This is a list of State Highways & expressways in Punjab, India.[1][2]
Expressways
editExpressways in Punjab in India are as follows:
- 1. Delhi–Chandigarh–Shimla route.
- 1a. Chandigarh–Shimla Expressway NH-5
- 1a.1. Himalayan Expressway, 27 km, from Zirakpur to Parwanoo, part of Chandigarh–Shimla Expressway, operational.
- 1a. Chandigarh–Shimla Expressway NH-5
- 1b. Ambala–Chandigarh Expressway NH-152, 35 km, greenfield, operational.
- 2. Amritsar–Ludhiana–Chandigarh–Haridwar route:
- 2a. Ludhiana–Rupnagar Expressway NH-205K, 91 km, Rs. 2792 Crore, greenfield, 4-6 lane access-controlled highway connecting Manewal village near Ludhiana on the "Delhi–Amritsar Expressway" with Bheora village near Rupnagar (Ropar or SAS Nagar) in Punjab.
- 2a.1. Kharar spur, includes a 19.5 km spur to Kharar, under construction.
- 2a.2. Ludhiana Elevated Corridor, brownfield, operational.
- 2b. Ambala–Shamli Expressway, greenfield, under-construction.
- 2c. Chandigarh–Haridwar Expressway, greenfield, From Ramgarh to Dera Bassi, Narayangsrh, Sadhura, Pratap Nagar (Khizrabad), Behat, Bahadarabad–Roorkee, Najibabad, Afzalgarh–Kashipur. Proposed, awaiting approvals.
- 3. Delhi–Amritsar–Katra Expressway (DAKE), 670 km (420 mi), greenfield, 4-lane (expandable to 8 lanes) wide controlled-access expressway connecting Bahadurgarh border near Delhi with Katra in Jammu and Kashmir.
- 3a. Nakodar–Amritsar Expressway (NAE) spur, greenfield.
- 3a.1. Amritsar Ring Road, greenfield, part of Nakodar-Amritsar spur of DAKE.
- 4. Amritsar–Jamnagar Expressway EC-3 NH-754, 1,257 km, greenfield, 6-lane wide expressway.
- 5. Ludhiana–Bathinda–Ajmer Expressway, greenfield, 6-lane.
- 6. Chandigarh–Fazilka route.
- 6a. Sirhind–Sehna Expressway, 108 km, greenfield, 6-lane access-controlled highway connecting Fatehgarh Sahib and Sehna Khera via Malerkotla, Barnala and Bathinda, under-construction in 2023.
- 6b. Sehna–Fazilka Expressway, greenfield, via Sri Muktsar Sahib.
- Planned but awaiting approval by the MoRTH (as of July 2023).
- 7. Kishtwar–Ludhiana–Hisar–Jaipur–Kota–Mandsaur Expressway,
- 7a. Ludiana–Hisar–Jaipur–Kota Expressway, greenfield, Ballowal, Longowal, Bhuna, Hisar, Isharwal-Jhumpa, Loharu-Pilani, Surajgarh, Singhana, Neem ka Thana, Chomu, Jaipur, Phagi, Tonk-Dhooni, Bundi, Kota-Rawatbhata spur, Bjinlot (Delhi–Mumbai Expressway).
- Isharwal–Jhumpa spur,
- Bahal–Jui Khurd spur
- Loharu–Pilani spur,
- Madhogarh (Mahendragarh)–Chirawa spur
- Singhana–Narnaul spur,
- Behror–Nangal Chaudhary–Gudha Gorji-Fatehpur Spur.
- Kuchaman–Khatoo–Reengus to Ajeetgarh–Shahpura spur to Delhi–Jaipur Super Expressway.
- Jaipur spur to Delhi–Mumbai Expressway
- Bijolia–Kota spur.
- 7a. Ludiana–Hisar–Jaipur–Kota Expressway, greenfield, Ballowal, Longowal, Bhuna, Hisar, Isharwal-Jhumpa, Loharu-Pilani, Surajgarh, Singhana, Neem ka Thana, Chomu, Jaipur, Phagi, Tonk-Dhooni, Bundi, Kota-Rawatbhata spur, Bjinlot (Delhi–Mumbai Expressway).
- 7b. Sukhnai–Mungli–Kishtwar route, greenfield.
- 7d. Kota–Rawatbhata–Mandsaur route, mix of greenfield and brownfield. From Kota, Rawatbhata, Gandhi Sagar, Rampura (with Rampura–Neemach brownfield spur), JanodMahagarh greenfield, Mahargarh–Narayangarh–Piplia Mandi (with Piplia Mandi–Malhargarh spur), Piplia Mandi–Balaguda–Palthan–Pratapgarh greenfield with PipliaMandi–Mandsaur brownfield spur.
- 8. DSDBO–Chandigarh–Hisar–Beawar–Vadodra–Mumbai route.
- 8a. Naina Devi–Hisar–Beawar Expressway, greenfield, phase-1. From Naina Devi, Panjhera, Fatehgarh Sahib, Patiala-Sanaur, Cheeka, Kalayat-Narwana, Durjanpur, Barwala, Hisar (Airport & Satrod), Kalod, Bidhwan, Bahal, Chandgothi, Norangpura, Jhunjhunu, Sikar, Kuchaman, Makrana, Bagot, Thanwala–Pushkar, Beawar.
- Baddi–Ropar spur
- Chandigarh spur
- Ambala–Patiala spur
- Mansa–Cheeka–Pehowa spur
- Kaithal spur
- 8a. Naina Devi–Hisar–Beawar Expressway, greenfield, phase-1. From Naina Devi, Panjhera, Fatehgarh Sahib, Patiala-Sanaur, Cheeka, Kalayat-Narwana, Durjanpur, Barwala, Hisar (Airport & Satrod), Kalod, Bidhwan, Bahal, Chandgothi, Norangpura, Jhunjhunu, Sikar, Kuchaman, Makrana, Bagot, Thanwala–Pushkar, Beawar.
- 8b. Naina Devi–Killar Expressway, phase-2.
- 8c. Killar–Sasoma-DSDBO (Daulat Beg Oldie) Expressway, greenfield, phase-2, Palampur–Bharmour tunnel, Bharmour–Tindi tunnel, Killar–Padum tunnel, Alchi/Nimoo–Thoise tunnel, Thoise–Sasoma tunnel, Saser to DBO.
- 8c.1. Sasoma–Saser La Road, under construction including tunnel under Saser La.
- 8c. Killar–Sasoma-DSDBO (Daulat Beg Oldie) Expressway, greenfield, phase-2, Palampur–Bharmour tunnel, Bharmour–Tindi tunnel, Killar–Padum tunnel, Alchi/Nimoo–Thoise tunnel, Thoise–Sasoma tunnel, Saser to DBO.
- 8d. Beawar–Vadodra Expressway, greenfield & brownfield upgrades. From Beawar, Asind, Karera, Gangapur, Bhinder, Slumbar, Karwai, Halol, Godhra, Vadodra, Karjan to Dahej.
- Rishabhdev-Slumbar-Mandsaur spur.
- Banswara-Modasa-Gandhinagar spur
- 8d. Beawar–Vadodra Expressway, greenfield & brownfield upgrades. From Beawar, Asind, Karera, Gangapur, Bhinder, Slumbar, Karwai, Halol, Godhra, Vadodra, Karjan to Dahej.
- 9. Ambala–Patiala–Sirsa–Anupgarh Expressway, greenfield, Ambala, Samana, Lehragaga-Budhlada, Sardulgarh, Rania, Elenabad–Tibbi, Pilibanga–Suratgarh, Bajuwala, Anupgarh, Chak 35A & 34A.
- 10. Ferozpur–Sangaria Expressway, greenfield, via Sri Muktsar Sahib, Malout, Sangaria/Chautala.
- 11. Abohar–Moga Expressway, greenfield, via Sri Muktsar Sahib & Faridkot.
- 12. Killar–Pathankot–Fazilka–Sri Ganganagar route.
- 12a. Sri Ganganagar–Fazilka–Ferozpur Expressway, brownfield upgrade except Ladhuka-Khui Khera-Khuian Sarwar is greenfield.
- 12b. Ferozpur–Sri Hargovindpur Expressway, greenfield, via Kirtowal, Govindwal Sahib & Beas.
- 12c. Pathankot–Killar route, brownfield upgrade.
State highways
edit
Punjab has 1102.4 km of State Highways.
See also
editReferences
edit- ^ "Archived copy" (PDF). Archived from the original (PDF) on 26 August 2016. Retrieved 18 July 2016.
{{cite web}}
: CS1 maint: archived copy as title (link) - ^ "Punjab-SH - OpenStreetMap Wiki".