Diseño de Puente (LOSA) NEL 8.0m
Diseño de Puente (LOSA) NEL 8.0m
Diseño de Puente (LOSA) NEL 8.0m
8.00 m
1.1 GEOMETRAS:
- Luz del Puente : 8.00 m
- Ancho del Carril : 7.20 m
- Ancho Viga de Borde : 0.35 m
- Altura Viga de Borde : 0.25 m
- Ancho Total : 7.90 m
A) CONCRETO ARMADO:
- Resistencia a la Compresin: f'c = 210 kg/cm
B) ACERO DE REFUERZO:
- Resistencia a la Fluencia: fy = 4200 kg/cm
C) ASFALTO
- Peso especfico del Asfalto: 2000 kg/m
8.00
H= = 0.53 0.55 m
15
H = 0.44 m 0.45 m
c) Se adptar: hL = 0.55 m
C) PENDIENTE DE LOSA:
Se considera una pendiente transversal de: 2.00%
(Bombeo) en Losa.
2% 2%
0.25 SECCIN
0.65 TRANSVERSAL
4.10
0.25
0.65
SECCIN
0.25 8.00 0.25 LONGITUDINAL
8.50
C) CARGA DE IMPACTO:
Coeficiente de Impacto
15.24 15.24
I = L + 38 = 8+38 = 0.33 > 0.30 I = 0.30
3.3 ANALISIS
A) POR CARGA MUERTA (MD)
WD = 1.42 ton/m
4 4
LI = = 2.00
4 +4
1.42 8 2
MD = = 11.36
4.00 4.00 2
2.1
1.90 1.90
YD
= 0.000
0 0 N
1.45
1.90 6.10 XD
= 0.000
M
Ms/c = P (XD/M)+4P (YD/N)+4P (MN/M+N)
Ms/c = 5.795 P
- Caso B:
MN
1.05
1.05
Emax = 1.80 m
- r = fs / fc = 1680 / 84 = 20
Es 2100000
- n = Ec = 217370.65 = 9.66 10
Ms 2 Ms
- dreq = =
Rsb fckjb
2 23.93 10e5
- dreq = = 43.87 cm < 0.55 cm
840.3330.889100
- Adoptaremos: d = 0.50
Ms 2.39E+06
- As = = = 32.05 cm
fsjd 16800.88950
fyAs
- Mu = 0.9Asfy
d - 1.7f'cb
50 4200 As
4.21E+06 = 0.9 As 4200
- 1.7 210
100
4.21E+06 = 189000 As - 444.71 As
444.71 As - -189000 As + 4.21E+06 = 0
As = 23.56 cm/m
24
Asumiendo Varilla de: 1/1'' (As = 5.07 cm)
100 23.56
S 5.07
22
S = (5.07100) / 23.56 = 21.52cm
- Colocaremos : 1/1'' @ 0.21 m
C) ACERO DE REPARTICIN:
Considerando que la losa se arma con el acero Principal Paralelo al Trfico:
- % = 55 / S
- % = 55 / 8
- % = 19.45% < 50% P
D) ACERO DE TEMPERATURA:
- Ast = 0.001bd
- Ast = 0.00110050 = 5.00 cm
Asumiendo Varillas : 1/2'' (As = 1.27 cm)
S = (1.27100) / 5 = 25.40 cm
E) DISTRIBUCIN DE ACERO:
El acero Principal lo disponemos en capas de 0.212 = 0.42 m entre las varillas de 1/1''
de modo que por lo menos la tercera parte del refuerzo positivo sea llevada hasta el
apoyo y extendido dentro de l por lo menos 15 cm y el resto solo hastapuntos de
los corte del acero.
A) ACERO DE TEMPERATURA:
CONSIDERANDO CORTE A 2.50 M
A.1) MOMENTO POR CARGA MUERTA: (MD)
W D = 1.42 ton/m
1.42 1.500 8
MD =
1.500 2
2.00 6.00
MD = 8.52 ton-m
24.08
Meq = = 7.90 ton-m
3.05
fyAs
- Mu = 0.9Asfy
d - 1.7f'cb
4200 As
3.93E+06 = 0.9 As 4200
50 - 1.7 210
100
3.93E+06 = 189000 As - 444.71 As
444.71 As - 189000 As + 3.93E+06 = 0
As = 21.92 cm/m
###
Asumiendo Varilla de: 1/1'' (As = 5.07 cm)
100 21.92
S 5.07
23
S = (5.07100) / 21.92 = 23.13cm
- Colocaremos : 1/1'' @ 0.23 m
11.24
Meq = = 3.75 ton-m
3
fyAs
- Mu = 0.9Asfy d -
1.7f'cb
4200 As
2.18E+06 = 0.9 As 4200 50 - 1.7 210
100
2.18E+06 = 189000 As - 444.71 As
444.71 As - 189000 As + 2.18E+06 = 0
As = 11.87 cm/m
###
Asumiendo Varilla de: 3/4'' (As = 2.85 cm)
100 11.87
S 2.85
24
S = (2.85100) / 11.87 = 24.01cm
- Colocaremos : 3/4'' @ 0.24 m
SECCIN MOMENTO EN
(m) (ton-m)
0.00 0.000
1.00 4.970
1.25 5.991
1.30 6.184
2.00 8.520
2.50 9.763
3.00 10.650
3.95 11.358
4.00 11.360
a = 2.10 m
Mmax = 0.18
1.05
1.05
4 (0.18) (5.90 X - X )
Mx = 5.90
Mx = 0.0211 (5.90 X - X )
L' 2.10
L Seccin Momento Momento Momento
(m) (ton-m) (ton-m/m) (ton-m/m)
0.00 0.000 0.000 0.000
1.00 0.103 0.057 0.017
1.25 0.123 0.068 0.020
1.30 0.126 0.070 0.021
2.00 0.164 0.091 0.027
2.50 0.179 0.100 0.030
3.00 0.183 0.102 0.031
3.95 0.162 0.090 0.027
4.00 0.160 0.089 0.027
C) MOMENTO POR IMPACTO:
MI = 0.3 MS/C
fyAs
- Mu = 0.9Asfy d -
1.7f'cb
N Varilla
L MD MS/C MI MU As
1" @
0.000 0.000 0.000 0.000 0.000 0.00 0.00
1.000 4.970 0.057 0.017 6.623 3.53 143.40
1.250 5.991 0.068 0.020 7.980 4.27 118.81
1.300 6.184 0.070 0.021 8.237 4.40 115.06
2.000 8.520 0.091 0.027 11.334 6.08 83.29
2.500 9.763 0.100 0.030 12.972 6.98 72.61
3.000 10.650 0.102 0.031 14.133 7.61 66.55
3.950 11.358 0.090 0.027 15.020 8.10 62.54
4.000 11.360 0.089 0.027 15.019 8.10 62.55
(0.85) (0.85)
0.20
0.65
VD = -1.78
8.00 m (8) (2)
(7.15) (7.15)
+ 1.78
7.2 /8 (8) (2)
VD = 5.607 ton
0.85 /8
0.85 7.15
VS/C = 5.050P
1.00 7.15 /8
2.95 /8 VS/C = 5.050P ( 4.00 / 2 )
0.00 /8
VS/C = 10.10 ton (Por eje de Rueda)
0.65
- Emax = 1.60 m
- a = E/2 - 0.30
1.60
a= - 0.30 = 0.50
2
aP 0.50 P
- P' = =
E 1.60
P' = 0.333 P
1.05
2 1.517E+06
-d= = 69.85 cm
84 0.333 0.889 25
- d = 70 cm < 90 cm P
- Asumimos: d = 90 - 5 = 85
fy*As
- Mu = 0.9Asfy
d - 1.7*F'c*b
4200 As
2.697E+06 = 0.9 As 4200
85 - 1.7 210
25
2.697E+06 = 321300 As - 1778.824 As
1778.824 As - 321300 As + 2.697E+06 = 0
As = 8.82 cm/m
###
Asumiendo Varilla de: 2 ## + 1 3/8'' (As = 10.85 cm) P
SECCIN MOMENTO
0.00 0.000
1.00 2.996
1.50 4.173
2.00 5.136
2.50 5.885
3.00 6.420
3.50 6.741
3.95 6.847
4.00 6.848
L MD MS/C MI MU As N Varillas
0.00 0.000 0.000 0.000 0.000 0 2 ## As = 10.13 cm
1.00 2.996 3.604 1.081 14.065 7.577 2 ## As = 10.13 cm
1.25 4.173 4.854 1.456 19.124 10.371 2 ## As = 10.13 cm
1.30 5.136 5.736 1.721 22.866 12.464 2 ## + 2 1/2'' As = 12.67 cm
2.00 5.885 6.251 1.875 25.293 13.833 2 ## + 2 1/2'' As = 12.67 cm
2.50 6.420 6.398 1.919 26.404 14.462 2 ## + 2 5/8'' As = 14.09 cm
3.00 6.741 6.178 1.853 26.198 14.346 2 ## + 2 5/8'' As = 14.09 cm
3.95 6.847 5.665 1.699 24.888 13.60 2 ## + 2 5/8'' As = 14.09 cm
4.00 6.848 5.589 1.677 24.677 13.484 2 ## + 2 5/8'' As = 14.09 cm
14.093
- viga = = 0.006263
25 90
WD = 0.67 ton/m VD = - A1 W D + A2 W D
A1, A2, son Areas de la Linea de Influencia
de cobre.
(1.10) (1.10)
VD = + 0.67
(8) (2)
0.20
0.90
(6.90) (6.90)
+ 0.67
8.00 m (8) (2)
6.90 /10
VD = 2.044 ton
(+)
1.10 /10
VS/C = 5.675P
d 90
- Smax1 = = 45 cm
2 2
- Smax2 60 cm
A) CORTANTE ACTUANTE:
- Pu = 1.3 1.67 0.750 = 1.63 ton
B) CORTANTE ADMISIBLE:
VC = 0.850.53210 100 20
VC = 13.06 ton
VC > Vu P
C) MOMENTO ULTIMO:
Mu = Pu h = 1.628 0.25 = 0.4071 ton-m
4.071E+04
-d= = 4.05 cm
84 0.333 0.889 100
d = 4.05 < 20 P
Del analisis de los resultados, colo con los estribos que se colocaran ser suficiente,
3/8''@ 0.30 m
0.65 0.60
VERIFICANDO
Segn el Diseo: 0.22 + 1.30 > ldb
1.52 > ldb = 75
5.2) EN EL SARDINEL:
- DIMENSION DE "a": db = 3/8''
d = 75 cm
a = 75 cm
12db = 12 0.95 = 11.43 cm
ldb = 75 cm
0.85 0.90
2.10