Simulation of maintenance strategies in mechanized tunneling

Published: 11 December 2016 Publication History

Abstract

Mechanized tunneling is one of the most common methods used for underground constructions for infrastructure systems. Since a tunnel boring machine (TBM) represents a non-redundant single machine system, the efficiency of maintenance work highly impacts the overall project performance. The wear and tear of cutting tools is a critical, but mostly unknown process. To plan the maintenance work of cutting tools efficiently, it is necessary to know the current tool conditions and adapt the planned maintenance strategies to the actual status accordingly. In this paper, an existing theoretical empiric surrogate model to describe cutting tool conditions will be used and implemented as a software component within a process simulation tool that manages TBM steering parameters. Further, different maintenance setups for TBM cutting tools are presented and evaluated. To prove the capability of the presented approach, a case study will show the effects that improved maintenance work can have on project performance.

References

[1]
Al-Battaineh, H. T., S. M. AbouRizk, J. Tan, and S. Fernando. 2006. "Productivity simulation during the planning phase of the Blencoe Tunnel in Calgary, Canada: A case study". In Proceedings of the 2006 Winter Simulation Conference, edited by D. Nicol, R. Fujimoto, B. Lawson, J. Liu, F. Perrone, and F. Wieland, 2087--2092. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
[2]
Alabdulkarim, A.A., and P.D. Ball. 2014."Selecting the apropriate product monitoring levels for maintenance operations: A simulation approach". In Proceedings of the 2014 Winter Simulation Conference, edited by A. Tolk, S. D. Diallo, L. Ryzhov, S. Yilmaz, J. A. Miller, and eds., 1026--1037. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
[3]
Altuger, G., and C. Chassapis. 2009. "Multi criteria preventive maintenance scheduling through Arena based simulation modeling". In Proceedings of the 2009 Winter Simulation Conference, edited by A. Dunkin, R. G. Ingalls, E. Ycesan, M. D. Rossetti, R. Hill, B. Johansson, and eds., 2123--2134. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
[4]
Contreras, L. R., C. Modi, and A. Pennathur. 2002. "Integrating simulation modeling and equipment condition diagnostics for predictive maintenance strategies-a case study". In Proceedings of the 2002 Winter Simulation Conference, edited by E. Yücesan, C.-H. Chen, J. L. Snowdon, J. M. Charnes, and eds., 1289--1296. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
[5]
Ebrahimy, Y., S. M. AbouRizk, S. Fernando, and Y. Mohamed. 2011. "Simulation modeling and sensitivity analysis of a tunneling construction project's supply chain". Engineering, Construction and Architectural Management 18 (5): 462--480.
[6]
Fernando, S., K. C. Er, Y. Mohamed, S. M. AbouRizk, and J. Y. Ruwanpura. 2003. "A review of simulation applications for varying demands in tunneling". In Proceedings of the 2003 ASCE Construction Research Congress, edited by K. R. Molenaar and P. S. Chinowsky, 80--90.
[7]
Gopalakrishnan, M., A. Skoogh, and C. Laroque. 2013. "Simulation-based planning of maintenance activities in the automotive industry". In Proceedings of the 2013 Winter Simulation Conference, edited by R. Pasupathy, S.-H. Kim, A. Hill, M. E. Kuhl, and eds., 2610--2621. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
[8]
Gopalakrishnan, M., A. Skoogh, and C. Laroque. 2014. "Simulation-based planning of maintenance activities by a shifting priority method". In Proceedings of the 2014 Winter Simulation Conference, edited by A. Tolk, S. D. Diallo, L. Ryzhov, S. Yilmaz, J. A. Miller, and eds., 2168--2179. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
[9]
Hajjar, D., and S. AbouRizk. 1999. "Simphony: an environment for building special purpose construction simulation tools". In Proceedings of the 1999 Winter Simulation Conference, edited by P. A. Farrington, H. B. Nembhard, D. T. Sturrock, and G. W. Evans, Volume 2, 998--1006 vol.2. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
[10]
Hajjar, D., and S. M. AbouRizk. 2002. "Unified modeling methodology for construction simulation". Journal of Construction Engineering and Management 128 (2): 174--185.
[11]
Halpin, D. W. 1977. "Cyclone-method for modeling job site processes". Journal of the Construction Division 103 (ASCE 13234 Proceeding).
[12]
Halpin, D. W., and L. S. Riggs. 1992. Planning and analysis of construction operations. New York: Wiley.
[13]
Herrenknecht AG 2016. "Mixshield Scheme". Website. online: https://www.herrenknecht.com/en/products/core-products/tunnelling/mixshield.html; last access 10.2016.".
[14]
Köhler, M., U. Maidl, and L. Martak. 2011. "Abrasiveness and tool wear in shield tunnelling in soil / Abrasivität und Werkzeugverschleiß beim Schildvortrieb im Lockergestein". Geomechanics and Tunnelling 4 (1): 36--54.
[15]
Köppl, F., and K. Thuro. 2013. "Cutting tool wear and management of wear related risks for Mix-Shield TBM in soft ground". Proceedings of the 18th International Conference on Soil Mechanics and Geotechnical Engineering: 1739--1742.
[16]
Köppl, F., K. Thuro, and M. Thewes. 2015a. "Factors with an influence on the wear to excavation tools in hydroshield tunnelling in soft ground / Einflussfaktoren auf den Verschleiß der Abbauwerkzeuge beim Vortrieb mit Hydroschild-TVM in Lockergesteinen". Geomechanics and Tunnelling 8 (3): 248--257.
[17]
Köppl, F., K. Thuro, and M. Thewes. 2015b. "Suggestion of an empirical prognosis model for cutting tool wear of Hydroshield TBM". Tunnelling and Underground Space Technology 49:287 -- 294.
[18]
Law, A. M. 2014. Simulation modeling and analysis. 4th ed. ed. McGraw-Hill series in industrial engineering and management science. Boston: McGraw-Hill.
[19]
Maidl, B., M. Herrenknecht, U. Maidl, and G. Wehrmeyer. 2012. Mechanised shield tunnelling. 2 ed. Berlin: Ernst W. + Sohn Verlag.
[20]
Mattern, H., M. Scheffer, A. Corads, M. Thewes, and M. König. 2016. "Simulation-based analysis of maintenance strategies for mechanized tunneling projects". In World Tunnel Congress 2016, inpress.
[21]
Osborne, N. H., C. Knight Hassell, W. C. Tan, and R. Wong. 2013. "A review of the performance of the tunnelling for Singapore's circle line project". In World Tunnel Congress 2008, 1497--1508.
[22]
Rahm, T., K. Sadri, C. Koch, M. Thewes, and M. König. 2012. "Advancement simulation of tunnel boring machines". In Proceedings of the 2012 Winter Simulation Conference, edited by C. Laroque, J. Himmelspach, R. Pasupathy, O. Rose, A. Uhrmacher, and M. Rabe, 727--738. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
[23]
Rahm, T., M. Scheffer, M. Thewes, M. König, and R. Duhme. 2016. "Evaluation of disturbances in mechanized tunneling using process simulation". Computer-Aided Civil and Infrastructure Engineering 31 (3): 176--192.
[24]
Ruwanpura, J. Y., and S. M. AbouRizk. 2001. "Design, development and application of soil transition algorithms for tunneling using special purpose simulation". In Proceedings of the 2001 Winter Simulation Conference, edited by M. Rohrer, D. Medeiros, B. Peters, and J. Smith, 1512--1520. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
[25]
Schneider, E., K. Thuro, and R. Galler. 2012. "Forecasting penetration and wear for TBM drives in hard rock - Results from the ABROCK research project / Prognose von Penetration und Verschleiß für TBM-Vortriebe im Festgestein Erkenntnisse aus dem Forschungsprojekt ABROCK". Geomechanics and Tunnelling 5 (5): 537--546.
[26]
Sharda, B., and S. Bury. 2014. "Evaluating the impact of batch degradation and maintenance policies on the production capacity of a batch production process". In Proceedings of the 2014 Winter Simulation Conference, edited by A. Tolk, S. D. Diallo, L. Ryzhov, S. Yilmaz, J. A. Miller, and eds., 2261--2268. Piscataway, New Jersey: Institute of Electrical and Electronics Engineers, Inc.
[27]
Wang, L., Y. Kang, Z. Cai, Q. Zhang, Y. Zhao, H. Zhao, and P. Su. 2012. "The energy method to predict disc cutter wear extent for hard rock TBMs". Tunnelling and Underground Space Technology 28:183 -- 191.
[28]
Wu, Y. H., H. Wang, H. Sun, T. Y. Wang, and K. J. Zhao. 2010, 4. "Characteristics analysis of TBM disc cutter ring". In Digital Design and Manufacturing Technology, Volume 102 of Advanced Materials Research, 219--222: Trans Tech Publications.
  1. Simulation of maintenance strategies in mechanized tunneling

    Recommendations

    Comments

    Please enable JavaScript to view thecomments powered by Disqus.

    Information & Contributors

    Information

    Published In

    cover image ACM Conferences
    WSC '16: Proceedings of the 2016 Winter Simulation Conference
    December 2016
    3974 pages
    ISBN:9781509044849

    Sponsors

    In-Cooperation

    • SAS
    • AnyLogic: The AnyLogic Company
    • Palgrave: Palgrave Macmillan
    • FlexSim: FlexSim Software Products, Inc.
    • ASA: American Statistical Association
    • IEEE/SMC: Institute of Electrical and Electronics Engineers: Systems, Man, and Cybernetics Society
    • Simio: Simio LLC
    • ODU: Old Dominion University
    • ASIM: Arbeitsgemeinschaft Simulation
    • ExtendSim: ExtendSim
    • NIST: National Institute of Standards & Technology
    • Amazon Simulations: Amazon Simulations

    Publisher

    IEEE Press

    Publication History

    Published: 11 December 2016

    Check for updates

    Qualifiers

    • Research-article

    Conference

    WSC '16
    Sponsor:
    WSC '16: Winter Simulation Conference
    December 11 - 14, 2016
    Virginia, Arlington

    Acceptance Rates

    Overall Acceptance Rate 3,413 of 5,075 submissions, 67%

    Contributors

    Other Metrics

    Bibliometrics & Citations

    Bibliometrics

    Article Metrics

    • 0
      Total Citations
    • 39
      Total Downloads
    • Downloads (Last 12 months)1
    • Downloads (Last 6 weeks)0
    Reflects downloads up to 14 Dec 2024

    Other Metrics

    Citations

    View Options

    Login options

    View options

    PDF

    View or Download as a PDF file.

    PDF

    eReader

    View online with eReader.

    eReader

    Media

    Figures

    Other

    Tables

    Share

    Share

    Share this Publication link

    Share on social media