ESTRUCTURA
METRADO
ITEM DESCRIPCION UND. TOTAL
1° Piso 2° Piso 3° Piso 4° Piso
ARQUITECTURA
METRADO
ITEM DESCRIPCION UND. TOTAL
1° Piso 2° Piso 3° Piso 4° Piso
1.00 MANPOSTERIA
1.01 Muros de Ladrillo KK dearcilla de Soga M2 300.56 421.52 381.16 326.74 1429.98
1.02 Trazos y nivelacion durante los trabajos GLB 1.00 1.00 1.00 1.00 4.00
5.00 COBERTURAS
5.01 Policarbonato Alveolar GLB − − − 3 3.00
5.02 Cobertura de Teja Serrana en Perimetro M2 − − − 16.01 16.01
7.00 CERRAJERIA
7.01 Bisagra capuchina de 3 1/2" x 3 1/2" UND 32 72 64 36 204
7.02 Bisagra aluminizada capuchina de 3" x 3" UND 16 8 12 4 40
7.03 Cerradura para puerta principal pesada UND 4 2 3 1 10
7.04 Cerradura p/baño seguro interno perilla manija cerradura goal 42 NP UND 2 5 4 4 58
7.05 Cerradura p/interior pestillo manija llave goal 53 NPS UND 6 13 12 5 36
9.00 BARANDAS
9.01 Escalera tipo 01 - Tub. 2" ML 15.5 15.5 15.5 − 46.5
9.02 Escalera tipo 02 - Tub. 2" ML 5.6 − 5.6 − 11.2
9.03 Escalera tipo 03 - Tub. 2" ML − − 10.65 − 10.65
9.04 Balcones - Tub. 2" ML − 91.44 91.44 − 182.88
9.05 Area Comun - Tub. 2" ML − 9.6 9.6 9.6 28.8
10.00 PINTURA
10.01 Muros Interiores - Pintura Oleo M2 250.12 456.08 375.36 418.48 1500.04
10.02 Muros Exteriores - Fachada - Pintura Latex M2 33.34 151.96 151.96 − 337.26
10.03 Columnas - Pintura Oleo M2 104.26 104.26 116.74 72.88 398.14
10.04 Vigas - Pintura Oleo M2 194.93 194.93 194.93 60.5 645.29
10.05 Cielo Raso - Pintura Oleo M2 157.00 152.00 147.00 81.4 537.40
APARATOS SANITARIOS
W.C. de Tanque Bajo
W.C. de Tanque Alto
Lavatorios de 22” por 16” con una llave cromada de ½” para 1/2 Baños
Ovalin + Mesa, Inlcuye Accesorios
Lavatorios de Cocina
Lavaderos para Lavanderia
Tinas
ACCESORIOS SANITARIAS
Toalleros
Papeleras
Jabonera
Sumidero 2"
Registro Roscado de bronce 4"
Duchas cromadas de cabeza giratoris y llave mezcladroa monocamando
Base de ducha de fibra de vidrio
VALVULAS
Valvula de compuerta de 3/4
Valvula de compuerta de 1/2
Valvula check
Boya para cisternas
REDES DE DESAGUE
Salidas de desague PVC SAL de 2"
Salidas de desague PVC SAL de 4"
Salida de Ventilacion de 2"
Sombrero para ventilacion 2"
Cajas de Registro 12"x24"
Tuberia PVC SAL 4"
Tuberia PVC SAL 2"
OTROS
Therma 65 lts.
Electrobomba 0.5 hp
Tanque Elevado 1100 lts.
ACCESORIOS
Codo 4"x90°
Codo 2"x90°
Codo 2"x45°
Codo 4"x45°
Codo con Reduccion 4"-2"
Yee simple 2"
Yee simple 4"
Yee simple de 4"-2"
Tee sanitaria de 4"
Trampa P 2"
Tee de 4"-2"
Pegamento para PVC - accesorios
INSTALACIONES ELECTRICAS
CAJAS
Caja de Pase FºGº 300mm x 200mm
Caja de Pase FºGº 100mm x100mm
ALIMENTACION A SERVICIOS
Cable THW - 2x4mm2 + 1x10mm (T) (alimentador principal)
Cable 2-1 x 2.5mm TW-Φ 20 mm (alumbrado)
Cable 2-1 x 4.0mm +1 x 2.5 TW-Φ 20 mm (tomacorriente)
INTERRUPTORES
Interruptor Termomagnetico 2x25A
Interruptor Diferencial 2x25A
VARIOS
Banco de Medidores
Pozo puesta a Tierra
Intercomunicador Principal
Luces de Emergencia
Intercomunicador Termomagnetico y Automatico (electrobomba)
Acometida Electrica
ESTRUCTURA
ITEM UND.
DESCRIPCION
OBRAS PROVISIONALES
Oficina
Almacen
Guardiania
Servicios Higienicos
Cerco Provisional del Obra
Agua para la Construccion (Instalacion)
Energia para La Construccion (Instalacion)
TRABAJOS PRELIMINARES
Limpieza de Terreno (manual)
Trazo y Replanteo Preliminar
Movilizacion de Equipos y Herramientas
MOVIMIENTO DE TIERRAS
Excavacion de Zapatas
Excavacion de Cimiento Corrido
Excavacion de Vigas de Cimentacion
Excavacion de Cisterna
Excavacion de Base de Escaleras
Eliminacion de Material Excendente
Mejoramiento con Piedra del Rio 6"(0.20 cm)
Afirmado compactado en zapatas (0.15cm)
MANPOSTERIA
Muros de Ladrillo KK dearcilla de Soga
Trazos y nivelacion durante los trabajos
REVOQUES Y ENLUCIDOS
Tarrajeo de Muros Interiores
Tarrajeo de Muros Exteriores - Fachada
Tarrajeo de Columnas
Tarrajeo de Vigas
Tarrajeo de Cielo Raso
Tarrajeos de Cisternas
Tarrajeo de Escaleras
PISOS Y CONTRAPISOS
Falso Piso e=0.10 cm.
Acabado de Cemento Pulido Bruñado en Cocheras
Acabado de Cemento Pulido en Patios, tendal, y Azotea
Contrapiso e=0.05 cm.
Forjado y Revestimiento en gradas de Escaleras en Madera
Pisos de Ceramico en Baños0.30x0.30
Pisos de Ceramico en Cocinas 0.42x0.42
Pisos de Parquet Huayacan 6x30cm Veteado en Dormitorios y Estudios
Pisos de Parqueton en Sala/Comedor y Demas Ambientes
ZOCALOS Y CONTRAZOCALOS
Zocalo de Ceramico en Servicios Higienicos
Zocalo de Ceramico en Cocinas
Contrazocalo de cemento pulido h=0.10
Contrazocalo h=0.10 de madera
COBERTURAS
Policarbonato Alveolar
Cobertura de Teja Serrana en Perimetro
CARPINTERIA DE MADERA
Puerta con marco P-1 / 0.90x2.10
Puerta con marco P-2 / 0.80x2.10
Closets segun diseño
Muebles de Cocina
CERRAJERIA
Bisagra capuchina de 3 1/2" x 3 1/2"
Bisagra aluminizada capuchina de 3" x 3"
Cerradura para puerta principal pesada
Cerradura p/baño seguro interno perilla manija cerradura goal 42 NP
Cerradura p/interior pestillo manija llave goal 53 NPS
CARPINTERIA METALICA
Reja R-1 / Ingreso Peatonal - 2.45x2.50
Reja R-2 / Ingreso Vehicular - 5.00x2.50
Reja R-3 / Ingreso Vehicular - 2.53x2.50
Reja R-4 / Ingreso Vehicular - 4.95x2.50
Reja R-5 / Ingreso Vehicular - 4.00x2.50
Estructura de Acero para cubierta de Policarbonato
BARANDAS
Escalera tipo 01 - Tub. 2"
Escalera tipo 02 - Tub. 2"
Escalera tipo 03 - Tub. 2"
Balcones - Tub. 2"
Area Comun - Tub. 2"
PINTURA
Muros Interiores - Pintura Oleo
Muros Exteriores - Fachada - Pintura Latex
Columnas - Pintura Oleo
Vigas - Pintura Oleo
Cielo Raso - Pintura Oleo
VIDRIOS
Vidrio Semidoble Incoloro Crudo / Sistema Directo
Espejos Biselados 4mm - Para Baños
APARATOS SANITARIOS
W.C. de Tanque Bajo
W.C. de Tanque Alto
Lavatorios de 22” por 16” con una llave cromada de ½” para 1/2 Baños
Ovalin + Mesa, Inlcuye Accesorios
Lavatorios de Cocina
Lavaderos para Lavanderia
Tinas
ACCESORIOS SANITARIAS
Toalleros
Papeleras
Jabonera
Sumidero 2"
Registro Roscado de bronce 4"
Duchas cromadas de cabeza giratoris y llave mezcladroa monocamando
Base de ducha de fibra de vidrio
VALVULAS
Valvula de compuerta de 3/4
Valvula de compuerta de 1/2
Valvula check
Boya para cisternas
REDES DE DESAGUE
Salidas de desague PVC SAL de 2"
Salidas de desague PVC SAL de 4"
Salida de Ventilacion de 2"
Sombrero para ventilacion 2"
Cajas de Registro 12"x24"
Tuberia PVC SAL 4"
Tuberia PVC SAL 2"
OTROS
Therma 65 LTS.
Electrobomba 0.5 HP
Tanque Elevado 11OO LTS.
ACCESORIOS
Codo 4"x90°
Codo 2"x90°
Codo 2"x45°
Codo 4"x45°
Codo con Reduccion 4"-2"
Yee simple 2"
Yee simple 4"
Yee simple de 4"-2"
Tee sanitaria de 4"
Trampa P 2"
Tee de 4"-2"
Pegamento para PVC - accesorios
INSTALACIONES ELECTRICAS
ITEM DESCRIPCION
CAJAS
Caja de Pase FºGº 300mm x 200mm
Caja de Pase FºGº 100mm x100mm
ALIMENTACION A SERVICIOS
Cable THW - 2x4mm2 + 1x10mm (T) (alimentador principal)
Cable 2-1 x 2.5mm TW-Φ 20 mm (alumbrado)
Cable 2-1 x 4.0mm +1 x 2.5 TW-Φ 20 mm (tomacorriente)
INTERRUPTORES
Interruptor Termomagnetico 2x25A
Interruptor Diferencial 2x25A
OBRAS PROVISIONALES
Oficina
Almacen
Guardiania
Servicios Higienicos
Cerco Provisional del Obra
Agua para la Construccion (Instalacion)
Energia para La Construccion (Instalacion)
TRABAJOS PRELIMINARES
Limpieza de Terreno (manual)
Trazo y Replanteo Preliminar
Yeso de 28 kg.
Estacas de madera de 2"x2"x1.2m
Pintura Esmalte Sintetico
Movilizacion de Equipos y Herramientas
MOVIMIENTO DE TIERRAS
Excavacion de Zapatas
Excavacion de Cimiento Corrido
Excavacion de Vigas de Cimentacion
Excavacion de Cisterna
Excavacion de Base de Escaleras
Eliminacion de Material Excendente
Mejoramiento con Piedra del Rio 6"(0.20 cm)
Piedra de Rio 6"
Afirmado compactado en zapatas (0.15cm)
Afirmado
Zapatas
Concreto fc=210 Kg/cm2
Cemento Portland Tipo 1
Piedra Chancada de 1/2
Arena Gruesa de rio
Encofrado y Desencofrado de Zapatas
5.01.03 Acero de Refuerso en Zapatas
Fierro de 1/2
Alambre Negro N° 16
Sobrecimiento
Concreto fc=175 Kg/cm2
Cemento Portland Tipo 1
Piedra Chancada de 1/2
Arena Gruesa de rio
Encofrado y Desencofrado de Sobrecimiento
Clavos para madera C/C 1 1/2"
Alambre Negro N° 8
Vigas de Cimentacion
Concreto fc=210 Kg/cm2
Cemento Portland Tipo 1
Piedra Chancada de 1/2
Arena Gruesa de rio
Encofrado y Desencofrado
Clavos para madera C/C 1 1/2"
Alambre Negro N° 8
Acero de Refuerso en Vigas de Cimentacion
Fierro de 1/2
Fierro de 1/4
Alambre Negro N° 16
Columnas
Concreto fc=175 Kg/cm2
Cemento Portland Tipo 1
Piedra Chancada de 1/2
Arena Gruesa de rio
Encofrado y Desencofrado
Clavos para madera C/C 1 1/2"
Alambre Negro N° 8
Acero de Refuerso
Fierro de 1/4
Fierro de 3/8
Fierro de 1/2
Fierro de 5/8
Alambre Negro N° 16
Vigas
Concreto fc=175 Kg/cm2
Cemento Portland Tipo 1
Piedra Chancada de 1/2
Arena Gruesa de rio
Encofrado y Desencofrado
Clavos para madera C/C 1 1/2"
Alambre Negro N° 8
Acero de Refuerso
Fierro de 1/4
Fierro de 3/8
Fierro de 1/2
Fierro de 5/8
Alambre Negro N° 16
Losas Aligeradas
Concreto fc= 175 Kg/cm2
Cemento Portland Tipo 1
Piedra Chancada de 1/2
Arena Gruesa de rio
Encofrado y Desencofrado
Clavos para madera C/C 3"
Alambre Negro N° 8
Acero de Refuerso
Fierro de 1/4
Fierro de 1/2
Alambre Negro N° 16
Ladrillo 15x30x30
Ladrillo 12x30x30
Cisterna
Concreto fc=210 Kg/cm2
Cemento Portland Tipo 1
Piedra Chancada de 1/2
Arena Gruesa de rio
Encofrado y Desencofrado
Clavos para madera C/C 3"
Alambre Negro N° 8
Acero de Refuerso
Fierro de 1/2
Alambre Negro N° 16
Escaleras
Concreto fc=210 Kg/cm2
Cemento Portland Tipo 1
Piedra Chancada de 1/2
Arena Gruesa de rio
Encofrado y Desencofrado
Clavos para madera C/C 3"
Alambre Negro N° 8
Acero de Refuerso
Fierro de 3/8
Fierro de 1/2
Alambre Negro N° 16
CEL
dis.arquitectura.const@gmail.com / yvan_nove@hotm
Mz. "I" Lt. 04 - Urb. Monserrate - TRUJILLO / Calle Tacna N° 33
ELABORACION DE PROYECTOS ARQUITECTONICOS Y EXPEDIENTES TECNICOS / METRADOS Y PRESUPUESTOS / LICENCIAS DE CONSTRUCCION / DIRECCION Y SUPERVISIO
PRESUPUESTO - MATERIALES
PROYECTO: VIVIENDA MULTIFAMILIAR
DIRECCION: URB. BARRIO C. HURTADO MILLER MZ. "I" LT. 11 - DISTRIDO DE BAÑOS DEL INCA / CAJAMARCA
PROPIETARIO: SR. FREDDY MEZA Y ESPOSA.
FECHA: FEBRERO DEL 2012
ARQUITECTURA
METRADO
ITEM DESCRIPCION UND.
1° Piso 2° Piso 3° Piso 4° Piso
1.00 MANPOSTERIA
1.01 Muros de Ladrillo KK dearcilla de Soga M2 300.56 421.52 381.16 326.16
Arena Gruesa de Rio M3 9.0168 12.6456 11.4348 9.7848
Ladrillo KK de arcilla UND 11421.28 16017.76 14484.08 12394.08
Cemento Portland Tipo I BLS 66.1232 92.7344 83.8552 71.7552
1.02 Trazos y nivelacion durante los trabajos GLB 1.00 1.00 1.00 1.00
5.00 COBERTURAS
5.01 Policarbonato Alveolar GLB − − − 3
5.02 Cobertura de Teja Serrana en Perimetro M2 − − − 16.01
7.00 CERRAJERIA
7.01 Bisagra capuchina de 3 1/2" x 3 1/2" UND 32 72 64 36
7.02 Bisagra aluminizada capuchina de 3" x 3" UND 16 8 12 4
7.03 Cerradura para puerta principal pesada UND 4 2 3 1
7.04 Cerradura p/baño seguro interno perilla manija cerradura go UND 2 5 4 4
7.05 Cerradura p/interior pestillo manija llave goal 53 NPS UND 6 13 12 5
10.00 PINTURA
10.01 Muros Interiores - Pintura Oleo M2 250.12 456.08 375.36 418.48
Pintura Oleo Mate GAL 11.26 20.52 16.89 18.83
Pintura imprimante para muros GAL 32.52 59.29 48.80 54.40
10.02 Muros Exteriores - Fachada - Pintura Latex M2 33.34 151.96 151.96 −
Sellador blanco para muros GAL 1.67 7.60 7.60 −
Lija de fierro N° 80 PZA 33.34 151.96 151.96 −
Pintura latex sintetico GAL 1.67 7.60 7.60 −
10.03 Columnas - Pintura Oleo M2 104.26 104.26 116.74 72.88
Pintura Oleo Mate GAL 4.69 4.69 5.25 3.28
Pintura imprimante para muros GAL 13.55 13.55 15.18 9.47
10.04 Vigas - Pintura Oleo M2 194.93 194.93 194.93 60.5
Pintura Oleo Mate GAL 8.77 8.77 8.77 2.72
Pintura imprimante para muros GAL 25.34 25.34 25.34 7.87
10.05 Cielo Raso - Pintura Oleo M2 157.00 152.00 147.00 81.4
Pintura Oleo Mate GAL 7.07 6.84 6.62 3.66
Pintura imprimante para muros GAL 20.41 19.76 19.11 10.58
TOTAL
ELABORADO POR:
PARCIAL
METRADO C.U. (S/) TOTAL (S/)
1429.40 − −
42.88 65.00 2787.33
54317.20 0.42 22813.22 32518.85
314.47 22.00 6918.30
4.00 − −
1500.04 − −
150.00 22.00 3300.09
27.00 60.00 1620.04
337.26 − −
33.73 22.00 741.97
6.07 60.00 364.24
398.14 − −
39.81 22.00 875.91
7.17 60.00 429.99
645.29 − −
64.53 22.00 1419.64 11608.05
11.62 60.00 696.91
537.40 − −
53.74 22.00 1182.28
9.67 60.00 580.39
50.11 − −
5.01 22.00 110.24
0.90 60.00 54.12
70.80 − −
7.08 22.00 155.76
1.27 60.00 76.46
199.36 − −
119.62 22.00 2631.55
10.96 65.00 712.71
13.96 55.00 767.54
72.74 − −
32.73 22.00 720.13
2.18 65.00 141.84
2.18 55.00 120.02
100.95 − −
45.43 22.00 999.41
3.03 65.00 196.85
3.03 55.00 166.57
540.18 − −
216.07 18.00 3889.30
38534.31
37.81 65.00 2457.82
30.85
10.85 75.00 813.75
24.00 90.00 2160.00
52.76 − −
8.97 22.00 197.32
54.34 31.00 1684.63
41.15 6.00 246.92
35.91 − −
6.10 22.00 134.30
36.99 42.00 1553.47
12.78 6.00 76.66
258.41 33.00 8527.53
136.00 76.00 10336.00
277.57 − −
47.19 22.00 1038.11
285.90 31.00 8862.81
216.50 6.00 1299.03
15.02 − −
2.55 22.00 56.17
15.47 25.00 386.77 29418.77
11.72 6.00 70.29
75.10 24.00 1802.40
117.68 − −
25.89 22.00 569.57
2.47 60.00 148.28
562.42 27.00 15185.34
26 380.00 9880.00
30 380.00 11400.00
68628.00
38.68 1100.00 42548.00
4 1200.00 4800.00
1500.04 − −
67.50 54.00 3645.10
195.01 35.00 6825.18
337.26 − −
16.86 12.45 209.94
337.26 1.70 573.34
16.86 32.50 548.05
398.14 − −
22835.81
17.92 54.00 967.48
51.76 35.00 1811.54
645.29 − −
29.04 54.00 1568.05
83.89 35.00 2936.07
537.40 − −
24.18 54.00 1305.88
69.86 35.00 2445.17
2.17 − −
20.18 22.00 443.98
1.74 55.00 95.48
1.09 65.00 70.53
23.42 − −
894.22
3.51 4.00 14.05
7.03 4.00 28.10
120.00 − −
13.33 16.00 213.28
7.20 4.00 28.80
S/. 262,747.58
ELABORADO POR:
INSTALACIONES SANITARIAS
METRADO PARCIAL
ITEM DESCRIPCION UND. TOTAL C.U. (S/) TOTAL (S/)
1° Piso 2° Piso 3° Piso 4° Piso
3.00 VALVULAS
3.01 Valvula de compuerta de 3/4 UND 5.00 − − − 5.00 − −
Cinta Teflon UND 5.00 − − − 5.00 0.84 4.20
Union Universal DE Fo. GALV. DE 1" UND 10.00 − − − 10.00 5.46 54.60
Niple F°G° Ø 1" x 3" UND 10.00 − − − 10.00 2.10 21.00
Valvula Esferica DE Ø 3/4"" - Pesada UND 5.00 − − − 5.00 60.00 300.00
3.02 Valvula de compuerta de 1/2 UND 11.00 16 14 12 53.00 − −
Cinta Teflon UND 11.00 16.00 14.00 12.00 53.00 0.84 44.52
Union Universal DE Fo. GALV. DE 1/2" UND 22.00 32.00 28.00 24.00 106.00 4.20 445.20 4589.60
Niple F°G° Ø 1/2" x 2" UND 22.00 32.00 28.00 24.00 106.00 1.68 178.08
Valvula Esferica DE Ø 1/2" - Pesada UND 11.00 16.00 14.00 12.00 53.00 55.00 2915.00
3.03 Valvula check UND 5.00 − − − 5.00 − −
Union universal de Fo. Galv. de 1/2" UND 10.00 − − − 10.00 4.20 42.00
Adaptador PVC SAP 1/2" UND 10.00 − − − 10.00 3.50 35.00
Valvula check 1/2" UND 5.00 − − − 5.00 93.00 465.00
3.04 Boya para cisternas UND 5.00 − − − 5.00 17.00 85.00
5375.61
Tub. PVC SAP 3/4" UND 36.00 − − − 36.00 8.4 302.40
4.03 Salida de Agua Caliente 1/2 PTO 5.00 10 9 7 31.00 − −
Pegamento para Tub. CPVC 100 ml UND 0.76 1.51 1.36 1.06 4.69 5.04 23.65 5375.61
Codo de FoGo 1/2" UND 5.00 10.00 9.00 7.00 31.00 1.68 52.08
Codode 90° CPVC 1/2" UND 5.00 10.00 9.00 7.00 31.00 1.26 39.06
Tub. CPVC 1/2" ML 10.00 20.00 18.00 14.00 62.00 19.33 1198.46
4.04 Tuberia PVC 1/2 ML 23.57 28.9 33.45 34.54 120.46 − −
Cinta teflon UND 2.36 2.89 3.35 3.45 12.05 0.84 10.12
Tub. PVC SAP 1/2" ML 24.75 30.35 35.12 36.27 126.48 2.02 255.50
4.05 Tuberia PVC 3/4 ML 79.76 14.76 14.76 24.65 133.93 − −
Cinta teflon UND 7.98 1.48 1.48 2.47 13.39 0.84 11.25
Tub. PVC SAP 3/4" ML 83.75 15.50 15.50 25.88 140.63 2.86 402.19
4.06 Tuberia CPVC 1/2 ML 22.13 27.76 32.53 31.43 113.85 − −
Pegamento para Tub. CPVC 100 ml UND 0.22 0.28 0.33 0.31 1.14 5.04 5.74
Tub. CPVC 1/2" ML 22.13 27.76 32.53 31.43 113.85 19.33 2200.72
6.00 OTROS
6.01 Therma 12 lts. - A GAS UND 2 1 − 2 5 2100.00 10500.00
6.02 Electrobomba 0.5 hp UND 5 − − − 5 450.00 2250.00 17250.00
6.03 Tanque Elevado 1100 lts. UND − − − 5 5 900.00 4500.00
7.00 ACCESORIOS
7.01 Codo 4"x90° PZA 8 5 5 2 20 21.00 420.00
7.02 Codo 2"x90° PZA 14 11 18 9 52 6.72 349.44
7.03 Codo 2"x45° PZA 1 5 2 1 9 7.56 68.04
7.04 Codo 4"x45° PZA 3 1 2 2 8 21.00 168.00
7.05 Codo con Reduccion 4"-2" PZA 1 0 0 2 3 15.00 45.00
7.06 Yee simple 2" PZA 7 0 3 1 11 2.52 27.72
2554.17
7.07 Yee simple 4" PZA 6 2 2 1 11 19.00 209.00
7.08 Yee simple de 4"-2" PZA 9 17 11 9 46 15.00 690.00
7.09 Tee sanitaria de 4" PZA 3 9 8 7 27 8.40 226.80
7.10 Trampa P 2" PZA 7 12 9 7 35 8.00 280.00
7.11 Tee de 4"-2" PZA 0 2 2 0 4 15.00 60.00
7.12 Pegamento para PVC - accesorios PZA 0.18 0.19 0.19 0.12 0.678 15.00 10.17
ELABORACION DE PROYECTOS ARQUITECTONICOS Y EXPEDIENTES TECNICOS / METRADOS Y PRESUPUESTOS / LICENCIAS DE CONSTRUCCION / DIRECCION Y SUPERVISION DE OBRAS DE EDIFICACION
PRESUPUESTO - MATERIALES
INSTALACIONES ELECTRICAS
METRADO PARCIAL
ITEM DESCRIPCION UND. TOTAL C.U. (S/) TOTAL (S/)
1° Piso 2° Piso 3° Piso 4° Piso
3.00 CAJAS
3.01 Caja de Pase FºGº 300mm x 200mm UND 2 2 2 2 8.00 45.00 360.00
395.00
3.02 Caja de Pase FºGº 100mm x100mm UND 1 0 0 0 1.00 35.00 35.00
6.00 INTERRUPTORES
6.01 Interruptor Termomagnetico 2x25A UND 5 − − − 5.00 120.00 600.00
1700.00
6.02 Interruptor Diferencial 2x25A UND 3 2 2 3 10.00 110.00 1100.00
8.00 VARIOS
8.01 Banco de Medidores UND 1.00 − − − 1.00 800.00 800.00
8.02 Pozo puesta a Tierra UND 2.00 − − − 2.00
Tierra de chacra o vegetal M3 3.00 − − − 3.00 25.00 75.00
Thor gel caja X 5kg UND 4.00 − − − 4.00 70.00 280.00
Conductor desnudo DE 16mm2 ML 24.00 − − − 24.00 8.45 202.80
Conector tipo AB 5/8" PZA 4.00 − − − 4.00 5.00 20.00
Caja de conexión simple P/TOMA TIERRA UND 2.00 − − − 2.00 25.00 50.00
Varilla de cobre COPERWELD 5/8" X 2.40 m PZA 2.00 − − − 2.00 124.00 248.00
8.03 Intercomunicador Principal UND 1.00 − − − 1.00 350.00 350.00 16205.80
8.04 Luces de Emergencia UND 1.00 1 1 1 4.00 120.00 480.00
8.05 Intercomunicador Termomagnetico y Automatico (electrob UND 5.00 − − − 5.00 140.00 700.00
8.06 Istalacion de Mecanismo Levantapuertas UND 5.00 − − − 5.00 380.00 1900.00
8.07 Suministro e Inst. Mecanismo Levantapuertas UND 5.00 − − − 5.00 1600.00 8000.00
8.08 Acometida Electrica UND 1.00 − − − 1.00
Caja F1 UND 5.00 − − − 5.00 180.00 900.00
Caja para medidor UND 5.00 − − − 5.00 100.00 500.00
Medidor trifasico 380 UND 5.00 − − − 5.00 340.00 1700.00
ELABORACION DE PROYECTOS ARQUITECTONICOS Y EXPEDIENTES TECNICOS / METRADOS Y PRESUPUESTOS / LICENCIAS DE CONSTRUCCION / DIRECCION Y SUPERVISION DE OBRAS DE EDIFICACION
HOJA RESUMEN
PROYECTO: VIVIENDA MULTIFAMILIAR
DIRECCION: URB. BARRIO C. HURTADO MILLER MZ. "I" LT. 11 - DISTRIDO DE BAÑOS DEL INCA / CAJAMARCA
PROPIETARIO: SR. FREDDY MEZA Y ESPOSA.
FECHA: FEBRERO DEL 2012
S/. 610.8690
VALOR DE LA CONSTRUCCION POR M2
$ 226.2478
dis.arquitectura.const@gmail.com / yvan_nov
Mz. "I" Lt. 04 - Urb. Monserrate - TRUJILLO / C
ELABORACION DE PROYECTOS ARQUITECTONICOS Y EXPEDIENTES TECNICOS / METRADOS Y PRESUPUESTOS / LICENCIAS DE CONSTRUCCION / DIRECCION Y SUPERV
CUADRO DE AREAS POR DEPARTAMENTO
PROYECTO: VIVIENDA MULTIFAMILIAR
DIRECCION: URB. BARRIO C. HURTADO MILLER MZ. "I" LT. 11 - DISTRIDO DE BAÑOS DEL INCA / CAJAMARCA
PROPIETARIO: SR. FREDDY MEZA Y ESPOSA.
FECHA: FEBRERO DEL 2012
PISOS AREA
DESCRIPCION HABITABLE AREA LIBRE
1 2 3 4
PISOS AREA
DESCRIPCION AREA LIBRE
1 2 3 4 HABITABLE
NUMERO DE ESTACIONAMIENTOS
DESCRIPCION AREA TOTAL
1 2 3 4 5
CROQUIS MULTIFAMILIAR
E
4° Piso D2 S F2
C
3° Piso D2 A F3
L
E
D1 R F2
A
S
C
A
L
E
2° Piso D1 R F2
A
1° Piso D1 F1
DESCRIPCIÓN:
El Edificio Multifamiliar esta conformado por cinco departamentos; dos duplex: el primero se ubica en el primero y segundo piso, el segundo se ubica en los pisos tres y cuatro
azotea en el cuarto piso.
Ademas tiene tres departamentos Flats, los cuales se reparten de la siguiente manera: el primero es un minidepartamento ubicado en el primer nivel, el segundo se ubica en
de tendal y azotea en el nivel cuatro, y el tercero se ubica en el nivel tres. teniendo tambien un area de tendal y azotea en el nivel cuatro.
ELABORADO POR:
CA / CAJAMARCA
57.64
705.90
42.73
OBSERVACIONES
F3
F3
F2
F2
F1
o, el segundo se ubica en los pisos tres y cuatro, ademas consta de un area de tendal y
ado en el primer nivel, el segundo se ubica en el nivel dos, teniendo ademas un area
vel cuatro.
CEL
dis.arquitectura.const@gmail.com / yvan_nove@hotma
Mz. "I" Lt. 04 - Urb. Monserrate - TRUJILLO / Calle Tacna N
ELABORACION DE PROYECTOS ARQUITECTONICOS Y EXPEDIENTES TECNICOS / METRADOS Y PRESUPUESTOS / LICENCIAS DE CONSTRUCCION / DIRECCION Y SUPERVISIO
METRADO
ITEM DESCRIPCION UND.
1° Piso 2° Piso 3° Piso 4° Piso
TOTAL OBSERVACIONES
10.00
55.00
2.00
1.18
280.00
3696.52
249.35
242.14
66.24
16.04
0.7
713.43
940.13
763.49
387.9
202.16
102.27
608.83
1294.72
3798.48
678.06
54316.6
297.4
334.24
36.99
15.48
75.1
26
30
204
40
10
58
36
138.23
400.51
16.87
182.2
337.26
15
8.00
6.00
5.00
9.00
4.00
4.00
9.00
14.00
14.00
14.00
10.00
1.00
6.00
84.00
31.00
114.00
52.00
27.00
8
3.00
11
11.00
46
4.00
44
10.00
1.00
37
72
17
10.00
10.00
106.00
5.00
53.00
5.00
116.00
63.00
87.21
5.00
3.68
5.83
162.63
175.85
232.49
266.45
66.00
250.95
18.00
5.00
2.00
1.00
2.00
4.00
5.00
5.00
120.00
239.00
140.00
8.00
1.00
80.00
16.00
12.00
131.00
1115.36
86.40
197.90
45.35
718.00
43.00
10.00
441.41
570.93
5.00
10.00
5.00
1.00
30
12.00
16.00
96.00
16.00
8.00
8.00
4.00
5.00
5.00
5.00
ZAPATAS L A H CANT. T. EXCAV.
Z-1 1.2 1.2 1.75 12 30.24 17.28
Z-2 1.5 1.5 1.75 12 47.25 27
Z-3 1 1 1.75 2 3.5 2
Z-4 1.2 2.2 1.75 1 4.62 2.64
5.9 85.61 48.92
CANTIDAD ALTU
COLUMNAS AREA
1 2 3 4 1
C1 21 23 23 0 0.1225
C2 1 1 1 1 0.0525
C3 1 0 0 1 0.0375
C4 1 1 1 1 0.0825 2.6
C5 1 1 1 1 0.0899
C6 3 2 2 2 0.1598
C7 0 0 4 18 0.09
0.6347
CANTIDAD ALTU
COLUMNAS PERIMETRO
1 2 3 4 1
C1 21 23 23 0 1.40
C2 1 1 1 1 1.00
C3 1 0 0 1 0.80
C4 1 1 1 1 1.40 2.6
C5 1 1 1 1 1.50
C6 3 2 2 2 2.00
C7 0 0 4 18 1.20
PRIMER PISO
LONGITUDES
COLUMNAS Φ N° COLUM. N° VARILLAS LONG.
1/4 3/8
3/8 21 29 1.36 828.24
C1 1/2 21 2 4.3
5/8 21 6 4.3
1/4 1 29 0.98 28.42
C2
C2
1/2 1 6 4.3
1/4 1 29 0.76 22.04
C3
1/2 1 6 4.3
1/4 1 58 0.98 56.84
C4
1/2 1 29 4.3
1/4 1 29 1.46 42.34
C5
1/2 1 10 4.3
1/4 3 29 1.96 170.52
C6
1/2 3 12 4.3
C7
320.16 828.24
80.04 463.8144
SEGUNDO PISO
LONGITUDES
COLUMNAS Φ N° COLUM. N° VARILLAS LONG.
1/4 3/8
3/8 23 22 1.36 688.16
C1 1/2 23 2 2.8
5/8 23 6 4.3
1/4 1 22 0.98 21.56
C2
1/2 1 6 2.8
1/4 0 22 0.76 0
C3
1/2 0 6 2.8
1/4 1 44 0.98 43.12
C4
1/2 1 12 2.8
1/4 1 22 1.46 32.12
C5
1/2 1 10 2.8
1/4 2 22 1.96 86.24
C6
1/2 2 12 2.8
C7
183.04 688.16
45.76 385.3696
TERCER PISO
LONGITUDES
COLUMNAS Φ N° COLUM. N° VARILLAS LONG.
1/4 3/8
3/8 23 22 1.36 688.16
C1 1/2 23 2 2.8
5/8 23 6 4.3
1/4 1 22 0.98 21.56
C2
1/2 1 6 2.8
1/4 0 22 0.76 0
C3
1/2 0 6 2.8
1/4 1 44 0.98 43.12
C4
1/2 1 12 2.8
1/4 1 22 1.46 32.12
C5
1/2 1 10 2.8
1/4 2 22 1.96 86.24
C6
1/2 2 12 2.8
1/4 4 22 1.24 109.12
C7
1/2 4 4 2.8
292.16 688.16
73.04 385.3696
CUARTO PISO
LONGITUDES
COLUMNAS Φ N° COLUM. N° VARILLAS LONG.
1/4 3/8
3/8 0 22 1.36 0
C1 1/2 0 2 2.8
5/8 0 6 4.3
1/4 1 22 0.98 21.56
C2
1/2 1 6 2.8
1/4 1 22 0.76 16.72
C3
1/2 1 6 2.8
1/4 1 44 0.98 43.12
C4
1/2 1 12 2.8
1/4 1 22 1.46 32.12
C5
1/2 1 10 2.8
1/4 2 22 1.96 86.24
C6
1/2 2 12 2.8
1/4 18 22 1.24 491.04
C7
1/2 18 4 2.8
690.8 0
172.7 0
LONG COEF KG
CISTERNA 573 0.99 567.27
ALTURA ENCOFRADO
2 3 4 1 2 3 4
76.44 83.72 83.72 0.00
2.60 2.60 2.60 2.40
2.08 0.00 0.00 2.08
2.6 2.6 2.4 3.64 3.64 3.64 3.36
3.90 3.90 3.90 3.60
15.60 10.40 10.40 9.60
0.00 0.00 12.48 51.84
104.26 104.26 116.74 72.88
LONGITUDES
1/2 5/8
180.6
541.8
25.8
25.8
124.7
43
154.8
554.7 541.8
549.153 839.79 1932.80
LONGITUDES
1/2 5/8
128.8
593.4
16.8
33.6
28
67.2
274.4 593.4
271.656 919.77 1622.56
LONGITUDES
1/2 5/8
128.8
593.4
16.8
33.6
28
67.2
44.8
274.4 593.4
271.656 919.77 1649.84
LONGITUDES
1/2 5/8
0
0
16.8
16.8
33.6
28
67.2
201.6
162.4 0
160.776 0 333.48
LONGITUDES
1/2 5/8
101.2
32.36
28.4
10.6
37.2
92.4
32.36
101.2
32.36
37.8
37.8
37.8
37.8
39
23.6
39
39
283.08 476.8
280.2492 739.04 1748.34
198.156 333.76
196.17444 517.328 1223.84