A two-level advanced production planning and scheduling model for RFID-enabled ubiquitous manufacturing

Published: 01 October 2015 Publication History

Abstract

An RFID-event driven mechanism is used to integrate planning and scheduling.RFID production shopfloor data was used to obtain APPS parameters.Release strategy is efficient to reduce the total tardiness by 44.46% averagely. Radio frequency identification (RFID) technology has been used in manufacturing industries to create a RFID-enabled ubiquitous environment, in where ultimate real-time advanced production planning and scheduling (APPS) will be achieved with the goal of collective intelligence. A particular focus has been placed upon using the vast amount of RFID production shop floor data to obtain more precise and reasonable estimates of APPS parameters such as the arrival of customer orders and standard operation times (SOTs). The resulting APPS model is based on hierarchical production decision-making principle to formulate planning and scheduling levels. A RFID-event driven mechanism is adopted to integrate these two levels for collective intelligence. A heuristic approach using a set of rules is utilized to solve the problem. The model is tested through four dimensions, including the impact of rule sequences on decisions, evaluation of released strategy to control the amount of production order from planning to scheduling, comparison with another model and practical operations, as well as model robustness. Two key findings are observed. First, release strategy based on the RFID-enabled real-time information is efficient and effective to reduce the total tardiness by 44.46% averagely. Second, it is observed that the model has the immune ability on disturbances like defects. However, as the increasing of the problem size, the model robustness against emergency orders becomes weak; while, the resistance to machine breakdown is strong oppositely. Findings and observations are summarized into a number of managerial implications for guiding associated end-users for purchasing collective intelligence in practice.

References

[1]
C.N. Potts, M.Y. Kovalyov, Scheduling with batching: a review, Eur. J. Oper. Res., 120 (2000) 228-249.
[2]
G.Q. Huang, M.J. Fang, H.L. Lu, Q.Y. Dai, W.N. Liu, S. Newman, RFID-Enabled Real-Time Mass-Customized Production Planning and Scheduling, in: Proceeding of 19th International Conference on Flexible Automation and Intelligent Manufacturing, 6-8 July, Teesside, UK, 2009.
[3]
J. Mula, R. Poler, J. Garcia-Sabater, F. Lario, Models for production planning under uncertainty: a review, Int. J. Prod. Econ., 103 (2006) 271-285.
[4]
R.Y. Zhong, G.Q. Huang, Q.Y. Dai, T. Zhang, Mining SOTs and dispatching rules from RFID-enabled real-time shopfloor production data, J. Intell. Manuf., 25 (2014) 825-843.
[5]
R. Want, Enabling ubiquitous sensing with RFID, Computer, 37 (2004) 84-86.
[6]
R.Y. Zhong, RFID-enabled Real-time Advanced Production Planning and Scheduling Using Data Mining, PhD, The University of Hong Kong, 2013.
[7]
J. Fang, G.Q. Huang, Z. Li, Event-driven multi-agent ubiquitous manufacturing execution platform for shop floor work-in-progress management, Int. J. Prod. Res., 51 (2013) 1168-1185.
[8]
R.V. Barenji, A.V. Barenji, M. Hashemipour, A multi-agent RFID-enabled distributed control system for a flexible manufacturing shop, Int. J. Adv. Manuf. Technol., 71 (2014) 1773-1791.
[9]
Y.F. Zhang, G.Q. Huang, T. Qu, S.D. Sun, Real-Time Work-in-Progress Management for Ubiquitous Manufacturing Environment, in Cloud Manufacturing, ed.: Springer, 2013, pp. 193-216.
[10]
Y. Zhang, G. Zhang, J. Wang, S. Sun, S. Si, T. Yang, Real-time information capturing and integration framework of the internet of manufacturing things, Int. J. Comput. Integr. Manuf. (2014) 1-12.
[11]
X. Xu, From cloud computing to cloud manufacturing, Robot. Comput.-Integr. Manuf., 28 (2012) 75-86.
[12]
Z. Guo, E. Ngai, C. Yang, X. Liang, An RFID-based intelligent decision support system architecture for production monitoring and scheduling in a distributed manufacturing environment, Int. J. Prod. Econ. (2014).
[13]
Y.-S. Tsai, R.-S. Chen, Y.-C. Chen, C.-P. Yeh, An RFID-based manufacture process control and supply chain management in the semiconductor industry, Int. J. Inf. Technol. Manage., 12 (2013) 85-105.
[14]
J. Um, I.A. Stroud, S.-H. Suh, Development and evaluation of customisation process for ubiquitous product recovery management system, Int. J. Comput. Integr. Manuf. (2014) 1-17.
[15]
K. Kwon, D. Kang, Y. Yoon, J.-S. Sohn, I.-J. Chung, A real time process management system using RFID data mining, Comput. Ind., 65 (2014) 721-732.
[16]
R.Y. Zhong, Q. Dai, T. Qu, G. Hu, G.Q. Huang, RFID-enabled real-time manufacturing execution system for mass-customization production, Robot. Comput.-Integr. Manuf., 29 (2013) 283-292.
[17]
Y.F. Zhang, G.Q. Huang, S.D. Sun, T. Yang, Multi-agent based real-time production scheduling method for radio frequency identification enabled ubiquitous shopfloor environment, Comput. Ind. Eng., 76 (2014) 89-97.
[18]
R.Y. Zhong, Z. Li, L. Pang, Y. Pan, T. Qu, G.Q. Huang, RFID-enabled real-time advanced planning and scheduling shell for production decision making, Int. J. Comput. Integr. Manuf., 26 (2013) 649-662.
[19]
Y.S. Tsai, R.S. Chen, Y.C. Chen, C.P. Yeh, An RFID-based manufacture process control and supply chain management in the semiconductor industry, Int. J. Inf. Technol. Manage., 12 (2013) 85-105.
[20]
M. Schmidt, L. Thoroe, M. Schumann, RFID and barcode in manufacturing logistics: interface concept for concurrent operation, Inform. Syst. Manage., 30 (2013) 100-115.
[21]
G.Q. Huang, T. Qu, M.J. Fang, A.N. Bramley, RFID-enabled gateway product service system for collaborative manufacturing alliances, CIRP Ann.-Manuf. Technol., 60 (2011) 465-468.
[22]
S. Makris, G. Michalos, G. Chryssolouris, RFID driven robotic assembly for random mix manufacturing, Robot. Comput.-Integr. Manuf., 28 (2012) 359-365.
[23]
K. Musselman, R. Uzsoy, Advanced Planning and Scheduling for Manufacturing, Handbook of Industrial Engineering, 2001.
[24]
Y.L. Li, W. Zhao, X.Y. Shao, A process simulation based method for scheduling product design change propagation, Adv. Eng. Inform., 26 (2012) 529-538.
[25]
C.T. Maravelias, C. Sung, Integration of production planning and scheduling: overview, challenges and opportunities, Comput. Chem. Eng., 33 (2009) 1919-1930.
[26]
T.R. Wang, S.S. Guo, B.R. Sarker, Y.B. Li, Process planning for collaborative product development with CD-DSM in optoelectronic enterprises, Adv. Eng. Inform., 26 (2012) 280-291.
[27]
H. Lee, S.S. Kim, Integration of process planning and scheduling using simulation based genetic algorithms, Int. J. Adv. Manuf. Technol., 18 (2001) 586-590.
[28]
K.J. Chen, P. Ji, A genetic algorithm for dynamic advanced planning and scheduling (DAPS) with a frozen interval, Expert Syst. Appl., 33 (2007) 1004-1010.
[29]
J.H. Trienekens, P.M. Wognum, A.J.M. Beulens, J.G. van der Vorst, Transparency in complex dynamic food supply chains, Adv. Eng. Inform., 26 (2012) 55-65.
[30]
F. David, H. Pierreval, C. Caux, Advanced planning and scheduling systems in aluminium conversion industry, Int. J. Comput. Integr. Manuf., 19 (2006) 705-715.
[31]
K. Neumann, C. Schwindt, N. Trautmann, Advanced production scheduling for batch plants in process industries, OR Spectrum, 24 (2002) 251-279.
[32]
W.M. Shen, Q. Hao, H.J. Yoon, D.H. Norrie, Applications of agent-based systems in intelligent manufacturing: an updated review, Adv. Eng. Inform., 20 (2006) 415-431.
[33]
R. Ruiz, J.A. Vázquez-Rodríguez, The hybrid flow shop scheduling problem, Eur. J. Oper. Res., 205 (2010) 1-18.
[34]
D. Ouelhadj, S. Petrovic, P.I. Cowling, A. Meisels, Inter-agent cooperation and communication for agent-based robust dynamic scheduling in steel production, Adv. Eng. Inform., 18 (2004) 161-172.
[35]
H.W. Chun, R.Y.M. Wong, N¿-an agent-based negotiation algorithm for dynamic scheduling and rescheduling, Adv. Eng. Inform., 17 (2003) 1-22.
[36]
R. Ruiz, F.S. Şerifoğlu, T. Urlings, Modeling realistic hybrid flexible flowshop scheduling problems, Comput. Oper. Res., 35 (2008) 1151-1175.
[37]
B. Naderi, M. Zandieh, V. Roshanaei, Scheduling hybrid flowshops with sequence dependent setup times to minimize makespan and maximum tardiness, Int. J. Adv. Manuf. Technol., 41 (2009) 1186-1198.
[38]
G.C. Lee, Estimating order lead times in hybrid flowshops with different scheduling rules, Comput. Ind. Eng., 56 (2009) 1668-1674.
[39]
M. Mirabi, S.F. Ghomi, F. Jolai, A two-stage hybrid flowshop scheduling problem in machine breakdown condition, J. Intell. Manuf., 24 (2013) 193-199.
[40]
Z.H. Jin, Z. Yang, T. Ito, Metaheuristic algorithms for the multistage hybrid flowshop scheduling problem, Int. J. Prod. Econ., 100 (2006) 322-334.
[41]
J.N.D. Gupta, E.F. Stafford, Flowshop scheduling research after five decades, Eur. J. Oper. Res., 169 (2006) 699-711.
[42]
R.Y. Zhong, Q.Y. Dai, T. Qu, G.J. Hu, G.Q. Huang, RFID-enabled Real-time manufacturing execution system for mass-customization production, Robot. Comput.-Integr. Manuf., 29 (2013) 283-292.
[43]
Q.Y. Dai, R.Y. Zhong, G.Q. Huang, T. Qu, T. Zhang, T.Y. Luo, Radio frequency identification-enabled real-time manufacturing execution system: a case study in an automotive part manufacturer, Int. J. Comput. Integr. Manuf., 25 (2012) 51-65.
[44]
F.A. Haight, Handbook of the Poisson distribution, Wiley, New York, 1967.
[45]
R.Y. Zhong, G.Q. Huang, S. Lan, Q. Dai, A Real-time RFID-driven Model for Two-level Production Decision-making, in: 2014 IEEE 11th International Conference on Networking, Sensing and Control (ICNSC), Miami, FL, 2014, pp. 565-571.

Cited By

View all

Recommendations

Comments

Please enable JavaScript to view thecomments powered by Disqus.

Information & Contributors

Information

Published In

cover image Advanced Engineering Informatics
Advanced Engineering Informatics  Volume 29, Issue 4
October 2015
370 pages

Publisher

Elsevier Science Publishers B. V.

Netherlands

Publication History

Published: 01 October 2015

Author Tags

  1. Advanced production planning and scheduling (APPS)
  2. Radio frequency identification (RFID)
  3. Real-time
  4. Shop floor
  5. Two-level
  6. Ubiquitous manufacturing

Qualifiers

  • Research-article

Contributors

Other Metrics

Bibliometrics & Citations

Bibliometrics

Article Metrics

  • Downloads (Last 12 months)0
  • Downloads (Last 6 weeks)0
Reflects downloads up to 25 Nov 2024

Other Metrics

Citations

Cited By

View all
  • (2024)Improved multi-objective brain storm optimization algorithm for RFID network planningWireless Networks10.1007/s11276-023-03543-x30:2(1055-1068)Online publication date: 1-Feb-2024
  • (2022)Integration of industrial IoT architectures for dynamic schedulingComputers and Industrial Engineering10.1016/j.cie.2022.108387171:COnline publication date: 1-Sep-2022
  • (2022)CPS-enabled and knowledge-aided demand response strategy for sustainable manufacturingAdvanced Engineering Informatics10.1016/j.aei.2022.10153452:COnline publication date: 1-Apr-2022
  • (2021)Development of Industry 4.0 predictive maintenance architecture for broadcasting chainAdvanced Engineering Informatics10.1016/j.aei.2021.10132449:COnline publication date: 1-Aug-2021
  • (2020)A proactive material handling method for CPS enabled shop-floorRobotics and Computer-Integrated Manufacturing10.1016/j.rcim.2019.10184961:COnline publication date: 1-Feb-2020
  • (2020)An operation synchronization model for distribution center in E-commerce logistics serviceAdvanced Engineering Informatics10.1016/j.aei.2019.10101443:COnline publication date: 1-Jan-2020
  • (2020)Analysis of production cycle-time distribution with a big-data approachJournal of Intelligent Manufacturing10.1007/s10845-020-01544-731:8(1889-1897)Online publication date: 1-Dec-2020
  • (2020)Hypernetwork-based manufacturing service scheduling for distributed and collaborative manufacturing operations towards smart manufacturingJournal of Intelligent Manufacturing10.1007/s10845-018-1417-831:7(1707-1720)Online publication date: 1-Oct-2020
  • (2019)Research on Flexible Production Line Scheduling Considering Multiple Maintenance MechanismsProceedings of the 5th International Conference on Industrial and Business Engineering10.1145/3364335.3364403(282-286)Online publication date: 27-Sep-2019
  • (2019)An Internet of Things-enabled BIM platform for modular integrated constructionAdvanced Engineering Informatics10.1016/j.aei.2019.10099742:COnline publication date: 1-Oct-2019
  • Show More Cited By

View Options

View options

Login options

Media

Figures

Other

Tables

Share

Share

Share this Publication link

Share on social media