Nothing Special   »   [go: up one dir, main page]

skip to main content
10.1007/978-3-319-21410-8_48guideproceedingsArticle/Chapter ViewAbstractPublication PagesConference Proceedingsacm-pubtype
Article

A Scheduling Problem for Software Project Solved with ABC Metaheuristic

Published: 22 June 2015 Publication History

Abstract

The scheduling problems are very common in any industry or organization. The software project management is frequently faced with different scheduling problems. We present the Resource-Constrained Project Scheduling problem as a generic problem in which different resources must be assigned to different activities, so that the make span is minimized and a set of precedence constraints between activities and resource allocation to these activities are met. This Problem is a NP-hard combinatorial optimization problem. In this paper we present the model the resolution of the problem through the Artificial Bee Colony algorithm. The Artificial Bee Colony is a metaheuristic that uses foraging behavior of honey bees for solving problems, especially applied to combinatorial optimization. We present an Artificial Bee Colony algorithm able to solve the Resource-Constrained Project Scheduling efficiently.

References

[1]
Bouleimen, K., Lecocq, H.: A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version. European Journal of Operational Research 1492, 268---281 2003
[2]
Chen, R.-M., Wu, C.-L., Wang, C.-M., Lo, S.-T.: Using novel particle swarm optimization scheme to solve resource-constrained scheduling problem in psplib. Expert systems with applications 373, 1899---1910 2010
[3]
Chiarandini, M., Di Gaspero, L., Gualandi, S., Schaerf, A.: The balanced academic curriculum problem revisited. Journal of Heuristics 181, 119---148 2012
[4]
Dorndorf, U., Pesch, E., Phan-Huy, T.: A time-oriented branch-and-bound algorithm for resource-constrained project scheduling with generalised precedence constraints. Management Science 4610, 1365---1384 2000
[5]
Hartmann, S.: A competitive genetic algorithm for resource-constrained project scheduling. Naval Research Logistics NRL 457, 733---750 1998
[6]
Herbots, J., Herroelen, W., Leus, R.: Experimental investigation of the applicability of ant colony optimization algorithms for project scheduling. DTEW Research Report 0459, 1---25 2004
[7]
Karaboga, D.: An idea based on honey bee swarm for numerical optimization. Technical report, Technical report-tr06, Erciyes university, engineering faculty, computer engineering department 2005
[8]
Kempf, K., Uzsoy, R., Smith, S., Gary, K.: Evaluation and comparison of production schedules. Computers in industry 422, 203---220 2000
[9]
Mingozzi, A., Maniezzo, V., Ricciardelli, S., Bianco, L.: An exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulation. Management Science 445, 714---729 1998
[10]
Nonobe, K., Ibaraki, T.: Formulation and tabu search algorithm for the resource constrained project scheduling problem. In: Essays and Surveys in Metaheuristics, pp. 557---588. Springer 2002
[11]
Pritsker, A.A.B., Waiters, L.J., Wolfe, P.M.: Multiproject scheduling with limited resources: A zero-one programming approach. Management science 161, 93---108 1969
[12]
Schirmer, A.: Case-based reasoning and improved adaptive search for project scheduling. Naval Research Logistics NRL 473, 201---222 2000
[13]
Valls, V., Ballestin, F., Quintanilla, S.: Justification and rcpsp: A technique that pays. European Journal of Operational Research 1652, 375---386 2005
[14]
Zhang, H., Li, H., Tam, C.: Particle swarm optimization for resource-constrained project scheduling. International Journal of Project Management 241, 83---92 2006
[15]
Zhang, H., Li, X., Li, H., Huang, F.: Particle swarm optimization-based schemes for resource-constrained project scheduling. Automation in Construction 143, 393---404 2005

Recommendations

Comments

Please enable JavaScript to view thecomments powered by Disqus.

Information & Contributors

Information

Published In

cover image Guide Proceedings
Proceedings, Part IV, of the 15th International Conference on Computational Science and Its Applications -- ICCSA 2015 - Volume 9158
June 2015
744 pages
ISBN:9783319214092

Publisher

Springer-Verlag

Berlin, Heidelberg

Publication History

Published: 22 June 2015

Author Tags

  1. Artificial Bee Colony
  2. Metaheuristic
  3. Optimization
  4. Project scheduling
  5. Software project management

Qualifiers

  • Article

Contributors

Other Metrics

Bibliometrics & Citations

Bibliometrics

Article Metrics

  • 0
    Total Citations
  • 0
    Total Downloads
  • Downloads (Last 12 months)0
  • Downloads (Last 6 weeks)0
Reflects downloads up to 13 Nov 2024

Other Metrics

Citations

View Options

View options

Get Access

Login options

Media

Figures

Other

Tables

Share

Share

Share this Publication link

Share on social media