A Scheduling Problem for Software Project Solved with ABC Metaheuristic
Abstract
References
- A Scheduling Problem for Software Project Solved with ABC Metaheuristic
Recommendations
PS-ABC
A hybrid algorithm (PS-ABC) based on PSO and ABC is proposed.PS-ABC examines the aging degree of pbest to decide which type of search phase.Particle swarm optimization (PSO) serves as a local search phase.Onlooker and modified scout bee from the ABC ...
ABC-based manufacturing scheduling for unrelated parallel machines with machine-dependent and job sequence-dependent setup times
To date, the topic of unrelated parallel machine scheduling problems with machine-dependent and job sequence-dependent setup times has received relatively little research attention. In this study, a hybrid artificial bee colony (HABC) algorithm is ...
A modified ABC algorithm for the stage shop scheduling problem
A modified artificial bee colony algorithm is proposed for the stage shop scheduling problem.The stage shop is a new extension for the mixed shop problem and as a result, for job shop and open shop problems.In employed bee phase of ABC, a potent ...
Comments
Please enable JavaScript to view thecomments powered by Disqus.Information & Contributors
Information
Published In

Publisher
Springer-Verlag
Berlin, Heidelberg
Publication History
Author Tags
Qualifiers
- Article
Contributors
Other Metrics
Bibliometrics & Citations
Bibliometrics
Article Metrics
- 0Total Citations
- 0Total Downloads
- Downloads (Last 12 months)0
- Downloads (Last 6 weeks)0