Nordsee-Ost offshore wind farm

Coordinates: 54°26′N 7°41′E / 54.43°N 7.68°E / 54.43; 7.68
From Wikipedia, the free encyclopedia
Nordsee-Ost
Map
Country
  • Germany
LocationNorth Sea
Coordinates54°26′N 7°41′E / 54.43°N 7.68°E / 54.43; 7.68
StatusOperational
Commission date
  • 11 May 2015
Wind farm
Type
Max. water depth25 m[1]
Distance from shore57 km[1]
Hub height92 m[1]
Rotor diameter
  • 126 m (413 ft)
Site area36 km2[1]
Power generation
Units operational48 × 6.15 MW
Make and modelSenvion 6.2M126 (48)
Nameplate capacity
  • 295.2 MW
External links
WebsiteNordsee Ost
CommonsRelated media on Commons
Map
Wind farm layout
Nordsee Ost's location in the wind farms of the German Bight

Nordsee-Ost offshore wind farm is an offshore wind farm in operation in the eastern part of the North Sea German sector. The project was developed by RWE Innogy, a subsidiary of RWE.

The wind farm consists of 48 turbines with a total capacity of 295 MW. The 6.15 MW turbines were provided by REpower.[2] Steel foundations for generators were supplied by Aker Verdal.[3][4] Power converters were supplied by Woodward Governor Company.[5] A consortium of Siemens and Prysmian built the high-voltage direct current submarine cable from the wind farm to the German transmission system operated by Transpower, a subsidiary of TenneT.[6]

Delays in power line construction by Dutch TenneT delayed its operational start.[7]

On 11 May 2015 the wind farm was officially put into operation.[8]

See also

[edit]

References

[edit]
  1. ^ a b c d "Nordsee Ost Offshore Wind Farm". 4coffshore.com. Retrieved 2017-03-05.
  2. ^ Backwell, Ben (2010-02-01). "REpower to supply 295MW of turbines for RWE's Nordsee Ost". ReCharge. NHST Media Group. Retrieved 2010-07-17.
  3. ^ "Aker wins deal at Nordsee Ost". ReCharge. NHST Media Group. 2010-06-17. Retrieved 2010-07-17.
  4. ^ "Aker Verdal wins wind project in Germany" (Press release). Aker Solutions. 2010-06-17. Retrieved 2010-07-17.
  5. ^ "Woodward power converters chosen for Nordsee Ost". ReCharge. NHST Media Group. 2010-04-15. Retrieved 2010-07-17.
  6. ^ Backwell, Ben (2010-07-16). "Siemens and Prysmian win €500m Nordsee-Ost wind farm contract". ReCharge. NHST Media Group. Archived from the original on 2012-02-24. Retrieved 2017-03-05.
  7. ^ David Crossland (6 March 2012). "German wind energy plans in the doldrums". thenational.ae. Retrieved 24 June 2015.
  8. ^ "G7-Energieministertreffen in Hamburg". Bundesministerium für Wirtschaft und Energie. 2015-05-11.