PROYECTO : "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO RURAL EN EL CASERIO DE SOLUGAN, DISTRITO DE TACABAMBA-CHOTA-CAJAMARCA", CUI:2372080
01.03 SEGURIDAD Y SALUD EN OBRA E IMPLEMENTACION DE PROTOCOLO COVID-19 S/79,999.70 S/14,820.82 S/22,354.07 S/22,354.07 S/20,470.75
01.03.01 SEGURIDAD EN OBRA glb 1.00 S/32,916.90 S/32,916.90 S/8,229.23 S/8,229.23 S/8,229.23 S/8,229.23
01.03.02 PLAN PARA LA VIGILANCIA, PREVENCION Y CONTROL DE COVID-19 - OBRA S/40,473.20 S/5,666.25 S/12,141.96 S/12,141.96 S/10,523.03
01.03.02.01 RESPONSABLES DE SEGURIDAD DE SALUD DE LOS TRABAJADORES glb 1.00 S/18,000.00 S/18,000.00 S/2,520.00 S/5,400.00 S/5,400.00 S/4,680.00
EQUIPAMIENTO, IMPLEMENTOS E INSUMOS PARA LA PREVENCION DEL COVID-
01.03.02.02 glb 1.00 S/19,933.20 S/19,933.20 S/2,790.65 S/5,979.96 S/5,979.96 S/5,182.63
19
01.03.02.03 SEÑALIZACION Y CAPACITACION glb 1.00 S/2,540.00 S/2,540.00 S/355.60 S/762.00 S/762.00 S/660.40
PLAN PARA LA VIGILANCIA, PREVENCION Y CONTROL DE COVID-19 -
01.03.03 S/6,609.60 S/925.34 S/1,982.88 S/1,982.88 S/1,718.50
SUPERVISIÓN
EQUIPAMIENTO, IMPLEMENTOS E INSUMOS PARA LA PREVENCION DEL COVID-
01.03.03.01 glb 1.00 S/6,609.60 S/6,609.60 S/925.34 S/1,982.88 S/1,982.88 S/1,718.50
19
01.04 FLETE S/384,840.00 S/300,480.00 S/42,180.00 S/42,180.00 S/0.00
01.04.01 FLETE TERRESTRE glb 1.00 S/258,300.00 S/258,300.00 S/258,300.00
01.04.02 FLETE RURAL glb 1.00 S/126,540.00 S/126,540.00 S/42,180.00 S/42,180.00 S/42,180.00
02 SOLUGAN S/1,766,915.10 S/247,368.11 S/530,074.53 S/530,074.53 S/459,397.93
02.01 SISTEMA DE AGUA POTABLE S/893,747.84 S/125,124.70 S/268,124.35 S/268,124.35 S/232,374.44
02.01.01 CAPTACION TIPO LADERA (01 UND) S/13,339.52 S/1,867.53 S/4,001.86 S/4,001.86 S/3,468.28
02.01.01.01 TRABAJOS PRELIMINARES S/184.87 S/25.88 S/55.46 S/55.46 S/48.07
02.01.01.01.01 DEMOLICION DE ESTRUCTURAS m3 2.53 S/34.57 S/87.46 S/12.24 S/26.24 S/26.24 S/22.74
02.01.01.01.02 LIMPIEZA DE TERRENO MANUAL m2 24.60 S/0.69 S/16.97 S/2.38 S/5.09 S/5.09 S/4.41
02.01.01.01.03 TRAZO Y REPLANTEO DE OBRA m2 24.60 S/3.27 S/80.44 S/11.26 S/24.13 S/24.13 S/20.91
02.01.01.02 MOVIMIENTO DE TIERRAS S/1,043.06 S/146.03 S/312.92 S/312.92 S/271.20
02.01.01.02.01 MOVIMIENTO DE TIERRAS PARA ESTRUCTURAS S/412.36 S/57.73 S/123.71 S/123.71 S/107.21
02.01.01.02.01.01 EXCAVACION MANUAL PARA ESTRUCTURA EN TERRENO NORMAL m3 5.26 S/39.50 S/207.77 S/29.09 S/62.33 S/62.33 S/54.02
02.01.01.02.02.03 CAMA DE APOYO PARA TUBERIA TODA PROFUNDIDAD TERRENO NORMAL m 12.00 S/3.96 S/47.52 S/6.65 S/14.26 S/14.26 S/12.36
02.01.01.03.03 ENCOFRADO Y DESENCOFRADO PARA ZANJAS DE CORONACION m2 9.84 S/30.55 S/300.61 S/42.09 S/90.18 S/90.18 S/78.16
02.01.01.03.04 CONCRETO F'C 140 KG/CM2, P / LOSA DE TECHO AFLORAMIENTO m3 0.77 S/376.60 S/289.98 S/40.60 S/86.99 S/86.99 S/75.39
02.01.01.03.05 ENCOFRADO Y DESENCOFRADO PARA LOSA DE TECHO AFLORAMIENTO m2 1.47 S/30.55 S/44.91 S/6.29 S/13.47 S/13.47 S/11.68
02.01.01.03.06 ASENTADO DE PIEDRA F'C=140KG/CM2 + 30 % PM. m2 0.25 S/35.58 S/8.90 S/1.25 S/2.67 S/2.67 S/2.31
02.01.01.03.07 MATERIAL IMPERMEABLE (LECHADA DE CEMENTO) m3 0.45 S/408.87 S/183.99 S/25.76 S/55.20 S/55.20 S/47.84
CONCRETO CICLOPEO f'c=140 kg/cm2 + 30 % PM. (RELLENO EN
02.01.01.03.08 m3 3.89 S/320.45 S/1,246.55 S/174.52 S/373.97 S/373.97 S/324.10
AFLORAMIENTO)
02.01.01.04 OBRAS DE CONCRETO ARMADO S/3,108.99 S/435.26 S/932.70 S/932.70 S/808.34
02.01.01.04.01 PROTECCION DE AFLORAMIENTO S/886.67 S/124.13 S/266.00 S/266.00 S/230.53
02.01.01.04.01.01 MUROS REFORZADOS S/886.67 S/124.13 S/266.00 S/266.00 S/230.53
02.01.01.04.01.01.01 CONCRETO F'C 210 KG/CM2 P/ MUROS REFORZADOS m3 0.94 S/429.50 S/403.73 S/56.52 S/121.12 S/121.12 S/104.97
02.01.01.04.01.01.02 ENCOFRADO\DESENCOFRADO NORMAL MURO REFORZADO m2 12.95 S/30.55 S/395.62 S/55.39 S/118.69 S/118.69 S/102.86
02.01.01.04.01.01.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 16.76 S/5.21 S/87.32 S/12.22 S/26.20 S/26.20 S/22.70
02.01.01.04.02 CAMARA HUMEDA S/1,759.92 S/246.39 S/527.98 S/527.98 S/457.58
02.01.01.04.02.01 LOSA DE FONDO S/351.07 S/49.15 S/105.32 S/105.32 S/91.28
02.01.01.04.02.01.01 CONCRETO F'C=210 KG/CM2, P/LOSA DE FONDO m3 0.56 S/429.50 S/240.52 S/33.67 S/72.16 S/72.16 S/62.54
02.01.01.04.02.01.02 ENCOFRADO Y DESENCOFRADO PARA LOSAS DE FONDO PISO m2 0.96 S/30.55 S/29.33 S/4.11 S/8.80 S/8.80 S/7.63
02.01.01.04.02.01.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 15.59 S/5.21 S/81.22 S/11.37 S/24.37 S/24.37 S/21.12
02.01.01.04.02.02 MURO REFORZADO S/1,207.78 S/169.09 S/362.33 S/362.33 S/314.02
02.01.01.04.02.02.01 CONCRETO F'C=210 KG/CM2, P/MURO REFORZADO m3 1.09 S/429.50 S/468.16 S/65.54 S/140.45 S/140.45 S/121.72
02.01.01.04.02.02.02 ENCOFRADO\DESENCOFRADO NORMAL MURO REFORZADO m2 14.16 S/30.55 S/432.59 S/60.56 S/129.78 S/129.78 S/112.47
02.01.01.04.02.02.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 58.93 S/5.21 S/307.03 S/42.98 S/92.11 S/92.11 S/79.83
02.01.01.04.02.03 LOSA DE TECHO S/201.07 S/28.15 S/60.32 S/60.32 S/52.28
02.01.01.04.02.03.01 CONCRETO F'C 210 KG/CM2, P/LOSA DE TECHO m3 0.19 S/429.50 S/81.61 S/11.43 S/24.48 S/24.48 S/21.22
02.01.01.04.02.03.02 ENCOFRADO Y DESENCOFRADO PARA LOSAS DE TECHO m2 2.13 S/30.55 S/65.07 S/9.11 S/19.52 S/19.52 S/16.92
02.01.01.04.02.03.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 10.44 S/5.21 S/54.39 S/7.61 S/16.32 S/16.32 S/14.14
02.01.01.04.03 CAMARA SECA S/462.40 S/64.74 S/138.72 S/138.72 S/120.22
02.01.01.04.03.01 LOSA DE FONDO S/122.45 S/17.14 S/36.74 S/36.74 S/31.84
02.01.01.04.03.01.01 CONCRETO F'C=210 KG/CM2, P/LOSA DE FONDO m3 0.14 S/429.50 S/60.13 S/8.42 S/18.04 S/18.04 S/15.63
02.01.01.04.03.01.02 ENCOFRADO Y DESENCOFRADO PARA LOSAS DE FONDO PISO m2 0.57 S/30.55 S/17.41 S/2.44 S/5.22 S/5.22 S/4.53
02.01.01.04.03.01.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 8.62 S/5.21 S/44.91 S/6.29 S/13.47 S/13.47 S/11.68
02.01.01.04.03.02 MURO REFORZADO S/250.83 S/35.12 S/75.25 S/75.25 S/65.22
02.01.01.04.03.02.01 CONCRETO F'C=210 KG/CM2, P/MURO REFORZADO m3 0.17 S/429.50 S/73.02 S/10.22 S/21.91 S/21.91 S/18.99
02.01.01.04.03.02.02 ENCOFRADO\DESENCOFRADO NORMAL MURO REFORZADO m2 3.24 S/30.55 S/98.98 S/13.86 S/29.69 S/29.69 S/25.73
02.01.01.04.03.02.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 15.13 S/5.21 S/78.83 S/11.04 S/23.65 S/23.65 S/20.50
02.01.01.04.03.03 LOSA DE TECHO S/89.12 S/12.48 S/26.74 S/26.74 S/23.17
02.01.01.04.03.03.01 CONCRETO F'C 210 KG/CM2, P/LOSA DE TECHO m3 0.06 S/429.50 S/25.77 S/3.61 S/7.73 S/7.73 S/6.70
CALENDARIO DE AVANCE DE OBRA VALORIZADO
PROYECTO : "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO RURAL EN EL CASERIO DE SOLUGAN, DISTRITO DE TACABAMBA-CHOTA-CAJAMARCA", CUI:2372080
02.01.01.05.02 TARRAJEO INTERIOR CON IMPERMEABILIZANTE C:A 1:3, e=2.0 cm m2 11.17 S/30.48 S/340.46 S/47.66 S/102.14 S/102.14 S/88.52
02.01.01.06.01 SUMINISTRO Y COLOCACION DE MATERIAL FILTRANTE DE 1" - 3/4" m3 1.58 S/79.08 S/124.95 S/17.49 S/37.49 S/37.49 S/32.49
02.01.01.06.02 SUMINISTRO Y COLOCACION DE MATERIAL FILTRANTE DE 1 1/2" - 2" m3 0.37 S/79.08 S/29.26 S/4.10 S/8.78 S/8.78 S/7.61
02.01.01.07.01.01 SUMINISTRO E INSTALACION DE CANASTILLA DE BRONCE DE D=2" und 1.00 S/108.06 S/108.06 S/15.13 S/32.42 S/32.42 S/28.10
02.01.01.07.01.02 SUMINISTRO E INSTALACION DE UNION ROSCADA DE Fº G° D= 1" und 2.00 S/26.46 S/52.92 S/7.41 S/15.88 S/15.88 S/13.76
02.01.01.07.01.04 SUMINISTRO E INSTALACION DE BRIDA ROMPE AGUA DE F°G° DE 1" und 2.00 S/35.25 S/70.50 S/9.87 S/21.15 S/21.15 S/18.33
02.01.01.07.01.05 SUMINISTRO E INSTALACION DE UNION UNIVERSAL DE F°G° D= 1" und 2.00 S/23.06 S/46.12 S/6.46 S/13.84 S/13.84 S/11.99
02.01.01.08.01 TAPA METALICA 0.80 X 0,80M CON MECANISMO DE SEGURIDAD und 2.00 S/178.24 S/356.48 S/49.91 S/106.94 S/106.94 S/92.68
02.01.01.10.01 SUMINISTRO E INSTALACION DE TUBERIA DE VENTILACION DE F°G° und 1.00 S/74.07 S/74.07 S/10.37 S/22.22 S/22.22 S/19.26
02.01.01.10.02 SUMINISTRO E INSTALACION DE VERTEDERO TRIANGULAR DE PVC und 1.00 S/32.99 S/32.99 S/4.62 S/9.90 S/9.90 S/8.58
02.01.01.11.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN TERRENO NORMAL m3 0.86 S/39.50 S/33.97 S/4.76 S/10.19 S/10.19 S/8.83
02.01.01.11.04.02 SUMINISTRO E INSTALACION DE MALLA METALICA N° 10 COCADAS 2" X 2" m2 43.39 S/51.92 S/2,252.81 S/315.39 S/675.84 S/675.84 S/585.73
02.01.01.11.04.03 SUMINISTRO Y COLOCACION ALAMBRE DE PUAS P/CERCO m 69.90 S/5.85 S/408.92 S/57.25 S/122.68 S/122.68 S/106.32
PUERTA METALICA DE 1.20 X 2.20M UNA HOJA CON TUBO DE 2" Y MALLA
02.01.01.11.04.04 und 1.00 S/344.30 S/344.30 S/48.20 S/103.29 S/103.29 S/89.52
OLIMPICA METALICA N° 10 ( 2" X 2")
02.01.02 LINEA DE CONDUCCION (L=103.15 m) S/4,173.06 S/584.23 S/1,251.92 S/1,251.92 S/1,085.00
02.01.02.01 TRABAJOS PRELIMINARES S/284.70 S/39.86 S/85.41 S/85.41 S/74.02
02.01.02.01.01 DESBROCE Y LIMPIEZA MANUAL EN OBRAS LINEALES m 103.15 S/0.46 S/47.45 S/6.64 S/14.24 S/14.24 S/12.34
02.01.02.01.02 TRAZO NIVELACION Y REPLANTEO m 103.15 S/2.30 S/237.25 S/33.22 S/71.18 S/71.18 S/61.69
02.01.02.02 MOVIMIENTO DE TIERRAS S/3,036.62 S/425.13 S/910.99 S/910.99 S/789.52
EXCAVACION DE ZANJA PARA TUBERIA; a=0.6 m, h=0.80 m, TERRENO
02.01.02.02.01 m 103.15 S/12.57 S/1,296.60 S/181.52 S/388.98 S/388.98 S/337.12
NORMAL, Manual
02.01.02.02.02 REFINE Y NIVELACION DE ZANJA EN TERRENO NORMAL m 103.15 S/1.38 S/142.35 S/19.93 S/42.71 S/42.71 S/37.01
02.01.02.02.03 CAMA DE APOYO PARA TUBERIA m 103.15 S/2.23 S/230.02 S/32.20 S/69.01 S/69.01 S/59.81
PROYECTO : "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO RURAL EN EL CASERIO DE SOLUGAN, DISTRITO DE TACABAMBA-CHOTA-CAJAMARCA", CUI:2372080
02.01.03.01.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN TERRENO NORMAL m3 30.46 S/39.50 S/1,203.17 S/168.44 S/360.95 S/360.95 S/312.82
02.01.03.01.02.02 REFINE Y COMPACTACIÓN MANUAL PARA ESTRUCTURAS m2 19.04 S/2.82 S/53.69 S/7.52 S/16.11 S/16.11 S/13.96
02.01.03.01.02.03 RELLENO C/MATERIAL PROPIO COMPACTADO m3 16.38 S/19.76 S/323.67 S/45.31 S/97.10 S/97.10 S/84.15
02.01.03.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE (Dprom=30 m) m3 16.91 S/23.04 S/389.61 S/54.55 S/116.88 S/116.88 S/101.30
02.01.03.01.03 OBRAS DE CONCRETO S/11,354.36 S/1,589.61 S/3,406.31 S/3,406.31 S/2,952.13
02.01.03.01.03.01 CONCRETO f'c=100 kg/cm2, h=2" (PARA SOLADO) m2 1.90 S/16.41 S/31.18 S/4.37 S/9.35 S/9.35 S/8.11
02.01.03.01.03.02 CONCRETO F'C=210 KG/CM2 EN ZAPATAS m3 11.42 S/429.50 S/4,904.89 S/686.68 S/1,471.47 S/1,471.47 S/1,275.27
02.01.03.01.03.03 CONCRETO F'C=210 KG/CM2 EN COLUMNAS m3 5.49 S/429.50 S/2,357.96 S/330.11 S/707.39 S/707.39 S/613.07
02.01.03.01.03.04 ACERO CORRUGADO FY= 4200 kg/cm2 EN ZAPATAS kg 216.97 S/5.21 S/1,130.41 S/158.26 S/339.12 S/339.12 S/293.91
02.01.03.01.03.05 ACERO CORRUGADO FY= 4200 kg/cm2 EN COLUMNAS kg 276.92 S/5.21 S/1,442.75 S/201.99 S/432.83 S/432.83 S/375.12
02.01.03.01.03.06 ENCOFRADO Y DESENCOFRADO NORMAL EN ZAPATAS m2 14.88 S/30.55 S/454.58 S/63.64 S/136.37 S/136.37 S/118.19
02.01.03.01.03.07 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 33.80 S/30.55 S/1,032.59 S/144.56 S/309.78 S/309.78 S/268.47
02.01.03.01.04 ACABADOS S/1,534.19 S/214.79 S/460.26 S/460.26 S/398.89
02.01.03.01.04.01 TARRAJEO DE EXTERIORES, C:A 1:4, e=20mm m2 29.12 S/27.38 S/797.31 S/111.62 S/239.19 S/239.19 S/207.30
02.01.03.01.04.02 PINTURA LATEX 2 MANOS, EN ESTRUCTURAS m2 29.12 S/11.32 S/329.64 S/46.15 S/98.89 S/98.89 S/85.71
02.01.03.01.04.03 PINTURA BITUMINOSA m2 19.56 S/20.82 S/407.24 S/57.01 S/122.17 S/122.17 S/105.88
02.01.03.02 CAMARA DE ANCLAJE S/23,910.49 S/3,347.47 S/7,173.15 S/7,173.15 S/6,216.73
02.01.03.02.01 TRABAJOS PRELIMINARES S/22.81 S/3.19 S/6.84 S/6.84 S/5.93
02.01.03.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 5.76 S/0.69 S/3.97 S/0.56 S/1.19 S/1.19 S/1.03
02.01.03.02.01.02 TRAZO Y REPLANTEO PRELIMINAR DE ESTRUCTURAS m2 5.76 S/3.27 S/18.84 S/2.64 S/5.65 S/5.65 S/4.90
02.01.03.02.02 MOVIMIENTO DE TIERRAS S/364.16 S/50.98 S/109.25 S/109.25 S/94.68
02.01.03.02.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN TERRENO NORMAL m3 5.18 S/39.50 S/204.61 S/28.65 S/61.38 S/61.38 S/53.20
02.01.03.02.02.02 REFINE Y COMPACTACIÓN MANUAL PARA ESTRUCTURAS m2 5.76 S/2.82 S/16.24 S/2.27 S/4.87 S/4.87 S/4.22
02.01.03.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE (Dprom=30 m) m3 6.22 S/23.04 S/143.31 S/20.06 S/42.99 S/42.99 S/37.26
02.01.03.02.03 OBRAS DE CONCRETO S/2,366.34 S/331.29 S/709.90 S/709.90 S/615.25
02.01.03.02.03.01 CONCRETO F'C=175 KG/CM2 m3 5.76 S/403.61 S/2,324.79 S/325.47 S/697.44 S/697.44 S/604.45
02.01.03.02.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 1.36 S/30.55 S/41.55 S/5.82 S/12.47 S/12.47 S/10.80
02.01.03.02.04 ELEMENTOS METÁNICOS DE SOPORTE S/21,157.18 S/2,962.01 S/6,347.15 S/6,347.15 S/5,500.87
ACCESORIOS METALICOS DE ANCLAJE Y SOPORTE DE CABLE PARA PASE
02.01.03.02.04.01 und 2.00 S/3,877.44 S/7,754.88 S/1,085.68 S/2,326.46 S/2,326.46 S/2,016.27
AEREO DE L=50m
02.01.03.02.04.02 CABLE TIPO BOA 6x19 DE 5/8" m 67.90 S/62.36 S/4,234.24 S/592.79 S/1,270.27 S/1,270.27 S/1,100.90
02.01.03.02.04.03 CABLE TIPO BOA 6x19 DE 1/4" m 96.63 S/31.00 S/2,995.53 S/419.37 S/898.66 S/898.66 S/778.84
02.01.03.02.04.04 ABRAZADERA CON PLATINA DE 1/4" CON PERNOS DE 1/2"x2 1/2" und 147.00 S/41.99 S/6,172.53 S/864.15 S/1,851.76 S/1,851.76 S/1,604.86
02.01.04.01 CONSTRUCCION DE RESERVORIO APOYADO PROYECTADO V=10m3 S/16,601.23 S/2,324.17 S/4,980.37 S/4,980.37 S/4,316.32
02.01.04.01.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN TERRENO NORMAL m3 5.69 S/39.50 S/224.76 S/31.47 S/67.43 S/67.43 S/58.44
02.01.04.01.04.09 ENCOFRADO (INCL. HABILITACIÓN DE MADERA) PARA LOSAS MACIZAS m2 13.12 S/30.55 S/400.82 S/56.11 S/120.25 S/120.25 S/104.21
02.01.04.01.06.02 ENCOFRADO (HABILITACION DE MADERA) P/VEREDAS Y RAMPAS m2 2.18 S/30.55 S/66.60 S/9.32 S/19.98 S/19.98 S/17.32
02.01.04.01.06.03 SELLADO DE JUNTAS EN VEREDAS E=1" m 3.00 S/5.58 S/16.74 S/2.34 S/5.02 S/5.02 S/4.35
02.01.04.01.07 CARPINTERIA METALICA Y HERRERIA S/523.99 S/73.36 S/157.20 S/157.20 S/136.24
02.01.04.01.07.01 ESCALERA MOVIL TIPO GATO und 1.00 S/300.00 S/300.00 S/42.00 S/90.00 S/90.00 S/78.00
02.01.04.01.07.02 TAPA METALICA 0.60 X 0,60M CON MECANISMO DE SEGURIDAD und 1.00 S/155.49 S/155.49 S/21.77 S/46.65 S/46.65 S/40.43
02.01.04.01.07.03 VENTILACION C/TUBERIA DE ACERO S/DISEÑO DE 2" und 1.00 S/68.50 S/68.50 S/9.59 S/20.55 S/20.55 S/17.81
02.01.04.01.08 PINTURA S/559.99 S/78.40 S/168.00 S/168.00 S/145.60
02.01.04.01.08.01 PINTURA LATEX 2 MANOS, EN ESTRUCTURAS EXTERIORES m2 31.62 S/17.71 S/559.99 S/78.40 S/168.00 S/168.00 S/145.60
CALENDARIO DE AVANCE DE OBRA VALORIZADO
PROYECTO : "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO RURAL EN EL CASERIO DE SOLUGAN, DISTRITO DE TACABAMBA-CHOTA-CAJAMARCA", CUI:2372080
02.01.04.01.09.01 PROVISION Y COLOCACION DE JUNTA WATER STOP DE PVC E=6" m 13.60 S/13.82 S/187.95 S/26.31 S/56.39 S/56.39 S/48.87
02.01.04.01.09.02 JUNTA DE DILATACIÓN CON SELLO ELASTOMERICO m2 0.08 S/48.42 S/3.87 S/0.54 S/1.16 S/1.16 S/1.01
02.01.04.01.10 PRUEBAS HIDRAULICA S/1,065.30 S/149.14 S/319.59 S/319.59 S/276.98
PRUEBA HIDRÁULICA CON EMPLEO DE CISTERNA Y EQUIPO DE BOMBEO
02.01.04.01.10.01 m3 10.00 S/96.17 S/961.70 S/134.64 S/288.51 S/288.51 S/250.04
PARA EL LLENADO
02.01.04.01.10.02 LIMPIEZA Y DESINFECCION DE RESERVORIOS APOYADOS m2 29.10 S/3.56 S/103.60 S/14.50 S/31.08 S/31.08 S/26.94
02.01.04.02 EQUIPAMIENTO HIDRÁULICO DEL RESERVORIO APOYADO V: 10 M3 S/763.08 S/106.83 S/228.92 S/228.92 S/198.40
02.01.04.03.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN TERRENO NORMAL m3 0.60 S/39.50 S/23.70 S/3.32 S/7.11 S/7.11 S/6.16
02.01.04.03.02.02 REFINE Y COMPACTACIÓN MANUAL PARA ESTRUCTURAS m2 1.33 S/2.82 S/3.75 S/0.53 S/1.13 S/1.13 S/0.98
02.01.04.03.02.03 ELIMINACION DE MATERIAL EXCEDENTE (Dprom=30 m) m3 0.72 S/23.04 S/16.59 S/2.32 S/4.98 S/4.98 S/4.31
02.01.04.03.03 OBRAS DE CONCRETO SIMPLE S/21.83 S/3.06 S/6.55 S/6.55 S/5.68
02.01.04.03.03.01 CONCRETO f'c=100 kg/cm2, h=2" (PARA SOLADO) m2 1.33 S/16.41 S/21.83 S/3.06 S/6.55 S/6.55 S/5.68
02.01.04.03.04 OBRAS DE CONCRETO ARMADO S/804.31 S/112.60 S/241.29 S/241.29 S/209.12
02.01.04.03.04.01 CONCRETO F'C=175 KG/CM2, DADO DE ANCLAJE m3 0.01 S/403.61 S/4.04 S/0.57 S/1.21 S/1.21 S/1.05
02.01.04.03.04.02 CONCRETO F'C=210 KG/CM2, P/CAJAS m3 0.60 S/429.50 S/257.70 S/36.08 S/77.31 S/77.31 S/67.00
02.01.04.03.04.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 51.68 S/5.21 S/269.25 S/37.70 S/80.78 S/80.78 S/70.01
02.01.04.03.04.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 8.92 S/30.55 S/272.51 S/38.15 S/81.75 S/81.75 S/70.85
02.01.04.03.04.05 PIEDRA CHANCADA 1/2" EN SUMIDERO m3 0.01 S/80.84 S/0.81 S/0.11 S/0.24 S/0.24 S/0.21
02.01.04.03.05 ACABADOS S/380.43 S/53.26 S/114.13 S/114.13 S/98.91
02.01.04.03.05.01 TARRAJEO DE EXTERIORES, C:A 1:4, e=1.50 cm. m2 5.90 S/26.08 S/153.87 S/21.54 S/46.16 S/46.16 S/40.01
02.01.04.03.05.02 TARRAJEO INTERIOR C/IMPERMEABILIZANTE, C:A 1:4, e=1.50 cm. m2 3.94 S/29.23 S/115.17 S/16.12 S/34.55 S/34.55 S/29.94
02.01.04.03.05.03 PINTURA LATEX 2 MANOS, EN ESTRUCTURAS m2 9.84 S/11.32 S/111.39 S/15.59 S/33.42 S/33.42 S/28.96
02.01.04.03.06 EQUIPAMIENTO S/155.49 S/21.77 S/46.65 S/46.65 S/40.43
02.01.04.03.06.01 TAPA METALICA 0.60 X 0,60M CON MECANISMO DE SEGURIDAD und 1.00 S/155.49 S/155.49 S/21.77 S/46.65 S/46.65 S/40.43
02.01.04.04 SISTEMA DE DESINFECCION CON DOSIFICADOR S/2,144.37 S/300.21 S/643.31 S/643.31 S/557.54
02.01.04.04.01 CASETA DE CLORACION S/1,732.00 S/242.48 S/519.60 S/519.60 S/450.32
02.01.04.04.01.01 CARPINTERIA METALICA Y HERRERIA S/1,191.89 S/166.86 S/357.57 S/357.57 S/309.89
SUMINISTRO Y COLOCACION DE COLUMNAS DE TUBO DE F°G° DE 2" x
02.01.04.04.01.01.01 und 5.00 S/81.85 S/409.25 S/57.30 S/122.78 S/122.78 S/106.41
2.5mm
SUMINISTRO E INSTALACION DE MALLA METALICA N° 10 COCADAS 2" X
02.01.04.04.01.01.02 m2 9.26 S/51.92 S/480.78 S/67.31 S/144.23 S/144.23 S/125.00
2"
PUERTA METALICA TIPO REJA CON MARCO DE "L"3/4"x3/4"x3/16",
02.01.04.04.01.01.03 und 1.00 S/301.86 S/301.86 S/42.26 S/90.56 S/90.56 S/78.48
1.00mx1.80m, S/detalle
02.01.04.04.01.02 TECHO DE CASETA DE CLORACION S/74.36 S/10.41 S/22.31 S/22.31 S/19.33
SUMINISTRO E INSTALACION DE COBERTURA CON CALAMINA
02.01.04.04.01.02.01 m2 3.28 S/22.67 S/74.36 S/10.41 S/22.31 S/22.31 S/19.33
GALVANIZADA
02.01.04.04.01.03 VIGAS Y VIGUETAS S/465.75 S/65.21 S/139.73 S/139.73 S/121.10
SUMINISTRO E INSTALACION DE PERFIL TUBULAR CUADRADO 1 1/4"X1
02.01.04.04.01.03.01 m 7.50 S/62.10 S/465.75 S/65.21 S/139.73 S/139.73 S/121.10
1/4"X1.22mm PARA VIGAS Y VIGUETAS
EQUIPAMIENTO HIDRAULICO DE SISTEMA DE CLORACION CON
02.01.04.04.02 S/412.37 S/57.73 S/123.71 S/123.71 S/107.22
DOSIFICADOR
02.01.04.04.02.01 EQUIPO DE CLORACION Y ACCESORIOS DE CLORACION S/PLANO. glb 1.00 S/412.37 S/412.37 S/57.73 S/123.71 S/123.71 S/107.22
02.01.04.05.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN TERRENO NORMAL m3 0.86 S/39.50 S/33.97 S/4.76 S/10.19 S/10.19 S/8.83
02.01.04.05.02.02 REFINE Y COMPACTACIÓN MANUAL PARA ESTRUCTURAS m2 1.44 S/2.82 S/4.06 S/0.57 S/1.22 S/1.22 S/1.06
02.01.04.05.02.03 ELIMINACION DE MATERIAL EXCEDENTE (Dprom=30 m) m3 1.08 S/23.04 S/24.88 S/3.48 S/7.46 S/7.46 S/6.47
02.01.04.05.03 OBRAS DE CONCRETO SIMPLE S/359.21 S/50.29 S/107.76 S/107.76 S/93.39
02.01.04.05.03.01 CONCRETO F'C=175 KG/CM2, EN DADO DE COLUMNAS m3 0.89 S/403.61 S/359.21 S/50.29 S/107.76 S/107.76 S/93.39
02.01.04.05.04 VARIOS S/4,205.76 S/588.81 S/1,261.73 S/1,261.73 S/1,093.50
SUMINISTRO Y COLOCACION DE COLUMNAS DE TUBO DE F°G° DE 2" x 2.5
02.01.04.05.04.01 und 9.00 S/56.83 S/511.47 S/71.61 S/153.44 S/153.44 S/132.98
mm x 3m
02.01.04.05.04.02 SUMINISTRO E INSTALACION DE MALLA METALICA N° 10 COCADAS 2" X 2" m2 54.99 S/51.92 S/2,855.08 S/399.71 S/856.52 S/856.52 S/742.32
02.01.04.05.04.03 SUMINISTRO Y COLOCACION ALAMBRE DE PUAS P/CERCO m 84.60 S/5.85 S/494.91 S/69.29 S/148.47 S/148.47 S/128.68
PUERTA METALICA DE 1.20 X 2.20M UNA HOJA CON TUBO DE 2" Y MALLA
02.01.04.05.04.04 und 1.00 S/344.30 S/344.30 S/48.20 S/103.29 S/103.29 S/89.52
OLIMPICA METALICA N° 10 ( 2" X 2")
02.01.05 LINEA DE ADUCCIÓN (L=6.97 m) S/280.57 S/39.28 S/84.17 S/84.17 S/72.95
02.01.05.01 TRABAJOS PRELIMINARES S/19.24 S/2.69 S/5.77 S/5.77 S/5.00
02.01.05.01.01 DESBROCE Y LIMPIEZA MANUAL EN OBRAS LINEALES m 6.97 S/0.46 S/3.21 S/0.45 S/0.96 S/0.96 S/0.83
02.01.05.01.02 TRAZO NIVELACION Y REPLANTEO m 6.97 S/2.30 S/16.03 S/2.24 S/4.81 S/4.81 S/4.17
02.01.05.02 MOVIMIENTO DE TIERRAS S/204.66 S/28.65 S/61.40 S/61.40 S/53.21
EXCAVACION DE ZANJA PARA TUBERIA; a=0.6 m, h=0.80 m, TERRENO
02.01.05.02.01 m 6.97 S/12.57 S/87.61 S/12.27 S/26.28 S/26.28 S/22.78
NORMAL, Manual
02.01.05.02.02 REFINE Y NIVELACION DE ZANJA EN TERRENO NORMAL m 6.97 S/1.38 S/9.62 S/1.35 S/2.89 S/2.89 S/2.50
CALENDARIO DE AVANCE DE OBRA VALORIZADO
PROYECTO : "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO RURAL EN EL CASERIO DE SOLUGAN, DISTRITO DE TACABAMBA-CHOTA-CAJAMARCA", CUI:2372080
02.01.07.01.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN TERRENO NORMAL m3 7.41 S/39.50 S/292.70 S/40.98 S/87.81 S/87.81 S/76.10
02.01.07.01.02.02 REFINE Y COMPACTACIÓN MANUAL PARA ESTRUCTURAS m2 5.70 S/2.82 S/16.07 S/2.25 S/4.82 S/4.82 S/4.18
02.01.07.01.02.03 RELLENO C/MATERIAL PROPIO COMPACTADO m3 4.30 S/19.76 S/84.97 S/11.90 S/25.49 S/25.49 S/22.09
02.01.07.01.02.04 ELIMINACION DE MATERIAL EXCEDENTE (Dprom=30 m) m3 3.73 S/23.04 S/85.94 S/12.03 S/25.78 S/25.78 S/22.34
02.01.07.01.03 OBRAS DE CONCRETO S/2,863.99 S/400.96 S/859.20 S/859.20 S/744.64
02.01.07.01.03.01 CONCRETO f'c=100 kg/cm2, h=2" (PARA SOLADO) m2 0.57 S/16.41 S/9.35 S/1.31 S/2.81 S/2.81 S/2.43
02.01.07.01.03.02 CONCRETO F'C=210 KG/CM2 EN ZAPATAS m3 2.28 S/429.50 S/979.26 S/137.10 S/293.78 S/293.78 S/254.61
02.01.07.01.03.03 CONCRETO F'C=210 KG/CM2 EN COLUMNAS m3 1.47 S/429.50 S/631.37 S/88.39 S/189.41 S/189.41 S/164.16
02.01.07.01.03.04 ACERO CORRUGADO FY= 4200 kg/cm2 EN ZAPATAS kg 42.60 S/5.21 S/221.95 S/31.07 S/66.59 S/66.59 S/57.71
02.01.07.01.03.05 ACERO CORRUGADO FY= 4200 kg/cm2 EN COLUMNAS kg 77.96 S/5.21 S/406.17 S/56.86 S/121.85 S/121.85 S/105.60
02.01.07.01.03.06 ENCOFRADO Y DESENCOFRADO NORMAL EN ZAPATAS m2 5.44 S/30.55 S/166.19 S/23.27 S/49.86 S/49.86 S/43.21
02.01.07.01.03.07 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 14.72 S/30.55 S/449.70 S/62.96 S/134.91 S/134.91 S/116.92
02.01.07.01.04 ACABADOS S/637.15 S/89.20 S/191.15 S/191.15 S/165.66
02.01.07.01.04.01 TARRAJEO DE EXTERIORES, C:A 1:4, e=20mm m2 12.16 S/27.38 S/332.94 S/46.61 S/99.88 S/99.88 S/86.56
02.01.07.01.04.02 PINTURA LATEX 2 MANOS, EN ESTRUCTURAS m2 12.16 S/11.32 S/137.65 S/19.27 S/41.30 S/41.30 S/35.79
02.01.07.01.04.03 PINTURA BITUMINOSA m2 8.00 S/20.82 S/166.56 S/23.32 S/49.97 S/49.97 S/43.31
02.01.07.02 CAMARA DE ANCLAJE S/8,718.02 S/1,220.52 S/2,615.41 S/2,615.41 S/2,266.69
02.01.07.02.01 TRABAJOS PRELIMINARES S/11.41 S/1.60 S/3.42 S/3.42 S/2.97
02.01.07.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 2.88 S/0.69 S/1.99 S/0.28 S/0.60 S/0.60 S/0.52
02.01.07.02.01.02 TRAZO Y REPLANTEO PRELIMINAR DE ESTRUCTURAS m2 2.88 S/3.27 S/9.42 S/1.32 S/2.83 S/2.83 S/2.45
02.01.07.02.02 MOVIMIENTO DE TIERRAS S/172.64 S/24.17 S/51.79 S/51.79 S/44.89
02.01.07.02.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN TERRENO NORMAL m3 2.45 S/39.50 S/96.78 S/13.55 S/29.03 S/29.03 S/25.16
02.01.07.02.02.02 REFINE Y COMPACTACIÓN MANUAL PARA ESTRUCTURAS m2 2.88 S/2.82 S/8.12 S/1.14 S/2.44 S/2.44 S/2.11
02.01.07.02.02.03 ELIMINACION DE MATERIAL EXCEDENTE (Dprom=30 m) m3 2.94 S/23.04 S/67.74 S/9.48 S/20.32 S/20.32 S/17.61
02.01.07.02.03 OBRAS DE CONCRETO S/1,135.22 S/158.93 S/340.57 S/340.57 S/295.16
02.01.07.02.03.01 CONCRETO F'C=175 KG/CM2 m3 2.74 S/403.61 S/1,105.89 S/154.82 S/331.77 S/331.77 S/287.53
02.01.07.02.03.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 0.96 S/30.55 S/29.33 S/4.11 S/8.80 S/8.80 S/7.63
02.01.07.02.04 ELEMENTOS METÁNICOS DE SOPORTE S/7,398.75 S/1,035.83 S/2,219.63 S/2,219.63 S/1,923.68
ACCESORIOS METALICOS DE ANCLAJE Y SOPORTE DE CABLE PARA PASE
02.01.07.02.04.01 und 2.00 S/693.19 S/1,386.38 S/194.09 S/415.91 S/415.91 S/360.46
AEREO DE L=25m
02.01.07.02.04.02 CABLE TIPO BOA 6x19 DE 1/2" m 42.86 S/49.78 S/2,133.57 S/298.70 S/640.07 S/640.07 S/554.73
02.01.07.02.04.03 CABLE TIPO BOA 6x19 DE 1/4" m 35.80 S/31.00 S/1,109.80 S/155.37 S/332.94 S/332.94 S/288.55
02.01.07.02.04.04 ABRAZADERA CON PLATINA DE 3/16" CON PERNOS DE 1/2"x2 1/2" und 75.00 S/36.92 S/2,769.00 S/387.66 S/830.70 S/830.70 S/719.94
02.01.08.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN TERRENO NORMAL m3 11.98 S/39.50 S/473.21 S/66.25 S/141.96 S/141.96 S/123.03
02.01.08.02.02 REFINE Y COMPACTACIÓN MANUAL PARA ESTRUCTURAS m2 9.00 S/2.82 S/25.38 S/3.55 S/7.61 S/7.61 S/6.60
02.01.08.02.03 RELLENO C/MATERIAL PROPIO COMPACTADO m3 7.17 S/19.76 S/141.68 S/19.84 S/42.50 S/42.50 S/36.84
CALENDARIO DE AVANCE DE OBRA VALORIZADO
PROYECTO : "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO RURAL EN EL CASERIO DE SOLUGAN, DISTRITO DE TACABAMBA-CHOTA-CAJAMARCA", CUI:2372080
02.01.08.04.02 TARRAJEO INTERIOR C/IMPERMEABILIZANTE, C:A 1:2, e=1.50 cm. m2 20.52 S/29.23 S/599.80 S/83.97 S/179.94 S/179.94 S/155.95
02.01.08.04.03 PINTURA LATEX 2 MANOS, EN ESTRUCTURAS m2 43.56 S/11.32 S/493.10 S/69.03 S/147.93 S/147.93 S/128.21
02.01.08.05 EQUIPAMIENTO S/3,057.13 S/428.00 S/917.14 S/917.14 S/794.85
02.01.08.05.01 TAPA METALICA 0.60 X 0,60M CON MECANISMO DE SEGURIDAD und 9.00 S/155.49 S/1,399.41 S/195.92 S/419.82 S/419.82 S/363.85
02.01.09.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN TERRENO NORMAL m3 27.65 S/39.50 S/1,092.18 S/152.91 S/327.65 S/327.65 S/283.97
02.01.09.02.02 REFINE Y COMPACTACIÓN MANUAL PARA ESTRUCTURAS m2 35.04 S/2.82 S/98.81 S/13.83 S/29.64 S/29.64 S/25.69
02.01.09.02.03 RELLENO C/MATERIAL PROPIO COMPACTADO m3 19.10 S/19.76 S/377.42 S/52.84 S/113.23 S/113.23 S/98.13
02.01.09.02.04 ELIMINACION DE MATERIAL EXCEDENTE (Dprom=30 m) m3 10.68 S/23.04 S/246.07 S/34.45 S/73.82 S/73.82 S/63.98
02.01.09.03 OBRAS DE CONCRETO S/7,374.12 S/1,032.38 S/2,212.24 S/2,212.24 S/1,917.27
02.01.09.03.01 CONCRETO f'c=100 kg/cm2, h=2" (PARA SOLADO) m2 15.36 S/16.41 S/252.06 S/35.29 S/75.62 S/75.62 S/65.54
02.01.09.03.02 CONCRETO f'c=140 Kg/cm2, PARA DADO m3 0.59 S/376.60 S/222.19 S/31.11 S/66.66 S/66.66 S/57.77
02.01.09.03.03 EMBOQUILLADO DE PIEDRA, CONCRETO f'c=140 kg/cm2, e=0.15 m m3 1.20 S/351.43 S/421.72 S/59.04 S/126.52 S/126.52 S/109.65
02.01.09.03.04 CONCRETO F'C=175 KG/CM2, P/CAJAS m3 5.12 S/403.61 S/2,066.48 S/289.31 S/619.94 S/619.94 S/537.28
02.01.09.03.05 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 341.88 S/5.21 S/1,781.19 S/249.37 S/534.36 S/534.36 S/463.11
02.01.09.03.06 ENCOFRADO Y DESENCOFRADO NORMAL m2 85.76 S/30.55 S/2,619.97 S/366.80 S/785.99 S/785.99 S/681.19
02.01.09.03.07 PIEDRA CHANCADA 1/2" EN SUMIDERO m3 0.13 S/80.84 S/10.51 S/1.47 S/3.15 S/3.15 S/2.73
02.01.09.04 ACABADOS S/3,011.17 S/421.56 S/903.35 S/903.35 S/782.90
02.01.09.04.01 TARRAJEO DE EXTERIORES, C:A 1:4, e=1.50 cm. m2 40.96 S/26.08 S/1,068.24 S/149.55 S/320.47 S/320.47 S/277.74
02.01.09.04.02 TARRAJEO INTERIOR C/IMPERMEABILIZANTE, C:A 1:2, e=1.50 cm. m2 36.48 S/29.23 S/1,066.31 S/149.28 S/319.89 S/319.89 S/277.24
02.01.09.04.03 PINTURA LATEX 2 MANOS, EN ESTRUCTURAS m2 77.44 S/11.32 S/876.62 S/122.73 S/262.99 S/262.99 S/227.92
02.01.09.05 EQUIPAMIENTO S/4,459.34 S/624.31 S/1,337.80 S/1,337.80 S/1,159.43
02.01.09.05.01 TAPA METALICA 0.60 X 0,60M CON MECANISMO DE SEGURIDAD und 16.00 S/155.49 S/2,487.84 S/348.30 S/746.35 S/746.35 S/646.84
02.01.09.05.02 SUMINISTRO E INSTALACION DE ACCESORIOS DE VALVULA DE PURGA, D= 1" und 2.00 S/139.80 S/279.60 S/39.14 S/83.88 S/83.88 S/72.70
02.01.10.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN TERRENO NORMAL m3 1.92 S/39.50 S/75.84 S/10.62 S/22.75 S/22.75 S/19.72
02.01.10.02.02 REFINE Y COMPACTACIÓN MANUAL PARA ESTRUCTURAS m2 3.00 S/2.82 S/8.46 S/1.18 S/2.54 S/2.54 S/2.20
02.01.10.02.03 RELLENO C/MATERIAL PROPIO COMPACTADO m3 0.32 S/19.76 S/6.32 S/0.88 S/1.90 S/1.90 S/1.64
02.01.10.02.04 ELIMINACION DE MATERIAL EXCEDENTE (Dprom=30 m) m3 2.00 S/23.04 S/46.08 S/6.45 S/13.82 S/13.82 S/11.98
02.01.10.03 OBRAS DE CONCRETO S/1,173.16 S/164.24 S/351.95 S/351.95 S/305.02
02.01.10.03.01 CONCRETO f'c=100 kg/cm2, h=2" (PARA SOLADO) m2 2.88 S/16.41 S/47.26 S/6.62 S/14.18 S/14.18 S/12.29
02.01.10.03.02 CONCRETO F'C=175 KG/CM2, PARA CAMARAS m3 0.85 S/403.61 S/343.07 S/48.03 S/102.92 S/102.92 S/89.20
02.01.10.03.03 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 64.10 S/5.21 S/333.96 S/46.75 S/100.19 S/100.19 S/86.83
02.01.10.03.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 14.64 S/30.55 S/447.25 S/62.62 S/134.18 S/134.18 S/116.29
02.01.10.03.05 PIEDRA CHANCADA 1/2" EN SUMIDERO m3 0.02 S/80.84 S/1.62 S/0.23 S/0.49 S/0.49 S/0.42
02.01.10.04 ACABADOS S/564.59 S/79.04 S/169.38 S/169.38 S/146.79
02.01.10.04.01 TARRAJEO DE EXTERIORES, C:A 1:4, e=1.50 cm. m2 7.68 S/26.08 S/200.29 S/28.04 S/60.09 S/60.09 S/52.08
02.01.10.04.02 TARRAJEO INTERIOR C/IMPERMEABILIZANTE, C:A 1:2, e=1.50 cm. m2 6.84 S/29.23 S/199.93 S/27.99 S/59.98 S/59.98 S/51.98
02.01.10.04.03 PINTURA LATEX 2 MANOS, EN ESTRUCTURAS m2 14.52 S/11.32 S/164.37 S/23.01 S/49.31 S/49.31 S/42.74
02.01.10.05 EQUIPAMIENTO S/812.20 S/113.71 S/243.66 S/243.66 S/211.17
02.01.10.05.01 TAPA METALICA 0.60 X 0,60M CON MECANISMO DE SEGURIDAD und 3.00 S/155.49 S/466.47 S/65.31 S/139.94 S/139.94 S/121.28
02.01.11.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN TERRENO NORMAL m3 65.49 S/39.50 S/2,586.86 S/362.16 S/776.06 S/776.06 S/672.58
02.01.11.02.02 REFINE Y COMPACTACIÓN MANUAL PARA ESTRUCTURAS m2 95.40 S/2.82 S/269.03 S/37.66 S/80.71 S/80.71 S/69.95
02.01.11.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 37.35 S/19.76 S/738.04 S/103.33 S/221.41 S/221.41 S/191.89
02.01.11.02.04 ELIMINACION DE MATERIAL EXCEDENTE (Dprom=30 m) m3 35.18 S/23.04 S/810.55 S/113.48 S/243.17 S/243.17 S/210.74
02.01.11.03 OBRAS DE CONCRETO S/22,226.48 S/3,111.71 S/6,667.94 S/6,667.94 S/5,778.88
02.01.11.03.01 CONCRETO f'c=140 Kg/cm2, PARA DADO m3 0.36 S/376.60 S/135.58 S/18.98 S/40.67 S/40.67 S/35.25
02.01.11.03.02 EMBOQUILLADO DE PIEDRA, CONCRETO f'c=140 kg/cm2, e=0.15 m m3 2.25 S/351.43 S/790.72 S/110.70 S/237.22 S/237.22 S/205.59
02.01.11.03.03 CONCRETO F'C=210 KG/CM2, PARA CAMARAS m3 15.84 S/429.50 S/6,803.28 S/952.46 S/2,040.98 S/2,040.98 S/1,768.85
CALENDARIO DE AVANCE DE OBRA VALORIZADO
PROYECTO : "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO RURAL EN EL CASERIO DE SOLUGAN, DISTRITO DE TACABAMBA-CHOTA-CAJAMARCA", CUI:2372080
02.01.11.04.02 TARRAJEO INTERIOR C/IMPERMEABILIZANTE, C:A 1:2, e=1.50 cm. m2 75.60 S/29.23 S/2,209.79 S/309.37 S/662.94 S/662.94 S/574.55
02.01.11.04.03 PINTURA LATEX 2 MANOS, EN ESTRUCTURAS EXTERIORES m2 45.60 S/17.71 S/807.58 S/113.06 S/242.27 S/242.27 S/209.97
02.01.11.04.04 PINTURA BITUMINOSA m2 43.20 S/20.82 S/899.42 S/125.92 S/269.83 S/269.83 S/233.85
02.01.11.05 CARPINTERÍA METÁLICA S/9,197.10 S/1,287.59 S/2,759.13 S/2,759.13 S/2,391.25
02.01.11.05.01 TAPA METALICA 0.60 X 0,60M CON MECANISMO DE SEGURIDAD und 30.00 S/155.49 S/4,664.70 S/653.06 S/1,399.41 S/1,399.41 S/1,212.82
TAPA METALICA 0.50 X 0.40M CON MECANISMO DE SEGURIDAD und 30.00 S/151.08 S/4,532.40 S/634.54 S/1,359.72 S/1,359.72 S/1,178.42
02.01.11.06.06 SUMINISTRO E INSTALACION DE TUBERIA DE VENTILACION DE F°G° EN CRP und 30.00 S/20.23 S/606.90 S/84.97 S/182.07 S/182.07 S/157.79
02.01.12 CONEXIONES DOMICILIARIAS (112 UND) S/90,677.62 S/12,694.87 S/27,203.29 S/27,203.29 S/23,576.18
02.01.12.01 TRABAJOS PRELIMINARES S/3,737.67 S/523.27 S/1,121.30 S/1,121.30 S/971.79
02.01.12.01.01 TRAZO Y REPLANTEO PARA LINEAS DE AGUA m 1,544.49 S/2.42 S/3,737.67 S/523.27 S/1,121.30 S/1,121.30 S/971.79
02.01.12.02 MOVIMIENTO DE TIERRAS S/38,186.00 S/5,346.04 S/11,455.80 S/11,455.80 S/9,928.36
EXCAVACION DE ZANJA PARA TUBERIA; a=0.40 m, h=0.80 m, TERRENO
02.01.12.02.01 m 1,544.49 S/12.57 S/19,414.24 S/2,717.99 S/5,824.27 S/5,824.27 S/5,047.70
NORMAL, Manual
02.01.12.02.02 REFINE Y NIVELACION DE ZANJA EN TERRENO NORMAL m 1,544.49 S/1.38 S/2,131.40 S/298.40 S/639.42 S/639.42 S/554.16
02.01.12.02.03 CAMA DE APOYO PARA TUBERIA m 1,544.49 S/2.23 S/3,444.21 S/482.19 S/1,033.26 S/1,033.26 S/895.49
RELLENO Y COMPACTADO CON MATERIAL PROPIO SELECCIONADO;
02.01.12.02.04 m 1,544.49 S/6.24 S/9,637.62 S/1,349.27 S/2,891.29 S/2,891.29 S/2,505.78
a=0.40 m, h=0.50 m
02.01.12.02.05 ELIMINACION DE MATERIAL EXCEDENTE (Dprom=30 m) m3 154.45 S/23.04 S/3,558.53 S/498.19 S/1,067.56 S/1,067.56 S/925.22
02.01.12.03 TUBERÍAS Y ACCESORIOS S/26,217.72 S/3,670.48 S/7,865.32 S/7,865.32 S/6,816.61
SUMINISTRO E INSTALACION DE TUBERIA. PVC NTP 399.002:2015 C10 SDR21,
02.01.12.03.01 m 1,544.49 S/5.04 S/7,784.23 S/1,089.79 S/2,335.27 S/2,335.27 S/2,023.90
D= 21.00 mm (1/2")
SUMINISTRO E INSTALACION DE ACCESORIOS PARA CONEXIÓN DN 1/2",
02.01.12.03.02 und 112.00 S/140.59 S/15,746.08 S/2,204.45 S/4,723.82 S/4,723.82 S/4,093.98
PARA RED DN 33mm
PRUEBA HIDRÁULICA + DESINFECCIÓN EN TUBERÍA DE AGUA POTABLE DN
02.01.12.03.03 m 1,544.49 S/1.74 S/2,687.41 S/376.24 S/806.22 S/806.22 S/698.73
25 - 63 mm
02.01.12.04 CAJAS Y TAPAS S/22,536.23 S/3,155.07 S/6,760.87 S/6,760.87 S/5,859.42
02.01.12.04.01 EXCAVACION MANUAL PARA ESTRUCTURA EN TERRENO NORMAL m3 24.19 S/39.50 S/955.51 S/133.77 S/286.65 S/286.65 S/248.43
02.01.12.04.02 REFINE Y COMPACTACIÓN MANUAL PARA ESTRUCTURAS m2 53.76 S/2.82 S/151.60 S/21.22 S/45.48 S/45.48 S/39.42
02.01.12.04.03 SOLADO CON MATERIAL CONFITILLO m3 2.69 S/101.91 S/274.14 S/38.38 S/82.24 S/82.24 S/71.28
02.01.12.04.04 CONCRETO f'c=140 Kg/cm2, PARA UÑAS m3 4.70 S/376.60 S/1,770.02 S/247.80 S/531.01 S/531.01 S/460.21
SUMINISTRO E INSTALACION DE CAJA DE REGISTRO CON TAPA
02.01.12.04.05 und 112.00 S/173.08 S/19,384.96 S/2,713.89 S/5,815.49 S/5,815.49 S/5,040.09
TERMOPLASTICA
02.01.13 LAVADERO MULTIUSOS PARA VIVIENDA (110 UND) S/56,281.76 S/7,879.45 S/16,884.53 S/16,884.53 S/14,633.26
02.01.13.01 TRABAJOS PRELIMINARES S/263.54 S/36.90 S/79.06 S/79.06 S/68.52
02.01.13.01.01 LIMPIEZA DE TERRENO MANUAL m2 66.55 S/0.69 S/45.92 S/6.43 S/13.78 S/13.78 S/11.94
02.01.13.01.02 TRAZO Y REPLANTEO DE OBRA m2 66.55 S/3.27 S/217.62 S/30.47 S/65.29 S/65.29 S/56.58
02.01.13.02 MOVIMIENTO DE TIERRAS S/644.49 S/90.23 S/193.35 S/193.35 S/167.57
02.01.13.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN TERRENO NORMAL m3 9.90 S/39.50 S/391.05 S/54.75 S/117.32 S/117.32 S/101.67
02.01.13.03.03 ENCOFRADO Y DESENCOFRADO NORMAL EN LAVADERO MULTIUSOS m2 438.16 S/30.55 S/13,385.79 S/1,874.01 S/4,015.74 S/4,015.74 S/3,480.31
02.01.13.03.04 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 1,145.38 S/5.21 S/5,967.43 S/835.44 S/1,790.23 S/1,790.23 S/1,551.53
02.01.13.04 REVOQUES, ENLUCIDOS Y MOLDURAS S/10,322.70 S/1,445.18 S/3,096.81 S/3,096.81 S/2,683.90
TARRAJEO INTERIOR PULIDO CON IMPERMEABILIZANTE MEZC. C:A 1:5,
02.01.13.04.01 m2 109.75 S/30.48 S/3,345.18 S/468.33 S/1,003.55 S/1,003.55 S/869.75
E=1.5 cm
TARRAJEO EXTERIOR FROTACHADO DE LAVADERO MEZC. C:A 1:5, E=1.5
02.01.13.04.02 m2 254.84 S/27.38 S/6,977.52 S/976.85 S/2,093.26 S/2,093.26 S/1,814.16
cm
02.01.13.05 SUMINISTRO E INSTALACION DE ACCESORIOS PARA LAVADERO S/15,315.30 S/2,144.14 S/4,594.59 S/4,594.59 S/3,981.98
02.02.01.01.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN TERRENO NORMAL m3 182.10 S/39.50 S/7,192.95 S/1,007.01 S/2,157.89 S/2,157.89 S/1,870.17
02.02.01.01.02.02 REFINE Y COMPACTACIÓN MANUAL PARA ESTRUCTURAS m2 802.11 S/2.82 S/2,261.95 S/316.67 S/678.59 S/678.59 S/588.11
02.02.01.01.02.03 ELIMINACION DE MATERIAL EXCEDENTE (Dprom=30 m) m3 227.63 S/23.04 S/5,244.60 S/734.24 S/1,573.38 S/1,573.38 S/1,363.60
02.02.01.01.03 OBRAS DE CONCRETO SIMPLE S/60,766.13 S/8,507.26 S/18,229.84 S/18,229.84 S/15,799.19
02.02.01.01.03.01 CONCRETO 1:10 + 30% P.G. PARA CIMIENTOS CORRIDOS m3 154.44 S/228.50 S/35,289.54 S/4,940.54 S/10,586.86 S/10,586.86 S/9,175.28
02.02.01.01.03.02 CONCRETO 1:8 + 25% P.M. PARA SOBRECIMIENTOS m3 32.38 S/316.87 S/10,260.25 S/1,436.44 S/3,078.08 S/3,078.08 S/2,667.67
02.02.01.01.03.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTOS m2 498.08 S/30.55 S/15,216.34 S/2,130.29 S/4,564.90 S/4,564.90 S/3,956.25
CALENDARIO DE AVANCE DE OBRA VALORIZADO
PROYECTO : "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO RURAL EN EL CASERIO DE SOLUGAN, DISTRITO DE TACABAMBA-CHOTA-CAJAMARCA", CUI:2372080
02.02.01.01.05.01 MURO DE LADRILLO CARAVISTA APAREJO DE SOGA MEZC. C:A 1:5 m2 1,216.38 S/67.40 S/81,984.01 S/11,477.76 S/24,595.20 S/24,595.20 S/21,315.84
02.02.01.01.08.01 CONCRETO f'c=175 kg/cm2 PARA PISO CON ACABADO PULIDO E=0.10m m2 235.13 S/37.54 S/8,826.78 S/1,235.75 S/2,648.03 S/2,648.03 S/2,294.96
02.02.01.01.08.02 CONCRETO F'C 140 Kg/cm2 PARA VEREDA E=0.10 m m2 482.23 S/70.25 S/33,876.66 S/4,742.73 S/10,163.00 S/10,163.00 S/8,807.93
02.02.01.01.08.03 ENCOFRADO Y DESENCOFRADO DE VEREDAS h=0.10 m. m2 188.43 S/30.55 S/5,756.54 S/805.92 S/1,726.96 S/1,726.96 S/1,496.70
02.02.01.01.08.04 JUNTA DE DILATACION (TECNOPOR Y MEZCLA ASFALTICA) m 840.40 S/8.82 S/7,412.33 S/1,037.73 S/2,223.70 S/2,223.70 S/1,927.21
02.02.01.01.08.05 SARDINEL DE DUCHA h=0.20 m m 167.20 S/12.21 S/2,041.51 S/285.81 S/612.45 S/612.45 S/530.79
02.02.01.01.09 CARPINTERIA DE MADERA S/55,655.41 S/7,791.76 S/16,696.62 S/16,696.62 S/14,470.41
02.02.01.01.09.01 SUMINISTRO E INSTALACION DE MADERA DE 3"x2" m 834.90 S/15.37 S/12,832.41 S/1,796.54 S/3,849.72 S/3,849.72 S/3,336.43
02.02.01.01.09.02 SUMINISTRO E INSTALACION DE CORREAS DE MADERA DE 2"x2" m 1,100.00 S/8.75 S/9,625.00 S/1,347.50 S/2,887.50 S/2,887.50 S/2,502.50
02.02.01.01.09.03 VENTANA CON MARCO DE MADERA 0.80x0.40m und 110.00 S/25.00 S/2,750.00 S/385.00 S/825.00 S/825.00 S/715.00
PUERTA CONTRAPLACADA 0.75x2.00 m, E=45mm INCLUYE BISAGRA Y
02.02.01.01.09.04 und 110.00 S/276.80 S/30,448.00 S/4,262.72 S/9,134.40 S/9,134.40 S/7,916.48
CERROJO
02.02.01.01.10 PINTURA S/18,239.95 S/2,553.59 S/5,471.99 S/5,471.99 S/4,742.39
02.02.01.01.10.01 PINTURA MUROS INTERIORES C/LATEX (2 MANOS) m2 963.25 S/13.65 S/13,148.36 S/1,840.77 S/3,944.51 S/3,944.51 S/3,418.57
02.02.01.01.10.02 PINTURA EN EXTERIORES C/LATEX (2 MANOS) m2 373.01 S/13.65 S/5,091.59 S/712.82 S/1,527.48 S/1,527.48 S/1,323.81
02.02.01.01.11 CUBIERTAS S/29,007.84 S/4,061.10 S/8,702.35 S/8,702.35 S/7,542.04
SUMINISTRO E INSTALACION DE COBERTURA CON TEJA ANDINA DE
02.02.01.01.11.01 m2 743.60 S/39.01 S/29,007.84 S/4,061.10 S/8,702.35 S/8,702.35 S/7,542.04
FIBROCEMENTO
02.02.01.01.12 APARATOS Y ACCESORIOS SANITARIOS S/47,091.00 S/6,592.74 S/14,127.30 S/14,127.30 S/12,243.66
02.02.01.01.12.01 INODORO TANQUE BAJO BLANCO INCLUIDO ACCESORIOS und 110.00 S/188.09 S/20,689.90 S/2,896.59 S/6,206.97 S/6,206.97 S/5,379.37
02.02.01.01.12.02 LAVATORIO DE PARED BLANCO INCLUIDO ACCESORIOS und 110.00 S/150.81 S/16,589.10 S/2,322.47 S/4,976.73 S/4,976.73 S/4,313.17
02.02.01.01.12.03 DUCHA CROMADA 1 LLAVE INCLUYE ACCESORIOS und 110.00 S/89.20 S/9,812.00 S/1,373.68 S/2,943.60 S/2,943.60 S/2,551.12
02.02.01.01.13 SISTEMA DE DESAGÜE S/20,799.72 S/2,911.96 S/6,239.92 S/6,239.92 S/5,407.93
02.02.01.01.13.01 SALIDA DE VENTILACION PVC SAL 2" pto 110.00 S/14.75 S/1,622.50 S/227.15 S/486.75 S/486.75 S/421.85
02.02.01.01.13.02 SALIDA DE DESAGÜE PVC SAL 2" pto 220.00 S/11.78 S/2,591.60 S/362.82 S/777.48 S/777.48 S/673.82
02.02.01.01.13.03 SUMIDERO DE BRONCE ROSCADO 2" und 110.00 S/43.57 S/4,792.70 S/670.98 S/1,437.81 S/1,437.81 S/1,246.10
02.02.01.01.13.04 REGISTRO DE BRONCE 2" und 110.00 S/3.11 S/342.10 S/47.89 S/102.63 S/102.63 S/88.95
02.02.01.01.13.05 REGISTRO DE BRONCE 4" und 110.00 S/12.34 S/1,357.40 S/190.04 S/407.22 S/407.22 S/352.92
02.02.01.01.13.06 SALIDA DE DESAGÜE PVC SAL 4" pto 110.00 S/14.40 S/1,584.00 S/221.76 S/475.20 S/475.20 S/411.84
02.02.01.01.13.07 REDES DE DESAGÜE CON TUBERIA PVC SAL 2" m 804.10 S/6.04 S/4,856.76 S/679.95 S/1,457.03 S/1,457.03 S/1,262.76
02.02.01.01.13.08 REDES DE DESAGÜE CON TUBERIA PVC SAL 4" m 198.00 S/10.07 S/1,993.86 S/279.14 S/598.16 S/598.16 S/518.40
02.02.01.01.13.09 CODO PVC SAL 2"x45° und 110.00 S/5.72 S/629.20 S/88.09 S/188.76 S/188.76 S/163.59
02.02.01.01.13.10 YEE PVC SAL 2" und 220.00 S/4.68 S/1,029.60 S/144.14 S/308.88 S/308.88 S/267.70
02.02.01.01.14 SISTEMA DE AGUA FRIA S/22,452.98 S/3,143.42 S/6,735.89 S/6,735.89 S/5,837.77
02.02.01.01.14.01 SALIDA DE AGUA FRIA CON TUBERIA PVC-SAP 1/2" pto 330.00 S/23.29 S/7,685.70 S/1,076.00 S/2,305.71 S/2,305.71 S/1,998.28
02.02.01.01.14.02 RED DE DISTRIBUCION CON TUBERIA PVC-SAP Ø1/2" m 1,281.50 S/5.12 S/6,561.28 S/918.58 S/1,968.38 S/1,968.38 S/1,705.93
02.02.01.01.14.03 CODO PVC SAL 1/2"x90° und 990.00 S/2.66 S/2,633.40 S/368.68 S/790.02 S/790.02 S/684.68
02.02.01.01.14.04 TEE PVC SAL 1/2" und 330.00 S/3.32 S/1,095.60 S/153.38 S/328.68 S/328.68 S/284.86
02.02.01.01.14.05 VALVULA ESFERICA DE BRONCE 1/2" und 110.00 S/40.70 S/4,477.00 S/626.78 S/1,343.10 S/1,343.10 S/1,164.02
02.02.01.01.15 INSTALACIONES ELECTRICAS S/18,419.45 S/2,578.72 S/5,525.84 S/5,525.84 S/4,789.06
02.02.01.01.15.01 SUMINISTRO E INSTALACIÓN DE TUBERIA PVC-P DE Ø 20mm m 427.90 S/3.88 S/1,660.25 S/232.44 S/498.08 S/498.08 S/431.67
02.02.01.01.15.02 SUMINISTRO E INSTALACION DE CABLE 2.5 mm2 THW m 1,251.80 S/3.28 S/4,105.90 S/574.83 S/1,231.77 S/1,231.77 S/1,067.53
02.02.01.01.15.03 SUMINISTRO E INSTALACION DE ALUMBRADO EN EL TECHO und 110.00 S/40.15 S/4,416.50 S/618.31 S/1,324.95 S/1,324.95 S/1,148.29
02.02.01.01.15.04 INTERRUPTOR TERMOMAGNETICO MONOFASICO 2X15A und 110.00 S/56.45 S/6,209.50 S/869.33 S/1,862.85 S/1,862.85 S/1,614.47
02.02.01.01.15.05 SUMINISTRO E INSTALACION DE INTERRUPTOR SIMPLE und 110.00 S/18.43 S/2,027.30 S/283.82 S/608.19 S/608.19 S/527.10
02.02.01.02 REDES COLECTORAS DE DESAGÜE EXTERNO S/44,927.53 S/6,289.85 S/13,478.26 S/13,478.26 S/11,681.16
02.02.01.02.01 TRABAJOS PRELIMINARES S/2,385.68 S/334.00 S/715.70 S/715.70 S/620.28
02.02.01.02.01.01 TRAZO Y REPLANTEO PARA LINEAS DE DESAGÜE m 985.82 S/2.42 S/2,385.68 S/334.00 S/715.70 S/715.70 S/620.28
02.02.01.02.02 MOVIMIENTO DE TIERRAS S/21,049.85 S/2,946.98 S/6,314.96 S/6,314.96 S/5,472.96
EXCAVACION DE ZANJA, PARA TUBERIA A.PROM. 0.40M. H=0.80M.
02.02.01.02.02.01 m 762.30 S/12.57 S/9,582.11 S/1,341.50 S/2,874.63 S/2,874.63 S/2,491.35
TERRENO NORMAL, Manual
EXCAVACION DE ZANJA, PARA TUBERIA A.PROM. 0.60M. H=0.80M.
02.02.01.02.02.02 m 223.52 S/12.57 S/2,809.65 S/393.35 S/842.90 S/842.90 S/730.51
TERRENO NORMAL, Manual
02.02.01.02.02.03 REFINE Y NIVELACION DE ZANJA EN TERRENO NORMAL m 985.82 S/1.38 S/1,360.43 S/190.46 S/408.13 S/408.13 S/353.71
02.02.01.02.02.04 CAMA DE APOYO PARA TUBERIA m 985.82 S/2.23 S/2,198.38 S/307.77 S/659.51 S/659.51 S/571.58
RELLENO DE ZANJAS APISONADO CON MATERIAL PROPIO EN CAPAS DE
02.02.01.02.02.05 m 985.82 S/3.89 S/3,834.84 S/536.88 S/1,150.45 S/1,150.45 S/997.06
0.20 M EN TERRENO NORMAL HASTA 0.70M
02.02.01.02.02.06 ELIMINACION DE MATERIAL EXCEDENTE (Dprom=30 m) m3 54.88 S/23.04 S/1,264.44 S/177.02 S/379.33 S/379.33 S/328.75
02.02.01.02.03 TUBERÍAS Y ACCESORIOS S/13,388.33 S/1,874.37 S/4,016.50 S/4,016.50 S/3,480.97
02.02.01.02.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC SAL 2" DESAGÜE m 765.60 S/6.04 S/4,624.22 S/647.39 S/1,387.27 S/1,387.27 S/1,202.30
02.02.01.02.03.02 SUMINISTRO E INSTALACION DE TUBERIA PVC SAL 4" DESAGÜE m 225.50 S/10.07 S/2,270.79 S/317.91 S/681.24 S/681.24 S/590.41
02.02.01.02.04.01 EXCAVACION MANUAL PARA ESTRUCTURA EN TERRENO NORMAL m3 11.55 S/39.50 S/456.23 S/63.87 S/136.87 S/136.87 S/118.62
02.02.01.02.04.02 REFINE Y COMPACTACIÓN MANUAL PARA ESTRUCTURAS m2 23.10 S/2.82 S/65.14 S/9.12 S/19.54 S/19.54 S/16.94
CALENDARIO DE AVANCE DE OBRA VALORIZADO
PROYECTO : "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO RURAL EN EL CASERIO DE SOLUGAN, DISTRITO DE TACABAMBA-CHOTA-CAJAMARCA", CUI:2372080
02.02.01.02.04.03 SUMINISTRO E INSTALACION DE CAJA DE REGISTRO 12"x24" CON TAPA und 110.00 S/68.93 S/7,582.30 S/1,061.52 S/2,274.69 S/2,274.69 S/1,971.40
02.02.01.03.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN TERRENO NORMAL m3 310.15 S/39.50 S/12,250.93 S/1,715.13 S/3,675.28 S/3,675.28 S/3,185.24
02.02.01.03.02.02 REFINE Y COMPACTACIÓN MANUAL PARA ESTRUCTURAS m2 87.76 S/2.82 S/247.48 S/34.65 S/74.24 S/74.24 S/64.34
02.02.01.03.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 170.23 S/19.76 S/3,363.74 S/470.92 S/1,009.12 S/1,009.12 S/874.57
02.02.01.03.02.04 ELIMINACION DE MATERIAL EXCEDENTE (Dprom=30 m) m3 174.90 S/23.04 S/4,029.70 S/564.16 S/1,208.91 S/1,208.91 S/1,047.72
02.02.01.03.03 CAMARA DE LODOS S/32,140.36 S/4,499.65 S/9,642.11 S/9,642.11 S/8,356.49
02.02.01.03.03.01 CONCRETO f'c=175 kg/cm2 PARA CAMARA DE LODOS m3 34.66 S/403.61 S/13,989.12 S/1,958.48 S/4,196.74 S/4,196.74 S/3,637.17
02.02.01.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN CAMARA DE LODOS m2 337.98 S/30.55 S/10,325.29 S/1,445.54 S/3,097.59 S/3,097.59 S/2,684.58
02.02.01.03.04.01 CONCRETO f'c=100 kg/cm2, h=2" (PARA SOLADO DE BIODIGESTOR) m2 52.56 S/16.41 S/862.51 S/120.75 S/258.75 S/258.75 S/224.25
02.02.01.03.04.02 TANQUE BIODIGESTOR 600 LTS, INC. ACCESORIOS und 110.00 S/872.10 S/95,931.00 S/13,430.34 S/28,779.30 S/28,779.30 S/24,942.06
02.02.01.04 POZO DE PERCOLACION S/122,261.27 S/17,116.58 S/36,678.38 S/36,678.38 S/31,787.93
02.02.01.04.01 TRABAJOS PRELIMINARES S/709.43 S/99.32 S/212.83 S/212.83 S/184.45
02.02.01.04.01.01 LIMPIEZA DE TERRENO MANUAL m2 179.15 S/0.69 S/123.61 S/17.31 S/37.08 S/37.08 S/32.14
02.02.01.04.01.02 TRAZO Y REPLANTEO PRELIMINAR DE ESTRUCTURAS m2 179.15 S/3.27 S/585.82 S/82.01 S/175.75 S/175.75 S/152.31
02.02.01.04.02 MOVIMIENTO DE TIERRAS S/26,066.76 S/3,649.35 S/7,820.03 S/7,820.03 S/6,777.36
02.02.01.04.02.01 EXCAVACION MANUAL PARA ESTRUCTURA EN TERRENO NORMAL m3 353.52 S/39.50 S/13,964.04 S/1,954.97 S/4,189.21 S/4,189.21 S/3,630.65
02.02.01.04.02.02 REFINE Y COMPACTACIÓN MANUAL PARA ESTRUCTURAS m2 149.29 S/2.82 S/421.00 S/58.94 S/126.30 S/126.30 S/109.46
02.02.01.04.02.03 RELLENO CON MATERIAL PROPIO SELECCIONADO m3 75.94 S/19.76 S/1,500.57 S/210.08 S/450.17 S/450.17 S/390.15
02.02.01.04.02.04 ELIMINACION DE MATERIAL EXCEDENTE (Dprom=30 m) m3 441.89 S/23.04 S/10,181.15 S/1,425.36 S/3,054.35 S/3,054.35 S/2,647.10
02.02.01.04.03 OBRAS DE CONCRETO S/54,360.13 S/7,610.42 S/16,308.04 S/16,308.04 S/14,133.63
02.02.01.04.03.01 CONCRETO f'c=175 kg/cm2 PARA CIMIENTO DEL POZO DE ABSORCIÓN m3 59.72 S/403.61 S/24,103.59 S/3,374.50 S/7,231.08 S/7,231.08 S/6,266.93
02.02.01.04.03.02 CONCRETO f'c=175 kg/cm2 PARA LOSA DE TECHO m3 11.12 S/403.61 S/4,488.14 S/628.34 S/1,346.44 S/1,346.44 S/1,166.92
02.02.01.04.03.03 CONCRETO f'c=175 kg/cm2 PARA TAPA m3 1.56 S/403.61 S/629.63 S/88.15 S/188.89 S/188.89 S/163.70
02.02.01.04.03.04 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 LOSA DE TECHO kg 1,538.94 S/5.27 S/8,110.21 S/1,135.43 S/2,433.06 S/2,433.06 S/2,108.65
02.02.01.04.03.05 ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 PARA TAPA kg 90.20 S/5.27 S/475.35 S/66.55 S/142.61 S/142.61 S/123.59
02.02.01.04.03.07 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSAS MACIZAS m2 174.83 S/30.55 S/5,341.06 S/747.75 S/1,602.32 S/1,602.32 S/1,388.68
02.02.01.04.03.08 ENCOFRADO Y DESENCOFRADO NORMAL PARA TAPA m2 51.84 S/30.55 S/1,583.71 S/221.72 S/475.11 S/475.11 S/411.76
02.02.01.04.04 MUROS Y TABIQUES S/40,472.28 S/5,666.12 S/12,141.68 S/12,141.68 S/10,522.79
02.02.01.04.04.01 MURO DE LADRILLO DE CONCRETO DE SOGA CON JUNTA ABIERTA m2 659.91 S/61.33 S/40,472.28 S/5,666.12 S/12,141.68 S/12,141.68 S/10,522.79
02.02.01.04.05 SUMINISTRO Y COLOCACIÓN DE GRAVA EN POZO DE PERCOLACIÓN S/652.67 S/91.37 S/195.80 S/195.80 S/169.69
02.02.01.04.05.01 GRAVA GRUESA 1" m3 8.64 S/75.54 S/652.67 S/91.37 S/195.80 S/195.80 S/169.69
03 MITIGACION DE IMPACTO AMBIENTAL S/68,605.04 S/9,604.71 S/20,581.51 S/20,581.51 S/17,837.31
03.01 PLAN DE MANEJO AMBIENTAL S/16,563.49 S/2,318.89 S/4,969.05 S/4,969.05 S/4,306.51
03.01.01 CAPACITACION A LOS TRABAJADORES DEL PROYECTO glb 1.00 S/7,443.49 S/7,443.49 S/1,042.09 S/2,233.05 S/2,233.05 S/1,935.31
03.01.02 DELIMITACION Y SEÑALIZACION DEL AREA DE TRABAJO m 2,000.00 S/1.16 S/2,320.00 S/324.80 S/696.00 S/696.00 S/603.20
03.01.03 PUENTE DE MADERA PARA PASE PEATONAL TEMPORAL glb 2.00 S/900.00 S/1,800.00 S/252.00 S/540.00 S/540.00 S/468.00
03.01.04 PERFILADO DE TALUDES, ESTABILIZACION POR COMPACTACION glb 1.00 S/5,000.00 S/5,000.00 S/700.00 S/1,500.00 S/1,500.00 S/1,300.00
03.02 PLAN DE MANEJO DE RESIDUOS SOLIDOS Y LIQUIDOS S/7,205.81 S/1,008.81 S/2,161.74 S/2,161.74 S/1,873.51
ADQUISICION DE CONTENEDORES PARA EL ALMACENAMIENTO TEMPORAL DE
03.02.01 und 1.00 S/900.00 S/900.00 S/126.00 S/270.00 S/270.00 S/234.00
LOS RESIDUOS SOLIDOS
IMPLEMENTACION Y EJECUCION DEL PLAN DE MANEJO DE RESIDUOS SOLIDOS
03.02.02 glb 1.00 S/6,305.81 S/6,305.81 S/882.81 S/1,891.74 S/1,891.74 S/1,639.51
Y LIQUIDOS
03.03 PLAN DE MONITOREO, SEGUIMIENTO Y CONTROL S/19,160.82 S/2,682.51 S/5,748.25 S/5,748.25 S/4,981.81
03.03.01 MONITOREO DE LA CALIDAD DEL AGUA PARA CONSUMO HUMANO glb 1.00 S/2,660.82 S/2,660.82 S/372.51 S/798.25 S/798.25 S/691.81
03.03.02 MONITOREO DE LA EMISION DE RUIDOS glb 1.00 S/500.00 S/500.00 S/70.00 S/150.00 S/150.00 S/130.00
03.03.03 MONITOREO DE LA CALIDAD DEL AIRE glb 1.00 S/1,000.00 S/1,000.00 S/140.00 S/300.00 S/300.00 S/260.00
MONITOREO DE LAS ACTIVIDADES CONSTRUCTIVAS Y DEL CUMPLIMIENTO DE
03.03.04 glb 1.00 S/15,000.00 S/15,000.00 S/2,100.00 S/4,500.00 S/4,500.00 S/3,900.00
LAS MEDIDAS DE MITIGACION Y CORRECCION
03.04 PLAN DE CONTINGENCIA S/12,492.80 S/1,748.99 S/3,747.84 S/3,747.84 S/3,248.13
03.04.01 CAPACITACION AL PERSONAL EN RESPUESTA A EMERGENCIAS glb 2.00 S/1,478.56 S/2,957.12 S/414.00 S/887.14 S/887.14 S/768.85
03.04.02 EQUIPOS DE PRIMEROS AUXILIOS (BOTIQUIN) glb 2.00 S/746.40 S/1,492.80 S/208.99 S/447.84 S/447.84 S/388.13
03.04.03 MITIGACION DE DERRAME DE SUSTANCIAS PELIGROSAS glb 2.00 S/3,000.00 S/6,000.00 S/840.00 S/1,800.00 S/1,800.00 S/1,560.00
03.04.04 ATENCION EN CASO DE ACCIDENTES EN OBRA (PRIMEROS AUXILIOS) glb 1.00 S/5,000.00 S/5,000.00 S/700.00 S/1,500.00 S/1,500.00 S/1,300.00
PROYECTO : "MEJORAMIENTO Y AMPLIACION DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO RURAL EN EL CASERIO DE SOLUGAN, DISTRITO DE TACABAMBA-CHOTA-CAJAMARCA", CUI:2372080