UNITARIO
PARTIDA PARTIDA FASE ORACLE UNIDAD MEDICIÓN ACUMULADA DESCRIPCIÓN PARTIDA OBSERVACIÓN
(S/.)

280 EXCAVACIÓN NO CLASIFICADA PARA ESTRUCTURAS 01BBB M3


290 RELLENO PARA ESTRUCTURAS 01BEBK M3
300 FILTRO DRENANTE 01BEBK M3
310 LÁMINA FILTRANTE 01BEBK M2
320 SUPLEMENTO DE TRANSPORTE (> 1 KM) BFKB / BFKM M3-KM
330 CONCRETO PARA SOLADOS 01CFBDI M3
340 CONCRETO CICLOPE0 (30% PM) CFB M3

350 CONCRETO EN CABEZALES DE ALCANTARILLA TMC 01CFBDI M3

360 CONCRETO EN ALCANTARILLAS MARCO, MUROS DE CONCRETO ARMADO Y BADENES 01CFBDI M3


370 TRANSPORTE DE CONCRETO BFKA M3.KM

380 ENCOFRADO Y DESENCOFRADO 01CAB M2

390 ACERO DE REFUERZO FY = 4200 KG/CM2 CBA KG

400 ACERO DE REFUERZO FY = 4200 KG/CM3 (SOLO COLOCACIÓN) CBA KG


410 DOWELLS CABBI ML
420 TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE D=36" JCAF ML
430 TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE D=48" JCAF ML
440 TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE D=60" JCAF ML
450 TUBERÍA CORRUGADA DE ACERO GALVANIZADO DE D=72" JCAF ML
460 EJECUCIÓN DE SUBDRENAJE BBD ML
470 GAVIÓN CAJA TIPO A BDC M3
480 GAVIÓN CAJA TIPO B BDC M3
490 GAVIÓN CAJA TIPO C BDC M3
500 GAVIÓN CAJA TIPO CFA BDC M3
510 GAVIÓN CAJA TIPO CFB BDC M3
520 ENROCADO BDA M3
530 JUNTA PARA MURO CABBI M2
540 JUNTA EN BADENES CABBI ML

ELABORADO POR REVISADO POR PROPIETARIO/PROVEEDOR

Nombre: D: Nombre: D: Nombre: D:

CRISTIAN CUETO ANUARBE GENARO HIDALGO MORAN

M: M: M:

Firma: Firma: Firma:

A: A: A:
Desde: 15-07-19
Proyecto: Mejoramiento Carretera Moquegua-Omate-Arequipa, Tramo II : Km. 35+000 al Km.
8/1/2018 Hasta: 31-07-19
153+500
Del 26.07.18 al 25.08.18 N° Dias: 17

VALORIZACIÓN N° 02 - FABRICACIÓN DE CONCRETO

RAZON SOCIAL: CONSORCIO NUEVO HORIZONTE MATERIAL: CONCRETO TIPO DE TARIFA: M3


N° DE R.U.C.: 20574719489 RESISTENCIA: 100 Kg/cm2 A 280 Kg/cm2 INCLUYE MATERIALES DE FABRICACIÓN: NO
CIUDAD: Moquegua FASE ORACLE: CFA INCLUYE COMBUSTIBLE: SI
REPRESENTANTE: Arcadio Galindo Aguirre FASE INTERNA: P-18A
N° DE D.N.I.: 28293096 TARIFA 1 S/.39.00

MEDICIÓN
PARTIDA PARTIDA FASE ORACLE UNIDAD PRECIO UNITARIO (S/.) DESCRIPCIÓN PARTIDA OBSERVACIÓN
ACUMUALDA

- - - - - - - -

DIAS CONTIENE EL PRESETE PERIODO: 17.00 DIAS EFECTIVOS PRESENTE PERIODO: 0.00 OBSERVACIONES:

DIAS PROGRAMADOS PERIODO: 12.00 VOLUMEN CONCRETO PRESENTE PERIODO: 0.00

M3 PRODUCCIÓN PERIODO: 0.00 DESCUENTO PRESENTE PERIODO: 0.00

CANT. A VALORIZAR 0.00

ELABORADO POR REVISADO POR PROPIETARIO/PROVEEDOR

Nombre: D: Nombre: D: Nombre: D:


CRISTIAN CUETO ANUARBE GENARO HIDALGO MORAN

M: M: M:

Firma: Firma: Firma:

A: A: A:
Desde: 15-07-19
8/1/2018 Proyecto: Mejoramiento Carretera Moquegua-Omate-Arequipa, Tramo II : Km. 35+000 al Km. 153+500 Hasta: 31-07-19
Del 26.07.18 al 25.08.18 N° Dias: 17

VALORIZACIÓN N° 02 - OBRAS DE ARTE Y DRENAJE ADICIONALES

RAZON SOCIAL: CONSORCIO NUEVO HORIZONTE TIPO DE TARIFA: PU


N° DE R.U.C.: 20574719489 INCLUYE MATERIALES DE FABRICACIÓN: NO
CIUDAD: Moquegua INCLUYE COMBUSTIBLE: SI
REPRESENTANTE: Arcadio Galindo Aguirre
N° DE D.N.I.: 28293096

PRECIO UNITARIO
PARTIDA PARTIDA FASE ORACLE UNIDAD MEDICIÓN ACUMULADA DESCRIPCIÓN PARTIDA OBSERVACIÓN
(S/.)

502.D SELECCIÓN DE PIEDRA MEDIANA M3


510.A CUNETA TRIANGULAR M
510.B CUNETA RECTANGULAR M
510.C CUNETA DE BANQUETA M
636.A EMBOQUILLADO E=0.50 m M2
636.B EMBOQUILLADO E=0.15 m M2
636.C EMBOQUILLADO E=0.30 m M2
DEMOLICIÓN DE ESTRUCTURAS EN OA M3

ELABORADO POR REVISADO POR PROPIETARIO/PROVEEDOR

Nombre: D: Nombre: D: Nombre: D:

CRISTIAN CUETO ANUARBE GENARO HIDALGO MORAN

M: M: M:

Firma: Firma: Firma:

A: A: A:
Desde: 15-07-19
Proyecto: Mejoramiento Carretera Moquegua-Omate-Arequipa, Tramo II : Km. 35+000 al Km. 153+500 Hasta: 31-07-19
N° Dias: 17

VALORIZACIÓN N° 02 - APOYO CON MAQUIANRIA DE CONCRETE AL CVS

CÓDIGO EQUIPO DESCRIPCIÓN OPERADOR FECHA TURNO FASE HM DESCONTAR (APOYO) TARIFA (S/HM) COSTO TOTAL (S/.) DESCRIPCIÓN ACTIVIDAD APOYO

0.00
TOTAL S/0.00

GASTOS
S/0.00
ADMINISTRATIVOS

TOTAL (+ IGV) S/0.00

ELABORADO POR REVISADO POR PROPIETARIO/PROVEEDOR

Nombre: D: Nombre: D: Nombre: D:

CRISTIAN CUETO ANUARBE GENARO HIDALGO MORAN

M: M: M:

Firma: Firma: Firma:

A: A: A: