Interstate 5 in Washington

Route map:
This is a good article. Click here for more information.
From Wikipedia, the free encyclopedia

Interstate 5 marker
Interstate 5
Purple Heart Trail
Map
A map of Western Washington with I-5 highlighted in red
Route information
Maintained by WSDOT
Length276.62 mi[1][2] (445.18 km)
ExistedAugust 14, 1957[3][4]–present
HistoryCompleted in 1969[5]
Tourist
routes
NHSEntire route
Major junctions
South end I-5 at the Oregon state line in Vancouver
Major intersections
North end Highway 99 at the Canadian border in Blaine
Location
CountryUnited States
StateWashington
CountiesClark, Cowlitz, Lewis, Thurston, Pierce, King, Snohomish, Skagit, Whatcom
Highway system
SR 4 SR 6

Interstate 5 (I-5) is an Interstate Highway on the West Coast of the United States that serves as the region's primary north–south route. It spans 277 miles (446 km) across the state of Washington, from the Oregon state border at Vancouver, through the Puget Sound region, to the Canadian border at Blaine. Within the Seattle metropolitan area, the freeway connects the cities of Tacoma, Seattle, and Everett.

I-5 is the only interstate to traverse the whole state from north to south and is Washington's busiest highway, with an average of 274,000 vehicles traveling on it through Downtown Seattle on a typical day. The segment in Downtown Seattle is also among the widest freeways in the United States, at 13 lanes, and includes a set of express lanes that reverse direction depending on time of the day. Most of the freeway is four lanes in rural areas and six to eight lanes in suburban areas, including a set of high-occupancy vehicle lanes in the latter. I-5 also has three related auxiliary Interstates in the state, I-205, I-405, and I-705, as well as several designated business routes and state routes.

The freeway follows several historic railroads and wagon trails developed during American settlement of western Washington in the mid-to-late 19th century. The state legislature incorporated local roads into the Pacific Highway in 1913, connecting the state's southern and northern borders between Vancouver and Blaine. The Pacific Highway was built and paved over the next decade, and became the northernmost segment of the national U.S. Route 99 (US 99) in 1926.

The federal government endorsed the creation of a national expressway system in the 1940s, including several bypasses on US 99 that were built by the state in the early 1950s. The state's planned toll superhighway in the Seattle area was shelved in favor of a federally-funded freeway under the new Interstate Highway System, under which I-5 was created in 1957. Construction of I-5 was completed in 1969, and several segments of the highway have been widened or improved in the decades since.

Route description

[edit]

Interstate 5 is the only Interstate to traverse Washington from north to south, serving as the primary highway for the western portion of the state.[6] It is listed as part of the National Highway System and the state's Highways of Statewide Significance program, recognizing its connection to major communities.[7][8] I-5 has three auxiliary Interstate Highways within Washington: I-205, an easterly bypass of Portland, Oregon, and Vancouver; I-405, bypassing Seattle via the Eastside; and I-705, a short spur into Tacoma.[9][10] It was designated as the Purple Heart Trail in 2013 by the Washington State Transportation Commission to honor wounded military veterans.[11]

The freeway runs through the most densely populated region of Washington state, with 4.6 million people living in the nine counties on the corridor, approximately 70 percent of the state's population.[12][13] Several of the largest cities along the I-5 corridor are also connected by the parallel Cascades, a regional train service between Eugene, Oregon, and Vancouver, British Columbia, operated by Amtrak and funded by the state governments of Oregon and Washington.[14][15]

I-5 is maintained by the Washington State Department of Transportation (WSDOT), who conduct an annual survey of traffic volume that is expressed in terms of annual average daily traffic (AADT), a measure of traffic volume for any average day of the year. The stretch of I-5 through Downtown Seattle is the busiest highway in Washington state, with a daily average of over 274,000 vehicles in the mainline and express lanes.[16] The least-traveled segment of I-5 is located at SR 548 in Blaine, with a daily average of 6,600 vehicles.[17] I-5 through the Seattle metropolitan area is among the worst congested highways in the United States, with 78 percent of peak direction miles classified as "routinely congested" for seven to eight hours a day and an average annual delay of 55 hours for Seattle–Everett commutes.[18][19][20] The freeway has a maximum speed limit of 70 miles per hour (110 km/h) in rural areas and 60 mph (97 km/h) in urban and suburban areas, which includes a 100-mile (160 km) section between Tumwater and Marysville.[1][21]

Southwestern Washington

[edit]
An Amtrak Cascades train running in the median of I-5 near Kalama. The route of the Cascades generally runs parallel to I-5 within Washington state.

I-5 enters Washington on the Interstate Bridge, a pair of vertical-lift bridges that span the Columbia River between Portland, Oregon, and Vancouver, Washington. The bridge is the only point on I-5 where vehicles have to stop for cross traffic, because of the lifts.[22] On the north bank of the river, the freeway passes under a railroad viaduct carrying Amtrak's Empire Builder and intersects SR 14. The interchange with SR 14, located west of Pearson Field and the Fort Vancouver National Historic Site, also includes ramps serving downtown Vancouver.[23][24] I-5 continues north through suburban Vancouver and into Hazel Dell, passing the Clark College campus and intersecting SR 501 at Fourth Plain Boulevard and SR 500 at Burnt Bridge Creek. I-5 intersects I-205, the eastern freeway bypass of the Portland metropolitan area, in Salmon Creek near the Vancouver campus of Washington State University.[25]

From Salmon Creek, I-5 continues northwesterly and intersects SR 502 at the Gee Creek rest area west of Battle Ground.[26] Its next interchange, in eastern Ridgefield, forms the eastern terminus of SR 501. The freeway passes the Ilani Casino Resort on the Cowlitz reservation and crosses the Lewis River into Woodland, where it intersects SR 503. Northwest of Woodland, the median of I-5 is used by freight trains and Amtrak's Cascades and Coast Starlight passenger trains, which follow the freeway for its entire length.[27][28] I-5 continues along the east bank of the Columbia River, passing through Kalama on the way towards Longview and Kelso. At the south end of Kelso, near the confluence of the Columbia and Cowlitz rivers, the freeway intersects SR 432, which connects to Longview and the Lewis and Clark Bridge via SR 433. I-5 continues north along the Coweeman River to the Three Rivers Mall, located east of downtown Kelso, where SR 4 terminates.[25] Between Vancouver and Kelso, the highway is part of the Lewis and Clark Trail, a state scenic highway that continues west along SR 4 towards the Pacific Ocean.[9][29]

The freeway continues north, following the Cowlitz River to Castle Rock, where it meets SR 411 and a short business route that loops back to an interchange with SR 504, the main highway to Mount St. Helens.[30] North of Castle Rock, the Cowlitz River turns away from I-5 as the latter enters Lewis County, intersecting SR 506 west of Toledo and SR 505 east of Winlock. Between the two interchanges is the Gospodor Monument Park, a roadside attraction with four sculptures of up to 100 feet (30 m) in height commemorating religious and indigenous figures.[31] After their installation in 2002, the sculptures caused backups on the freeway due to rubbernecking by passing drivers who slowed down near them.[32][33] Near Napavine, I-5 becomes concurrent with US 12, which continues east across White Pass to Yakima.[9][25]

The two highways intersect SR 508 and cross over the Newaukum River near the Uncle Sam billboard, a politically conservative message board and roadside attraction.[34] I-5 and US 12 turn northwest to follow the river and pass along the western edge of Chehalis, where they intersect SR 6. After passing the Chehalis-Centralia Airport, the freeway follows the Chehalis River to the western side of Centralia. I-5 and US 12 then intersect SR 507 and gain a set of collector–distributor lanes as the freeway crosses the Skookumchuck River and a set of railroad tracks on the northwest side of the city. US 12 leaves the concurrency at Grand Mound, heading west towards Aberdeen while I-5 continues north into Thurston County.[9][25]

South Sound region

[edit]
A section of I-5 near downtown Tacoma, pictured in 2015 during an expansion project

North of Grand Mound, I-5 passes two interchanges with SR 121, which forms a loop between two of the exits to serve Millersylvania State Park. The freeway travels through the suburb of Tumwater, passing the Olympia Regional Airport and several state office parks before reaching the terminus of US 101, a major highway that encircles the Olympic Peninsula, on the south side of Capitol Lake.[9] After the interchange, I-5 enters Olympia and turns eastward after passing the Washington State Capitol campus and downtown Olympia. The freeway passes through Lacey and the Hawks Prairie industrial area, where it intersects SR 510, a highway serving the Nisqually Indian Community and Yelm.[9] I-5 continues northeast through the Billy Frank Jr. Nisqually National Wildlife Refuge towards DuPont on the east side of the Nisqually River in Pierce County.[25]

Immediately east of DuPont, I-5 travels through Joint Base Lewis–McChord, a major military installation that encompasses land on both sides of the freeway and its parallel railroad. Near American Lake, an interchange with Thorne Lane marks the proposed western terminus of SR 704, a new highway that would travel between the boundaries of Fort Lewis and McChord Air Force Base (the two components of Joint Base Lewis–McChord) to Spanaway.[35] Continuing past the bases, I-5 passes through Lakewood and intersects SR 512, a freeway connecting east to Puyallup, before it reaches Tacoma.[25]

In Tacoma, the freeway passes the Tacoma Mall, turns east, and splits into collector–distributor lanes that run through central Tacoma and serve two interchanges: the terminus of SR 16, which continues northwest over the Tacoma Narrows Bridge to the Kitsap Peninsula; and I-705 and SR 7, which serve downtown Tacoma, the Tacoma Dome, Tacoma Dome Station, and the Pacific Avenue corridor.[36] East of the Tacoma Dome area, I-5 intersects SR 167 and crosses over the Puyallup River and a railroad carrying Sounder commuter trains. The freeway reaches Fife on the Puyallup Indian Reservation and intersects SR 99, a section of former US 99, at 54th Avenue East near the Emerald Queen Casino. After crossing Hylebos Creek, I-5 turns north and ascends from the Puyallup River Valley, entering King County and the city of Federal Way while parallel to SR 99.[25]

After passing under SR 161 at Kitts Corner near the Wild Waves Theme Park, I-5 intersects SR 18, a freeway that connects to Auburn and Maple Valley. I-5 continues north past the former corporate headquarters of Weyerhauser to central Federal Way, where the freeway's high-occupancy vehicle lanes (HOV lanes) have a direct off-ramp to the Federal Way Transit Center and The Commons at Federal Way shopping mall. The freeway travels north into western Kent, intersecting SR 516 near Highline College. North of Angle Lake, I-5 tracks eastward between the cities of SeaTac and Tukwila, passing east of Seattle–Tacoma International Airport. At the Westfield Southcenter shopping mall in Tukwila, I-5 intersects SR 518, the primary means of access to the airport and Burien, and I-405, the eastern freeway bypass of Seattle that travels through Renton and the Eastside. The interchange includes several left-hand ramps, necessitating the separation of the thru HOV lanes from the mainline.[37] For a short distance, the light rail tracks of the Link 1 Line, which followed SR 518 from Tukwila International Boulevard station, join I-5 and run on its west side until the next interchange at SR 599, a short freeway that connects to SR 99.[38] From the SR 599 interchange, I-5 makes a gradual turn to the northwest while crossing over the Duwamish River and a mainline railroad, following the latter into the city of Seattle after an interchange with SR 900.[9][25]

Seattle and Shoreline

[edit]

I-5 and the Downtown Seattle skyline, as seen from Dr. Jose Rizal Park on Beacon Hill

After entering Seattle, I-5 passes under the Link 1 Line tracks at Boeing Access Road and runs northwesterly between Boeing Field and Georgetown to the west along the railroad and Beacon Hill to the east.[39] Mid-way along Beacon Hill near Jefferson Park, the freeway turns due north and intersects the east end of the Spokane Street Viaduct, part of the West Seattle Bridge, which has additional ramps to the SoDo area and the VA Puget Sound Medical Center.[25] I-5 continues north between SoDo and northern Beacon Hill, crossing over the western portal of the Beacon Hill light rail tunnel near 1 Line's railyard and operating base.[40] At the north end of SoDo and Beacon Hill, I-5 intersects I-90, the state's major east–west freeway, forming a large interchange with ramps to T-Mobile Park and Lumen Field, two of the city's professional sports stadiums.[9][25]

North of the interchange, I-5 travels on an elevated viaduct over the International District and splits into collector–distributor lanes that serve exits to Downtown Seattle. The thirteen-lane freeway, among the widest in the United States,[41] runs in the full block between 6th and 7th avenues between downtown to the west and First Hill to the east, home to Harborview Medical Center and Yesler Terrace. It passes to the east of Seattle's tallest building, the Columbia Center,[42] and the city's Central Library before adding a set of reversible express lanes in the median near Madison Street.[25] I-5 turns northeasterly and passes under two structures built atop sections of the highway: Freeway Park, a landscaped city park between Seneca and Union streets; and the Seattle Convention Center between Union and Pike streets.[43][44][45]

The Ship Canal Bridge, which carries I-5 into the University District in Seattle

I-5 continues north out of downtown Seattle under a 20-to-30-foot (6.1 to 9.1 m) retaining wall along Melrose Avenue at the edge of Capitol Hill.[46] To the west is the South Lake Union and Cascade neighborhoods, accessed via ramps to Stewart Street and Mercer Street. The freeway travels along the north end of Capitol Hill through the Eastlake neighborhood on the east side of Lake Union, passing over the I-5 Colonnade mountain bike park.[47] At Roanoke Park, I-5 intersects the western terminus of SR 520, a major freeway that crosses Lake Washington on the Evergreen Point Floating Bridge to Bellevue and Redmond.[25] The heavily trafficked Mercer Street and SR 520 exits use ramps that are on opposite sides of the freeway, causing vehicles to weave across several lanes that contributes to traffic congestion.[48][49]

I-5 continues onto the Ship Canal Bridge towards the University District, crossing 160 feet (49 m) over a section of the Lake Washington Ship Canal and Eastlake Avenue parallel to the University Bridge. The bridge also includes a lower deck for the express lanes, with a ramp connecting to Northeast 42nd Street in the University District.[50][51]

I-5 runs north along 5th Avenue through the University District, a few blocks west of the University of Washington campus, and intersects Northeast 45th and 50th streets using a weaved pair of diamond interchanges.[52] In the RooseveltGreen Lake area, I-5 intersects Ravenna Boulevard and SR 522, a major highway that travels along the north side of Lake Washington.[9] Further north, the freeway reaches Northgate and the express lanes merge back with the mainline, forming a set of HOV lanes.[53] I-5 passes to the west of Northgate Mall and the Northgate light rail station along 1st Avenue before moving back east to 5th Avenue near Haller Lake.[54] At Jackson Park, freeway intersects SR 523, which runs on 145th Street and forms the northern city limit of Seattle. The interchange includes a set of flyer stops that are connected to SR 523 by a northbound loop ramp and southbound slip ramp.[55] I-5 continues north through Shoreline, passing the King County Metro north bus base and several suburban neighborhoods before reaching Snohomish County.[25]

Snohomish County

[edit]
View of northbound I-5 in Lynnwood

At the county line near Lake Ballinger, I-5 intersects SR 104, a highway that connects to Lake Forest Park, Edmonds, and the Kitsap Peninsula via the Edmonds–Kingston ferry.[9] The freeway continues through western Mountlake Terrace, passing the Mountlake Terrace Transit Center and its median bus station near 236th Street Southwest. Upon entering Lynnwood, I-5 turns northeast and follows the Interurban Trail, passing the Lynnwood Transit Center, which is connected to the HOV lanes via a set of direct ramps.[56] The freeway then intersects SR 524 (196th Street Southwest) and its spur route on 44th Avenue West before heading towards Alderwood Mall. To the east of the mall, I-5 intersects I-405 and SR 525.[25]

I-5 crosses into northern Lynnwood and intersects 164th Street Southwest near Martha Lake and Mill Creek, where a partial HOV ramp connects to the Ash Way Park and Ride.[57] The freeway continues north into Everett and intersects SR 96 southeast of Paine Field. It then passes Silver Lake and the South Everett park and ride (located in the freeway's median) at 112th Street Southeast near the Everett Mall and a southbound-only rest area.[58][59] Northeast of the mall, I-5 comes to a major interchange with several highways: SR 99, which travels southwest as Everett Mall Way; SR 526, which travels west to the Boeing Everett Factory and Mukilteo; SR 527, which travels south through Mill Creek; and Broadway, which continues north into downtown Everett.[9][60] From the mall interchange, I-5 descends towards the Lowell area on the east side of a hill with several suburban neighborhoods. Near the Everett Memorial Stadium and Lowell Park, the freeway intersects 41st Street in a single-point urban interchange, with additional ramps from the HOV and mainline lanes towards downtown Everett on Broadway.[61][62]

I-5 then curves northeasterly around downtown Everett, following the general course of the Snohomish River, and intersects the southern terminus of SR 529 at a half-diamond interchange with Pacific Avenue and Maple Street near the Everett train station and transit center. One block north of the interchange, the freeway intersects US 2, a major highway that travels across Stevens Pass to eastern Washington.[9] To the north of the US 2 ramps is a second half-diamond interchange with SR 529 Spur on Everett Avenue, at which point the HOV lanes terminate and leave the freeway at six total lanes.[63][64] I-5 continues north through a narrow trench in the Riverside neighborhood and passes Summit Park, a city park built using leftover land and excavated dirt from the freeway's construction.[25][65]

The freeway continues over the Snohomish River and descends into the river's estuary, which has several sloughs that I-5 crosses.[66] It also passes the Everett Water Pollution Control Facility and several wastewater treatment ponds, which produces strong odors that are noted by motorists.[67] On the north side of Steamboat Slough, I-5 turns northwesterly and intersects SR 529 before crossing over the BNSF Railway and Ebey Slough into Marysville. Within Marysville, the freeway runs due north along the boundary between the city and the Tulalip Indian Reservation and intersects several arterial streets:[68] SR 528 west of downtown Marysville, 88th Street near Quil Ceda Village, and 116th Street near the Tulalip Resort Casino and Seattle Premium Outlets shopping mall.[25][69]

North of the city and reservation, I-5 crosses over the railroad and enters Arlington's Smokey Point neighborhood, where it intersects SR 531 just west of Arlington Municipal Airport. A pair of rest areas are situated north of the interchange and are the busiest in the state, serving 2.1 million visitors per year, and is home to a 22-foot-wide (6.7 m) Western red cedar stump that was once hollowed out to allow vehicles to drive through it.[70][71] The area around the freeway transforms from suburban to rural, with rolling hills and forested areas, as it approaches Island Crossing and an interchange with SR 530 west of downtown Arlington. North of Island Crossing, I-5 crosses the Stillaguamish River and passes the Stillaguamish Indian Reservation and the Angel of the Winds Casino Resort. The freeway continues northwest through rural Snohomish County and intersects SR 532 east of Stanwood before crossing into Skagit County.[25]

Skagit and Whatcom counties

[edit]
The Peace Arch monument on the Canadian border marks where I-5 enters British Columbia as Highway 99

From the Snohomish County line, the freeway turns north and descends into the Skagit Valley from Conway Hill, following the Skagit River that runs to its west. At Conway, I-5 intersects SR 534 and is joined by the BNSF railroad while continuing north towards Mount Vernon. The freeway narrows to four lanes within Mount Vernon and forms the boundary between the uphill suburban neighborhoods and downtown along the river. In downtown Mount Vernon, it intersects SR 536 in an interchange adjacent to the city's train station. At its next interchange, I-5 crosses the railroad and encounters SR 538, which connects the freeway to the Skagit Valley College and a minor retail corridor.[25] The freeway then crosses the Skagit River into Burlington on a bridge that partially collapsed on May 23, 2013, and was subsequently renamed the Trooper Sean M. O'Connell Jr. Memorial Bridge after a state trooper who died while directing detour traffic during its rebuilding.[72][73]

On the north side of the river, I-5 skirts the western edge of Burlington, passing car dealerships and retail stores, including the Cascade Mall and an outlet mall.[74][75] To the west of downtown Burlington, the freeway intersects SR 20, a major state highway, in a partial cloverleaf interchange that includes several businesses inside the western loop.[76] SR 20 continues west towards Anacortes and the Olympic Peninsula, and east through North Cascades National Park to the Okanogan Country as the North Cascades Highway. In northern Burlington, I-5 intersects the southern end of SR 11, which provides access to the western Chuckanut Mountains.[9] I-5 crosses the railroad and the Samish River before reaching the Skagit Casino Resort and Skagit Speedway near Bow and Alger, located in the middle of the heavily forested Chuckanut foothills. The freeway then travels up into the Chuckanut Mountains and crosses into Whatcom County south of Lake Samish.[25] The entire Skagit County section of I-5 is designated as the Skagit Valley Agricultural Scenic Corridor, a state scenic byway, in recognition of its agricultural industry.[77]

I-5 travels along the eastern shore of Lake Samish before turning west to follow Chuckanut Creek through a narrow valley formed by Chuckanut and Lookout mountains in Lake Samish State Park. At Lake Padden, it turns north and enters the city of Bellingham, intersecting SR 11 east of Fairhaven and the Alaska Marine Highway terminal.[9] The freeway travels along the east side of Sehome Hill and downtown, passing the Western Washington University campus and several intersections with downtown streets. Northeast of downtown Bellingham, I-5 intersects SR 542 (the Mount Baker Highway) and turns west to meet SR 539 at the Bellis Fair Mall. The freeway heads northwest and leaves Bellingham after passing Bellingham International Airport, entering the predominately rural part of the Fraser Lowland region.[78] I-5 continues northwest along the railroad, crossing the Nooksack River on a pair of truss bridges near downtown Ferndale and reaching a junction with SR 548 north of the city. SR 548 continues along the highway and travels west towards the Cherry Point Refinery and Birch Bay.[25][79]

In Blaine, the northernmost city on I-5, SR 543 splits off to serve an alternate border crossing for trucks and freight.[80] I-5 travels along the northeast edge of downtown Blaine and intersects SR 548 before it reaches the Canadian border at the Peace Arch, where the highway terminates.[25][81] The monument was built in 1921 and its surrounding park is open to the public without needing to report to customs officers.[82] The park is connected to its administrative buildings and parking lots by a set of crosswalks across the northbound and southbound lanes of Interstate 5.[81] The Peace Arch–Douglas crossing is the third-busiest port of entry on the Canadian border,[81] with an average of 3,500 to 4,800 vehicles crossing per day.[83] The highway continues north as Highway 99 towards Vancouver, located 30 miles (48 km) northwest of Blaine.[84]

Seattle express lanes

[edit]

The northbound mainline entrance to the express lanes at Seneca Street, with barriers and signage indicating its closure

I-5 has 7.14 miles (11.49 km)[1] of express lanes within Seattle, which reverse to carry traffic in the peak direction; the express lanes run in the median of the freeway between Downtown Seattle and Northgate, carrying 54,000 of the 270,000 vehicles on the Ship Canal Bridge on an average weekday, as measured in 2010.[85] The express lanes split from I-5 near James Street, with ramps to the mainline near the northbound Seneca Street exit; the southernmost downtown exit is at 5th Avenue and Cherry and Columbia streets under the Seattle Municipal Tower and adjacent to Seattle City Hall.[86][87]

The express lanes run through downtown and the Cascade neighborhood on the lower deck of I-5's southbound lanes, with ramps to the Pike Street at 9th Avenue (including a former exit to Downtown Seattle Transit Tunnel's Convention Place station), and Stewart and Howell streets at Eastlake Avenue.[88][89] After the ramps from Mercer Street, the four-abreast express lanes emerge onto the median of I-5, following it past Capitol Hill and Eastlake to the Ship Canal Bridge. The express lanes cross the Ship Canal on the lower deck of the bridge, which includes an exit to Northeast 42nd Street in the University District. A southbound-only, HOV-only onramp from Ravenna Boulevard and an additional ramp to SR 522 connect the express lanes to North Seattle, leaving two express lanes and an HOV lane. The express lanes end southwest of the Northgate Mall, with a ramp to Northeast 103rd Street and the two remaining lanes merging onto I-5.[25][88] The downtown entrances at Cherry, Columbia, and Pike streets are designated for HOV use only to encourage carpooling without affecting buses using the ramps.[90][91][92]

The express lanes typically carry southbound traffic from 5 a.m. to 11 a.m. and northbound traffic from 11:15 a.m. to 11 p.m. on weekdays, with an overnight closure from 11 p.m. to 5 a.m. On most weekends, the lanes are open to southbound traffic from 8 a.m. to 1:30 p.m. and northbound traffic from 1:45 p.m. to 11 p.m., with an overnight closure to reduce neighborhood noise.[88] The weekend times are sometimes adjusted for special events, including weekend sporting events, or construction on the mainline lanes in Seattle.[93] The express lanes are controlled by a series of movable gates and electronic signs controlled by a remote operations center that relies on CCTV cameras and an inspection and sweep for abandoned vehicles by a ground crew, who also set up safety nets during the 15-minute switch-over.[94][95] Prior to a $6.6 million project to automate the gates and signage in 2012, the switch-over took 50 minutes in total.[94][96] During snowstorms and severe cold weather, WSDOT keeps the express lanes open in one direction for the entire day to prevent snow and ice from causing electronic failures in the automated gates.[97]

Express lane exit list

[edit]

The entire highway is in Seattle, King County.

mi[1]kmDestinationsNotes
165.29266.01
I-5 south – Tacoma, Portland
South end of express lanes
165.62266.545th Avenue, Columbia StreetSouthbound exit and northbound entrance (HOV only)
166.49267.94Pike StreetSouthbound exit and northbound entrance (HOV only)
166.63268.16Stewart Street – Seattle City CenterSouthbound exit and northbound entrance
167.20–
167.26
269.08–
269.18
Mercer Street – Seattle CenterSouthbound exit and northbound entrance
168.96271.91Northeast 42nd Street – University of WashingtonNorthbound exit and southbound entrance
169.66273.04Ravenna BoulevardSouthbound entrance only (HOV only)
170.54274.46 SR 522 (Lake City Way) – BothellNorthbound exit and southbound entrance
172.07276.92Northeast 103rd Street, 1st Avenue NortheastNorthbound exit and southbound entrance
172.43277.50
I-5 north – Everett, Vancouver, BC
North end of express lanes
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

History

[edit]

Early state and national highways

[edit]
The shields for Primary State Highway 1 and U.S. Route 99, both predecessors of I-5

The Pacific Highway was formed in 1913 by the state government as the north–south trunk in its first highway system, following the general route of modern-day I-5.[98] The trunk route, one of three suggested by good roads activists for several years and studied by the state legislature in 1909,[98][99] strung together several wagon trails dating back as early as the 1840s, when settlers arrived in the Puget Sound region from the Willamette Valley via the Cowlitz Trail.[100] Part of the highway also followed the military road constructed in the 1850s from Fort Vancouver to Fort Bellingham.[101]

The Washington section was part of a longer highway along the West Coast from Canada to Mexico, which was conceived by the Pacific Highway Association of North America in 1910.[102] The Pacific Highway was dedicated by 60,000 people at the Peace Arch in Blaine on September 4, 1923, with a few sections still under construction.[98] Earlier that year, the Washington state government had designated it as State Road 1 and allotted funds to pave some rural sections. By 1925, almost all of the highway had been paved or improved to modern standards.[98][103]

The federal government and the American Association of State Highway Officials established a national highway system in 1926, designating most of the Pacific Highway north of Los Angeles as part of U.S. Route 99 (US 99).[104] The highway's Washington segment would ultimately be completed four years later with the opening of several bridges between Everett and Marysville.[98] It was also realigned in several areas to use newer cut-off roadways, bypassing older sections. The section between Burlington and Bellingham, historically on the water-facing Chuckanut Drive, was moved inland via Lake Samish in 1931.[105][106] State Road 1 was re-designated in 1937 as Primary State Highway 1 under the state's new highway numbering system, but was not signed as such, giving priority to the overlapping US 99.[107][108] By 1941, the Pacific Highway was the busiest road in the Pacific Northwest and had been widened to four lanes in most urban areas because of traffic congestion, necessitating studies into by-passing cities along the corridor.[109][110]

State upgrades and Interstate planning

[edit]

The federal government began planning for a national "superhighway" system in the late 1930s, including the US 99 corridor as the main route along the West Coast.[111] The highway system, designed with a minimum of four lanes in rural areas and strict grade separation, was approved for limited funding by Congress in 1944 and planned by the Bureau of Public Roads over the following years. The US 99 corridor was included in the initial 37,700-mile (60,672 km) system announced three years later by the Public Roads Administration.[112]

The state legislature adopted its own set of standards for limited-access highways in 1947, later amending them to encourage upgrades to existing two-lane roadways.[113] In 1951, the legislature authorized a $66.7 million bond issue (equivalent to $628 million in 2023 dollars)[114] to fund upgrades to US 99, including four-lane sections on all but 40 miles (64 km) of the highway and a modern "freeway" through Vancouver.[115] The plan was opposed by Governor Arthur B. Langlie, who questioned its constitutionality on the basis that it could violate the state constitution's 18th amendment. The bond's use of future gas tax revenues to pay interest would, under some interpretations, violate the amendment's requirement that the gas tax must be used for highway purposes, using it instead to pay off debts.[116] Later that year, the state supreme court upheld the legislature's authorization and allowed the program to move forward.[117] A separate bill in 1953 authorized planning for a toll highway between Tacoma and Everett to replace the nearly-complete Alaskan Way Viaduct and other urban streets with grade crossings and 19 total interchanges.[118][119][120]

The upgrade program was divided into 226 miles (364 km) of four-lane highway and 47 miles (76 km) of two-lane highway in rural sections between Marysville and Blaine.[121] Construction on the rural sections in southwestern Washington began in late 1951 and the first section near Kalama was opened early the following year.[122][123] Major bypasses of Centralia, Fort Lewis, Kelso, Marysville, and Tumwater were completed in 1954.[124][125][126] The 2-mile-long (3.2 km) Vancouver freeway opened on April 1, 1955, constituting the state's first grade-separated freeway and costing $7 million (equivalent to $62.2 million in 2023 dollars)[114] to construct.[127] In December 1955, the section between Chehalis and Olympia was moved onto a straighter highway that bypassed Tenino and other small towns along the meandering route of the Pacific Highway. Its opening marked the end of the southern section of the upgraded US 99.[128][129] The northern section was declared complete after a bypass of Mount Vernon and Burlington, including a new bridge over the Skagit River, was opened to traffic in June 1957.[130]

The Federal-Aid Highway Act of 1956, signed into law by President Dwight D. Eisenhower on June 29, 1956, formally authorized the creation and majority-federal funding of the Interstate Highway System.[112] A few months later, the state supreme court overturned the $194 million authorization (equivalent to $1.67 billion in 2023 dollars)[114] to build the 65-mile (105 km) Tacoma–Everett expressway as a toll road after finding it to be unconstitutional. The federal contribution under the Interstate Highways program was anticipated to be $165 million (equivalent to $1.42 billion in 2023 dollars),[114] but come in smaller installments that would require more time to complete the freeway project.[131] The entire US 99 corridor was subsequently assigned the designation of "Interstate 5" in 1957 and the federal government allocated planning funds to begin engineering of the Seattle Freeway,[132] which commanded its own Highway Department division.[119][133]

Suburban and rural construction

[edit]
I-5 was routed around downtown Bellingham and opened in 1960

Washington was the fastest of the three West Coast states to upgrade sections of US 99 to four lanes and partial Interstate standards using new interchanges, with only 15 miles (24 km) of the highway in northern Whatcom County still two-laned by 1959.[134] Among the first projects to use federal funding from the 1956 act was an upgrade of the Fort Lewis highway to four-lane freeway standards, which opened in September 1957 and included the relocation of the military base's main gate to a new cloverleaf interchange.[135][136] Another early Interstate project, the 6.5-mile (10.5 km) Olympia Freeway, was opened to traffic on December 12, 1958, at a cost of $11.6 million (equivalent to $94 million in 2023 dollars).[114] It also included a freeway section of US 101 and US 410 that intersected I-5 in the state's first three-level interchange.[137] A rural section of freeway between Marysville and Mount Vernon was completed in early 1959.[138]

The first section of the Tacoma–Seattle–Everett freeway was opened to traffic on October 1, 1959, extending the Fort Lewis freeway 5 miles (8.0 km) from Gravelly Lake near McChord Field to South 72nd Street in southern Tacoma. The $4.68 million project (equivalent to $37.4 million in 2023 dollars)[114] built the six-lane freeway and a cloverleaf interchange at SSH 5G (now SR 512).[139][140] The Tacoma section was also the first to use the Interstate highway shield, which was installed during construction in 1958.[141] By the end of 1959, new interchanges and overpasses had brought most of the highway between Vancouver and Olympia to Interstate standards.[142] Governor Albert D. Rosellini announced an accelerated push for freeway construction, primarily aimed at completing Interstate 5 between Seattle and the Canadian border, in August 1960.[143]

The Tacoma section was extended 13.5 miles (21.7 km) north to Midway (near Des Moines) on October 10, 1962. The dedication ceremony was attended by Governor Rosellini and included a parade of U.S. Army vehicles from Fort Lewis. The Tacoma–Midway section cost $14.5 million to construct (equivalent to $136 million in 2023 dollars)[114] and included a cloverleaf interchange for the Auburn cutoff (later SR 18) in Federal Way.[144] The ceremony had been preceded by drivers trespassing onto the finished but unopened freeway a month earlier to avoid congestion on US 99.[145] The Tacoma and Olympia sections of I-5 were connected by a new freeway across Fort Lewis and the Nisqually River that opened in November 1968 and cost $12 million (equivalent to $80.3 million in 2023 dollars).[114][146] Its opening eliminated the last traffic signal between Seattle and Portland.[147][148]

I-5 was routed around Bellingham on an easterly arc with several interchanges that were added after lobbying by downtown business groups who had originally favored a waterfront route.[149] The first section, 5 miles (8.0 km) long and four lanes wide, opened to traffic on December 5, 1960, connecting with an existing expressway to Ferndale.[150] The remainder of I-5 from Ferndale to the Peace Arch border crossing was upgraded in two stages, beginning with 11 miles (18 km) to Dakota Creek near Blaine that opened on October 29, 1963.[151] The last section through Blaine was delayed by construction issues and opened on November 23, 1965, with a dedication ceremony at the Peace Arch.[152] The British Columbian government had already completed upgrades to its section of Highway 99 between Blaine and the Fraser River in 1962.[153] The southernmost section of the Bellingham Freeway through the Chuckanut Mountains opened in three stages in 1966, completing the last four-lane section of the highway in the state.[154][155]

The 19.7-mile (31.7 km) section between north Seattle and Everett was opened on February 3, 1965.[156] It was constructed over sections of the former Seattle–Everett Interurban Railway and cost $23 million (equivalent to $170 million in 2023 dollars).[114][157] Several of the freeway's interchanges in southern Snohomish County were opened two months later.[158][159] The freeway was initially six lanes wide but was expanded to eight lanes from Northgate to modern-day Shoreline in 1966 because of increased traffic congestion.[160] The 3-mile (4.8 km) bypass of downtown Everett between 41st Street and the Snohomish River was completed on January 18, 1968;[161] its opening eliminated fourteen traffic lights and included ramps to connect with the Hewitt Avenue Trestle.[162] The final section of I-5 was opened on May 14, 1969, spanning 3.5 miles (5.6 km) between Everett and Marysville over the Snohomish River delta.[163][164] It was originally scheduled to open several months earlier, but delayed steel work on the bridge over the Snohomish River caused scheduling issues.[165]

Several right-in/right-out intersections and non-grade-separated sections remained on I-5 until the completion of widening and grade separation projects in the 1970s.[166][167] The section between northern Kelso and Castle Rock was improved to Interstate standards and widened to six lanes in 1976,[168] which was followed by an expansion through Kelso that opened in 1981.[169][170] The Kelso expansion project included relocating the freeway away from a mudslide-prone hill, transferring maintenance of the old alignment to the city government.[171] A similar six-lane expansion project in Marysville in the late 1960s was delayed after a dispute between the state government and Tulalip Tribes over compensation for land that was later settled in 1970.[172][173] A section further north of Marysville was expanded to six lanes in 1972, including a new bridge over the Stillaguamish River for northbound traffic and replacement of a railroad underpass with a pair of overpasses.[174][175]

Seattle planning and construction

[edit]
Land clearing for I-5 near Green Lake in north Seattle, pictured in 1963

A municipal traffic plan from 1946 outlined designs for a north–south freeway through Seattle that was later refined into the early concepts for Interstate 5 in the 1950s.[176] A design from 1954 proposed an eight-lane facility from Downtown Seattle to Ravenna that would cost $194 million (equivalent to $1.75 billion in 2023 dollars)[114] to construct.[177] Alternate plans would have placed the freeway further east on 12th Avenue in Capitol Hill or along Empire Way, which would later be used for the proposed R. H. Thomson Expressway.[178] A larger, twelve-lane freeway through Downtown Seattle with a reversible express lane system was announced in April 1957 ahead of a series of public hearings.[179] The proposal received a mix of strong support and criticism from members of the public, while the city government endorsed the plan with a caveat that right of way along the freeway be reserved for use by rapid transit.[180][181] The twelve-lane design, sans transit, was approved the following year by the Bureau of Public Roads, allowing for property acquisition to begin.[182][183][184] A dedicated office was created to handle property acquisition, which would require 4,500 parcels of land, and 10 percent were condemned by the government.[185][186]

The first section of the freeway within Seattle to be built was the Ship Canal Bridge, a double-decker bridge over the Lake Washington Ship Canal between the University District and Eastlake, which began construction in August 1958.[187] Construction of the freeway through Downtown Seattle was delayed after 100 citizens marched on June 1, 1961, in protest of the "trench" design and sought to add a lidded tunnel with a rooftop park.[188][189] The proposed design change was deferred for later consideration, but delayed the start of construction south of Olive Way to the following year.[190]

Land acquisition for the downtown section of I-5 was completed in June 1962 after a series of condemnations were settled by the King County Superior Court.[191] Demolition of buildings along the block-wide right-of-way had already begun, including the Kalmar Hotel (built in 1881), which pre-dated the Great Seattle Fire,[192] and the Seventh Avenue Fire Hall (built in 1890), the oldest public building in the city.[193][194] The demolitions were opposed by local preservationists, among them architects Victor Steinbrueck and Paul Thiry, but proceeded as planned.[193] Thiry described the freeway's construction as when "Seattle began taking one of its wrong turns and started to lose its identity as a city" and proposed a park lid from Columbia Street to Olive Way along the entire downtown section of I-5.[195] Seattle's Chinatown was divided by the construction of I-5, which resulted in the formation of a special district to preserve the neighborhood's Asian American heritage.[196]

The Ship Canal Bridge and 2.2 miles (3.5 km) of freeway between Ravenna Boulevard and Roanoke Street were dedicated and opened to traffic on December 18, 1962. The bridge cost $14 million to construct (equivalent to $108 million in 2023 dollars)[114] and was among the largest ever built in the Pacific Northwest.[197][198] After the opening of the Evergreen Point Floating Bridge on August 28, 1963, traffic from the bridge was permitted to use a section of I-5 between SR 520 and Mercer Street.[199] Traffic from the North Seattle section, which had been extended north from Ravenna Boulevard to Bothell Way (SR 522), was diverted until a through connection was opened on November 12.[200] The section in the Ravenna neighborhood also included a 300-person fallout shelter under the freeway at Weedin Place that was completed in 1963 and later used for records storage before its abandonment.[201] Some sections of the extensive retaining walls along I-5 were pre-assembled at a plant in Woodinville and hoisted in place by a crane to reduce working hours in residential neighborhoods.[202]

The completed downtown section of I-5, looking north from University Street in 1971, before the construction of Freeway Park and the Seattle Convention Center

The remaining downtown section and approaches from the suburbs remained scheduled to be completed by 1967, with the state legislature passing a provision in a spending bill to accelerate construction.[203][204] The delayed timeline was blamed by the Department of Highways on several uncontrollable factors, among them landslides along Beacon Hill and Capitol Hill, unfavorable weather, a cement masons strike, and relocation of utilities.[205][206] The section between Olive Way and Mercer Street opened to limited traffic on October 30, 1964, with two northbound lanes to bypass congestion at the Mercer Street interchange.[207] Two additional downtown interchanges at University Street and Cherry Street opened on June 30, 1966.[208] Access to the northbound lanes of I-5 was extended to South Dearborn Street in late September 1966, while opening of the southbound section was delayed because of issues with the Airport Way exit.[209] The Connecticut Street interchange, intended to be part of I-90 and connected to the Alaskan Way Viaduct, was partially constructed as part of the downtown section of I-5 but was left unfinished until 1991.[210][211] The remainder of the Seattle section, a 17.2-mile (27.7 km) stretch from Midway to Olive Way, was opened to traffic on January 31, 1967, by Governor Dan Evans.[212]

The reversible express lane system was built along with the rest of I-5 through Seattle and opened in separate phases. The first section of reversible lanes opened on June 2, 1965, with 13 access ramps between Olive Way and Northgate Mall.[213][214] The express lanes were managed using a series of ramp barriers that were remotely controlled and monitored by eleven closed-circuit television cameras that were activated in September 1965.[215][216] An additional ramp at the Mercer Street interchange opened in October 1966 after southbound traffic was diverted to a new set of ramps.[217][218] The southernmost section of the express lanes, including ramps to Columbia and Cherry streets at 5th Avenue, opened on January 31, 1967.[212] The new ramps were later converted to bus-only use as part of the Blue Streak express bus program, which debuted in 1970 and was later replaced by a King County Metro route.[219][220]

Major projects and expansions

[edit]
Aerial view of Freeway Park, looking south

The First Hill Improvement Club and architect Paul Thiry led a campaign in 1961 to reconnect areas of Seattle severed by the freeway with lids that would house parks, parking garages, and other buildings through leased air rights.[221][222] The lid proposal was approved in October 1969 with funding split between the local government, state government, the Forward Thrust bonds program, and a private developer.[223] Landscape architects Lawrence Halprin and Angela Danadjieva were selected to design the park lid and adjoining parking garages, which would incorporate Brutalist elements and a series of waterfalls.[224][225]

The 5.5-acre (2.2 ha) Freeway Park opened on July 4, 1976, incorporating pedestrian and open spaces between Seneca and University streets that continued up the northwest slope of First Hill.[226][227] The Washington State Convention and Trade Center (now the Seattle Convention Center) was constructed north of Freeway Park over a section of I-5 and opened in 1988.[193][228] Part of the convention center complex was designed by Danadjieva as a continuation of Freeway Park, while the main structure rested on a series of trusses over I-5.[229] In 2019, the Seattle city government approved funding for a feasibility study for an expanded downtown lid after lobbying from a grassroots campaign.[230][231] The I-5 Colonnade, a 7.5-acre (30,000 m2) mountain bike park, opened in 2007 under an elevated section of the freeway between Eastlake and Capitol Hill.[232]

WSDOT began installing ramp meters in 1981 to address worsening onramp congestion on I-5 from Seattle to Mountlake Terrace. The first set of 16 ramp meters were activated on September 30, 1981, with a computer system controlling entry at 5–15 second increments; some ramps also had un-metered bypass lanes for transit and three-person carpools.[233][234] The state's first set of HOV lanes opened in August 1983 for use by buses and carpools from Northgate to Mountlake Terrace.[235] By the late 1980s, the 36 miles (58 km) of HOV lanes had reduced average travel times on I-5 by four minutes despite an 86 percent increase in traffic volumes.[236] The HOV lanes were extended north to Lynnwood in 1996 and southern Everett by the end of the decade, while the carpool minimum was lowered to two people per vehicle.[237][238]

In the 1970s, the state government began planning extensive rebuilding of the oldest sections of I-5 to meet newer Interstate standards and eliminate design issues.[239] The 6.5-mile (10.5 km), four-lane section through Tumwater, Olympia, and Lacey was rebuilt in the 1980s at a cost of $164 million (equivalent to $327 million in 2023 dollars).[114] The freeway project was completed in late 1991 with an expansion to six lanes, six rebuilt interchanges, a new bridge for Capitol Way, and improved landscaping.[240][241] The existing Pacific Avenue interchange near the Tacoma Dome was expanded in the 1980s to accommodate I-705, a new spur freeway traveling north to downtown Tacoma.[242]

The rebuilding of the three-mile (4.8 km) Vancouver section was completed in August 1983 at a cost of $40 million (equivalent to $103 million in 2023 dollars).[114] It included widening the freeway to six lanes, new interchanges with SR 14 and SR 500, relocation of railroad tracks, and the replacement of several overpasses.[243][244] An additional expansion project on I-5 through Vancouver and Hazel Dell was completed in 2001, replacing the original overpasses and adding a southbound HOV lane.[245][246] The HOV lane was later removed in 2005 after drivers complained about increased travel times for single-occupant vehicles.[247] A second widening project, completed in 2006, added two lanes on a from Hazel Dell to the I-205 interchange in Salmon Creek, where a new ramp to Northeast 139th Street was later opened in 2014.[248][249]

An expanded section of I-5 in Everett, featuring HOV lanes and sound walls

In April 2003, the state legislature passed the Nickel Funding Package, which enacted a five-cent gas tax increase to fund $4.2 billion in transportation projects (equivalent to $6.67 billion in 2023 dollars)[114] that were rejected in an earlier public referendum.[250] The program funded several projects to widen and modernize sections of I-5, including new interchanges in Clark County and the extension of HOV lanes in Everett and from Tukwila to Tacoma.[251] Several direct access ramps for the HOV lanes were constructed in the 2000s using funds from Sound Transit to serve bus facilities in Lynnwood and Federal Way.[252][253] The Everett expansion project cost $263 million to construct and consisted of HOV lanes from the Everett Mall to the Snohomish River, realigned ramps, a new single-point urban interchange at 41st Street, and a reconstructed Broadway interchange with HOV ramps and a flyover ramp. Construction began in September 2005 under a design–build contract, the third in WSDOT's history, and was completed in June 2008 as part of an accelerated timeline to prepare for the 2010 Winter Olympics hosted by Vancouver, British Columbia.[254][255]

The southern end of the HOV lanes on I-5 in King County was extended to SR 516 in 1995 and Federal Way in 2007 using Nickel Package funding.[256] Construction of an HOV lane system through Tacoma, which would also include a new interchange with SR 16 and the Nalley Valley Viaduct, began in 2001 with the replacement of the South 38th Street overpass to accommodate a wider freeway.[257][258] The Tacoma/Pierce County HOV program launched with partial funding for the $1.6 billion megaproject that was later filled with an earmark in the state legislature's 2005 transportation funding package.[259][260] Construction on the HOV lanes began in 2009 with an extension through Fife to Port of Tacoma Road and seismic retrofitting of bridges that was completed two years later.[261][262] The reconstructed SR 16 opened in two phases, with the new westbound viaduct carrying all between its opening in June 2011 and the completion of the eastbound viaduct in August 2014.[263] A set of ramps connecting the HOV lanes of I-5 and SR 16 on the Nalley Valley Viaduct opened in November 2019.[264]

WSDOT broke ground on the longest section of the Tacoma HOV program, spanning 4 miles (6.4 km) from SR 16 to Port of Tacoma Road, in July 2014.[265] The reconstructed section was completed in November 2018 with a new set of collector–distributor lanes,[266] a carriageway for the northbound lanes of I-5 through the I-705 interchange, the replacement of two overpasses, and extended retaining walls for excavated areas.[267][268] WSDOT began the final phase of the project, replacement of the Puyallup River crossing with wider bridges on a straighter alignment, in February 2015.[269][270] The 1,569-foot (478 m) northbound bridge was completed in October 2017 and all traffic was shifted to it beginning in June 2019.[271][272] The southbound bridge was opened to traffic in April 2022 and the HOV lanes were fully opened from Fife to SR 16 in late August.[273][274]

The 2003 and 2005 gas tax programs also funded improvements to I-5 in areas outside of the central Puget Sound region, including $322 million for lane expansions on a 18-mile (29 km) corridor in Lewis and Thurston counties.[275][276] The existing four-lane section from US 12 in Grand Mound to SR 121 in Maytown gained a third lane in each direction that opened in November 2010 at a cost of $61.5 million.[277] The following year, the six-lane section was extended south by four miles (6.4 km) to Blakeslee Junction near Centralia. Widening of the eight-mile (13 km) section through Centralia to six lanes was completed in 2016 and also included the addition of collector–distributor lanes, three reconstructed interchanges, and flood control measures.[275][278] A 20-mile (32 km) section of the freeway from Chehalis to Grand Mound had closed for four days during December 2007 floods that covered the roadway in 10 feet (3.0 m) of water from the Chehalis River.[279][280]

WSDOT was also allocated funding from the 2003 and 2005 packages to repair bridges on I-5 and add cable barriers to sections of I-5 in Lewis, Skagit, Snohomish, and Whatcom counties.[281] A section through Marysville was later upgraded to a concrete barrier in 2010 after several fatal crossover collisions despite a reduction in the speed limit to 60 mph (97 km/h).[282] Other parts of the packages funded seismic retrofitting for bridges and overpasses, and the implementation of smart highway technology in 2010 that included variable speed limit signs in the Seattle area.[283][284] In May 2023, a third northbound lane from Seneca Street to Olive Way and ramp meters for the collector–distributor lanes and the Cherry Street onramp were added to I-5 to improve weaving.[285][286]

Incidents and closures

[edit]
Aerial view of the 2017 Amtrak derailment over southbound I-5 in DuPont

On May 23, 2013, the northernmost span of the Skagit River bridge between Mount Vernon and Burlington collapsed after a semi-trailer truck struck an overhead beam.[287] The collapse caused two vehicles to fall into the river, where all three people were later rescued with minor injuries.[288] The incident triggered a state of emergency and discussions about the state of national infrastructure. A temporary span was assembled using prefabricated steel sections and opened to limited traffic on June 19, 2013.[289][290] A permanent replacement for the span was built west of the bridge and slid into place before opening to traffic on September 15, 2013.[291]

A section of I-5 was closed for several hours on December 18, 2017, after an Amtrak Cascades passenger train derailed onto the southbound lanes near DuPont. The train had been on the inaugural trip on the new Point Defiance Bypass route, constructed along the freeway between Nisqually and Tacoma Dome Station, which was subsequently closed.[292] The derailment, which killed three passengers and injured more than 70 others, was caused by high speeds on a curved section of track approaching the I-5 overpass.[293]

The Seattle section of I-5 has been the site of several large protests and demonstrations since its construction.[294] A demonstration against the U.S. invasion of Cambodia at the University of Washington on May 5, 1970, held in response to the Kent State shootings, culminated in 5,000 protesters marching onto the Ship Canal Bridge en route to Downtown Seattle.[295] An attempted protest on the freeway the following day was stopped by local police and state troopers armed with tear gas and clubs. The city government sanctioned a march in the express lanes on May 8 that was attended by 15,000 people as other protests continued for several days.[296][297] The 1999 WTO Conference protests included minor disruptions to I-5 traffic while police blocked access from ramps in Downtown Seattle.[298] Several Black Lives Matter protests in 2014, 2016, and 2020 resulted in long nighttime shutdowns of the freeway in Seattle and Olympia.[299][300] The 2020 George Floyd protests included over a month of nightly protests on I-5 with a non-intervention policy implemented by the Washington State Patrol and precautionary closures.[301] The non-intervention policy was suspended after a July 4 incident in which a driver evaded the blockades and struck two protesters on I-5, killing one.[302][303]

Future projects and proposals

[edit]
The Interstate Bridge, a pair of movable bridges that carry I-5 over the Columbia River, are planned to be replaced in the 2020s

Within the Puget Sound region, preservation and maintenance of I-5 is expected to cost $2.5 billion between 2020 and 2040, and substantial rebuilding of the freeway will be required.[304][305] WSDOT began extensive repaving of the highway in the Seattle area in the 2010s, alongside repairs to expansion joints and other deteriorating structures during weekend closures.[306][307] Pavement replacement and expansion joint repairs on the section between Yesler Way and North 117th Street in Seattle is expected to begin in 2023 and take four years to complete.[308] Portions of the freeway's right-of-way will be used for extensions of Sound Transit's Link light rail system, which is planned to extend north to Lynnwood and south to Federal Way by 2025.[309][310] As part of the reconstruction of SR 520, a new HOV ramp from the I-5 reversible lanes to SR 520 is planned to be opened in early 2024, alongside a fifth reversible lane for HOVs that extends south to Mercer Street.[311][312]

The 2015 Connecting Washington transportation funding package included allocations for several major projects on I-5, among them an expansion in the Joint Base Lewis–McChord area and several new and reconstructed interchanges in Lacey and Marysville. Widening of an eight-mile (13 km) section through the military base and neighboring DuPont to eight lanes began in October 2018 and is planned to be completed in 2025;[313] the project also includes reconstruction of several interchanges and accommodations for the adjacent Point Defiance Bypass railroad corridor.[314][315] The SR 510 interchange in Lacey was reconstructed into the state's first diverging diamond interchange, which opened in 2020.[316]

The northbound HOV lane is planned to be extended from Everett to Marysville by late 2024 as part of a $123 million retrofit project that began construction in 2022.[317] It will also include an expansion of the SR 529 interchange in southern Marysville into a full interchange to provide a bypass for a congested railroad crossing on SR 528.[318][319] A new interchange at 156th Street in northern Marysville is planned to open in the late 2020s.[320][321] The Puget Sound Gateway Program, scheduled to be completed in 2028 will include the construction of two interchanges on I-5, at the Port of Tacoma to serve a realigned SR 167 and near SeaTac for an extension of SR 509.[322]

The Vancouver section of I-5 was planned to be rebuilt as part of the Columbia River Crossing program, which would have replaced the six-lane Interstate Bridge with a wider bridge at a cost of approximately $3.4 billion. The northern approach to the bridge would have included a collector–distributor system with a maximum width of 16 lanes. The program was cancelled in 2013 after $175 million had been spent planning because of opposition within the Washington state legislature, but the bridge proposal has been revived several times since.[323] A new panel of legislators from both states was convened in 2018 to study the bridge project, with funding to continue planning work in time for federal deadlines on loan repayment.[324] Oregon and Washington plan to submit an environmental review in 2023 and begin construction in 2025 if funding is found for the project.[325][326] The bridge replacement is expected to cost up to $2.45 billion, while the entire program—including reconstruction of several interchanges and transit improvements—is estimated to cost $5.5 billion to $7.5 billion.[327][328]

Exit list

[edit]
CountyLocationmi[1]kmExitDestinationsNotes
Columbia River0.000.00
I-5 south – Portland
Continuation into Oregon
Interstate Bridge
ClarkVancouver0.410.661A
SR 14 east / Lewis and Clark Trail – Camas
0.450.721B6th Street – Vancouver City Center, Convention CenterNorthbound exit and southbound entrance
1.051.691C SR 501 (Mill Plain Boulevard) – Vancouver City Center, Port of Vancouver
1.582.541D4th Plain Boulevard
2.353.782
SR 500 east / 39th Street
3.074.943Northeast Highway 99, Main Street
4.367.024Northeast 78th Street
5.398.675Northeast 99th Street
7.2411.657ANortheast 134th Street – Washington State University VancouverNorthbound exit and southbound entrance; southbound exit is via I-205 (exit 36)
7.4712.027BNortheast 139th StreetNo southbound exit
7.5012.077


I-205 south to I-84 / SR 14 / Northeast 134th Street – Salem, Washington State University Vancouver
Southbound exit and northbound entrance
9.5115.309Northeast 179th Street – Clark County Event Center
11.2018.0211
SR 502 east (Northeast 219th Street) – Battle Ground
Ridgefield14.2122.8714
SR 501 south (Pioneer Street) – Ridgefield
La Center16.8027.0416Northwest La Center Road – La Center, Cowlitz Reservation
CowlitzWoodland21.0833.9221
SR 503 east – Woodland, Cougar
22.7236.5622Dike Access Road
27.7044.5827Todd Road – Port of Kalama
Kalama29.84–
30.64
48.02–
49.31
30Kalama
32.2851.9532Kalama River Road
Kelso36.9759.5036AKelso DriveNo southbound exit
36.9759.5036Talley Way – Kelso Industrial AreaSigned as exits 36B northbound and 36A southbound
36.9759.5036


SR 432 west to SR 4 / US 30 – Longview, Long Beach, Kelso
39.8864.1839
SR 4 west (Allen Street) / Lewis and Clark Trail – Kelso
40.7765.6140North Kelso Avenue – Lower Columbia College, Long Beach
42.7368.7742Lexington Bridge Drive
46.2074.3546Headquarters Road, Pleasant Hill Road
Castle Rock48.0477.3148
I-5 BL north (Huntington Avenue) – Castle Rock
49.9180.3249

SR 411 south (I-5 Bus. south) / SR 504 east – Castle Rock, Toutle, Mount St. Helens National Volcanic Monument
52.7284.8452Barnes Drive, Toutle Park Road
Lewis57.4192.3957Jackson Highway, Barnes Drive
59.2795.3959
SR 506 west – Vader, Ryderwood
60.9898.1460
SR 506 west (Toledo Vader Road)
63.49102.1863 SR 505 – Winlock, Toledo
68.48110.2168
US 12 east – Morton, Yakima
South end of US 12 overlap
Napavine71.12114.4671
SR 508 east – Napavine, Onalaska
72.85117.2472Rush Road
Chehalis74.78120.3574Labree Road
76.62123.317613th Street
78.04125.5977
SR 6 west – Pe Ell, Raymond
79.15127.3879Chamber Way
Centralia81.74131.5581
SR 507 north (Mellen Street) – Centralia City Center
Southbound access is via exit 82
82.80133.2582Harrison Avenue, Factory Outlet Way
Thurston88.40142.2788
US 12 west – Aberdeen, Tenino
North end of US 12 overlap
95.28153.3495
SR 121 north – Littlerock, Maytown
Tumwater99.35159.8999
SR 121 south (93rd Avenue Southwest)
101.37163.14101Tumwater Boulevard – Olympia Regional Airport
102.86165.54102Trosper Road – Black Lake
104.05167.45103Deschutes Way, 2nd AvenueNo southbound entrance
104.39168.00104
US 101 north – Aberdeen, Port Angeles
Olympia105.52169.82105AState Capitol, Olympia City CenterSigned as exit 105 northbound
105.82170.30105BPort of OlympiaSigned as exit 105 northbound
107.52173.04107Pacific Avenue
108.46174.55108ASleater–Kinney Road southNo northbound entrance; signed as exit 108 southbound
108.46174.55108BSleater–Kinney Road northNo northbound entrance; southbound exit is via exit 109
108.96175.35108CCollege StreetNorthbound exit only
Lacey109.19175.72109Martin Way
112.01180.26111
SR 510 east (Marvin Road) – Yelm
114.36184.04114Nisqually
Pierce116.77187.92116Mounts Road – Old Nisqually
DuPont118.02189.93118Center Drive – DuPont City Center
119.07191.62119Steilacoom–DuPont Road
Joint Base Lewis–McChord120.93194.6212041st Division Drive – Joint Base Lewis–McChord
Lakewood122.74197.53122Berkeley Street
123.64198.98123Thorne Lane
124.70200.69124Gravelly Lake Drive
125.92202.65125Bridgeport Way – McChord Field
127.54205.26127
SR 512 east / South Tacoma Way – Puyallup
128.98207.57128South 84th StreetSouthbound exit is via exit 129
Tacoma129.65208.65129South 72nd Street, South 74th Street, South 84th Street
130.75210.42130South 56th Street, Tacoma Mall Boulevard – University Place
131.89212.26132
SR 16 west (South 38th Street) – Gig Harbor, Bremerton, Tacoma Mall
133.76215.27133

I-705 north / SR 7 south (38th Street) / East 26th Street – Tacoma City Center
134.93217.15134Portland AvenueSouthbound exit is via exit 135
135.09217.41135
SR 167 north – Puyallup
Fife136.15219.1113620th Street East – Port of TacomaSigned as exits 136A (20th Street) and 136B (Port of Tacoma) northbound
137.51221.30137
SR 99 north (54th Avenue East) – Fife
KingFederal Way142.06228.62142 SR 18 (South 348th Street) – AuburnSigned as exits 142A (east) and 142B (west) northbound
143.89231.57143South 320th Street – Federal Way
144.08231.87South 317th StreetHOV only
Kent146.87236.36147South 272nd Street
149.23240.16149 SR 516 – Kent, Des Moines
SeaTac150

SR 509 Toll north / 24th Avenue South
Northbound exit and southbound entrance; under construction
151.24243.40151Military Road, South 200th Street
152.32245.14152South 188th Street, Orillia Road South
Tukwila154.19248.14153Southcenter Parkway – Tukwila, Southcenter MallNorthbound exit and southbound entrance
154.46248.58154A
SR 518 west – Sea-Tac Airport, Burien
Signed as exit 154B southbound
154.46248.58154B
I-405 north – Bellevue, Renton
Signed as exit 154A southbound
154.71248.98154BSouthcenter Boulevard – Southcenter MallSouthbound exit and northbound entrance via Klickitat Drive
156.00251.06156
SR 599 north / Interurban Avenue – Tukwila
Split into two interchanges with some movements requiring the use of an interchange on SR 599.
157.40253.31157
SR 900 east (M. L. King Way)
No northbound exit to eastbound SR 900; no southbound entrance from westbound SR 900
158.07254.39158Boeing Access Road, East Marginal Way, Airport Way
Seattle161.27259.54161Swift Avenue, Albro Place
161.37–
161.60
259.70–
260.07
162Corson Avenue, Michigan Street
163.03262.37163AColumbian Way, West Seattle Bridge, Spokane Street – Lumen Field, T-Mobile ParkSigned as exit 163 northbound
163.54263.19163BForest Street, 6th Avenue SouthSouthbound exit only
164.33264.46164Airport WaySouthbound exit only
164.55264.82164A
I-90 east – Bellevue, Spokane
Signed as exit 164 southbound; I-90 exits 2A-B eastbound, 2B-C westbound
164.55264.82164B4th Avenue South, Airport Way, E. Martinez Drive (to SR 519) – FerriesSigned as exit 164 southbound
164.68265.03164Dearborn StreetSigned as exit 164A northbound; no southbound entrance
165.35266.11Express LanesNorthbound exit and southbound entrance
165.38266.15165AJames StreetSigned as exit 164A northbound
165.63266.56164AMadison Street – Convention CenterNorthbound exit only
165.75266.75165Seneca StreetNorthbound exit and southbound entrance
165.81266.85165BUnion StreetSouthbound exit and northbound entrance
166.26267.57166Olive WayNorthbound exit and entrance
166.42267.83166Stewart Street, Denny WaySouthbound exit and entrance
166.97268.71167Mercer Street – Seattle Center
167.73269.94168ALakeview BoulevardNorthbound exit and southbound entrance
168.12270.56168B SR 520 – Bellevue, Kirkland
168.18270.66168ABoylston Avenue, Roanoke StreetSouthbound exit and northbound entrance
168.40–
169.07
271.01–
272.09
Ship Canal Bridge
169.44272.69169Northeast 45th Street
169.69273.09169Northeast 50th Street
170.31274.09170Ravenna Boulevard, Northeast 65th StreetNorthbound exit and southbound entrance
170.70274.72171Northeast 71st Street, Northeast 65th StreetSouthbound exit and northbound entrance
170.87274.99171 SR 522 (Lake City Way) – BothellNorthbound exit and southbound entrance
171.56276.10172North 85th Street to Aurora Avenue North (SR 99), Northeast 80th Street
172.58277.74Express LanesSouthbound exit and northbound entrance
172.82278.13173Northgate Way, 1st Avenue Northeast
173.89279.85174Northeast 130th Street, Roosevelt WayNorthbound exit and southbound entrance
SeattleShoreline
city line
174.64281.06175 SR 523 (Northeast 145th Street) / 5th Avenue Northeast
Shoreline175.58282.57Metro Transit BaseBuses and transit vehicles only
176.19283.55176Northeast 175th Street – Shoreline
KingSnohomish
county line
ShorelineMountlake Terrace
city line
177.81286.16177 SR 104 – Edmonds, Lake Forest Park
SnohomishMountlake Terrace178.33286.99178236th Street Southwest – Mountlake TerraceNorthbound exit and southbound entrance
179.35288.64179220th Street Southwest – Mountlake Terrace
Lynnwood180.69290.7946th Avenue West (Lynnwood Park & Ride)HOV only
180.77290.92181A
To SR 524 / 44th Avenue West – Lynnwood
Northbound exit and southbound entrance
181.59292.24181B SR 524 (196th Street Southwest) / Alderwood Mall Parkway – LynnwoodSigned as exit 181 southbound
182.67293.98182
I-405 south – Renton, Bellevue


SR 525 north to SR 99 – Mukilteo
Northbound exit and southbound entrance
183.96296.05183164th Street Southwest
184.21296.46Ash WayNorthbound exit and southbound entrance (buses only)
186.49300.13186
SR 96 east / 128th Street Southwest – Paine Field
Everett187.80302.23112th Street Southeast – S. Everett Park & RideHOV only
189.37304.76189


SR 99 south (Everett Mall Way) / SR 526 west / SR 527 south / Broadway – Mukilteo, Whidbey Island Ferry, Paine Field
192.51309.81BroadwayNorthbound exit southbound entrance (HOV only)
192.72310.1519241st Street (to Evergreen Way), Broadway
193.69311.71193 SR 529 (Pacific Avenue) – Everett City CenterNorthbound exit and southbound entrance
193.98312.18194
US 2 east – Snohomish, Wenatchee
194.08312.34194 SR 529 (Everett Avenue) – Everett City CenterSouthbound exit and northbound entrance
194.87313.61195Marine View Drive – Port of EverettNorthbound exit and southbound entrance
Marysville198.33319.18198
SR 529 south / North Broadway – Port of Everett
Southbound exit and northbound entrance
MarysvilleTulalip line199.17320.53199
SR 528 east – Marysville, Tulalip
200.84323.2220088th Street Northeast, Quil Ceda Way
202.52325.92202116th Street Northeast
MarysvilleArlington
city line
206.13331.73206 SR 531 (172nd Street Northeast)
Arlington208.72335.90208
SR 530 east – Arlington, Darrington
210.36338.54210236th Street Northeast
212.71342.32212
SR 532 west – Stanwood, Camano Island
215.09346.15215300th Street Northwest
Skagit218.61351.82218Starbird Road
221.13355.87221
SR 534 east – Lake McMurray
224.00360.49224Old Highway 99 SouthNorthbound exit and southbound entrance
Mount Vernon225.19362.41225Anderson Road
226.45364.44226
SR 536 west (Kincaid Street)
227.79366.59227
SR 538 east (College Way)
Burlington228.93368.43229George Hopper Road
230.20370.47230 SR 20 – Burlington, Anacortes
231.27372.19231
SR 11 north (Chuckanut Drive) – Bow, Edison, Burlington
232.89374.80232Cook Road – Sedro-Woolley
236.45380.53236Bow Hill Road – Bow, Edison
240.99387.84240Alger
Whatcom242.92390.94242Nulle Road – South Lake Samish
246.30396.38246North Lake Samish
Bellingham250.79403.61250
SR 11 south (Old Fairhaven Parkway, Chuckanut Drive) – Alaska Marine Highway
252.14405.78252Samish Way – Western Washington University
253.03407.21253Lakeway Drive
253.85408.53254Iowa Street, Ohio Street, State Street
254.88410.19255
SR 542 east (Sunset Drive) – Mt. Baker
256.27412.43256
SR 539 north (Meridian Street) / Bellis Fair Mall – Lynden
Signed as exits 256A (SR 539) and 256B (Bellis Fair Mall Parkway) northbound
257.04413.67257Northwest Avenue
257.72414.76258 Bakerview Road – Bellingham International Airport
Ferndale260.19418.74260Slater Road – Lummi Island
262.63422.66262Main Street – Ferndale City Center
263.52424.09263Portal Way
266.04428.15266
SR 548 north (Grandview Road) – Custer
270.30435.01270Birch Bay, Lynden
Blaine274.23441.33274Peace Portal Drive – SemiahmooNorthbound exit and southbound entrance
275.21442.91275 SR 543 north to Highway 15 – Pacific Border Crossing (Truck Customs)Northbound exit and southbound entrance
276.26444.60276
SR 548 south – Blaine City Center, Peace Arch State Park
276.62445.18Canada – United States border at Peace Arch Border Crossing
Highway 99 north – VancouverContinuation into British Columbia
1.000 mi = 1.609 km; 1.000 km = 0.621 mi

References

[edit]
  1. ^ a b c d e Multimodal Planning Division (February 26, 2014). "State Highway Log Planning Report 2013, SR 2 to SR 971" (PDF). Washington State Department of Transportation. pp. 220–322. Retrieved June 14, 2018.
  2. ^ "Table 1: Main Routes of the Dwight D. Eisenhower National System Of Interstate and Defense Highways as of December 31, 2017". Federal Highway Administration. December 31, 2017. Retrieved June 15, 2018.
  3. ^ Official Route Numbering for the National System of Interstate and Defense Highways (Map). American Association of State Highway Officials, Public Roads Administration. August 14, 1957. Retrieved June 14, 2018.
  4. ^ Weingroff, Richard F. (1996). "Federal-Aid Highway Act of 1956, Creating the Interstate System". Public Roads. 60 (1). Washington, D.C.: Federal Highway Administration. ISSN 0033-3735. Retrieved June 14, 2018.
  5. ^ Dougherty, Phil (April 10, 2010). "Interstate 5 is completed in Washington state on May 14, 1969". HistoryLink. Retrieved June 14, 2018.
  6. ^ Horton, Jeffery L. (November 2014). "Surviving An Interstate Bridge Collapse". Public Roads. 78 (3). Federal Highway Administration. Retrieved June 14, 2018.
  7. ^ National Highway System: Washington (PDF) (Map). Federal Highway Administration. October 1, 2012. Retrieved June 14, 2018.
  8. ^ "Transportation Commission List of Highways of Statewide Significance" (PDF). Washington State Transportation Commission. July 26, 2009. Archived from the original (PDF) on July 24, 2013. Retrieved June 14, 2018.
  9. ^ a b c d e f g h i j k l m n Washington State Highways 2014–2015 (PDF) (Map). 1:842,000. Washington State Department of Transportation. 2014. Archived from the original (PDF) on February 21, 2017. Retrieved June 14, 2018, with inset maps.
  10. ^ "The Dwight D. Eisenhower System of Interstate and Defense Highways: Part II – Mileage". Federal Highway Administration. December 31, 1997. Retrieved August 6, 2018.
  11. ^ Hill, Christian (August 2, 2013). "I-5 in Washington becomes Purple Heart Trail to honor veterans". The Columbian. Retrieved October 1, 2018.
  12. ^ MacDonald, Douglas (May 15, 2013). "Trans-poor-tation 3: No high five for I-5". Crosscut.com. Retrieved June 21, 2018.
  13. ^ Lewis, Mike (March 27, 2001). "I-5 drives population increase". Seattle Post-Intelligencer. p. A1.
  14. ^ Bacon, John; Farley, Josh (December 18, 2017). "6 dead after Amtrak Cascades train derails onto Interstate 5 near Tacoma". Statesman-Journal. Retrieved June 17, 2018.
  15. ^ "Passenger Rail in Washington". Washington State Department of Transportation. Archived from the original on June 29, 2018. Retrieved June 17, 2018.
  16. ^ Gutman, David (June 19, 2017). "Can't Washington state ease I-5 traffic? Fixes exist, but most of them are pricey". The Seattle Times. Retrieved June 14, 2018.
  17. ^ "2016 Annual Traffic Report" (PDF). Washington State Department of Transportation. pp. 73–82. Archived from the original (PDF) on August 12, 2017. Retrieved June 14, 2018.
  18. ^ Lindblom, Mike (February 5, 2018). "It's worse than you think: Everett leads the nation in traffic congestion, report says". The Seattle Times. Retrieved June 17, 2018.
  19. ^ "2017 Corridor Capacity Report" (PDF). Washington State Department of Transportation. December 2017. pp. 11–14. Retrieved June 17, 2018.
  20. ^ Gutman, David (June 19, 2017). "Here's why I-5 is such a mess in Seattle area, and what keeps us moving at all". The Seattle Times. Retrieved June 17, 2018.
  21. ^ Dietrich, William (April 30, 2006). "Lynnwood Redux: Where else will 100,000 newcomers a year go now?". The Seattle Times. p. 16. Retrieved June 30, 2018.
  22. ^ Pesanti, Dameon (February 12, 2017). "Interstate Bridge turns 100: 'With Iron Bands,' a century spanned". The Columbian. Retrieved June 14, 2018.
  23. ^ "SR 5 – Exit 1A/1B: Junction SR 14" (PDF). Washington State Department of Transportation. June 9, 2016. Retrieved June 14, 2018.
  24. ^ Downtown Vancouver Walking Map (PDF) (Map). City of Vancouver. Retrieved June 14, 2018.
  25. ^ a b c d e f g h i j k l m n o p q r s t u v "Interstate 5, Washington" (Map). Google Maps. Retrieved June 14, 2018.
  26. ^ Florip, Eric (October 8, 2014). "Rest area rebuild expands Gee Creek site". The Columbian. Retrieved June 14, 2018.
  27. ^ Passenger Rail System, Washington State (PDF) (Map). Washington State Department of Transportation. January 2012. Archived from the original (PDF) on February 22, 2017. Retrieved June 14, 2018.
  28. ^ "SR 5 – Exit 22: Junction Dike Access Road" (PDF). Washington State Department of Transportation. October 12, 2011. Retrieved June 14, 2018.
  29. ^ "Lewis and Clark Trail Scenic Byway". Washington State Department of Transportation. Archived from the original on October 23, 2014. Retrieved June 14, 2018.
  30. ^ LaBoe, Barbara (September 5, 2006). "Castle Rock hopes to catch travelers' eyes with new signs". The Daily News. Londview, Washington. Retrieved July 13, 2020.
  31. ^ Richard, Terry (March 25, 2009). "I-5 eye catcher: Gospodor Monument at Toledo". The Oregonian. Retrieved September 11, 2018.
  32. ^ Mittge, Brian (December 24, 2002). "Gospodor's monuments continue to affect traffic". The Chronicle. Centralia, Washington. p. A3.
  33. ^ Anderson, Peggy (May 25, 2003). "Safety of motorists towers over debate about man's art". Statesman Journal. Salem, Oregon. Associated Press. p. C9. Retrieved September 11, 2018 – via Newspapers.com.
  34. ^ Kershaw, Sarah (November 28, 2004). "Highway's Message Board Now Without a Messenger". The New York Times. p. 37. Retrieved September 11, 2018.
  35. ^ "SR 704 - Cross Base Highway Project". Washington State Department of Transportation. Archived from the original on June 15, 2018. Retrieved June 14, 2018.
  36. ^ Nunnally, Derrick (July 11, 2017). "Southbound I-5 will get local/express division in Tacoma". The News Tribune. Tacoma, Washington. Retrieved June 14, 2018.
  37. ^ "SR 5 – Exit 154: Junction SR 405/SR 518" (PDF). Washington State Department of Transportation. January 5, 2009. Retrieved June 15, 2018.
  38. ^ Nowlin, Mark (July 12, 2009). "Your guide to riding light rail" (Map). The Seattle Times. Archived from the original on July 15, 2009. Retrieved June 15, 2018.
  39. ^ "Your ride to airport is on the way". The Seattle Times. November 24, 2006. p. A1.
  40. ^ "Beacon Hill Tunnel & Station" (PDF). Sound Transit. Archived from the original (PDF) on September 9, 2015. Retrieved June 15, 2018.
  41. ^ "Urban Highways with the Most Lanes" (PDF). Federal Highway Administration. July 27, 2010. Retrieved June 15, 2018.
  42. ^ Duncan, Don (October 8, 1989). "Promises to keep: The sky's the limit". The Seattle Times. p. 13.
  43. ^ Easton, Valerie (June 27, 2008). "In the concrete jungle, Freeway Park will offer respite once again". The Seattle Times. Archived from the original on June 16, 2018. Retrieved June 15, 2018.
  44. ^ Mahoney, Sally Gene (July 24, 1983). "Convention Center: Unveiled model gives a glimpse of how it may look". The Seattle Times. p. D6.
  45. ^ "Final List of Nationally and Exceptionally Significant Features of the Federal Interstate Highway System" (PDF). Federal Highway Administration. November 1, 2006. Archived from the original (PDF) on June 16, 2018. Retrieved June 16, 2018.
  46. ^ Barber, Mike; Wong, Brad; Murakami, Kery (December 19, 2008). "Students screamed as bus crashed through I-5 barrier". Seattle Post-Intelligencer. Retrieved June 15, 2018.
  47. ^ McQuaide, Mike (September 25, 2008). "Flying high under I-5 at the new mountain bike park". The Seattle Times. p. H12. Archived from the original on June 16, 2018. Retrieved June 15, 2018.
  48. ^ Lindblom, Mike (February 8, 2018). "More traffic lights on Mercer Street: Ramp-metering signals coming to I-5 onramps". The Seattle Times. Retrieved July 9, 2018.
  49. ^ Robinson, Herb (May 3, 1968). "Freeway 'Friction' Develops". The Seattle Times. p. A.
  50. ^ Clarridge, Christine; Birkland, Dave (August 29, 2001). "A day of despair, anger on I-5 – Woman survives plunge; commute halted 3-1/2 hours". The Seattle Times. p. A1.
  51. ^ Birkland, Dave; Nalder, Eric; Andrews, Paul (May 14, 1993). "Driver escapes dangling truck – with fiery cab hanging off I-5, trucker unhurt". The Seattle Times. p. C1.
  52. ^ "SR 5 – Exit 169: Junction NE 45th Street/NE 50th Street" (PDF). Washington State Department of Transportation. August 9, 2010. Retrieved June 15, 2018.
  53. ^ Foster, George (October 21, 2001). "Getting There: Now you see the lane ..." Seattle Post-Intelligencer. Retrieved June 15, 2018.
  54. ^ Miller, Brian (November 8, 2017). "TOD proposals due for Northgate Station; city is seeking an upzone". Seattle Daily Journal of Commerce. Retrieved June 15, 2018.
  55. ^ "SR 5 – Exit 175: Junction SR 523/NE 145th Street" (PDF). Washington State Department of Transportation. February 7, 2011. Retrieved July 28, 2018.
  56. ^ Hadley, Jane (November 16, 2004). "State opens direct-access ramps to I-5 at Lynnwood Transit Center". Seattle Post-Intelligencer. Retrieved June 15, 2018.
  57. ^ "SR 5 – Exit 183: Junction 164th Street SW" (PDF). Washington State Department of Transportation. August 29, 2017. Retrieved June 15, 2018.
  58. ^ Nohara, Yoshiaki (September 12, 2008). "Soon, you'll be able to hop on a bus in the I-5 median". The Everett Herald. Retrieved June 15, 2018.
  59. ^ "Safety rest area locations". Washington State Department of Transportation. Archived from the original on June 12, 2018. Retrieved June 15, 2018.
  60. ^ "SR 5 – Exit 189: Junction SR 99/SR 526/SR 527" (PDF). Washington State Department of Transportation. January 13, 2013. Retrieved June 15, 2018.
  61. ^ "SR 5 – Exit 192: Junction 41st Street/Old SR 529/Broadway Avenue" (PDF). Washington State Department of Transportation. July 20, 2016. Retrieved June 15, 2018.
  62. ^ Nohara, Yoshiaki (September 30, 2008). "Everett finishing work on link to I-5". The Everett Herald. Retrieved June 15, 2018.
  63. ^ "SR 5 – Exit 193/194: Junction Pacific Avenue/SR 2/SR 529" (PDF). Washington State Department of Transportation. June 3, 2011. Retrieved June 15, 2018.
  64. ^ "I-5 – Everett HOV Freeway Expansion Project" (PDF). Washington State Department of Transportation. November 2007. Archived from the original (PDF) on February 21, 2017. Retrieved June 15, 2018.
  65. ^ May, Allan; Preboski, Dale (1989). The History of Everett Parks: A Century of Service and Vision. Norfolk, Virginia: The Donning Company. p. 50. ISBN 0-89865-794-6. OCLC 20453314.
  66. ^ "Snohomish River Estuary Recreation Guide". Snohomish County Parks and Recreation. 1999. Archived from the original on June 16, 2018. Retrieved June 15, 2018.
  67. ^ Tuinstra, Rachel (March 24, 2004). "Go ahead, take a deep breath". The Seattle Times. p. H13. Retrieved June 15, 2018.
  68. ^ "Tulalip Tribes Hazard Mitigation Plan 2010 Update, Section II: Community Profile" (PDF). Tulalip Tribes. August 2010. p. 13. Archived from the original (PDF) on January 26, 2017. Retrieved June 15, 2018.
  69. ^ Winters, Chris (November 25, 2015). "Bridge over I-5 enters final phases". The Everett Herald. Retrieved June 15, 2018.
  70. ^ Whitley, Peyton (August 6, 2003). "Rest areas: I-5 asylums". The Seattle Times. p. H20. Retrieved June 15, 2018.
  71. ^ Barr, Robert A. (July 5, 1970). "Marysville Stump Dates Back to Caesar". The Seattle Times. p. G5.
  72. ^ Burton, Lynsi (May 23, 2014). "The Skagit River bridge, 1 year after collapse". Seattle Post-Intelligencer. Retrieved June 15, 2018.
  73. ^ Long, Priscilla (September 16, 2013). "I-5 Skagit River Bridge at Mount Vernon collapses on May 23, 2013". HistoryLink. Retrieved June 15, 2018.
  74. ^ Wanielista, Kera (March 4, 2016). "Burlington postpones marijuana zoning issue". Skagit Valley Herald. Mount Vernon, Washington. Archived from the original on January 16, 2018. Retrieved June 15, 2018.
  75. ^ Judd, Ron C. (December 26, 2003). "Burlington frets about its soul". The Seattle Times. p. B1. Retrieved June 15, 2018.
  76. ^ "SR 5 – Exit 230: Junction SR 20/Burlington/Anacortes" (PDF). Washington State Department of Transportation. February 4, 2010. Retrieved June 15, 2018.
  77. ^ Judd, Ron (April 21, 2013). "From wild birds to beet seeds, the Skagit Valley's riches are being kept safe". The Seattle Times. p. 7. Archived from the original on April 30, 2013. Retrieved August 30, 2018.
  78. ^ "Whatcom County Rural Land Study: A Collaborative Report Identifying Rural Areas of Agricultural Significance". Whatcom County. February 2007. pp. 6–7. Archived from the original on June 16, 2018. Retrieved June 15, 2018.
  79. ^ "BP Cherry Point Revised Cogeneration Project Compensatory Mitigation Plan". BP. 2004. p. 21. Retrieved June 15, 2018 – via Google Books.
  80. ^ "New signs show wait times at Canadian border". The Everett Herald. Associated Press. June 23, 2008. Retrieved June 15, 2018.
  81. ^ a b c "Peace Arch Port of Entry Redevelopment Draft Environmental Impact Statement". General Services Administration. November 28, 2005. p. 3-126. Retrieved June 15, 2018 – via Google Books.
  82. ^ Dougherty, Phil (October 18, 2009). "Peace Arch Park (Blaine)". HistoryLink. Retrieved June 15, 2018.
  83. ^ Heim, Kristi (February 9, 2009). "Border work at Peace Arch won't end in time for Olympics". The Seattle Times. p. A1. Archived from the original on June 16, 2018. Retrieved June 15, 2018.
  84. ^ "Peace Arch Land Port of Entry" (PDF). General Services Administration. June 23, 2014. Retrieved June 15, 2018.
  85. ^ Lindblom, Mike (July 14, 2011). "State considers tolls for I-5 express lanes". The Seattle Times. p. A1. Archived from the original on June 16, 2018. Retrieved June 15, 2018.
  86. ^ Lindblom, Mike (May 8, 2018). "Preparations for closure of transit tunnel lag". The Seattle Times. p. A1. Retrieved June 15, 2018.
  87. ^ McDermott, Terry (May 7, 1989). "High-rise: Digging the hole – Latest skyscraper rises from one man's dream, another's financial pit". The Seattle Times. p. A1.
  88. ^ a b c "Express lanes". Washington State Department of Transportation. Retrieved October 10, 2022.
  89. ^ Guillen, Tomas (September 26, 1990). "Sign at bus tunnel can't always be believed". The Seattle Times. p. A1.
  90. ^ "Hot line set against fast-lane cheaters". The Seattle Times. February 3, 1984. p. C16.
  91. ^ Lane, Bob (February 28, 1977). "Carpoolers gain route; Access to express lanes". The Seattle Times. p. A7.
  92. ^ Murakami, Kery (July 20, 2003). "Getting There: HOV exits are meant to discourage solo driving". Seattle Post-Intelligencer. Retrieved June 15, 2018.
  93. ^ "I-5 Express Lane Operation on Weekends". Washington State Department of Transportation. 2018. Archived from the original on June 2, 2018. Retrieved June 20, 2018.
  94. ^ a b "Drivers save time and money with automated I-5 express lanes" (Press release). Washington State Department of Transportation. July 23, 2012. Archived from the original on July 10, 2014. Retrieved June 19, 2018.
  95. ^ Whitely, Peyton (October 28, 1990). "I-5 express lanes built to prevent bottlenecks". The Seattle Times. p. B1. Retrieved June 20, 2018.
  96. ^ Lindblom, Mike (March 29, 2008). "Express-lane switch stuck in slow motion". The Seattle Times. Archived from the original on June 20, 2018. Retrieved June 20, 2018.
  97. ^ Lindblom, Mike (December 20, 2022). "How snow is affecting Seattle-area roads and transit". The Seattle Times. Retrieved December 20, 2022.
  98. ^ a b c d e Caldbick, John (March 23, 2012). "Ebey Slough Bridge (1925-2012)". HistoryLink. Retrieved June 20, 2018.
  99. ^ "Good Roads Association Outlines Great Highways". Kennewick Courier. May 31, 1912. p. 3. Retrieved June 20, 2018 – via Newspapers.com.
  100. ^ "Another Trail". Terre Haute Star. March 1, 1962. p. 8. Retrieved June 20, 2018 – via Newspapers.com.
  101. ^ McDonald, Lucile (November 24, 1963). "Old Military Road Takes on a New Life". The Seattle Times. pp. 4–5.
  102. ^ "Autoists Organize Highway Association". The Seattle Times. September 20, 1910. p. 9.
  103. ^ Rand McNally Official 1925 Auto Trails Map of Washington and Oregon (Map). 1:1,077,120. Rand McNally. 1925. Retrieved July 25, 2018 – via David Rumsey Historical Map Collection.
  104. ^ Bureau of Public Roads; American Association of State Highway Officials (November 11, 1926). United States System of Highways Adopted for Uniform Marking by the American Association of State Highway Officials (Map). 1:7,000,000. Washington, DC: U.S. Geological Survey. OCLC 32889555. Retrieved November 7, 2013 – via Wikimedia Commons.
  105. ^ "Samish, Skagit Highways Next, Humes Pledges". The Seattle Times. Associated Press. August 21, 1931. p. 10.
  106. ^ "Chapter 36: Pacific Highway" (PDF). Session Laws of the State of Washington, 1931. Washington State Legislature. March 12, 1931. pp. 107–108. Retrieved August 4, 2018.
  107. ^ "George Washington's Head to Mark State Highways". The Seattle Times. February 8, 1938. p. 13.
  108. ^ "Chapter 190: Establishment of Primary State Highways" (PDF). Session Laws of the State of Washington, Twenty-Fifth Session. Washington State Legislature. March 17, 1937. pp. 933–943. Retrieved June 16, 2018.
  109. ^ "Washington State Highways Traverse Scenic Wonderland". The Seattle Times. July 27, 1941. p. 48.
  110. ^ "Alaskan Way By-Pass Asked". The Seattle Times. June 30, 1938. p. 36.
  111. ^ Bureau of Public Roads (April 27, 1939). Toll Roads and Free Roads. Government Printing Office. p. 19. OCLC 2843728. Retrieved August 5, 2018 – via HathiTrust.
  112. ^ a b Weingroff, Richard F. "Designating the Urban Interstates". Federal Highway Administration. Retrieved August 5, 2018.
  113. ^ Tate, Cassandra (November 8, 2004). "Washington Legislature authorizes construction of limited access highways in 1947". HistoryLink. Retrieved August 5, 2018.
  114. ^ a b c d e f g h i j k l m n Johnston, Louis; Williamson, Samuel H. (2023). "What Was the U.S. GDP Then?". MeasuringWorth. Retrieved November 30, 2023. United States Gross Domestic Product deflator figures follow the MeasuringWorth series.
  115. ^ "State Outlines Plans for New Super-Highway". The Daily Chronicle. Centralia, Washington. Associated Press. April 28, 1951. p. 1. Retrieved August 5, 2018 – via Newspapers.com.
  116. ^ Cunningham, Ross (May 9, 1951). "Many Lawyers Back Langlie View That Highway Bond Issue Is Unconstitutional". The Seattle Times. p. 10.
  117. ^ Cunningham, Ross (June 27, 1951). "Upholding Highway Bond Law Seen as Paving Way For Income-Tax O. K.". The Seattle Times. p. 20.
  118. ^ Cunningham, Ross (February 3, 1952). "Knotty Financial, Traffic Problems Face Building Freeway Through Seattle". The Seattle Times. p. 12.
  119. ^ a b Dugovich, William (May 1967). "Seattle's Superfreeway". Washington Highways. Vol. 14, no. 2. Washington State Department of Highways. pp. 2–5. OCLC 29654162. Retrieved September 11, 2018 – via WSDOT Library Digital Collections.
  120. ^ "85-Cent Charge On Everett-Tacoma Toll Road Recommended". The Seattle Times. March 30, 1954. p. 1.
  121. ^ Hittle, Leroy (May 21, 1953). "Paving Near Castle Rock Is Completed". The Seattle Times. p. 28.
  122. ^ "Four-Lane Highway Near Kalama Due for Completion by January". The Daily Chronicle. Centralia, Washington. December 20, 1951. p. 9. Retrieved August 6, 2018 – via Newspapers.com.
  123. ^ "More Highway Will Be Paved". The Daily Chronicle. Centralia, Washington. February 15, 1952. p. 7. Retrieved August 6, 2018 – via Newspapers.com.
  124. ^ Patty, Stanton (October 31, 1954). "Highway Section Opens". The Seattle Times. p. 22.
  125. ^ "New Highway Link Opened". The Daily Chronicle. Centralia, Washington. September 15, 1954. p. 1. Retrieved August 6, 2018 – via Newspapers.com.
  126. ^ "Fort Lewis Bottlenecks To Be Broken". Washington Highways. Vol. 6, no. 9. Washington State Department of Highways. March 1957. pp. 8–9. OCLC 29654162. Retrieved September 12, 2018 – via WSDOT Library Digital Collections.
  127. ^ "Traffic Flows on New Freeway". Fairbanks News-Miner. Associated Press. April 1, 1955. p. 10. Retrieved August 6, 2018 – via Newspapers.com.
  128. ^ Batcheldor, Matt (December 7, 2008). "I-5 at 50: It's changed the face of the region". The Olympian. p. A1. Retrieved February 23, 2023 – via Newspapers.com.
  129. ^ "New 4-Lane Link in '99' Is Opened". The Seattle Times. United Press International. December 22, 1955. p. 29.
  130. ^ "Construction for Busy U.S. 99 Begun Early; Much More Due in Future". Washington Highway News. Vol. 8, no. 1. Washington State Department of Highways. August 1958. pp. 8–10. OCLC 29654162. Retrieved September 12, 2018 – via WSDOT Library Digital Collections.
  131. ^ Cunningham, Ross (December 5, 1956). "State High Court's Decision Means No Expressway Tolls". The Seattle Times. p. 15.
  132. ^ Hittle, Leroy (October 9, 1957). "State's Two Major Highways To Be Renumbered In Defense System". Port Angeles Evening News. Associated Press. p. 1. Retrieved August 6, 2018 – via Newspapers.com.
  133. ^ Becker, Paula (April 30, 2003). "First part of Seattle Freeway (Interstate 5) route receives federal funding on October 1, 1957". HistoryLink. Retrieved August 6, 2018.
  134. ^ Jaques, Tom (October 4, 1959). "Engineers Closing Gaps in North-South Highway That Will Link Canada, Maxico; Washington Leads California, Oregon In Amount of Work Done". Eugene Register-Guard. p. C1. Retrieved September 11, 2018 – via Newspapers.com.
  135. ^ "Two Key Projects on Highway 99 Progress Rapidly". The Seattle Times. July 26, 1957. p. 15.
  136. ^ "New Fort Lewis Road Opened To Highway Traffic". Washington Highway News. Vol. 7, no. 4. Washington State Department of Highways. October 1957. p. 24. OCLC 29654162. Retrieved September 11, 2018 – via WSDOT Library Digital Collections.
  137. ^ "Freeway Open in Olympia". The Daily Chronicle. Centralia, Washington. Associated Press. December 12, 1958. p. 1. Retrieved September 12, 2018 – via Newspapers.com.
  138. ^ "Four Lane Roadway Pushing North". Washington Highway News. Vol. 8, no. 3. Washington State Department of Highways. December 1958. p. 14. OCLC 29654162. Retrieved September 12, 2018 – via WSDOT Library Digital Collections.
  139. ^ "1st Stretch of Freeway To Be Opened Tomorrow". The Seattle Times. September 30, 1959. p. 20.
  140. ^ Stansfield, Dick (October 1, 1959). "Ceremony Opens New Freeway". The News Tribune. p. 1. Retrieved March 27, 2022 – via Newspapers.com.
  141. ^ "Sign of the times". The Seattle Times. March 9, 1958. p. 43.
  142. ^ "Interstate Construction Program Forging Ahead". Washington Highway News. Vol. 8, no. 5. Washington State Department of Highways. April 1959. pp. 2–4. OCLC 29654162. Retrieved September 13, 2018 – via WSDOT Library Digital Collections.
  143. ^ "Rosellini Will Push Freeway Projects". The Seattle Times. August 30, 1960. p. 21.
  144. ^ "Tacoma-Midway Link In Freeway Opened". The Seattle Times. October 10, 1962. p. 1.
  145. ^ Barr, Robert A. (September 25, 1962). "'Sneaky' Drivers Use Yet-to-Open Freeway". The Seattle Times. p. 1.
  146. ^ Barr, Robert A. (March 5, 1968). "Interstate 5's Nisqually Flats Link to Be Opened by Autumn". The Seattle Times. p. 17.
  147. ^ "Ft. Lewis-Lacey: Freeway Lanes To Open". The Daily Chronicle. Centralia, Washington. August 22, 1968. p. 7. Retrieved July 7, 2020 – via Newspapers.com.
  148. ^ "Next-to-Last Freeway Link To Be Opened". The Seattle Times. November 3, 1968. p. 37.
  149. ^ Vouri, Mike (July 21, 1986). "I-5's impact still being felt". The Bellingham Herald. p. B3. Retrieved November 26, 2021 – via Newspapers.com.
  150. ^ Larson, Glenn (December 5, 1960). "Bellingham Freeway in Use: Ribbon Cut, Siren Blast Opens Road; More Work Ahead". The Bellingham Herald. p. 1. Retrieved November 26, 2021 – via Newspapers.com.
  151. ^ "Rosellini Backs Parks Board In Dispute at Peace Arch". The Seattle Times. October 29, 1963. p. A.
  152. ^ "Road to Beauty Opens Tuesday". The Vancouver Sun. November 22, 1965. p. 7. Retrieved July 7, 2020 – via Newspapers.com.
  153. ^ Deverell, Bill (May 30, 1962). "Brass of All Kinds on Hand For Opening of Deas Thruway". The Sun. p. 6. Retrieved July 7, 2020 – via Newspapers.com.
  154. ^ "Official Opening: Bellingham Freeway". Washington State Highway Commission. November 3, 1966. p. 4. Retrieved July 7, 2020 – via WSDOT Library Digital Collections.
  155. ^ "It's All Four-Lane Highway From Border to Border Now". The Bellingham Herald. November 3, 1966. p. 1. Retrieved November 26, 2021 – via Newspapers.com.
  156. ^ "Seattle-Everett freeway opens today". The Enterprise. Lynnwood, Washington. February 3, 1965. p. 1.
  157. ^ Fish, Byron (September 4, 1964). "Everett Interurban Did a Freeway's Job". The Seattle Times. p. 24.
  158. ^ "3 Interchanges To Open Next Month". The Seattle Times. March 25, 1965. p. 1.
  159. ^ Barr, Robert A. (January 25, 1965). "Big Freeway Jams Expected Because of Uncompleted Exits". The Seattle Times. p. 1.
  160. ^ Barr, Robert A. (November 10, 1966). "Reversible Traffic In Freeway To Be Diverted". The Seattle Times. p. 1.
  161. ^ Barr, Robert A. (January 18, 1968). "Everett Freeway Bypass Is Opened". The Seattle Times. p. 45.
  162. ^ "Freeway Set For Opening". The Everett Herald. January 16, 1968. p. A1. Retrieved February 10, 2024 – via Newspapers.com.
  163. ^ Mansfield, Tom (May 14, 1969). "I-5 Opened Today". The Everett Herald. p. A1. Retrieved February 10, 2024 – via Newspapers.com.
  164. ^ Cameron, David A.; LeWarne, Charles P.; May, M. Allan; O'Donnell, Jack C.; O'Donnell, Lawrence E. (2005). Snohomish County: An Illustrated History. Index, Washington: Kelcema Books LLC. pp. 331–332. ISBN 978-0-9766700-0-1. OCLC 62728798.
  165. ^ Barr, Robert A. (September 1, 1968). "Completion of Everett Link Delayed". The Seattle Times. p. 1.
  166. ^ "Project Status Report: Interstate 5, Cowlitz–Lewis County Line Vicinity to Koontz Road". Washington State Highway Commission. November 1972. Retrieved December 29, 2018 – via WSDOT Library Digital Collections.
  167. ^ "Major interchange due to open north of Marysville". The Seattle Times. April 2, 1972. p. A19.
  168. ^ Vink, Graham (April 22, 1977). "I-5 expansion through Kelso outlined here". The Daily News. p. 7. Retrieved May 12, 2021 – via Newspapers.com.
  169. ^ "New freeway lanes to open". The Daily News. June 15, 1981. p. A1. Retrieved May 12, 2021 – via Newspapers.com.
  170. ^ "I-5 won't look good for a while". The Daily News. November 1, 1978. p. 18. Retrieved May 12, 2021 – via Newspapers.com.
  171. ^ Paulu, Tom (July 22, 1981). "Cost of Kelso's freeway 'gift' questioned". The Daily News. p. B1. Retrieved May 12, 2021 – via Newspapers.com.
  172. ^ Barr, Robert A. (March 16, 1969). "Angry Indians Stall Paleface Path". The Seattle Times. p. 39.
  173. ^ Barr, Robert A. (October 16, 1970). "Indians, state 'bury hatchet' over land". The Seattle Times. p. D5.
  174. ^ Barr, Robert A. (July 16, 1972). "Rain stalls I-5 reconstruction project". The Seattle Times. p. H7.
  175. ^ Barr, Robert A. (June 30, 1970). "6-Lane Highway Being Relocated Over Rail Line". The Seattle Times. p. B2.
  176. ^ "The Seattle Freeway". Washington Highway News. Vol. 9, no. 12. Washington State Department of Highways. June 1962. pp. 16–17. OCLC 29654162. Retrieved September 24, 2018 – via WSDOT Library Digital Collections.
  177. ^ "Schedule For Freeway Up To Congress". The Seattle Times. December 31, 1957. p. 3.
  178. ^ Cunningham, Ross (February 5, 1957). "House Group to Hold Hearing on Proposal To Shift Freeway". The Seattle Times. p. 6.
  179. ^ "Route for Proposed Freeway Announced for Public Hearing". The Seattle Times. April 21, 1957. p. 16.
  180. ^ "Officials Study Reactions To Freeway Plan". The Seattle Times. April 26, 1957. p. 25.
  181. ^ "State Won't Share Cost Of Seattle-Area Traffic Survey". The Seattle Times. Associated Press. August 21, 1957. p. 15.
  182. ^ "Approval Obtained For Twelve Lane Design". Seattle Freeway News. Washington State Highway Commission. January 31, 1958. p. 1. Retrieved August 6, 2018 – via WSDOT Digital Library Collections.
  183. ^ "O. K. on 12 Lanes to Speed Freeway Job, Says Bugge". The Seattle Times. January 12, 1958. p. 7.
  184. ^ Hill, Gene (January 5, 1958). "Much Property for Freeway Right of Way Has Been Purchased by State". The Seattle Times. p. 21.
  185. ^ Becker, Paula (December 1, 2002). "Washington establishes an office for clearing the route of the Seattle Freeway (Interstate 5) on April 1, 1957". HistoryLink. Retrieved December 28, 2018.
  186. ^ "Appraisal, Purchase of 1,000 More Tracts for Freeway Begins". The Seattle Times. February 20, 1958. p. 12.
  187. ^ "Next Steps For Freeway Outlined". The Seattle Times. August 21, 1958. p. 45.
  188. ^ Duncan, Don (June 1, 1961). "100 Marchers Call For Freeway Lid". The Seattle Times. p. 1.
  189. ^ Lane, Bob (December 14, 1961). "'Lid' Dispute Stalls Freeway Work 5 Months". The Seattle Times. p. 1.
  190. ^ Harvey, Barney (July 2, 1962). "Confusion: That's Name For Freeway". The Seattle Times. p. 1.
  191. ^ "All Downtown Freeway Area Now Acquired". The Seattle Times. June 13, 1962. p. 10.
  192. ^ "Wreckers Begin To Raze Kalmar Hotel". The Seattle Times. April 12, 1962. p. 4.
  193. ^ a b c Becker, Paula (April 30, 2003). "First Hill neighborhood objects to the Seattle Freeway route at a public hearing on September 13, 1961". HistoryLink. Retrieved November 7, 2007.
  194. ^ Steinbrueck, Victor (1962). Seattle Cityscape. University of Washington Press. p. 43. OCLC 2098110.
  195. ^ Jones, Nard (1972). Seattle. Doubleday. p. 21. ISBN 0-385-01875-4. OCLC 532396.
  196. ^ "Seattle Chinatown Historic District". National Park Service. June 5, 2018. Retrieved May 9, 2023.
  197. ^ "Traffic on Freeway: Span-Opening Ceremony Due". The Seattle Times. December 12, 1962. p. 2.
  198. ^ "Freeway Ribbon Cut: Rehearsal Becomes Real Thing". The Seattle Times. December 19, 1962. p. 22.
  199. ^ "To Mercer Exit Freeway Users Soon can Go". The Seattle Times. August 30, 1963. p. 1.
  200. ^ "Mercer Street: Freeway Access Almost Ready". The Seattle Times. November 12, 1963. p. 12.
  201. ^ Becker, Paula (August 9, 2010). "State of Washington breaks ground for a fallout shelter under the Seattle Freeway (Interstate 5) in Seattle's Ravenna neighborhood on May 15, 1962". HistoryLink. Retrieved July 7, 2020.
  202. ^ Barr, Robert A. (October 2, 1963). "Freeway 'Assembly Line': Huge Walls Go Up in a Hurry". The Seattle Times. p. 36.
  203. ^ Burt, Lyle (January 20, 1963). "State Plans to Open Freeway Stretch Soon". The Seattle Times. p. 22.
  204. ^ "Rosellini Signs Highway Measure". The Seattle Times. Associated Press. April 19, 1963. p. 37.
  205. ^ Barr, Robert A. (June 12, 1966). "Strike, Slides May Delay Freeway Date". The Seattle Times. p. 4.
  206. ^ "Opening Of Freeway Units Postponed". The Seattle Times. October 19, 1966. p. 12.
  207. ^ "Olive-Mercer Link Of Freeway to Open". The Seattle Times. October 28, 1964. p. 1.
  208. ^ Barr, Robert A. (July 1, 1966). "Freeway Habit Hard to Break: 2 New On-Ramps 'Ignored'". The Seattle Times. p. 1.
  209. ^ Barr, Robert A. (September 25, 1966). "Northbound Freeway Unit to Open Thursday". The Seattle Times. p. 55.
  210. ^ "Freeway Complex Readied South of Downtown". The Seattle Times. September 15, 1966. p. 59.
  211. ^ "'Ramps to nowhere' open today". Seattle Post-Intelligencer. November 18, 1991. p. B1.
  212. ^ a b Heilman, Robert (January 31, 1967). "Ceremony Opens Final Freeway Link". The Seattle Times. p. 1.
  213. ^ Barr, Robert A. (June 3, 1965). "New Reversible Route Relieves Traffic Congestion on Freeway". The Seattle Times. p. 21.
  214. ^ "Reversible Lanes to Aid Traffic Flow". The Seattle Times. May 3, 1965. p. 13.
  215. ^ Barr, Robert A. (May 13, 1964). "State Highway engineers Explain Reversible-Expressway System". The Seattle Times. p. 10.
  216. ^ Barr, Robert A. (September 13, 1965). "Closed-Circuit TV Soon Will Control Freeway Lanes". The Seattle Times. p. 4.
  217. ^ Barr, Robert A. (October 18, 1966). "Mercer St. Reversible Exit to Open Tuesday". The Seattle Times. p. 1.
  218. ^ Barr, Robert A. (October 27, 1966). "Freeway Jam Eased by New Lanes". The Seattle Times. p. 1.
  219. ^ Lane, Bob (August 30, 1970). "September 9: Blue Streak buses roll soon". The Seattle Times. p. A11.
  220. ^ Lane, Bob (January 18, 1978). "Signs of change for Metro buses". The Seattle Times. p. E12.
  221. ^ "Questions and Answers on Rival Freeway Plans—Open or Covered?". The Seattle Times. April 30, 1961. p. 12.
  222. ^ Jacobi, Wayne (September 28, 1961). "Lease On Freeway Air Space Sought". The Seattle Times. p. 1.
  223. ^ "Freeway Park Approved". The Seattle Times. October 17, 1969. p. 14.
  224. ^ Lane, Polly (November 22, 1970). "Freeway lid: Halprin to do park project". The Seattle Times. p. C1.
  225. ^ Lane, Polly (June 22, 1975). "Designer pleased by progress". The Seattle Times. p. D6.
  226. ^ "Freeway Park: Past, Present, and Future?". The Cultural Landscape Foundation. October 10, 2006. Retrieved July 8, 2020.
  227. ^ "Freeway Park design OK'd". The Seattle Times. April 8, 1973. p. E1.
  228. ^ Lane, Polly (March 27, 1984). "Convention site official; freeway lid wins". The Seattle Times. p. C3.
  229. ^ Boss, Kit (June 10, 1988). "Unconventional look: Convention center draws favorable reviews with its textured fascade, mix of plantings, glass, concrete". The Seattle Times. p. D1.
  230. ^ Baume, Matt (January 13, 2016). "The Big Lid". The Stranger. Retrieved July 8, 2020.
  231. ^ Conroy, Bill (May 2019). "The Drive to Close Downtown Seattle's Freeway Divide Gains Speed". Seattle Business Magazine. pp. 18–20. Archived from the original on November 9, 2019. Retrieved May 15, 2019.
  232. ^ Johnston, Greg (March 29, 2007). "Mountain-bike club reclaims a wasteland". Seattle Post-Intelligencer. p. 10. Archived from the original on January 15, 2008. Retrieved November 7, 2007.
  233. ^ Norton, Dee (September 29, 1981). "Freeway computer to debut tomorrow". The Seattle Times. p. B1.
  234. ^ Duncan, Don (October 4, 1981). "FLOW: Control-center crew stayed calm". The Seattle Times. p. D2.
  235. ^ "Bus/carpool lanes, opening Monday, to improve traffic on I-5 north of city". The Seattle Times. August 25, 1983. p. D27.
  236. ^ Dickie, Lance (May 21, 1989). "Can commuters love HOVs?". The Seattle Times. p. A19.
  237. ^ Penhale, Ed (June 15, 1995). "Freeway car-pool lanes might return to three-person minimum". Seattle Post-Intelligencer. p. A1.
  238. ^ Gilmore, Susan (May 25, 2002). "More to HOV options than opening lanes". The Seattle Times. p. B1.
  239. ^ Bacon, Leonard (November 28, 1972). "Vancouver council to hear public views of new I-5 route". The Oregonian. p. 10.
  240. ^ Oakland, Mike (November 15, 1991). "I-5: 'Finally over'; 8 years later, the work is done". The Olympian. p. C1. Retrieved March 17, 2022 – via Newspapers.com.
  241. ^ Gough, William (February 8, 1987). "Olympia traffic mess to end—eventually". The Seattle Times. p. B2.
  242. ^ Bailey, Gil (October 14, 1988). "Tacoma is big on new little freeway". Seattle Post-Intelligencer. p. C2.
  243. ^ Hamilton, Don (March 7, 1983). "Final highway touches eyed". The Oregonian. p. B7.
  244. ^ Richards, Leverett (July 19, 1983). "New links to Interstate Bridge to open soon". The Oregonian. p. M4.
  245. ^ Ryll, Thomas (October 28, 2001). "Finally, an all-new freeway". The Columbian. p. A1.
  246. ^ Painter, John Jr. (October 30, 2001). "HOV lane opens, cuts traffic time on south I-5". The Oregonian. p. B1.
  247. ^ Jenkins, Don (August 10, 2005). "Drivers jeer, cheer end of HOV lane". The Columbian. p. A1.
  248. ^ Ryll, Thomas (July 12, 2006). "Ahead of schedule". The Columbian. p. A1.
  249. ^ Florip, Eric (August 28, 2014). "Leaders celebrate completion of Salmon Creek project". The Columbian. p. C1. Retrieved July 13, 2020.
  250. ^ Phuong Cat Le (April 27, 2003). "Legislature 2003: Help for roads and ferries". Seattle Post-Intelligencer. p. B1. Retrieved July 13, 2020.
  251. ^ ""Nickel Funding Package" Enacted for Transportation by the 2003 Washington State Legislature" (PDF). Washington State Department of Transportation. September 13, 2005. Archived from the original (PDF) on January 4, 2007. Retrieved July 13, 2020.
  252. ^ Brown, Charles E. (July 31, 2006). "Bumper to Bumper: Why access ramps in the middle of I-90?". The Seattle Times. p. B1.
  253. ^ Maynard, Steve (February 6, 2006). "Federal Way transit hub here at last". The News Tribune. Tacoma, Washington. p. B1.
  254. ^ Nohara, Yoshiaki (March 4, 2008). "Headache looming on I-5 in Everett". The Everett Herald. Retrieved July 13, 2020.
  255. ^ "Crossing the finish line on I-5 in Everett" (Press release). Washington State Department of Transportation. June 5, 2008. Archived from the original on August 4, 2008. Retrieved July 13, 2020.
  256. ^ "I-5 HOV Lanes, Pierce County Line to Tukwila: Project Phases". Washington State Department of Transportation. Archived from the original on May 13, 2008. Retrieved July 13, 2020.
  257. ^ Corvin, Aaron (July 23, 2001). "HOV lanes heading this way". The News Tribune. Tacoma, Washington. p. B1.
  258. ^ Corvin, Aaron; Vedder, Mina (July 30, 2001). "Don't fret, 38th Street overpass is past halfway". The News Tribune. Tacoma, Washington. p. A1.
  259. ^ Boiko-Weyrauch (March 28, 2018). "Traffic at this spot on I-5 has been terrible for 25 years. Here's why". KUOW. Retrieved July 13, 2020.
  260. ^ Lynn, Adam (April 26, 2005). "Car pools win gas tax gold". The News Tribune. Tacoma, Washington. p. A1. Archived from the original on December 18, 2005. Retrieved July 13, 2020.
  261. ^ Henrikson, John (February 21, 2011). "Massive I-5 overhaul is under way". The News Tribune. Tacoma, Washington. p. A3.
  262. ^ McCarthy, Jane (August 14, 2009). "I-5 HOV project begins in Fife". Northwest Cable News. Archived from the original on August 17, 2009. Retrieved July 13, 2020.
  263. ^ Carson, Rob (August 16, 2014). "Sprague ramps ready to merge onto I-5". The News Tribune. Tacoma, Washington. p. A1. Retrieved July 13, 2020.
  264. ^ "I-5 and SR 16 HOV connections opening soon in Tacoma" (Press release). Washington State Department of Transportation. November 4, 2019. Retrieved July 13, 2020.
  265. ^ Carson, Rob (August 10, 2014). "Six-year overhaul of I-5 in Tacoma about to start". The News Tribune. Tacoma, Washington. p. A1. Retrieved July 13, 2020.
  266. ^ Lynn, Adam (April 8, 2017). "Exiting I-5 in Tacoma gets trickier later this month". The News Tribune. Tacoma, Washington. p. A3. Retrieved July 13, 2020.
  267. ^ "I-5 - M Street to Portland Avenue - HOV - Complete November 2018". Washington State Department of Transportation. Archived from the original on July 16, 2020. Retrieved July 13, 2020.
  268. ^ Carson, Rob (May 18, 2015). "No quick relief from the slog I-5 has become in Tacoma". The News Tribune. Tacoma, Washington. p. A1. Retrieved July 13, 2020.
  269. ^ "Leaders celebrate construction start of new I-5 HOV project" (Press release). Washington State Department of Transportation. February 18, 2015. Archived from the original on March 16, 2015. Retrieved July 13, 2020.
  270. ^ Nunnally, Derrick (September 4, 2015). "I-5 construction projects are moving along in Tacoma — but have years to go". The News Tribune. Tacoma, Washington. p. A1. Retrieved July 13, 2020.
  271. ^ Hill, Craig (October 27, 2017). "The new I-5 Puyallup River Bridge is about to open. But first, more closures". The News Tribune. Tacoma, Washington. p. A4. Retrieved July 13, 2020.
  272. ^ Sailor, Craig (June 7, 2019). "Lanes to shift on I-5 in Tacoma again as work on new bridge over Puyallup River begins". The News Tribune. Tacoma, Washington. p. A4. Retrieved July 13, 2020.
  273. ^ "Relief at last? New Interstate 5 Puyallup River bridge has opened in Tacoma". The News Tribune. April 1, 2022. Retrieved April 1, 2022.
  274. ^ Sailor, Craig (August 27, 2022). "After two decades of construction it's finally here: Tacoma's I-5 HOV project opens Friday". The News Tribune. Retrieved November 23, 2022.
  275. ^ a b "Safety and congestion-relief work wraps up on I-5 in south Thurston and north Lewis counties" (Press release). Washington State Department of Transportation. August 24, 2016. Archived from the original on August 28, 2016. Retrieved July 14, 2020.
  276. ^ Schwartz, Eric (April 2, 2008). "I-5 on the Verge of Major Change". The Daily Chronicle. Centralia, Washington. Retrieved July 14, 2020.
  277. ^ "New lane opens on northbound I-5 in Thurston County" (Press release). Washington State Department of Transportation. November 18, 2010. Archived from the original on January 26, 2011. Retrieved July 14, 2020.
  278. ^ Hughes, Lee (November 11, 2011). "I-5: A Whirl of Changes". The Daily Chronicle. Centralia, Washington. Retrieved July 14, 2020.
  279. ^ Bernton, Hal; Thomas, Ralph (December 5, 2007). "Flood-damaged I-5 to stay closed until this weekend". The Seattle Times. Retrieved July 14, 2020.
  280. ^ "Interstate 5 Reopens to All Traffic Through Chehalis, Highways Still Closed Elsewhere in the State" (Press release). Washington State Department of Transportation. December 7, 2007. Archived from the original on July 6, 2008. Retrieved August 10, 2008.
  281. ^ Olson, Dave; Sujka, Mark; Manchas, Brad (June 2013). Cable Median Barrier Program in Washington State (WA-RD 812.1) (PDF) (Report). Washington State Department of Transportation. pp. 8, 34. Retrieved July 14, 2020.
  282. ^ Sheets, Bill (January 21, 2010). "Heavy-duty I-5 barriers going up through Marysville". The Everett Herald. Retrieved July 14, 2020.
  283. ^ Lindblom, Mike (November 7, 2010). "I-5 'smart signs' cut crashes, not travel times". The Seattle Times. Archived from the original on January 14, 2011. Retrieved July 15, 2020.
  284. ^ Ryan, John (March 23, 2016). "Hollow Columns Holding Up I-5, I-405 Bridges Could Implode In Major Quake". KUOW. Retrieved July 15, 2020.
  285. ^ Lindblom, Mike (May 17, 2021). "Work gets underway to ease an I-5 bottleneck in downtown Seattle". The Seattle Times. Retrieved May 17, 2021.
  286. ^ Lindblom, Mike (August 1, 2023). "Seattle's I-5 squeeze finally not so tight as new lane opens". The Seattle Times. Retrieved August 1, 2023.
  287. ^ Fiege, Gale; Stevick, Eric (May 23, 2013). "Everyone safe after bridge over Skagit River collapses". The Everett Herald. Archived from the original on June 17, 2015. Retrieved October 7, 2018.
  288. ^ "'Miracles': 3 survive I-5 collapse". The Seattle Times. May 23, 2013. Archived from the original on October 15, 2013. Retrieved July 14, 2020.
  289. ^ Long, Priscilla (September 16, 2013). "I-5 Skagit River Bridge at Mount Vernon collapses on May 23, 2013". HistoryLink. Retrieved October 7, 2018.
  290. ^ "Skagit River Bridge reopens". Skagit Valley Herald. Mount Vernon, Washington. June 19, 2013. Retrieved July 14, 2020.
  291. ^ DeMay, Daniel (September 15, 2013). "Skagit River Bridge span moves into place". Skagit Valley Herald. Mount Vernon, Washington. Retrieved July 14, 2020.
  292. ^ Pearce, Matt; Nelson, Laura J. (December 18, 2017). "Amtrak train derails over I-5 in Washington state; 3 people killed". Los Angeles Times. Retrieved December 18, 2017.
  293. ^ Malas, Nour; Elinson, Zusha (December 19, 2017). "Derailed Amtrak Train Was Traveling at 80 MPH in a 30 MPH Zone". The Wall Street Journal. Retrieved July 14, 2020.
  294. ^ Berger, Knute (June 5, 2020). "A short, violent history of Puget Sound uprisings, protests and riots". Crosscut.com. Retrieved July 14, 2020.
  295. ^ Hannula, Don (May 5, 1970). "5,000 U.W. Protesters Block Traffic on Freeway". The Seattle Times. p. 1.
  296. ^ Crowley, Walt (January 1, 2000). "Antiwar protesters block Interstate 5 in Seattle on May 5, 1970". HistoryLink. Retrieved July 14, 2020.
  297. ^ Hannula, Don (May 9, 1970). "City Calm as Protests Subside". The Seattle Times. p. 1.
  298. ^ Sunde, Scott (November 30, 1999). "It's protest city—and get ready for the big one today". Seattle Post-Intelligencer. p. A1.
  299. ^ "In Seattle, a march, 'die-ins' and police pelted with rocks". The Seattle Times. November 25, 2014. Retrieved July 14, 2020.
  300. ^ Dickson, Amelia (July 7, 2016). "Olympia demonstrators cause damage, clog I-5 on-ramp in protest". The Olympian. Retrieved July 14, 2020.
  301. ^ Sullivan, Chris (June 18, 2020). "Washington State Patrol plans to keep shutting down I-5 for protests". KIRO Radio. Retrieved July 14, 2020.
  302. ^ Bazzaz, Dahlia; Fields, Asia; Lacitis, Erik (July 4, 2020). "1 protester dead, 1 injured after man drives into protesters on I-5 in Seattle". The Seattle Times. Retrieved July 14, 2020.
  303. ^ Waller, Allyson (July 6, 2020). "Seattle Protester Dies After Being Struck by Car". The New York Times. p. A16. Retrieved July 14, 2020.
  304. ^ Slager, Melissa (January 12, 2018). "Traffic's going to worsen, but don't worry, there's a $40B plan". The Everett Herald. Retrieved September 11, 2018.
  305. ^ Lindblom, Mike (March 13, 2008). "No new state money requested for cracked, clogged Seattle stretch". The Seattle Times. Retrieved September 11, 2018.
  306. ^ Gutman, David (April 17, 2017). "I-5 repaving starts this week: 3 years, 22 miles, 'some rough commutes'". The Seattle Times. Retrieved July 13, 2020.
  307. ^ "Revive I-5: Preserving the freeway". Washington State Department of Transportation. Archived from the original on July 14, 2020. Retrieved July 13, 2020.
  308. ^ "I-5/Yesler Way to NE 117th St. – Pavement, Deck, and Expansion Joints". Washington State Department of Transportation. Retrieved September 19, 2022.
  309. ^ "Lynnwood Link Extension" (PDF). Sound Transit. September 2018. Retrieved September 11, 2018.
  310. ^ "Sound Transit Board identifies preferred alternative for light rail extension to Kent/Des Moines, Federal Way" (Press release). Sound Transit. July 23, 2015. Retrieved September 11, 2018.
  311. ^ Lindblom, Mike (September 26, 2018). "I-5 will add a 5th express lane to serve future Eastside-South Lake Union bus routes". The Seattle Times. Retrieved September 26, 2018.
  312. ^ Lindblom, Mike (November 16, 2022). "A crumbling Highway 520 ramp support needs a do-over". The Seattle Times. Retrieved November 23, 2022.
  313. ^ Ocker, Kenny (September 30, 2018). "WSDOT is going to add lanes to Interstate 5 near JBLM. What's the catch?". The News Tribune. Tacoma, Washington. Retrieved July 14, 2020.
  314. ^ Schrader, Jordan (August 29, 2015). "Wider I-5 — along with years of worse congestion — coming to JBLM area". The News Tribune. Tacoma, Washington. Retrieved July 13, 2020.
  315. ^ McKay, Bud (September 1, 2018). "Interstate 5 widening project by JBLM moves into stage 2". U.S. Army. Retrieved July 14, 2020.
  316. ^ Boone, Rolf (August 3, 2020). "Long awaited 'diverging diamond' interchange opens in Lacey". The Olympian. Retrieved August 3, 2020.
  317. ^ Watanabe, Ben (May 28, 2023). "$123M project starting on Highway 529 interchange, I-5 HOV lane". The Everett Herald. Retrieved June 8, 2023.
  318. ^ Watanabe, Ben (March 2, 2023). "Work on I-5 HOV lane from Everett to Marysville starts next week". The Everett Herald. Retrieved March 2, 2023.
  319. ^ Winters, Chris (February 7, 2015). "New I-5 interchange planned for Marysville". The Everett Herald. Retrieved September 11, 2018.
  320. ^ "State plans new I-5 interchange near Smokey Point". The Everett Herald. October 19, 2015. Retrieved October 6, 2018.
  321. ^ "Connecting Washington". Washington State Department of Transportation. Retrieved September 11, 2018.
  322. ^ Peterson, Josephine (June 22, 2020). "Federal funding for construction on highways 167 and 509 aims to reduce local traffic". The News Tribune. Retrieved July 10, 2020.
  323. ^ Hernton, Hal (July 1, 2013). "State Senate deadlock kills Columbia Crossing". The Seattle Times. Archived from the original on September 12, 2018. Retrieved September 11, 2018.
  324. ^ Mize, Jeffrey (October 13, 2019). "New I-5 Bridge project: Here we go, again...again". The Columbian. Retrieved July 7, 2020.
  325. ^ Seekamp, William (July 21, 2022). "I-5 Bridge Replacement Program moves into environmental review phase". The Columbian. Retrieved February 1, 2023.
  326. ^ Theen, Andrew (September 24, 2019). "Oregon and Washington: We'll start building a new Interstate Bridge by 2025". The Oregonian. Retrieved July 7, 2020.
  327. ^ Seekamp, William (February 27, 2023). "Up to $2.45 billion of I-5 Bridge project budget will go to actual replacement". The Columbian. Retrieved March 1, 2023.
  328. ^ Seekamp, William (December 9, 2022). "New I-5 Bridge cost: Likely $6 Billion". The Columbian. Retrieved December 10, 2022.
[edit]
KML is from Wikidata


Interstate 5
Previous state:
Oregon
Washington Next state:
Terminus