Nothing Special   »   [go: up one dir, main page]

skip to main content
10.1145/3568834.3568882acmotherconferencesArticle/Chapter ViewAbstractPublication PagesicibeConference Proceedingsconference-collections
research-article

Lean Agile Model to Improve the Service Level in Pharmaceutical Company: Case Study from Peru

Published: 25 January 2023 Publication History

Abstract

The service level is a critical factor that affects pharmaceutical enterprises because its focuses on taking care of people's lives. An important factor is fulfilling orders on time to customers (doctors and patients), which requires the availability of products and the highest service level in the health system. The proposal of this study is based on developing a model that integrates supply chain processes at operational level to improve the service level. The model is carried out with the integration of Lean and Agile methodologies that seek to streamline and make the supply chain processes more flexible to fulfill orders. This study was simulated using Arena software, who helps to quantify the operational processes and improvement in the supply chain performance. Lean Agile model achieves the service level required for the industry, as well as improves the performance of the supply chain in the company.

References

[1]
Ministry of production, “Sector statistics in the pharmaceutical industry in Peru,” 2020. https://ogeiee.produce.gob.pe/index.php/en/shortcode/estadistica-oee/estadistica-sectorial/ (accessed May 09, 2021)
[2]
National institute of statistics and informatics, “National production of pharmaceutical products,” 2020, Accessed: Oct. 04, 2020. [Online]. Available:http://m.inei.gob.pe/biblioteca-virtual/boletines/produccion-nacional/1/#lista.
[3]
M. Nematollahi, S. M. Hosseini-Motlagh, and J. Heydari, “Economic and social collaborative decision-making on visit interval and service level in a two-echelon pharmaceutical supply chain,” J. Clean. Prod., vol. 142, pp. 3956–3969, Jan. 2017.
[4]
M. Nematollahi, S. M. Hosseini-Motlagh, J. Ignatius, M. Goh, and M. Saghafi Nia, “Coordinating a socially responsible pharmaceutical supply chain under periodic review replenishment policies,” J. Clean. Prod., vol. 172, pp. 2876–2891, Oct. 2018.
[5]
S. De Treville, R. D. Shapiro, and A. P. Hameri, “From supply chain to demand chain: The role of lead time reduction in improving demand chain performance,” J. Oper. Manag., vol. 21, no. 6, pp. 613–627, Jan. 2004.
[6]
K. Arana, K. Flores, E. Ramos, T. Pettit, and M. Flanigan, “Service level of pharmaceutical supply chain applying optimal policy: Case study in Lima, Perú,” 2020. [Online]. Available: http://excelingtech.co.uk/.
[7]
M. Khalfallah and L. Lakhal, “The impact of lean manufacturing practices on operational and financial performance: the mediating role of agile manufacturing,” Int. J. Qual. Reliab. Manag., vol. 38, no. 1, pp. 147–168, Apr. 2020.
[8]
N. Nemtajela and C. Mbohwa, “Relationship between Inventory Management and Uncertain Demand for Fast Moving Consumer Goods Organisations,” Procedia Manuf., vol. 8, pp. 699–706, 2017.
[9]
S. Modgil and S. Sharma, “Information Systems, Supply Chain Management and Operational Performance: Tri-linkage—An Exploratory Study on Pharmaceutical Industry of India,” Glob. Bus. Rev., vol. 18, no. 3, pp. 652–677, Jun. 2017.
[10]
F. Sabouhi, M. S. Pishvaee, and M. S. Jabalameli, “Resilient supply chain design under operational and disruption risks considering quantity discount: A case study of pharmaceutical supply chain,” Comput. Ind. Eng., vol. 126, pp. 657–672, Dec. 2018.
[11]
M. Wang and F. Jie, “Managing supply chain uncertainty and risk in the pharmaceutical industry,” Heal. Serv. Manag. Res., vol. 33, no. 3, pp. 156–164, Aug. 2020.
[12]
S. A. Narayana, R. Kumar Pati, and P. Vrat, “Managerial research on the pharmaceutical supply chain - A critical review and some insights for future directions,” J. Purch. Supply Manag., vol. 20, no. 1, pp. 18–40, Mar. 2014.
[13]
C. Alzaman, Z. H. Zhang, and A. Diabat, “Supply chain network design with direct and indirect production costs: Hybrid gradient and local search based heuristics,” Int. J. Prod. Econ., vol. 203, pp. 203–215, Sep. 2018.
[14]
A. Haial, A. Berrado, and L. Benabbou, “Redesigning a transportation network: the case of a pharmaceutical supply chain,” 2020.
[15]
A. S. Muntaka, A. Haruna, and H. Kofi Mensah, “Supply Chain Integration and Flexibility and Its Impact on Business Performance,” Int. J. Bus. Manag., vol. 12, no. 4, p. 130, Mar. 2017.
[16]
J. Dinis-Carvalho, F. Moreira, S. Bragança, E. Costa, A. Alves, and R. Sousa, “Waste identification diagrams,” Prod. Plan. Control, vol. 26, no. 3, pp. 235–247, Feb. 2015.
[17]
A. Z. Abideen and F. B. Mohamad, “Supply chain lead time reduction in a pharmaceutical production warehouse – a case study,” Int. J. Pharm. Healthc. Mark., vol. 14, no. 1, pp. 61–88, 2019.
[18]
N. Virmani, R. Saha, and R. Sahai, “Evaluating key performance indicators of leagile manufacturing using fuzzy TISM approach,” Int. J. Syst. Assur. Eng. Manag., vol. 9, no. 2, pp. 427–439, Apr. 2018.
[19]
F. Pakdil and K. M. Leonard, “Criteria for a lean organisation: Development of a lean assessment tool,” Int. J. Prod. Res., vol. 52, no. 15, pp. 4587–4607, Aug. 2014.
[20]
M. Shamsuzzaman, M. Alzeraif, I. Alsyouf, and M. B. C. Khoo, “Using Lean Six Sigma to improve mobile order fulfilment process in a telecom service sector,” Prod. Plan. Control, vol. 29, no. 4, pp. 301–314, 2018.
[21]
S. Routroy, P. K. Potdar, and A. Shankar, “Measurement of manufacturing agility: A case study,” Meas. Bus. Excell., vol. 19, no. 2, pp. 1–22, May 2015.
[22]
M. Ghobakhloo and A. Azar, “Business excellence via advanced manufacturing technology and lean-agile manufacturing,” J. Manuf. Technol. Manag., vol. 29, no. 1, pp. 2–24, Jan. 2018.
[23]
F. L. Ribeiro and M. T. Fernandes, “Exploring agile methods in construction small and medium enterprises: A case study,” J. Enterp. Inf. Manag., vol. 23, no. 2, pp. 161–180, 2010.
[24]
P. K. Potdar, S. Routroy, and A. Behera, “Agile manufacturing: a systematic review of literature and implications for future research,” Benchmarking, vol. 24, no. 7. Emerald Group Publishing Ltd., pp. 2022–2048, 2017.
[25]
M. Christopher and H. Lee, “Mitigating supply chain risk through improved confidence,” Int. J. Phys. Distrib. Logist. Manag., vol. 34, no. 5, pp. 388–396, 2004.
[26]
D. Li and C. O'Brien, “A quantitative analysis of relationships between product types and supply chain strategies,” Int. J. Prod. Econ., vol. 73, no. 1, pp. 29–39, Aug. 2001.
[27]
E. Selldin and J. Olhager, “Linking products with supply chains: Testing Fisher's model,” Supply Chain Manag., vol. 12, no. 1, pp. 42–51, 2007.
[28]
Y. Li, A. Diabat, and C. C. Lu, “Leagile supplier selection in Chinese textile industries: a DEMATEL approach,” Ann. Oper. Res., vol. 287, no. 1, pp. 303–322, 2020.
[29]
Y. Qi, B. Huo, Z. Wang, and H. Y. J. Yeung, “The impact of operations and supply chain strategies on integration and performance,” Int. J. Prod. Econ., vol. 185, pp. 162–174, Mar. 2017.
[30]
M. R. Galankashi and S. A. Helmi, “Assessment of hybrid Lean-Agile (Leagile) supply chain strategies,” J. Manuf. Technol. Manag., vol. 27, no. 4, pp. 470–482, May 2016.
[31]
F. Rahimnia, M. Moghadasian, and P. Castka, “Benchmarking leagility in mass services: The case of a fast food restaurant chains in Iran,” Benchmarking, vol. 16, no. 6, pp. 799–816, Oct. 2009.
[32]
T. Kelepouris, P. Miliotis, and K. Pramatari, “The impact of replenishment parameters and information sharing on the bullwhip effect: A computational study,” Comput. Oper. Res., vol. 35, no. 11, pp. 3657–3670, Nov. 2008.
[33]
M. Li and Z. Wang, “An integrated robust replenishment/production/distribution policy under inventory inaccuracy,” Int. J. Prod. Res., vol. 56, no. 12, pp. 4115–4131, Jun. 2018.
[34]
P. Sen Wang, T. Yang, and L. C. Yu, “Lean-pull strategy for order scheduling problem in a multi-site semiconductor crystal ingot-pulling manufacturing company,” Comput. Ind. Eng., vol. 125, pp. 545–562, Nov. 2018.
[35]
M. Varl, J. Duhovnik, and J. Tavčar, “Agile product development process transformation to support advanced one-of-a-kind manufacturing,” Int. J. Comput. Integr. Manuf., vol. 33, no. 6, pp. 590–608, Jun. 2020.
[36]
R. Maharaja, S. R. Devadasan, M. Sakthivel, and R. Murugesh, “Performance measurement of the leagile supply chain,” Int. J. Serv. Oper. Manag., vol. 31, no. 3, p. 396, 2018.
[37]
A. Azadegan, T. A. Syed, C. Blome, and K. Tajeddini, “Supply chain involvement in business continuity management: effects on reputational and operational damage containment from supply chain disruptions,” Supply Chain Manag., vol. 25, no. 6, pp. 747–772, Aug. 2020.
[38]
A. Azadegan, R. Srinivasan, C. Blome, and K. Tajeddini, “Learning from near-miss events: An organizational learning perspective on supply chain disruption response,” Int. J. Prod. Econ., vol. 216, pp. 215–226, Oct. 2019.
[39]
K. Tajeddini, V. Ratten, and T. Merkle, Tourism, Hospitality and Digital Transformation. Routledge, 2019.

Index Terms

  1. Lean Agile Model to Improve the Service Level in Pharmaceutical Company: Case Study from Peru

    Recommendations

    Comments

    Please enable JavaScript to view thecomments powered by Disqus.

    Information & Contributors

    Information

    Published In

    cover image ACM Other conferences
    ICIBE '22: Proceedings of the 8th International Conference on Industrial and Business Engineering
    September 2022
    552 pages
    ISBN:9781450397582
    DOI:10.1145/3568834
    Permission to make digital or hard copies of all or part of this work for personal or classroom use is granted without fee provided that copies are not made or distributed for profit or commercial advantage and that copies bear this notice and the full citation on the first page. Copyrights for components of this work owned by others than ACM must be honored. Abstracting with credit is permitted. To copy otherwise, or republish, to post on servers or to redistribute to lists, requires prior specific permission and/or a fee. Request permissions from [email protected]

    Publisher

    Association for Computing Machinery

    New York, NY, United States

    Publication History

    Published: 25 January 2023

    Permissions

    Request permissions for this article.

    Check for updates

    Author Tags

    1. JIT Purchasing
    2. Leagile
    3. Order Fulfillment
    4. Process Standardization
    5. Work Standardization

    Qualifiers

    • Research-article
    • Research
    • Refereed limited

    Conference

    ICIBE 2022

    Contributors

    Other Metrics

    Bibliometrics & Citations

    Bibliometrics

    Article Metrics

    • 0
      Total Citations
    • 63
      Total Downloads
    • Downloads (Last 12 months)29
    • Downloads (Last 6 weeks)0
    Reflects downloads up to 18 Nov 2024

    Other Metrics

    Citations

    View Options

    Login options

    View options

    PDF

    View or Download as a PDF file.

    PDF

    eReader

    View online with eReader.

    eReader

    HTML Format

    View this article in HTML Format.

    HTML Format

    Media

    Figures

    Other

    Tables

    Share

    Share

    Share this Publication link

    Share on social media