CC Itimizado ConsPrisma
CC Itimizado ConsPrisma
CC Itimizado ConsPrisma
Pagina 1
1.2.6.5 CADENAS
1.2.6.5.1 fe Ø 8 KG 0
1.2.6.5.2 fe Ø 12 KG 0
1.2.6.5.3 fe Ø 16 KG 0
1.2.6.6 LOSAS
1.2.6.6.1 fe Ø 8 KG 98.49
1.2.6.6.2 fe Ø 12 KG 0
1.2.6.6.3 fe Ø 16 KG 0
1.3 MOLDAJES PARA ELEMENTOS DE HORMIGON
1.3.1 MOLDAJE MUROS M2 1,013.68
1.3.2 MOLDAJE PILARES M2
1.3.3 MOLDAJE VIGAS M2
1.3.4 MOLDAJE CADENAS M2
1.3.5 MOLDAJE LOSAS M2 1.98
1.3.6 MOLDAJE VIGAS DE FUNDACION M2 109.66
1.4 RADIERES
1.4.1 BAÑOS Y DUCHAS
1.4.1.1 BAÑO CAPACIDADES ESPECIALES M2 5.03
1.4.1.2 BAÑO MUJER PARTE 1 LAVAMANOS M2 2.12
1.4.1.3 BAÑO MUJER PARTE 2 W.C M2 2.91
1.4.1.4 BAÑO HOMBRES LAVAMANOS M2 1.87
1.4.1.5 BAÑO HOMBRE W.C M2 2.26
1.4.1.6 BAÑO MUJER PERSONAL M2 2.23
1.4.1.7 BAÑO HOMBRE PERSONAL M2 1.78
1.4.1.8 DUCHA PERSONAL MASCULINO M2 3.20
1.4.1.9 DUCHA PERSONAL FEMENINO M2 2.65
1.4.1.10 BAÑO SALA DE PROCEDIMIENTOS M2 1.94
1.4.1.11 BAÑO GINE OBTETRICA M2 2.98
1.5 ESTRUCTURA DE TECHUMBRE
1.5.1 VIGAS IPE KG 1,885.11
1.5.2 PERFILES C100/50/15/2 KG 16.98
1.5.3 PERFILES C100/50/3 KG 1,430.94
1.7 CUBIERTA DE TECHUMBRE
1.7.1 CUBIERTA
1.7.1.1 CUBIERTA ZINC PV4 M2 353.031
1.7.2 HOJALATERIA
1.7.2.1 FORROS Y CUMBRERAS ML 178.03
1.7.2.2 CANALES DE AGUAS LLUVIAS ML 60.761
1.7.2.3 BAJADAS DE AGUAS LLUVIAS ML 24
1.7.2.4 DRENES DE AGUAS LLUVIAS M3 9.62
1.8 PROTECCIONES CLIMATICAS Y AMBIENTALES
1.8.1 AISLACION TERMICA CUBIERTA M2 353.031
1.9 ENVOLVENTE TERMICA DE MUROS
1.9.1 SISTEMA EIFS PROMURO M2 305.5
1.10 BARRERA DE CONDENSACIÓN - VAPOR
1.10.1 BARRERA DE CONDENSACIÓN M2 353.031
1.10.2 BARRERA DE VAPOR M2 28.97
2 TERMINACIONES
2.1 TABIQUES DIVISORIOS INTERIORES
2.1.1 TABIQUES DE YESO CARTON ST ML 91.64
2.1.2 TABIQUES DE YESO CARTON RH ML 36.83
Pagina 2
2.2.2 INTERIORES REVESTIMIENTOS
2.2.2.1 ESTUCOS M2
2.2.2.2 CERAMICA
2.2.2.2.1 CERAMICA MUROS M2 142.68
2.2.2.2.2 CERAMICA PISOS M2 22.02
2.3 CIELOS
2.3.1 CIELO DE HORMIGON M2 15
2.3.2 CIELO DE YESO CARTON M2 326.64
2.4 PAVIMENTOS INTERIORES
2.4.1 BALDOSA MICROVIBRADA LISA M2 326.59
2.4.2 GRADAS 50 X 50 ML 6.8
2.4.3 GUARDAPOLVOS ML 264.474
2.5 GUARDA MUROS
2.5.1 GUARDAMUROS PASILLOS ML 55.78
2.7.2.1 PUERTAS AL
2.7.2.1.1 PUERTAS DE ACCESO
2.7.2.1.1.1 P1 UN 2
2.7.2.1.2 PUERTAS INTERIORES
2.7.2.1.2.1 P3 90x200 UN 1
2.7.2.1.2.2 P4 75x200 UN 7
2.7.2.1.2.3 P5 65x200 UN 2
2.7.2.1.2.4 P6 110x200 UN 11
2.7.2.1.2.5 P7 150x200 UN 2
2.7.2.2 VENTANAS PVC TERMOPANEL
2.7.2.2.1 V1 180x120 UN 2
2.7.2.2.2 V2 240x120 UN 13
2.7.2.2.3 V3 300x240 UN 2
2.7.2.2.4 V4 65x60 UN 6
2.7.2.2.5 V5 340x145 UN 1
2.7.2.2.6 V6 240X195 UN 2
2.7.4 QUINCALLERIA PUERTAS
2.7.4.1 BISAGRAS EN MARCOS UN 75
2.7.4.2 CERRADURA DE PUERTAS INTERIORES UN 18
2.7.4.3 CERRADURA DE PUERTAS EXTERIORES UN 2
2.8 PINTURAS
2.8.1 PINTURA ESMALTE AL AGUA M2 685.4
2.8.2 PINTURA LATEX CIELOS REVESTIMIENTO INTERIOR M2 308.0
2.8.3 PINTURA OLEO CIELOS INTERIORES M2 33.7
2.8.4 PINTURA ESMALTE SINTETICO M2 0
3.0 ARTEFACTOS SANITARIOS
3.1 LAVAMANOS UN 20
3.2 WC DISCAPACITADOS UN 1
3.3 WC PUBLICO Y PERSONAL UN 8
3.4 RECEPTACULOS UN 2
3.5 LAVAPLATOS UN 1
3.6 URINARIO UN 1
4.0 ACCESORIOS SANITARIOS
4.1 PORTAROLLO UN 9
4.2 DISPENSADOR DE JABON LIQUIDO UN 19
4.3 BARRA DE APOYO FIJA UN 1
4.4 BARRA DE APOYO ABATIBLE UN 1
Pagina 3
4.5 DISPENSADOR DE TOALLAS UN 19
5.0 INSTALACIONES
5.1 ALCANTARILLADO GL
5.2 CONEXIÓN A ALCANTARILLADO UD GL
5.3 AGUA POTABLE GL
5.4 ELECTRICIDAD GL
5.4.1 FUERZA Y ALUMBRADO GL
5.5 EQUIPO HIDROPACK AGUA POTABLE
5.5.1 EXCAVACION PARA ESTANQUE DE AGUA POTABLE M3
5.5.2 HORMIGON DE LA ESTRUCTURA M3
5.5.3 ARMADURAS KG
5.5.4 MOLDAJE M2
5.5.5 IMPERMEABILIZACION M2
5.5.6 ESCALERILLA M2
5.5.7 BOMBAS UN
5.5.8 HIDROPACK UN
5.5.9 FLOTADOR UN
5.6 EQUIPO ELECTROGENO
5.6.1 GENERADOR ELECTRICO UN
5.6.2 HORMIGON RADIER M2
5.6.3 ESTRUCTURA METALICA KG
5.6.4 CUBIERTA M2
5.6.5 ANTIOXIDO Y ESMALTE SINTETICO M2
6.0 OBRAS COMPLEMENTARIAS
6.1 EXTINTORES UN
6.2 GABINETES UN
7.0 ASEO Y ENTREGA
7.1 ASEO Y LIMPIEZA INTERIOR Y EXTERIOR DEL RECINTO GL
8 TOTAL COSTO DIRECTO
9 GASTOS GENERALES
10 UTILIDADES
11 VALOR NETO
12 I.V.A 19%
13 TOTAL
Pagina 4
DAD CONSTRUCTORA PRISMA LTDA
DA SALVADOR 757, PROVIDENCIA
TELEFONO: +56948802104
NTACTO@CONSTRUCTORAPRISMA.CL
o Web: www.constructoraprisma.cl
V.P.U TOTAL
$ 13,594 $ 1,898,027
$ 15,231 $ 1,207,418
$ 12,188 $ 95,660
$ 12,772 $ 151,474
$ 74,270 $ 460,013
$ 68,778 $ 2,555,973
$ 68,778 $ 126,414
$ 82,198 $ 8,333,572
$ 82,198 $ 192,985
$ 82,198 $ 1,675,877
$ 82,198 $ 160,944
$ 5,220 $ 2,049,717
$ 1,278 $ 1,611,439
$ 1,162 $ 6,088,986
$ 1,325 $ 1,318,902
$ 1,161 $ 793,970
$ 1,126 $ 266,391
$ 1,278 $ 151,315
$ 1,126 $ 69,502
$ 1,278 $ 206,843
Pagina 5
$ 1,126 $ 110,898
$ 18,365 $ 18,616,678
$ 10,084 $ 19,967
$ 14,283 $ 1,566,335
$ 16,058 $ 80,756
$ 16,058 $ 33,963
$ 16,058 $ 46,681
$ 16,058 $ 29,974
$ 16,058 $ 36,362
$ 16,058 $ 35,886
$ 16,058 $ 28,612
$ 16,058 $ 51,426
$ 16,058 $ 42,610
$ 16,058 $ 31,088
$ 16,058 $ 47,773
$ 45,207 $ 85,219,601
$ 19,136 $ 324,929
$ 24,293 $ 34,761,929
$ 10,484 $ 3,701,140
$ 5,397 $ 960,905
$ 7,313 $ 444,357
$ 7,740 $ 185,763
$ 23,804 $ 8,403,631
$ 9,397 $ 2,870,441
$ 9,700 $ 3,424,401
$ 1,209 $ 35,027
$ 33,224 $ 3,044,587
$ 50,325 $ 1,853,466
Pagina 6
$ 7,650 $ 1,091,525
$ 7,650 $ 168,458
$ 81,314 $ 1,219,710
$ 20,362 $ 6,651,044
$ 27,558 $ 9,000,164
$ 5,461 $ 304,631
$ 494,038 $ 988,077
$ 36,864 $ 36,864
$ 34,948 $ 244,636
$ 31,275 $ 62,550
$ 41,745 $ 459,197
$ 49,132 $ 98,265
$ 230,523 $ 461,045
$ 288,879 $ 3,755,427
$ 639,017 $ 1,278,034
$ 87,063 $ 522,381
$ 455,032 $ 455,032
$ 434,770 $ 869,539
$ 13,751 $ 1,031,325
$ 19,132 $ 344,374
$ 42,298 $ 84,596
$ 2,013 $ 1,379,800
$ 1,766 $ 543,875
$ 2,205 $ 74,242
$ - $ -
$ 69,711 $ 1,394,213
$ 150,546 $ 150,546
$ 69,546 $ 556,369
$ 64,790 $ 129,581
$ 111,753 $ 111,753
$ 150,879 $ 150,879
$ 17,808 $ 160,268
$ 10,638 $ 202,113
$ 38,401 $ 38,401
$ 97,692 $ 97,692
Pagina 7
$ 17,818 $ 338,533
$ 229,879,743
$0
$0
$0
$0
$0
Pagina 8
Declaración de remuneraciones x mes liq. x dia
Jornal $ 450,000 $ 15,000
Ayudante $ 490,000 $ 16,333
Concretero $ 550,000 $ 18,333
Maestro 2º $ 630,000 $ 21,000
Maestro 1° $ 750,000 $ 25,000
Gasfiter $ 600,000 $ 20,000
Electricista $ 750,000 $ 25,000
Pintor $ 700,000 $ 23,333
Albañil $ 700,000 $ 23,333
Leyes Sociales 30%
SUBCONTRATO
Declaración de remuneraciones x mes liq. x dia
Pintor (Mnatencion) $ 500,000 $ 16,667
Electricos $ 600,000 $ 20,000
Gasfiter $ 600,000 $ 20,000
Enfierrador $ 600,000 $ 20,000
Estructurero $0
Hojalatero $0
Aluminero $0
Clima $0
Administrativos
Declaración de remuneraciones x mes liq. x dia
Administrador de obra $ 1,800,000 $ 60,000
Jefe de Terreno $ 1,100,000 $ 36,667
Trazador $ 700,000 $ 23,333
Capataz $ 900,000 $ 30,000
Chofer $ 600,000 $ 20,000
Bodeguero $ 450,000 $ 15,000
Item Descripcion Unidad Cantidad Rendimiento
0.8 TRABAJOS PREVIOS 0.0
0.8.1 CONSTRUCCIONES PROVISORIAS GL 0.0
0.8.3 CIERROS PROVISORIOS M2 0.0
0.8.4 MUROS DIVISORIOS Y/O MEDIANEROS M2 0.0
0.8.5 EXTRACCION DE ESCOMBROS M3 0.0
0.8.6 TRAZADO Y NIVELES GL 0.0
0.8.7 ACCESO, SALIDA Y VÍAS DE CIRCULACIÓN GL 0.0
0.9 ASEO DE LAS OBRAS GL 0.0
1 OBRA GRUESA 0.0
1.1 MOVIMIENTO DE TIERRA 0.0
1.1.1 ESCARPES Y EXTRACCION DE ESCOMBROS M3 139.6 28
1.1.2 EXCAVACIONES PARA FUNDACIONES M3 79.3 13
1.1.2.1 EXCAVACIONES PARA FUNDACIONES A MANO M3 7.8 3.2
1.1.3 RELLENOS 0.0
1.1.3.1 RELLENOS ESTRUCTURALES M3 11.9 12.8
1.1.3.2 RELLENOS CON ESTABILIZADO M3 0.0
1.2 ELEMENTOS ESTRUCTURALES DE HORMIGON 0.0
1.2.1 EMPLANTILLADOS DE HORMIGON M2 6.2
1.2.2 HORMIGON DE FUNDACIONES M3 37.2
1.2.3 VIGAS DE FUNDACIONES M3 1.8
1.2.4 MUROS DE HORMIGON ARMADO M3 101.4
1.2.5 PILARES, CADENAS, VIGAS Y LOSAS DE HORMIGON 0.0
1.2.5.1 HORMIGON PILARES M3 2.3
1.2.5.2 HORMIGON VIGAS M3 0.0
1.2.5.3 HORMIGON CADENAS M3 20.4
1.2.5.4 HORMIGON LOSAS M3 2.0
1.2.5.5 HORMIGON ESTUCO M2 392.7
1.2.6 ENFIERRADURA 0.0
1.2.6.1 CIMIENTOS
1.2.6.1.1 fe Ø 8 KG 60.0
1.2.6.1.2 fe Ø 12 KG 1,260.9 100
1.2.6.1.3 fe Ø 16 KG
1.2.6.2 MUROS
1.2.6.2.1 fe Ø 8 KG 5,240.1 100
1.2.6.2.2 fe Ø 12 KG 995.6 100
1.2.6.2.3 fe Ø 16 KG 683.9 150
1.2.6.3 VIGAS DE FUNDACIONES
1.2.6.3.1 fe Ø 8 KG 236.6 100
1.2.6.3.2 fe Ø 12 KG 118.4 100
1.2.6.3.3 fe Ø 16 KG
1.2.6.4 PILARES
1.2.6.4.1 fe Ø 8 KG 61.7 100
1.2.6.4.2 fe Ø 12 KG 161.8 100
1.2.6.4.3 fe Ø 16 KG
1.2.6.5 CADENAS
1.2.6.5.1 fe Ø 8 KG
1.2.6.5.2 fe Ø 12 KG
1.2.6.5.3 fe Ø 16 KG
1.2.6.6 LOSAS
1.2.6.6.1 fe Ø 8 KG 98.5 100
1.2.6.6.2 fe Ø 12 KG
1.2.6.6.3 fe Ø 16 KG
1.3 MOLDAJES PARA ELEMENTOS DE HORMIGON
1.3.1 MOLDAJE MUROS M2 1,013.7 17
1.3.2 MOLDAJE PILARES M2
1.3.3 MOLDAJE VIGAS M2
1.3.4 MOLDAJE CADENAS M2
1.3.5 MOLDAJE LOSAS M2 2.0 17
1.3.6 MOLDAJE VIGAS DE FUNDACION M2 109.7 17
1.4 RADIERES 0.0
1.4.1 BAÑOS Y DUCHAS 0.0
1.4.1.1 BAÑO CAPACIDADES ESPECIALES M2 5.0 8
1.4.1.2 BAÑO MUJER PARTE 1 LAVAMANOS M2 2.1 8
1.4.1.3 BAÑO MUJER PARTE 2 W.C M2 2.9 8
1.4.1.4 BAÑO HOMBRES LAVAMANOS M2 1.9 8
1.4.1.5 BAÑO HOMBRE W.C M2 2.3 8
1.4.1.6 BAÑO MUJER PERSONAL M2 2.2 8
1.4.1.7 BAÑO HOMBRE PERSONAL M2 1.8 8
1.4.1.8 DUCHA PERSONAL MASCULINO M2 3.2 8
1.4.1.9 DUCHA PERSONAL FEMENINO M2 2.7 8
1.4.1.10 BAÑO SALA DE PROCEDIMIENTOS M2 1.9 8
1.4.1.11 BAÑO GINE OBTETRICA M2 3.0 8
1.5 ESTRUCTURA DE TECHUMBRE 0.0
1.5.1 VIGAS IPE KG 1,885.1 10
1.5.2 PERFILES C100/50/15/2 KG 17.0 4
1.5.3 PERFILES C100/50/3 KG 1,430.9 4
1.7 CUBIERTA DE TECHUMBRE 0.0
1.7.1 CUBIERTA 0.0
1.7.1.1 CUBIERTA ZINC PV4 M2 353.0 35
1.7.2 HOJALATERIA 0.0
1.7.2.1 FORROS Y CUMBRERAS ML 178.0 9
1.7.2.2 CANALES DE AGUAS LLUVIAS ML 60.8 16
1.7.2.3 BAJADAS DE AGUAS LLUVIAS ML 24.0 16
1.7.2.4 DRENES DE AGUAS LLUVIAS M3 9.6
1.8 PROTECCIONES CLIMATICAS Y AMBIENTALES 0.0
1.8.1 AISLACION TERMICA CUBIERTA M2 353.0
1.9 ENVOLVENTE TERMICA DE MUROS 0.0
1.9.1 SISTEMA EIFS PROMURO M2 305.5 20
1.10 BARRERA DE CONDENSACIÓN - VAPOR 0.0
1.10.1 BARRERA DE CONDENSACIÓN M2 353.0 20
1.10.2 BARRERA DE VAPOR M2 29.0 27
2 TERMINACIONES 0.0
2.1 TABIQUES DIVISORIOS INTERIORES 0.0
2.1.1 TABIQUES DE YESO CARTON ST ML 91.6 11
2.1.2 TABIQUES DE YESO CARTON RH ML 36.8 11
2.2.2 INTERIORES REVESTIMIENTOS 0.0
2.2.2.1 ESTUCOS M2 0.0
2.2.2.2 CERAMICA 0.0
2.2.2.2.1 CERAMICA MUROS M2 142.7 8
2.2.2.2.2 CERAMICA PISOS M2 22.0 10
2.3 CIELOS 0.0
2.3.1 CIELO DE HORMIGON M2 15.0
2.3.2 CIELO DE YESO CARTON M2 326.6
2.4 PAVIMENTOS INTERIORES 0.0
2.4.1 BALDOSA MICROVIBRADA LISA M2 326.6 12
2.4.2 GRADAS 50 X 50 ML 6.8
2.4.3 GUARDAPOLVOS ML 264.5 12
2.5 GUARDA MUROS 0.0
2.5.1 GUARDAMUROS PASILLOS ML 55.8 18
2.7.2.1 PUERTAS AL 0.0
2.7.2.1.1 PUERTAS DE ACCESO 0.0
2.7.2.1.1.1 P1 UN 2.0 2
2.7.2.1.2 PUERTAS INTERIORES 0.0
2.7.2.1.2.1 P3 90x200 UN 1.0 2
2.7.2.1.2.2 P4 75x200 UN 7.0 2
2.7.2.1.2.3 P5 65x200 UN 2.0 2
2.7.2.1.2.4 P6 110x200 UN 11.0 2
2.7.2.1.2.5 P7 150x200 UN 2.0 2
2.7.2.2 VENTANAS PVC TERMOPANEL 0.0
2.7.2.2.1 V1 180x120 UN 2.0
2.7.2.2.2 V2 240x120 UN 13.0
2.7.2.2.3 V3 300x240 UN 2.0
2.7.2.2.4 V4 65x60 UN 6.0
2.7.2.2.5 V5 340x145 UN 1.0
2.7.2.2.6 V6 240X195 UN 2.0
2.7.4 QUINCALLERIA PUERTAS 0.0
2.7.4.1 BISAGRAS EN MARCOS UN 75.0
2.7.4.2 CERRADURA DE PUERTAS INTERIORES UN 18.0
2.7.4.3 CERRADURA DE PUERTAS EXTERIORES UN 2.0
2.8 PINTURAS 0.0
2.8.1 PINTURA ESMALTE AL AGUA M2 685.4 90.91
2.8.2 PINTURA LATEX CIELOS REVESTIMIENTO INTERIOR M2 308.0
2.8.3 PINTURA OLEO CIELOS INTERIORES M2 33.7
2.8.4 PINTURA ESMALTE SINTETICO M2 0.0
3.0 ARTEFACTOS SANITARIOS 0.0
3.1 LAVAMANOS UN 20.0 3
3.2 WC DISCAPACITADOS UN 1.0 3
3.3 WC PUBLICO Y PERSONAL UN 8.0 3
3.4 RECEPTACULOS UN 2.0 3
3.5 LAVAPLATOS UN 1.0 3
3.6 URINARIO UN 1.0 3
4.0 ACCESORIOS SANITARIOS 0.0
4.1 PORTAROLLO UN 9.0
4.2 DISPENSADOR DE JABON LIQUIDO UN 19.0
4.3 BARRA DE APOYO FIJA UN 1.0
4.4 BARRA DE APOYO ABATIBLE UN 1.0
4.5 DISPENSADOR DE TOALLAS UN 19.0
5.0 INSTALACIONES 0.0
5.1 ALCANTARILLADO GL 0.0
5.2 CONEXIÓN A ALCANTARILLADO UD GL 0.0
5.3 AGUA POTABLE GL 0.0
5.4 ELECTRICIDAD GL 0.0
5.4.1 FUERZA Y ALUMBRADO GL 0.0
5.5 EQUIPO HIDROPACK AGUA POTABLE 0.0
5.5.1 EXCAVACION PARA ESTANQUE DE AGUA POTABLE M3 0.0
5.5.2 HORMIGON DE LA ESTRUCTURA M3 0.0
5.5.3 ARMADURAS KG 0.0
5.5.4 MOLDAJE M2 0.0
5.5.5 IMPERMEABILIZACION M2 0.0
5.5.6 ESCALERILLA M2 0.0
5.5.7 BOMBAS UN 0.0
5.5.8 HIDROPACK UN 0.0
5.5.9 FLOTADOR UN 0.0
5.6 EQUIPO ELECTROGENO 0.0
5.6.1 GENERADOR ELECTRICO UN 0.0
5.6.2 HORMIGON RADIER M2 0.0
5.6.3 ESTRUCTURA METALICA KG 0.0
5.6.4 CUBIERTA M2 0.0
5.6.5 ANTIOXIDO Y ESMALTE SINTETICO M2 0.0
6.0 OBRAS COMPLEMENTARIAS 0.0
6.1 EXTINTORES UN 0.0
6.2 GABINETES UN 0.0
7.0 ASEO Y ENTREGA 0.0
7.1 ASEO Y LIMPIEZA INTERIOR Y EXTERIOR DEL RECINTO GL 0.0
Rendimiento Total Dias
m3/dia 5
m3/dia 7
m3/dia 3
m3/dia 1
1
1
1
3
1
1
3
kg/dia 13
kg/dia 53
kg/dia 10
kg/dia 5
kg/dia 3
kg/dia 2
kg/dia 1
kg/dia 2
kg/dia 1
m2/dia 60
m2/dia 1
m2/dia 7
m2/dia 1
m2/dia 1
m2/dia 1
m2/dia 1
m2/dia 1
m2/dia 1
m2/dia 1
m2/dia 1
m2/dia 1
m2/dia 1
m2/dia 1
kg/dia 189
kg/dia 5
kg/dia 358
m2/dia 11
m/dia 20
m/dia 4
m/dia 2
m2/dia 16
m2/dia 18
m2/dia 2
ml/dia 9
ml/dia 4
m2/dia 18
m2/dia 3
26
m2/dia 28
ml/dia 23
ml/dia 4
un/dia 1
un/dia 1
un/dia 4
un/dia 1
un/dia 6
un/dia 1
5
2
1
8
3
1
un/dia 7
un/dia 1
un/dia 3
un/dia 1
un/dia 1
un/dia 1
1
1
1
1
1
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 18
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 19
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 20
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 21
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 22
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 23
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
2.3.1
2.3.1
2.3.1 Total m² Cielo de Hormigon
Item Descripcion un Cantidad
2.3.2 Plancha de Yeso Carton 12.5MM 1,20X2,40M. m² 1
2.3.2 Tornillos Drywall #6 1 1/4 UN 8
2.3.2 Aislacion Lana Mineral AISLAN GLASS ROLLO 1
2.3.2 Portante 40R 40x18x10x0,5 ML 2
2.3.2 Larguero Perfil AT 20x25x4x0,5 ML 2
2.3.2 Conector TI 150x66x0,85 ML 4
2.3.2 Tornillo Cabeza Trompeta PF 6x14 UN 16
2.3.2 Perdida % 1
2.3.2 Maestro 1º ML/m² 1
2.3.2 Ayudante ML/m² 1
2.3.2 Leyes Sociales % 1
2.3.2 Total m² Cielo de Yeso Carton
Pagina 24
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 25
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
2.7.2.1.2.2 PERDIDA % 1
2.7.2.1.2.2 MAESTRO 1º un/dia 1
2.7.2.1.2.2 Pintor H/dia 1
2.7.2.1.2.2 Leyes Sociales % 1
2.7.2.1.2.2 Total Puerta 4 200x75x4,5
Item Descripcion un Cantidad
2.7.2.1.2.3 PUERTA TERCIADO PINO 65X200X4,5 un 1
2.7.2.1.2.3 OLEO PROFESIONAL SEMI BRILLO 1 GALON TRICOLOR m² 2.5
2.7.2.1.2.3 TOPE DE PUERTA BASICO 30MM un 1
2.7.2.1.2.3 TARUGO PLASTICO 8MM 10un un 1
2.7.2.1.2.3 TORNILLO BDG COMBINADO 12 x 2", 5 unes Fixser un 1
2.7.2.1.2.3 PERDIDA % 1
2.7.2.1.2.3 MAESTRO 1º un/dia 1
2.7.2.1.2.3 Leyes Sociales % 1
2.7.2.1.2.3 Total Puerta 5 200x65x4,5
Item Descripcion un Cantidad
2.7.2.1.2.4 PUERTA TERCIADO PINO 90X200X4,5 un 1
2.7.2.1.2.4 OLEO PROFESIONAL SEMI BRILLO 1 GALON TRICOLOR m² 2.5
2.7.2.1.2.4 TOPE DE PUERTA BASICO 30MM un 1
2.7.2.1.2.4 TARUGO PLASTICO 8MM 10un un 1
2.7.2.1.2.4 TORNILLO BDG COMBINADO 12 x 2", 5 unes Fixser un 1
2.7.2.1.2.4 TERCIADO ESTRUCTURAL 9MM m² 2
2.7.2.1.2.4 PINO BRUTO 2X2 3,2M ml 1
2.7.2.1.2.4 CLAVOS 3" kg 20
2.7.2.1.2.4 PERDIDA % 1
2.7.2.1.2.4 MAESTRO 1º un/dia 1
2.7.2.1.2.4 Leyes Sociales % 1
2.7.2.1.2.4 Total Puerta 6 200x90x4,5
Pagina 26
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 27
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 28
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 29
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 30
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 31
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 32
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 33
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
0.01 $ 1,168 $ 47
0.007 $ 1,555 $ 11
10% $ 673 $ 67
0.01 $ 41,333 $ 413
30% $ 413 $ 124
$ 1,325
Rendimiento P. unitario Total
1 $ 655 $ 655
0.01 $ 1,168 $ 47
0.007 $ 1,588 $ 11
10% $ 713 $ 71
0.007 $ 41,333 $ 289
30% $ 289 $ 87
$ 1,161
Rendimiento P. unitario Total
0.013 $ 38,571 $ 482
0.347 $ 13,437 $ 4,666
0.063 $ 2,092 $ 132
0.027 $ 9,697 $ 266
0.400 $ 1,776 $ 711
0.400 $ 5,874 $ 2,350
5% $ 8,606 $ 430
0.117 $ 30,667 $ 3,588
0.117 $ 30,667 $ 3,588
30% $ 7,176 $ 2,153
$ 18,365
Rendimiento P. unitario Total
0.013 $ 38,571 $ 482
0.217 $ 1,605 $ 349
0.313 $ 1,395 $ 436
0.027 $ 9,697 $ 266
0.400 $ 1,776 $ 711
0.400 $ 5,874 $ 2,350
5% $ 4,594 $ 230
0.117 $ 30,667 $ 3,588
0.117 $ 30,667 $ 3,588
30% $ 10,427 $ 3,128
$ 15,127
Rendimiento P. unitario Total
0.01 $ 38,571 $ 482
0.13 $ 1,000 $ 125
0.22 $ 1,605 $ 349
0.31 $ 1,395 $ 436
0.03 $ 9,697 $ 266
0.40 $ 1,776 $ 711
0.40 $ 5,874 $ 2,350
5% $ 4,719 $ 236
0.12 $ 30,667 $ 3,588
0.12 $ 30,667 $ 3,588
30% $ 7,176 $ 2,153
$ 14,283
Rendimiento P. unitario Total
0.013 $ 38,571 $ 482
0.347 $ 5,706 $ 1,981
0.313 $ 1,395 $ 436
Pagina 34
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 35
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
$ -
Rendimiento P. unitario Total
0.720 21840 15725
0.5 15725 7863
0.011 15000 167
0.3 167 50
$ 23,804
Rendimiento P. unitario Total
0.05 $ 16,511 $ 888
0.50
³ $ 1,008 $ 1,008
0.033 $ 39,487 $ 1,316
Pagina 36
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 37
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 38
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
$ -
$ -
$ -
Rendimiento P. unitario Total
0.347 $ 11,336 $ 3,934
0.001 $ 8,992 $ 72
0.167 $ 12,597 $ 2,099
1 $ 1,295 $ 2,590
1 $ 1,098 $ 2,197
0.1 $ 6,092 $ 2,437
0.004 $ 4,361 $ 279
10% $ 13,608 $ 1,361
0.071 $ 25,000 $ 1,775
0.009 $ 16,333 $ 147
30% $ 1,922 $ 577
$ 17,467
Pagina 39
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 40
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 41
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 42
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
5% $ 2,778 $ 139
0.11 $ 25,000 $ 2,778
30% $ 2,778 $ 833
$ 42,298
Rendimiento P. unitario Total
0.14 $ 2,479 $ 354
0.03 $ 15,084 $ 754
10% $ 1,108 $ 111
0.00 $ 3,773 $ 4
0.02 $ 5,958 $ 179
0.08 $ 235 $ 19
0.02 $ 2,261 $ 68
10% $ 269 $ 27
0.011 $ 20,000 $ 220
0.02 $ 20,000 $ 300
0.01 $ 16,333 $ 147
30% 666.997 $ 200
$ 2,382
Pagina 43
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 44
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 45
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 46
COLTAUCO Analisis de Precios Unitarios
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 47
COLTAUCO CUBICACIONES HORMIGON RADIERES
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 48
CUBICACION EXCAVACIONES
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Alto Ancho
Item Descripción Eje
(m) (m)
1.1.2 EXCAVACIONES PARA FUNDACIONES A' 1.01 0.40
1.1.2 EXCAVACIONES PARA FUNDACIONES A 1.01 0.40
1.1.2 EXCAVACIONES PARA FUNDACIONES B' 1.01 0.40
1.1.2 EXCAVACIONES PARA FUNDACIONES B 1.01 0.40
1.1.2 EXCAVACIONES PARA FUNDACIONES C 1.01 0.40
1.1.2 EXCAVACIONES PARA FUNDACIONES D 1.01 0.40
1.1.2 EXCAVACIONES PARA FUNDACIONES E 1.01 0.40
1.1.2 EXCAVACIONES PARA FUNDACIONES 1 1.01 0.40
1.1.2 EXCAVACIONES PARA FUNDACIONES 2 1.01 0.40
1.1.2 EXCAVACIONES PARA FUNDACIONES 3 1.01 0.40
1.1.2 EXCAVACIONES PARA FUNDACIONES 3' 1.01 0.40
1.1.2 EXCAVACIONES PARA FUNDACIONES 4 1.01 0.40
1.1.2 EXCAVACIONES PARA FUNDACIONES 5 1.01 0.40
1.1.2 EXCAVACIONES PARA FUNDACIONES 6 1.01 0.40
1.1.2 EXCAVACIONES PARA FUNDACIONES 7 1.01 0.40
1.1.2
1.1.2 ESPONJAMIENTO
1.1.2 TOTAL EXCAVACIONES PARA FUNDACIONES
Pagina 49
CUBICACION EXCAVACIONES
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Lago
Dcto Total (m³)
(m)
4.10 1.66
10.98 4.44
19.05 7.70
4.10 1.66
26.05 10.52
7.03 2.84
19.80 8.00
8.78 3.55
8.78 3.55
11.78 4.76
0.76 0.31
11.01 4.45
6.80 2.75
5.58 2.25
12.38 5.00
TOTAL m³ 63.42
25% 15.85
TOTAL m³ 79.27
Pagina 50
CUBICACION HORMIGONES
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 51
CUBICACION HORMIGONES
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 52
CUBICACION HORMIGONES
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 53
CUBICACION HORMIGONES
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 54
CUBICACION HORMIGONES
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
0.00 14.99
1.76 2.38
0.00 2.17
2.14 2.00
0.00 2.17
2.63 1.51
1.27 2.70
0.00 0.42
1.20 2.48
1.27 2.70
1.27 2.70
1.15 2.53
0.94 2.12
1.42 2.56
TOTALm³ 78.6
0.00 0.90
0.00 0.48
0.00 0.24
0.00 0.12
0.00 0.12
0.00 0.12
0.00 0.36
TOTALm³ 2.3
0.00 1.57
0.00 0.60
0.00 2.51
0.00 4.68
0.00 1.01
0.00 0.96
0.00 0.50
0.00 0.96
0.00 0.50
0.00 0.96
0.00 0.92
0.00 0.86
0.00 0.92
0.00 0.92
0.00 0.86
0.00 0.71
0.00 0.92
TOTALm³ 20.4
0.00 0.65
0.00 0.47
0.00 0.68
0.00 2.88
0.00 4.50
0.00 1.44
0.00 0.86
Pagina 55
CUBICACION HORMIGONES
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
0.00 0.55
0.00 1.21
0.00 0.94
0.00 1.21
0.00 0.81
0.00 0.38
0.00 1.20
0.00 1.15
0.00 1.20
0.00 1.15
0.00 1.15
0.00 1.15
0.00 0.94
0.00 0.48
0.00 0.58
TOTAL m² 25.6
1.96
TOTAL m³ 2.0
Pagina 56
CUBICACION RELLENO ESTRUCTURALES
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 57
CUBICACION MOLDAJES
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 58
CUBICACION MOLDAJES
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
RESUMEN
Pagina 59
CUBICACION MOLDAJES
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 60
CUBICACION MOLDAJES
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Total(m³)
20.56
2.34
14.97
6.86
4.22
11.88
4.97
1.92
4.91
1.92
6.71
1.92
6.25
1.92
4.02
2.58
2.76
7.03
1.92
109.66
70.31
23.69
104.39
30.42
188.65
43.52
146.92
34.20
27.45
29.64
27.45
27.15
38.19
5.64
33.34
38.19
38.19
38.16
28.27
39.90
1,013.68
1.02
2.22
1.24
Pagina 61
CUBICACION MOLDAJES
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
4.80
4.80
2.52
1.68
0.96
1.46
1.26
1.48
1.15
0.80
1.46
2.40
1.46
2.40
1.92
1.44
1.23
0.88
0.96
39.55
3.24
2.34
3.38
14.40
22.50
7.20
4.32
2.77
6.03
4.68
6.03
4.03
1.92
6.00
5.76
6.00
5.76
5.76
5.76
4.71
2.40
2.88
127.87
Pagina 62
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 63
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
1.2.6.2 MUROS A'-A' D.M. VER 0.20 1.40 8 1.11 1.29 0.050 0.12 1 0.01 1
1.2.6.2 MUROS A'-A' D.M. HOR 0.20 0.80 5 4.3 4.64 0.050 0.12 2
1.2.6.2 MUROS A'-A' D.M. HOR 0.20 2.40 13 2.7 3.04 0.050 0.12 2
1.2.6.2 MUROS A'-A' D.M. HOR 0.20 1.11 7 4.3 4.64 0.050 0.12 2
1.2.6.2 MUROS B'-B' L=2100 2 21 21.00
1.2.6.2 MUROS B'-B' L=460 20 4.6 4.60
1.2.6.2 MUROS B'-B' L=380 12 3.8 3.80
1.2.6.2 MUROS B'-B' L=600 4 6 6.00
1.2.6.1 CIMIENTOS B'-B' L=60 0.15 18.15 122 0.60 0.60
1.2.6.1 CIMIENTOS B'-B' L=600 4 20.4 20.40
1.2.6.2 MUROS B'-B' D.M. HOR 0.20 0.80 5 18.35 19.65 0.050 0.12 2
1.2.6.2 MUROS B'-B' D.M. HOR 0.20 2.31 13 18.35 19.65 0.050 0.12 2
1.2.6.2 MUROS B'-B' D.M. HOR 0.20 1.20 7 1.80 2.14 0.050 0.12 2
1.2.6.2 MUROS B'-B' D.M. HOR 0.20 1.20 7 1.50 1.84 0.050 0.12 2
1.2.6.2 MUROS B'-B' D.M. HOR 0.20 1.20 7 1.50 1.84 0.050 0.12 2
1.2.6.2 MUROS B'-B' D.M. VER 0.20 2.40 13 2.31 2.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS B'-B' D.M. VER 0.20 1.50 9 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS B'-B' D.M. VER 0.20 2.40 13 2.31 2.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS B'-B' D.M. VER 0.20 1.50 9 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS B'-B' D.M. VER 0.20 2.40 13 2.31 2.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS B'-B' D.M. VER 0.20 1.50 9 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS B'-B' D.M. VER 0.20 2.40 13 2.31 2.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS B'-B' D.M. VER 0.20 2.40 13 2.31 2.57 0.050 0.12 1 0.09 1
1.2.6.3 VIGAS B'-B' D.M. VER 0.20 2.40 13 0.80 1.19 0.050 0.12 2
1.2.6.3 VIGAS B'-B' D.M. VER 0.20 2.40 13 0.80 1.19 0.050 0.12 2
1.2.6.3 VIGAS B'-B' D.M. VER 0.20 2.40 13 0.80 1.19 0.050 0.12 2
1.2.6.3 VIGAS B'-B' D.M. VER 0.20 2.40 13 0.80 1.19 0.050 0.12 2
1.2.6.3 VIGAS B'-B' D.M. VER 0.20 2.40 13 0.80 1.19 0.050 0.12 2
1.2.6.2 MUROS B'-B' D.M. HOR 0.20 0.80 5 18.35 19.65 0.050 0.12 2
1.2.6.2 MUROS B'-B' D.M. HOR 0.20 2.31 13 18.35 19.65 0.050 0.12 2
1.2.6.2 MUROS B'-B' D.M. HOR 0.20 1.20 7 1.80 2.14 0.050 0.12 2
1.2.6.2 MUROS B'-B' D.M. HOR 0.20 1.20 7 1.50 1.84 0.050 0.12 2
1.2.6.2 MUROS B'-B' D.M. HOR 0.20 1.20 7 1.50 1.84 0.050 0.12 2
Pagina 64
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
1.2.6.2 MUROS B'-B' D.M. VER 0.20 2.40 13 2.31 2.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS B'-B' D.M. VER 0.20 1.50 9 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS B'-B' D.M. VER 0.20 2.40 13 2.31 2.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS B'-B' D.M. VER 0.20 1.50 9 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS B'-B' D.M. VER 0.20 2.40 13 2.31 2.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS B'-B' D.M. VER 0.20 1.50 9 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS B'-B' D.M. VER 0.20 2.40 13 2.31 2.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS B'-B' D.M. VER 0.20 2.40 13 2.31 2.57 0.050 0.12 1 0.09 1
1.2.6.3 VIGAS B'-B' D.M. VER 0.20 2.40 13 0.80 1.19 0.050 0.12 2
1.2.6.3 VIGAS B'-B' D.M. VER 0.20 2.40 13 0.80 1.19 0.050 0.12 2
1.2.6.3 VIGAS B'-B' D.M. VER 0.20 2.40 13 0.80 1.19 0.050 0.12 2
1.2.6.3 VIGAS B'-B' D.M. VER 0.20 2.40 13 0.80 1.19 0.050 0.12 2
1.2.6.3 VIGAS B'-B' D.M. VER 0.20 2.40 13 0.80 1.19 0.050 0.12 2
1.2.6.4 PILARES B'-B' P3 4 4.31 4.31
1.2.6.4 PILARES B'-B' P3 2 4.31 4.31
1.2.6.4 PILARES B'-B' P3. EST. 0.20 1.2 7 1.2 1.20
1.2.6.4 PILARES B'-B' P3 4 4.31 4.31
1.2.6.4 PILARES B'-B' P3 2 4.31 4.31
1.2.6.4 PILARES B'-B' P3. EST. 0.20 1.2 7 1.2 1.20
1.2.6.2 MUROS C-C L=380 2 3.8 3.80
1.2.6.2 MUROS C-C L=460 4 4.6 4.60
1.2.6.2 MUROS C-C L=155 2 1.55 1.55
1.2.6.2 MUROS C-C L=410 2 4.1 4.10
1.2.6.2 MUROS C-C L=470 20 4.7 4.70
1.2.6.2 MUROS C-C L=460 4 4.6 4.60
1.2.6.2 MUROS C-C L=300 4 3 3.00
1.2.6.2 MUROS C-C L=440 4 4.4 4.40
1.2.6.2 MUROS C-C L=300 4 3 3.00
1.2.6.2 MUROS C-C L=390 2 3.9 3.90
1.2.6.2 MUROS C-C L=600 12 6 6.00
1.2.6.2 MUROS C-C L=250 4 2.5 2.50
1.2.6.1 CIMIENTOS C-C L=200 4 2 2.00
1.2.6.1 CIMIENTOS C-C L=450 4 4.5 4.50
Pagina 65
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 66
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
1.2.6.3 VIGAS C-C D.M. VER 0.20 3.00 16 0.80 1.19 0.050 0.12 2
1.2.6.3 VIGAS C-C D.M. VER 0.20 3.00 16 0.80 1.19 0.050 0.12 2
1.2.6.3 VIGAS C-C D.M. VER 0.20 1.50 9 0.80 1.19 0.050 0.12 2
1.2.6.3 VIGAS C-C D.M. VER 0.20 3.00 16 0.80 1.19 0.050 0.12 2
1.2.6.3 VIGAS C-C D.M. VER 0.20 1.50 9 0.80 1.19 0.050 0.12 2
1.2.6.2 MUROS C-C D.M. HOR 0.20 0.80 5 33.43 33.77 0.050 0.12 2
1.2.6.2 MUROS C-C D.M. HOR 0.20 3.51 19 1.00 1.34 0.050 0.12 2
1.2.6.2 MUROS C-C D.M. VER 0.20 1.00 6 3.51 3.77 0.050 0.12 1 0.09 1
1.2.6.2 MUROS C-C D.M. HOR 0.20 3.51 19 4.42 4.76 0.050 0.12 2
1.2.6.2 MUROS C-C D.M. VER 0.20 4.42 24 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS C-C D.M. HOR 0.20 4.31 23 4.30 4.64 0.050 0.12 2
1.2.6.2 MUROS C-C D.M. VER 0.20 4.31 23 4.30 4.64 0.050 0.12 2
1.2.6.2 MUROS C-C D.M. HOR 0.20 4.31 23 4.30 4.64 0.050 0.12 2
1.2.6.2 MUROS C-C D.M. VER 0.20 4.31 23 4.30 4.64 0.050 0.12 2
1.2.6.2 MUROS C-C D.M. HOR 0.20 4.31 23 4.30 4.64 0.050 0.12 2
1.2.6.2 MUROS C-C D.M. VER 0.20 4.31 23 4.30 4.64 0.050 0.12 2
1.2.6.2 MUROS C-C D.M. HOR 0.20 1.11 7 1.50 1.50
1.2.6.2 MUROS C-C D.M. VER 0.20 1.50 9 1.11 1.37 0.050 0.12 1 0.09 1
1.2.6.2 MUROS C-C D.M. HOR 0.20 1.11 7 1.50 1.50
1.2.6.2 MUROS C-C D.M. VER 0.20 1.50 9 1.11 1.37 0.050 0.12 1 0.09 1
1.2.6.3 VIGAS C-C D.M. VER 0.20 3.00 16 0.80 1.19 0.050 0.12 2
1.2.6.3 VIGAS C-C D.M. VER 0.20 3.00 16 0.80 1.19 0.050 0.12 2
1.2.6.3 VIGAS C-C D.M. VER 0.20 1.50 9 0.80 1.19 0.050 0.12 2
1.2.6.3 VIGAS C-C D.M. VER 0.20 3.00 16 0.80 1.19 0.050 0.12 2
1.2.6.3 VIGAS C-C D.M. VER 0.20 1.50 9 0.80 1.19 0.050 0.12 2
1.2.6.2 MUROS D-D L=460 8 4.60 4.60
1.2.6.2 MUROS D-D L=470 8 4.70 4.70
1.2.6.2 MUROS D-D L=330 8 3.30 3.30
1.2.6.2 MUROS D-D L=290 2 2.90 2.90
1.2.6.1 CIMIENTOS D-D L=600 6 6.00 6.00
1.2.6.1 CIMIENTOS D-D L=280 4 2.80 2.80
1.2.6.1 CIMIENTOS D-D L=60 0.15 7.43 51 0.60 0.60
1.2.6.2 MUROS D-D D.M. HOR 0.20 2.31 13 7.23 7.57 0.050 0.12 2
Pagina 67
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
1.2.6.2 MUROS D-D D.M. HOR 0.20 0.80 5 7.23 7.57 0.050 0.12 2
1.2.6.2 MUROS D-D D.M. HOR 0.20 1.20 7 1.38 1.72 0.050 0.12 2
1.2.6.2 MUROS D-D D.M. HOR 0.20 1.20 7 1.67 2.01 0.050 0.12 2
1.2.6.2 MUROS D-D D.M. HOR 0.20 1.20 7 0.59 0.93 0.050 0.12 2
1.2.6.2 MUROS D-D D.M. VER 0.20 1.38 8 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS D-D D.M. VER 0.20 1.80 10 2.31 2.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS D-D D.M. VER 0.20 1.66 10 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS D-D D.M. VER 0.20 0.59 4 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.3 VIGAS D-D D.M. VER 0.20 1.80 10 0.80 1.19 0.050 0.12 2
1.2.6.3 VIGAS D-D D.M. VER 0.20 1.80 10 0.80 1.19 0.050 0.12 2
1.2.6.2 MUROS D-D D.M. HOR 0.20 2.31 13 7.23 7.57 0.050 0.12 2
1.2.6.2 MUROS D-D D.M. HOR 0.20 0.80 5 7.23 7.57 0.050 0.12 2
1.2.6.2 MUROS D-D D.M. HOR 0.20 1.20 7 1.38 1.72 0.050 0.12 2
1.2.6.2 MUROS D-D D.M. HOR 0.20 1.20 7 1.67 2.01 0.050 0.12 2
1.2.6.2 MUROS D-D D.M. HOR 0.20 1.20 7 0.59 0.93 0.050 0.12 2
1.2.6.2 MUROS D-D D.M. VER 0.20 1.38 8 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS D-D D.M. VER 0.20 1.80 10 2.31 2.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS D-D D.M. VER 0.20 1.66 10 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS D-D D.M. VER 0.20 0.59 4 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.3 VIGAS D-D D.M. VER 0.20 1.80 10 0.80 1.19 0.050 0.12 2
1.2.6.3 VIGAS D-D D.M. VER 0.20 1.80 10 0.80 1.19 0.050 0.12 2
1.2.6.4 PILARES A-A P2 4 4.60 4.60
1.2.6.4 PILARES A-A P2 2 4.60 4.60
1.2.6.4 PILARES A-A P2. EST. 0.20 1.35 8 1.00 1.00
1.2.6.4 PILARES A-A P2 4 2.20 2.20
1.2.6.4 PILARES A-A P2 2 2.00 2.00
1.2.6.4 PILARES A-A P2. EST. 0.20 0.60 4 1.00 1.00
1.2.6.4 PILARES A-A P2 4 2.20 2.20
1.2.6.4 PILARES A-A P2 2 2.20 2.20
1.2.6.4 PILARES A-A P2. EST. 0.20 0.60 4 1.00 1.00
1.2.6.4 PILARES A-A P2 4 2.20 2.20
1.2.6.4 PILARES A-A P2 2 2.20 2.20
1.2.6.4 PILARES A-A P2. EST. 0.20 0.60 4 1.00 1.00
Pagina 68
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 69
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
1.2.6.2 MUROS A-A D.M. VER 0.20 3.48 19 2.91 3.17 0.050 0.12 1 0.09 1
1.2.6.2 MUROS A-A D.M. VER 0.20 1.80 10 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS A-A D.M. VER 0.20 1.60 9 2.91 3.17 0.050 0.12 1 0.09 1
1.2.6.2 MUROS A-A D.M. VER 0.20 0.93 6 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS A-A D.M. VER 0.20 3.48 19 0.80 1.19 0.050 0.12 2
1.2.6.2 MUROS A-A D.M. VER 0.20 1.60 9 0.80 1.19 0.050 0.12 2
1.2.6.2 MUROS 1-1 L=460 8 4.60 4.60
1.2.6.2 MUROS 1-1 L=255 2 2.55 2.55
1.2.6.2 MUROS 1-1 L=400 2 4.00 4.00
1.2.6.3 VIGAS 1-1 V.F. 4 4.00 4.00
1.2.6.3 VIGAS 1-1 V.F. 2 4.00 4.00
1.2.6.3 VIGAS 1-1 V.F. EST. 0.20 4.00 21 1.10 1.10
1.2.6.1 CIMIENTOS 1-1 L=480 4 4.80 4.80
1.2.6.1 CIMIENTOS 1-1 L=60 0.15 4.50 31 0.60 0.60
1.2.6.1 CIMIENTOS 1-1 L=550 0.15 4 5.50 5.50
1.2.6.1 CIMIENTOS 1-1 L=60 0.15 5.17 36 0.60 0.60
1.2.6.2 MUROS 1-1 D.M. VER 0.20 4.00 21 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 1-1 D.M. VER 0.20 2.41 14 0.80 1.19 0.050 0.12 2
1.2.6.2 MUROS 1-1 D.M. VER 0.20 3.05 17 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 1-1 D.M. VER 0.20 1.43 9 0.80 1.19 0.050 0.12 2
1.2.6.2 MUROS 1-1 D.M. VER 0.20 1.43 9 1.56 1.82 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 1-1 D.M. HOR 0.20 0.80 5 11.08 11.42 0.050 0.12 2
1.2.6.2 MUROS 1-1 D.M. HOR 0.20 4.31 23 4.00 4.34 0.050 0.12 2
1.2.6.2 MUROS 1-1 D.M. HOR 0.20 2.75 15 3.04 3.38 0.050 0.12 2
1.2.6.2 MUROS 1-1 D.M. HOR 0.20 1.56 9 1.43 1.77 0.050 0.12 2
1.2.6.2 MUROS 2-2 L=600 2 6.00 6.00
1.2.6.2 MUROS 2-2 L=670 2 6.70 6.70
1.2.6.2 MUROS 2-2 L=460 8 4.60 4.60
1.2.6.2 MUROS 2-2 L=400 2 4.00 4.00
1.2.6.2 MUROS 2-2 L=350 4 3.50 3.50
1.2.6.1 CIMIENTOS 2-2 L=480 4 4.80 4.80
1.2.6.1 CIMIENTOS 2-2 L=550 4 5.50 5.50
1.2.6.1 CIMIENTOS 2-2 L=60 0.15 4.50 31 0.60 0.60
Pagina 70
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 71
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 72
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
1.2.6.2 MUROS 3-3 D.M. HOR 0.20 2.31 13 6.97 7.63 0.050 0.12 2
1.2.6.2 MUROS 3-3 D.M. HOR 0.20 1.20 7 0.95 1.29 0.050 0.12 2
1.2.6.2 MUROS 3-3 D.M. HOR 0.20 1.20 7 1.06 1.40 0.050 0.12 2
1.2.6.2 MUROS 3-3 D.M. HOR 0.20 2.40 13 1.60 1.94 0.050 0.12 2
1.2.6.2 MUROS 3-3 D.M. HOR 0.20 1.11 7 4.68 5.02 0.050 0.12 2
1.2.6.2 MUROS 3-3 D.M. VER 0.20 0.95 6 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 3-3 D.M. VER 0.20 5.00 26 2.31 2.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 3-3 D.M. VER 0.20 5.00 26 2.31 2.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 3-3 D.M. VER 0.20 1.05 7 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 3-3 D.M. VER 0.20 2.40 13 0.80 1.14 0.050 0.12 2
1.2.6.2 MUROS 3-3 D.M. VER 0.20 1.60 9 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 3-3 D.M. VER 0.20 3.08 17 0.80 1.14 0.050 0.12 2
1.2.6.2 MUROS 3-3 D.M. VER 0.20 3.08 17 1.11 1.45 0.050 0.12 2
1.2.6.4 PILARES 3-3 P1 4 4.70 4.70
1.2.6.4 PILARES 3-3 P1. EST. 0.20 1.20 7 0.80 0.80
1.2.6.4 PILARES 3-3 P3 4 4.70 4.70
1.2.6.4 PILARES 3-3 P3 2 4.70 4.70
1.2.6.4 PILARES 3-3 P3. EST. 0.20 2.40 13 1.20 1.20
1.2.6.2 MUROS 4-4 L=470 6 4.70 4.70
1.2.6.2 MUROS 4-4 L=600 4 6.00 6.00
1.2.6.2 MUROS 4-4 L=370 2 3.70 3.70
1.2.6.2 MUROS 4-4 L=700 2 7.00 7.48
1.2.6.2 MUROS 4-4 L=720 2 7.20 7.68
1.2.6.1 CIMIENTOS 4-4 L=600 4 6.00 6.00
1.2.6.1 CIMIENTOS 4-4 L=310 4 3.10 3.10
1.2.6.1 CIMIENTOS 4-4 L=60 0.15 7.50 51 0.60 0.60
1.2.6.1 CIMIENTOS 4-4 L=470 4 4.70 4.70
1.2.6.1 CIMIENTOS 4-4 L=60 0.15 4.42 31 0.60 0.60
1.2.6.2 MUROS 4-4 D.M. HOR 0.20 0.80 5 13.32 15.10 0.050 0.12 2
1.2.6.2 MUROS 4-4 D.M. HOR 0.20 1.20 7 0.95 1.29 0.050 0.12 2
1.2.6.2 MUROS 4-4 D.M. HOR 0.20 2.31 13 7.00 7.66 0.050 0.12 2
1.2.6.2 MUROS 4-4 D.M. HOR 0.20 1.20 7 1.05 1.39 0.050 0.12 2
1.2.6.2 MUROS 4-4 D.M. HOR 0.20 3.51 19 3.95 4.29 0.050 0.12 2
Pagina 73
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
1.2.6.2 MUROS 4-4 D.M. VER 0.20 0.95 6 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 4-4 D.M. VER 0.20 5.00 26 0.80 1.14 0.050 0.12 2
1.2.6.2 MUROS 4-4 D.M. VER 0.20 1.05 7 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 4-4 D.M. VER 0.20 2.40 13 0.80 1.14 0.050 0.12 2
1.2.6.2 MUROS 4-4 D.M. VER 0.20 3.40 18 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 4-4 D.M. VER 0.20 5.00 26 2.31 2.57 0.050 0.12 1 0.09 1
1.2.6.4 PILARES 4-4 P1 4 4.70 4.70
1.2.6.4 PILARES 4-4 P1. EST. 0.20 1.20 7 0.80 0.80
1.2.6.3 VIGAS 4-4 V.F. 4 4.00 4.00
1.2.6.3 VIGAS 4-4 V.F. 2 4.00 4.00
1.2.6.3 VIGAS 4-4 V.F. EST. 0.20 4.00 21 1.10 1.10
1.2.6.2 MUROS 4-4 D.M. HOR 0.20 0.80 5 13.32 15.10 0.050 0.12 2
1.2.6.2 MUROS 4-4 D.M. HOR 0.20 1.20 7 0.95 1.29 0.050 0.12 2
1.2.6.2 MUROS 4-4 D.M. HOR 0.20 2.31 13 7.00 7.66 0.050 0.12 2
1.2.6.2 MUROS 4-4 D.M. HOR 0.20 1.20 7 1.05 1.39 0.050 0.12 2
1.2.6.2 MUROS 4-4 D.M. HOR 0.20 3.51 19 3.95 4.29 0.050 0.12 2
1.2.6.2 MUROS 4-4 D.M. VER 0.20 0.95 6 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 4-4 D.M. VER 0.20 5.00 26 0.80 1.14 0.050 0.12 2
1.2.6.2 MUROS 4-4 D.M. VER 0.20 1.05 7 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 4-4 D.M. VER 0.20 2.40 13 0.80 1.14 0.050 0.12 2
1.2.6.2 MUROS 4-4 D.M. VER 0.20 3.40 18 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 4-4 D.M. VER 0.20 5.00 26 2.31 2.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 5-5 L=470 4 4.70 4.70
1.2.6.2 MUROS 5-5 L=700 4 7.00 7.64
1.2.6.2 MUROS 5-5 L=600 2 6.00 6.00
1.2.6.2 MUROS 5-5 L=290 2 2.90 2.90
1.2.6.1 CIMIENTOS 5-5 L=600 4 6.00 6.00
1.2.6.1 CIMIENTOS 5-5 L=280 4 2.80 2.80
1.2.6.1 CIMIENTOS 5-5 L=60 0.15 7.20 49 0.60 0.60
1.2.6.2 MUROS 5-5 D.M. HOR 0.20 0.80 5 7.00 7.34 0.050 0.12 2
1.2.6.2 MUROS 5-5 D.M. HOR 0.20 2.31 13 7.00 7.34 0.050 0.12 2
1.2.6.2 MUROS 5-5 D.M. HOR 0.20 1.20 7 0.95 1.29 0.050 0.12 2
1.2.6.2 MUROS 5-5 D.M. HOR 0.20 1.20 7 1.06 1.40 0.050 0.12 2
Pagina 74
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
1.2.6.2 MUROS 5-5 D.M. VER 0.20 0.95 6 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 5-5 D.M. VER 0.20 5.00 26 0.80 1.14 0.050 0.12 2
1.2.6.2 MUROS 5-5 D.M. VER 0.20 5.00 26 2.31 2.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 5-5 D.M. VER 0.20 1.06 7 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.4 PILARES 5-5 P1 4 4.70 4.70
1.2.6.4 PILARES 5-5 P1. EST. 0.20 1.20 7 0.80 0.80
1.2.6.2 MUROS 5-5 D.M. HOR 0.20 0.80 5 7.00 7.34 0.050 0.12 2
1.2.6.2 MUROS 5-5 D.M. HOR 0.20 2.31 13 7.00 7.34 0.050 0.12 2
1.2.6.2 MUROS 5-5 D.M. HOR 0.20 1.20 7 0.95 1.29 0.050 0.12 2
1.2.6.2 MUROS 5-5 D.M. HOR 0.20 1.20 7 1.06 1.40 0.050 0.12 2
1.2.6.2 MUROS 5-5 D.M. VER 0.20 0.95 6 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 5-5 D.M. VER 0.20 5.00 26 0.80 1.14 0.050 0.12 2
1.2.6.2 MUROS 5-5 D.M. VER 0.20 5.00 26 2.31 2.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 5-5 D.M. VER 0.20 1.06 7 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 6-6 D.M. HOR 0.20 4.31 23 5.28 5.62 0.050 0.12 2
1.2.6.2 MUROS 6-6 D.M. HOR 0.20 4.31 23 5.28 5.62 0.050 0.12 2
1.2.6.2 MUROS 6-6 D.M. VER 0.20 5.28 28 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 6-6 D.M. VER 0.20 5.28 28 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.1 CIMIENTOS 6-6 L=600 4 6.00 6.00
1.2.6.1 CIMIENTOS 6-6 L=60 0.15 5.78 40 0.60 0.60
1.2.6.2 MUROS 7-7 L=470 8 4.70 4.70
1.2.6.2 MUROS 7-7 L=470 4 4.70 4.70
1.2.6.2 MUROS 7-7 L=470 4 4.70 4.70
1.2.6.2 MUROS 7-7 L=625 2 6.25 6.73
1.2.6.2 MUROS 7-7 L=600 2 6.00 6.00
1.2.6.2 MUROS 7-7 L=290 2 2.90 2.90
1.2.6.2 MUROS 7-7 L=700 4 7.00 7.00
1.2.6.1 CIMIENTOS 7-7 L=600 4 6.00 6.00
1.2.6.1 CIMIENTOS 7-7 L=280 4 2.80 2.80
1.2.6.1 CIMIENTOS 7-7 L=60 0.15 7.73 53 0.60 0.60
1.2.6.1 CIMIENTOS 7-7 L=610 4 6.10 6.10
1.2.6.1 CIMIENTOS 7-7 L=60 0.15 5.78 40 0.60 0.60
1.2.6.3 VIGAS 7-7 V.F. 4 4.00 4.00
Pagina 75
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 76
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
1.2.6.2 MUROS 7-7 D.M. VER 0.20 3.25 18.00 2.60 2.86 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 7-7 D.M. VER 0.20 1.25 8.00 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 7-7 D.M. VER 0.20 3.25 18.00 7.23 7.57 0.050 0.12 2
1.2.6.2 MUROS 7-7 D.M. HOR 0.20 0.80 5.00 7.23 7.57 0.050 0.12 2
1.2.6.2 MUROS 7-7 D.M. HOR 0.20 2.31 13.00 2.31 2.65 0.050 0.12 2
1.2.6.2 MUROS 7-7 D.M. HOR 0.20 1.20 7.00 1.05 1.39 0.050 0.12 2
1.2.6.2 MUROS 7-7 D.M. HOR 0.20 1.20 7.00 0.60 0.94 0.050 0.12 2
1.2.6.2 MUROS 7-7 D.M. HOR 0.20 1.20 7.00 1.18 1.52 0.050 0.12 2
1.2.6.2 MUROS 7-7 D.M. VER 0.20 1.05 7.00 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 7-7 D.M. VER 0.20 0.60 4.00 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 7-7 D.M. VER 0.20 1.17 7.00 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 7-7 D.M. VER 0.20 2.00 11.00 2.31 2.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 7-7 D.M. VER 0.20 2.40 13.00 2.31 2.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 7-7 D.M. VER 0.20 1.05 7.00 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 7-7 D.M. VER 0.20 0.60 4.00 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 7-7 D.M. VER 0.20 1.18 7.00 4.31 4.57 0.050 0.12 1 0.09 1
1.2.6.2 MUROS 7-7 D.M. VER 0.20 0.80 5.00 2.00 2.34 0.050 0.12 2
1.2.6.2 MUROS 7-7 D.M. VER 0.20 0.80 5.00 2.40 2.74 0.050 0.12 2
1.2.6.6 LOSA 101 Fe. Sup. 0.20 4.00 21.00 5.30 5.30
1.2.6.6 LOSA 101 Fe. Inf. 0.20 4.45 24.00 5.75 5.75
Pagina 77
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Gancho
Sismico Tras. ø Coef.
Total
(mm) (Kg)
(m) Cant.
12 0.889 32.71
12 0.889 16.53
12 0.889 17.07
12 0.889 9.33
0.1016 1 8 0.395 41.54
0.075 2 8 0.395 42.34
0.1016 1 8 0.395 41.54
0.075 2 8 0.395 42.34
12 0.889 32.71
12 0.889 74.13
12 0.889 21.33
12 0.889 41.60
0.1016 2 8 0.395 96.00
0.075 2 8 0.395 94.86
0.1016 2 8 0.395 96.00
0.075 2 8 0.395 94.86
12 0.889 32.71
16 1.580 14.85
12 0.889 4.44
12 0.889 9.33
12 0.889 16.53
12 0.889 17.24
0.10 2 8 0.395 4.24
0.10 1 8 0.395 27.09
0.10 1 8 0.395 4.08
0.075 2 8 0.395 9.17
0.075 2 8 0.395 15.61
0.075 2 8 0.395 12.83
0.10 2 8 0.395 4.24
0.10 1 8 0.395 27.09
Pagina 78
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 79
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 80
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
12 0.889 21.33
12 0.889 20.27
12 0.889 14.93
12 0.889 21.33
12 0.889 6.76
12 0.889 6.93
12 0.889 16.00
12 0.889 37.33
12 0.889 37.33
8 0.395 9.56
12 0.889 14.58
8 0.395 3.24
8 0.395 10.00
12 0.889 15.64
12 0.889 7.82
8 0.395 10.00
12 0.889 15.64
12 0.889 7.82
0.075 2 8 0.395 66.70
0.075 2 8 0.395 10.06
0.1016 1 8 0.395 8.94
0.075 2 8 0.395 35.73
0.1016 1 8 0.395 43.35
0.075 2 8 0.395 42.16
0.075 2 8 0.395 42.16
0.075 2 8 0.395 42.16
0.075 2 8 0.395 42.16
0.075 2 8 0.395 42.16
0.075 2 8 0.395 42.16
8 0.395 4.15
0.1016 1 8 0.395 4.88
8 0.395 4.15
0.1016 1 8 0.395 4.88
Pagina 81
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 82
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 83
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
12 0.889 7.82
8 0.395 1.74
8 0.395 1.58
12 0.889 61.87
12 0.889 4.98
12 0.889 41.07
16 1.580 74.27
12 0.889 17.42
12 0.889 13.16
12 0.889 10.67
12 0.889 2.67
0.075 2 8 0.395 40.96
0.075 2 8 0.395 27.94
0.075 2 8 0.395 3.38
0.075 2 8 0.395 2.01
0.075 2 8 0.395 5.88
0.1016 1 8 0.395 9.36
0.1016 1 8 0.395 11.16
0.1016 1 8 0.395 9.03
0.1016 1 8 0.395 23.81
0.1016 1 8 0.395 18.06
0.1016 1 8 0.395 11.28
0.1016 1 8 0.395 10.84
0.1016 2 8 0.395 8.96
0.1016 2 8 0.395 4.24
0.075 2 8 0.395 40.96
0.075 2 8 0.395 27.94
0.075 2 8 0.395 3.38
0.075 2 8 0.395 2.01
0.075 2 8 0.395 5.88
0.1016 1 8 0.395 9.36
0.1016 1 8 0.395 11.16
0.1016 1 8 0.395 9.03
Pagina 84
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 85
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
12 0.889 19.20
0.1016 1 8 0.395 37.93
0.075 2 8 0.395 6.31
0.1016 1 8 0.395 21.67
0.075 2 8 0.395 5.85
0.1016 1 8 0.395 9.36
0.075 2 8 0.395 32.58
0.075 2 8 0.395 22.55
0.075 2 8 0.395 10.45
0.075 2 8 0.395 18.17
0.1016 1 8 0.395 37.93
0.075 2 8 0.395 6.31
0.1016 1 8 0.395 21.67
0.075 2 8 0.395 5.85
0.1016 1 8 0.395 9.36
0.075 2 8 0.395 32.58
0.075 2 8 0.395 22.55
0.075 2 8 0.395 10.45
0.075 2 8 0.395 18.17
12 0.889 14.22
8 0.395 3.16
8 0.395 9.13
16 1.580 59.42
12 0.889 21.33
12 0.889 15.64
1 12 0.889 12.76
1 12 0.889 12.94
12 0.889 6.93
12 0.889 9.60
12 0.889 21.33
12 0.889 11.02
12 0.889 27.20
12 0.889 18.06
Pagina 86
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
12 0.889 18.67
0.075 2 3 8 0.395 30.36
0.075 2 1 8 0.395 39.19
0.075 2 8 0.395 3.57
0.075 2 8 0.395 3.87
0.075 2 8 0.395 9.96
0.075 2 8 0.395 13.87
0.1016 1 8 0.395 10.84
0.1016 1 8 0.395 26.41
0.1016 1 8 0.395 26.41
0.1016 1 8 0.395 12.64
0.075 2 8 0.395 5.85
0.1016 1 8 0.395 16.25
0.075 2 8 0.395 7.66
0.075 2 8 0.395 9.74
12 0.889 14.22
8 0.395 3.16
8 0.395 9.13
0.075 2 3 8 0.395 30.36
0.075 2 1 8 0.395 39.19
0.075 2 8 0.395 3.57
0.075 2 8 0.395 3.87
0.075 2 8 0.395 9.96
0.075 2 8 0.395 13.87
0.1016 1 8 0.395 10.84
0.1016 1 8 0.395 26.41
0.1016 1 8 0.395 26.41
0.1016 1 8 0.395 12.64
0.075 2 8 0.395 5.85
0.1016 1 8 0.395 16.25
0.075 2 8 0.395 7.66
0.075 2 8 0.395 9.74
0.075 2 3 8 0.395 30.36
Pagina 87
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 88
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 89
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 90
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
8 0.395 3.16
8 0.395 9.13
0.075 2 8 0.395 11.10
0.075 2 8 0.395 26.64
0.075 2 8 0.395 4.05
0.075 2 8 0.395 5.65
0.1016 1 8 0.395 9.03
0.1016 1 8 0.395 20.35
0.1016 1 8 0.395 14.45
0.075 2 8 0.395 53.83
0.075 2 8 0.395 14.95
0.075 2 8 0.395 13.61
0.075 2 8 0.395 3.84
0.075 2 8 0.395 2.60
0.075 2 8 0.395 4.20
0.1016 1 8 0.395 12.64
0.1016 1 8 0.395 7.22
0.1016 1 8 0.395 12.64
0.1016 1 8 0.395 11.18
0.1016 1 8 0.395 13.21
0.1016 1 8 0.395 12.64
0.1016 1 8 0.395 7.22
0.1016 1 8 0.395 12.64
0.075 2 8 0.395 4.62
0.075 2 8 0.395 5.41
12 0.889 16.71
8 0.395 7.43
8 0.395 4.42
0.075 2 8 0.395 11.10
0.075 2 8 0.395 26.64
0.075 2 8 0.395 4.05
0.075 2 8 0.395 5.65
0.1016 1 8 0.395 9.03
Pagina 91
CUBICACION ENFIERRADURAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 92
DESGLOSE ENFIERRADURAS
COLTAUCO Centro de Salud Villa Olímpica
Ingeniería y Construccion
TOTAL 8,759.06 Kg
Pagina 95
DESGLOSE ENFIERRADURAS
COLTAUCO Centro de Salud Villa Olímpica
Ingeniería y Construccion
Kg
16 mm
0
0
0
0
0
0
0
0
0
0
59.4173
0
0
0
44.563
0
0
0
78.001
0
0
0
0
0
0
0
59.4173
0
4,036.61 Kg
Pagina 96
DESGLOSE ENFIERRADURAS
COLTAUCO Centro de Salud Villa Olímpica
Ingeniería y Construccion
Pagina 97
COLTAUCO CUBICACION ESTRUCTURA DE TECHUMBRE
Ingeniería y Construcción Centro de Salud Villa Olímpica
Coef.
Item Descripción Eje Cant. Distancia i% Altura Largo
(Kg/M)
1.5.1 IPE240x30.7 1'-1' 1 3.6 5% 0.18 3.604 30.7
1.5.1 IPE240x30.7 1'-1' 1 6.875 5% 0.344 6.884 30.7
1.5.1 IPE240x30.7 3'-3' 1 6.6 5% 0.33 6.608 30.7
1.5.1 IPE240x30.7 3'-3' 1 6.113 5% 0.306 6.121 30.7
1.5.1 IPE240x30.7 4'-4' 1 6.6 5% 0.33 6.608 30.7
1.5.1 IPE240x30.7 4'-4' 1 6.113 5% 0.306 6.121 30.7
1.5.1 IPE240x30.7 5-5 1 6.113 5% 0.306 6.121 30.7
1.5.1 IPE240x30.7 5'-5' 1 6.6 5% 0.33 6.608 30.7
1.5.1 IPE240x30.7 5'-5' 1 6.113 5% 0.306 6.121 30.7
1.5.1 IPE240x30.7 6'-6' 1 6.6 5% 0.33 6.608 30.7
Total Kg
Coef.
Item Descripción Eje Cant. Uniones i% Altura Largo
(Kg/M)
PL 430/250/16 mm.
1.5.1 1'-1' 1 2
PL 430/250/16 mm.
1.5.1 1'-1' 1 2
PL 430/250/16 mm.
1.5.1 3'-3' 1 2
PL 430/250/16 mm.
1.5.1 3'-3' 1 2
PL 430/250/16 mm.
1.5.1 4'-4' 1 2
PL 430/250/16 mm.
1.5.1 4'-4' 1 2
PL 430/250/16 mm.
1.5.1 5-5 1 2
PL 430/250/16 mm.
1.5.1 5'-5' 1 2
PL 430/250/16 mm.
1.5.1 5'-5' 1 2
1.5.1 PL 430/250/16 mm. 6'-6' 1 2
Total
Coef.
Item Descripción Eje Cant. Uniones i% Altura Largo
PERNO NELSON STUP 3/4" X5" (Kg/M)
1.5.1 PERNO NELSON STUP 3/4" X5" 1'-1' 6 2
1.5.1 PERNO NELSON STUP 3/4" X5" 1'-1' 6 2
1.5.1 PERNO NELSON STUP 3/4" X5" 3'-3' 6 2
1.5.1 PERNO NELSON STUP 3/4" X5" 3'-3' 6 2
1.5.1 PERNO NELSON STUP 3/4" X5" 4'-4' 6 2
1.5.1 PERNO NELSON STUP 3/4" X5" 4'-4' 6 2
1.5.1 PERNO NELSON STUP 3/4" X5" 5-5 6 2
1.5.1 PERNO NELSON STUP 3/4" X5" 5'-5' 6 2
1.5.1 PERNO NELSON STUP 3/4" X5" 5'-5' 6 2
1.5.1 6'-6' 6 2
Total
Coef.
Item Descripción Eje Cant. Uniones i% Altura Largo
(Kg/M)
1.5.1 C100/50/15/2 A-B 5 6.83 3.40
1.5.1 C100/50/15/2 A-B 5 3.00 3.40
1.5.1 C100/50/15/2 A-B 4 9.70 3.40
1.5.1 C100/50/15/2 A-B 4 8.80 3.40
1.5.1 C100/50/15/2 A-B 4 3.90 3.40
1.5.1 C100/50/15/2 A-A' 1 3.90 3.40
1.5.1 C100/50/15/2 A-B' 1 3.90 3.40
Pagina 98
COLTAUCO CUBICACION ESTRUCTURA DE TECHUMBRE
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 99
COLTAUCO CUBICACION ESTRUCTURA DE TECHUMBRE
Ingeniería y Construcción Centro de Salud Villa Olímpica
Coef.
Item Descripción Eje Cant. Uniones i% Altura Largo
(Kg/M)
1.5.1 C100/50/3 1-1 1 5% 0.344 6.884 6.875 4.48
1.5.1 C100/50/3 1-1 1 5% 0.180 3.604 3.60 4.48
1.5.1 C100/50/3 2-2 1 5% 0.180 3.604 3.60 4.48
1.5.1 C100/50/3 2-2 2 5% 0.341 6.834 6.825 4.48
1.5.1 C100/50/3 3-3 1 5% 0.328 6.558 6.55 4.48
1.5.1 C100/50/3 3-3 2 5% 0.341 6.834 6.825 4.48
1.5.1 C100/50/3 4-4 1 5% 0.328 6.558 6.55 4.48
1.5.1 C100/50/3 4-4 2 5% 0.306 6.118 6.11 4.48
1.5.1 C100/50/3 5-5 1 5% 0.328 6.558 6.55 4.48
1.5.1 C100/50/3 6-6 1 5% 0.306 6.118 6.11 4.48
1.5.1 C100/50/3 6-6 1 5% 0.242 4.836 4.83 4.48
1.5.1 C100/50/3 7-7 1 5% 0.328 6.558 6.55 4.48
1.5.1 C100/50/3 7-7 1 5% 0.242 4.836 4.83 4.48
Total Kg
Pagina 100
COLTAUCO CUBICACION ESTRUCTURA DE TECHUMBRE
Ingeniería y Construcción Centro de Salud Villa Olímpica
Total (Kg)
110.643
211.339
202.866
187.915
202.866
187.915
187.915
202.866
187.915
202.866
1,885.11
Total (Kg)
2
2
2
2
2
2
2
2
2
2
20
TOTAL
12
12
12
12
12
12
12
12
12
12
120
Total (Kg)
116.11
51
131.92
119.68
53.04
13.26
13.26
Pagina 101
COLTAUCO CUBICACION ESTRUCTURA DE TECHUMBRE
Ingeniería y Construcción Centro de Salud Villa Olímpica
69.67
30.60
98.94
89.76
116.03
527.68
1,430.94
Pagina 102
COLTAUCO CUBICACION ESTRUCTURA DE TECHUMBRE
Ingeniería y Construcción Centro de Salud Villa Olímpica
Total (Kg)
1.540
0.806
0.806
1.529
1.467
1.529
1.467
1.369
1.467
1.369
1.082
1.467
1.082
16.980
Total
14
8
8
14
14
14
14
13
14
13
10
14
10
160.00
Pagina 103
COLTAUCO CUBICACION DRENES
Ingeniería y Construcción Centro de Salud Villa Olímpica
RESUMEN
Excavación Sumidero 1.62 m3
Excavación DREN 8.00 m3
TOTAL 9.62 m3
Pagina 104
COLTAUCO CUBICACION TABIQUERIA MUROS INTERIORES
Ingeniería Construcción Centro de Salud Villa Olímpica
Alto Ancho
Item Descripción Recinto
(m) (m)
2.1.1 Plancha Yeso Carton ST 10mm Sala de reunion Comunitaria 2.40
2.1.1 Plancha Yeso Carton ST 10mm Sala Rehabilitacion 2.40
2.1.1 Plancha Yeso Carton ST 10mm Sala Rehabilitacion 2.40
2.1.1 Plancha Yeso Carton ST 10mm Sala de Tratamientos 2.40
2.1.1 Plancha Yeso Carton ST 10mm Sala de Tratamientos 2.40
2.1.1 Plancha Yeso Carton ST 10mm Sala de Tratamientos 2.40
2.1.1 Plancha Yeso Carton ST 10mm Sala de Procedimientos 2.40
2.1.1 Plancha Yeso Carton ST 10mm Sala de Procedimientos 2.40
2.1.2 Plancha Yeso Carton RH 15mm Sala de Procedimientos 2.40
2.1.2 Plancha Yeso Carton RH 15mm Sala de Procedimientos Baño 2.40
2.1.2 Plancha Yeso Carton RH 15mm Sala de Procedimientos Baño 2.40
2.1.1 Plancha Yeso Carton ST 10mm Sala de Aseo 2.40
2.1.2 Plancha Yeso Carton RH 15mm Ducha Personal Femenino 2.40
2.1.2 Plancha Yeso Carton RH 15mm Ducha Personal Femenino 2.40
2.1.2 Plancha Yeso Carton RH 15mm Ducha Personal Femenino 2.40
2.1.2 Plancha Yeso Carton RH 15mm Ducha Personal Femenino 2.40
2.1.2 Plancha Yeso Carton RH 15mm Ducha Personal Masculino 2.40
2.1.2 Plancha Yeso Carton RH 15mm Baño Personal Hombre 2.40
2.1.2 Plancha Yeso Carton RH 15mm Baño Personal Hombre 2.40
2.1.2 Plancha Yeso Carton RH 15mm Baño Personal Hombre 2.40
2.1.2 Plancha Yeso Carton RH 15mm Baño Personal Hombre 2.40
2.1.2 Plancha Yeso Carton RH 15mm Baño Personal Mujeres 2.40
2.1.2 Plancha Yeso Carton RH 15mm Baño Personal Mujeres 2.40
2.1.2 Plancha Yeso Carton RH 15mm Baño Hombres 2.40
2.1.2 Plancha Yeso Carton RH 15mm Baño Hombres 2.40
2.1.2 Plancha Yeso Carton RH 15mm Baño Hombres 2.40
2.1.2 Plancha Yeso Carton RH 15mm Baño Hombres 2.40
2.1.2 Plancha Yeso Carton RH 15mm Baño Hombres 2.40
2.1.2 Plancha Yeso Carton RH 15mm Baño Hombres 2.40
2.1.2 Plancha Yeso Carton RH 15mm Baño Mujeres 2.40
2.1.2 Plancha Yeso Carton RH 15mm Baño Mujeres 2.40
2.1.2 Plancha Yeso Carton RH 15mm Baño Mujeres 2.40
2.1.2 Plancha Yeso Carton RH 15mm Baño Capacidades Especiales 2.40
2.1.2 Plancha Yeso Carton RH 15mm Baño Capacidades Especiales 2.40
2.1.2 Plancha Yeso Carton RH 15mm Baño Cap. Esp. Y Baño Mujeres 2.40
2.1.1 Plancha Yeso Carton ST 10mm Botiquín Farmacia 2.40
2.1.1 Plancha Yeso Carton ST 10mm Some 2.40
2.1.1 Plancha Yeso Carton ST 10mm Box de Atención Médico 2.40
2.1.1 Plancha Yeso Carton ST 10mm Box Multipropósito 2.40
2.1.2 Plancha Yeso Carton RH 15mm Baño (Sala Gineco Obtetrica) 2.40
2.1.1 Plancha Yeso Carton ST 10mm Sala Gineco Obtetrica 2.40
2.1.1 Plancha Yeso Carton ST 10mm Box de Atención Médico 2.40
2.1.1 Plancha Yeso Carton ST 10mm Pasillo 2.40
2.1.1 Plancha Yeso Carton ST 10mm Box de Atención Médico 1 2.40
2.1.1 Plancha Yeso Carton ST 10mm Box de Atención Médico 2 2.40
2.1.1 Plancha Yeso Carton ST 10mm Box de Atención Médico 3 2.40
2.1.1 Plancha Yeso Carton ST 10mm Box de Atención Médico 4 2.40
2.1.1 Plancha Yeso Carton ST 10mm Pasillo 2.40
Pagina 105
COLTAUCO CUBICACION TABIQUERIA MUROS INTERIORES
Ingeniería Construcción Centro de Salud Villa Olímpica
Lago Total
(m) m²
0.59 1.41
7.22 17.33
1.56 3.74
3.04 7.30
1.16 2.78
3.51 8.42
1.96 4.69
2.81 6.75
0.80 1.92
2.09 5.03
1.20 2.88
2.19 5.27
0.55 1.32
1.82 4.38
0.70 1.68
0.70 1.68
1.72 4.13
1.40 3.36
0.48 1.14
0.80 1.92
1.50 3.60
0.57 1.38
1.50 3.60
0.55 1.33
0.73 1.74
0.80 1.92
1.48 3.55
1.42 3.41
0.32 0.78
0.80 1.92
1.40 3.36
2.25 5.40
1.95 4.68
0.92 2.21
4.27 10.25
2.43 5.83
2.43 5.83
6.23 14.95
6.04 14.50
4.10 9.84
5.78 13.87
5.78 13.87
6.52 15.65
6.23 14.95
6.23 14.95
6.93 16.63
6.84 16.42
6.16 14.78
128.47 308.32
Pagina 106
COLTAUCO CUBICACION TABIQUERIA MUROS INTERIORES
Ingeniería Construcción Centro de Salud Villa Olímpica
Total Total
Item Descripción
ml m²
2.1.1 Plancha Yeso Carton ST 10mm 91.64 219.93
2.1.2 Plancha Yeso Carton RH 15mm 36.83 88.39
Total m² Tabiqueria 128.47 308.32
Pagina 107
COLTAUCO CUBICACION ARTEFACTOS Y ACCESORIOS SANITARIOS
Ingeniería Construcción Centro de Salud Villa Olímpica
Pagina 108
COLTAUCO CUBICACION ARTEFACTOS Y ACCESORIOS SANITARIOS
Ingeniería Construcción Centro de Salud Villa Olímpica
Pagina 109
COLTAUCO CUBICACION PUERTAS y VENTANAS
Ingeniería Construcción Centro de Salud Villa Olímpica
Pagina 110
COLTAUCO CUBICACION PUERTAS y VENTANAS
Ingeniería Construcción Centro de Salud Villa Olímpica
RESUMEN DE PUERTAS Y
VENTANAS
Item Descripción Cantidad
2.7.2.1.1.1 P1 2
2.7.2.1.2.1 P3 1
2.7.2.1.2.2 P4 7
2.7.2.1.2.3 P5 2
2.7.2.1.2.4 P6 11
2.7.2.1.2.5 P7 2
2.7.2.2.1 V1 2
2.7.2.2.2 V2 13
2.7.2.2.3 V3 2
2.7.2.2.4 V4 6
2.7.2.2.5 V5 1
2.7.2.2.6 V6 2
TOTAL PUE. Y VENT. 51
Pagina 111
COLTAUCO CUBICACION QUINCALLERIA PUERTAS
Ingeniería Construcción Centro de Salud Villa Olímpica
Pagina 112
COLTAUCO CUBICACION QUINCALLERIA PUERTAS
Ingeniería Construcción Centro de Salud Villa Olímpica
RESUMEN DE PUERTAS Y
VENTANAS
Item Descripción Cantidad
2.7.3.1 BISAGRAS EN MARCOS 75
2.7.3.2 CERRADURA DE PUERTAS INTERIORES 18
2.7.3.3 CERRADURA DE PUERTAS EXTERIORES 2
TOTAL QUINCALLERIA PUERTAS 95
Pagina 113
CUBICACION BALDOSAS Y CERAMICAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 114
CUBICACION BALDOSAS Y CERAMICAS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Total m²
2.48
4.18
0.34
2.14
3.69
2.06
1.98
1.65
1.78
1.74
22.02
13.50
26.04
24.72
17.31
14.61
13.60
10.70
11.16
11.04
142.68
61.55
64.02
15.30
7.20
13.28
72.00
4.43
3.98
5.48
12.00
16.35
32.56
18.47
326.59
Pagina 115
CUBICACION PINTURAS INTERIORES
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 116
CUBICACION PINTURAS INTERIORES
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 117
CUBICACION PINTURAS INTERIORES
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 118
CUBICACION PINTURAS INTERIORES
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Dcto Total
5.6 20.29
3.4 2.64
0.0 9.36
14.4 29.16
29.7 73.26
4.3 12.07
0.0 46.56
8.8 16.84
10.7 12.34
17.7 7.75
11.8 22.32
5.8 10.08
10.0 17.56
280.2
11.66
20.50
6.72
7.30
8.88
8.26
8.74
2.30
2.74
5.81
13.49
16.85
2.83
10.22
9.26
10.22
10.22
8.06
3.98
9.74
4.08
10.80
2.02
3.50
7.10
2.64
6.72
7.20
7.20
2.64
10.08
19.78
Pagina 119
CUBICACION PINTURAS INTERIORES
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
14.40
19.68
8.16
19.68
34.70
19.68
7.68
19.68
405.2
Pagina 120
CUBICACION PINTURAS INTERIORES
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
EN PINTURAS INTERIORES
Resumen m²
INT. E.AGUA MUROS 685.4
PIN. LATEX CIELOS 307.97
PIN. OLEO CIELOS 33.67
Pintura Interior 1027.1
Pagina 121
CUBICACION GUARDAPOLVOS Y
COLTAUCO GUARDAMUROS
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 122
CUBICACION GUARDAPOLVOS Y
COLTAUCO GUARDAMUROS
Ingeniería y Construcción Centro de Salud Villa Olímpica
Pagina 123
CUBICACION GUARDAPOLVOS Y
COLTAUCO GUARDAMUROS
Ingeniería y Construcción Centro de Salud Villa Olímpica
Total (m³)
9.07
14.40
11.89
6.02
18.58
3.54
8.43
8.62
14.69
23.32
16.31
18.45
13.50
13.64
13.64
13.50
13.30
13.50
12.60
13.45
2.15
1.87
264.474
4.45
4.30
4.30
4.30
4.30
1.88
0.10
0.73
1.50
0.28
0.10
2.33
2.33
0.10
1.50
2.33
4.50
4.50
3.00
0.60
0.10
0.38
0.10
Pagina 124
CUBICACION GUARDAPOLVOS Y
COLTAUCO GUARDAMUROS
Ingeniería y Construcción Centro de Salud Villa Olímpica
0.25
1.60
3.05
0.73
2.15
55.78
Pagina 125
CUBICACION SISTEMA PROMURO EIFS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Dcto
Item Descripcion Eje Largo H Subtotal Total
Vanos
1.9 ENV. TERMICA MUROS A-A 11.18 3.2 35.776 5.58 30.196
1.9 ENV. TERMICA MUROS B-B 4.00 3.2 12.8 0 0
1.9 ENV. TERMICA MUROS B'-B' 17.95 3.2 57.424 14.47 42.954
1.9 ENV. TERMICA MUROS A'-A' 4.30 3.2 13.76 3.372 10.388
1.9 ENV. TERMICA MUROS C-C 11.00 3.2 22.4 15 7.4
1.9 ENV. TERMICA MUROS D-D 7.23 3.2 23.12 4.32 18.8
1.9 ENV. TERMICA MUROS E-E 20.20 3.2 64.64 0 64.64
1.9 ENV. TERMICA MUROS 1-1 11.08 3.2 35.44 8.794 26.646
1.9 ENV. TERMICA MUROS 2-2 3.80 3.2 12.16 0 12.16
1.9 ENV. TERMICA MUROS 3-3 6.80 3.2 21.76 5.76 16
1.9 ENV. TERMICA MUROS 3'-3' 0.76 3.2 2.432 0 2.432
1.9 ENV. TERMICA MUROS 4-4 6.80 3.2 21.76 5.76 16
1.9 ENV. TERMICA MUROS 5-5 6.80 3.2 21.76 5.76 16
1.9 ENV. TERMICA MUROS 7-7 14.68 3.2 46.96 17.9125 29.0475
1.9 Total mm² Sistema Eifs
Pagina 126
CUBICACION SISTEMA PROMURO EIFS
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Total (m²)
30.20
12.80
42.95
10.39
7.40
18.80
64.64
26.65
12.16
16.00
2.43
16.00
16.00
29.05
305.5
Pagina 127
CUBICACION CUBIERTA DE TECHUMBRE
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 128
CUBICACION CUBIERTA DE TECHUMBRE
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Total (m²)
24.597
46.983
20.652
64.098
3.786
55.949
53.832
64.098
19.036
353.031
Pagina 129
Item Descripción Eje Total ml
1.7.2.1 FORROS Y CUMBRERAS 1-1 10.88
1.7.2.1 FORROS Y CUMBRERAS 2-2 10.88
1.7.2.1 FORROS Y CUMBRERAS 3-3 13.88
1.7.2.1 FORROS Y CUMBRERAS 3'-3' 0.76
1.7.2.1 FORROS Y CUMBRERAS 4-4 13.11
1.7.2.1 FORROS Y CUMBRERAS 5-5 13.11
1.7.2.1 FORROS Y CUMBRERAS 6-6 5.07
1.7.2.1 FORROS Y CUMBRERAS 7-7 11.87
1.7.2.1 FORROS Y CUMBRERAS A-A 10.98
1.7.2.1 FORROS Y CUMBRERAS A'-A' 4.10
1.7.2.1 FORROS Y CUMBRERAS B-B 4.10
1.7.2.1 FORROS Y CUMBRERAS B'-B' 18.15
1.7.2.1 FORROS Y CUMBRERAS C-C 34.33
1.7.2.1 FORROS Y CUMBRERAS D-D 7.03
1.7.2.1 FORROS Y CUMBRERAS E-E 19.80
1.7.2.1 Total ml 178.03
Item Descripción Eje Total ml
1.7.2.2 CANALES DE AGUAS LLUVIAS A-A 10.00
1.7.2.2 CANALES DE AGUAS LLUVIAS A'-A' 3.90
1.7.2.2 CANALES DE AGUAS LLUVIAS B'-B' 18.50
1.7.2.2 CANALES DE AGUAS LLUVIAS D-D 6.83
1.7.2.2 CANALES DE AGUAS LLUVIAS E-E 19.40
1.7.2.2 CANALES DE AGUAS LLUVIAS 3-3 0.76
1.7.2.2 CANALES DE AGUAS LLUVIAS 6-6 1.38
1.7.2.2 Total ml 60.761
CUBICACION HORMIGONES
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 132
CUBICACION HORMIGONES
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Pagina 133
CUBICACION HORMIGONES
COLTAUCO
Centro de Salud Villa Olímpica
Ingeniería y Construcción
Cant.
Dcto Total
CARAS
1 5.6 20.29
1 3.4 2.64
1 0.0 9.36
1 14.4 29.16
2 21.7 137.81
1 4.3 12.07
1 0.0 46.56
1 8.8 16.84
1 10.7 13.06
1 17.7 7.75
1 11.8 22.32
1 5.8 10.08
2 0.0 42.19
1 10.0 18.09
1 0.0 2.54
1 0.0 1.92
392.7
Pagina 134
Ancho Largo
LARGO Total
Item Descripción Eje PLANCHA CUBIERTA
PLANCHA Plancha
(m) (ml)
1.7.2.1 FORROS Y CUMBRERAS
1.7.2.1 Caballete (0,25X3,00)M C-C 3.00 0.25 22.12 7.37
TOTAL 7.37