Mario Vanhoucke
Person information
Refine list
refinements active!
zoomed in on ?? of ?? records
view refined list in
export refined list as
2020 – today
- 2024
- [j113]Rob Van Eynde, Mario Vanhoucke, José Coelho:
Correction to: on the summary measures for the resource-constrained project scheduling problem. Ann. Oper. Res. 332(1): 1309 (2024) - [j112]Paulo André de Andrade, Mario Vanhoucke, Annelies Martens:
An empirical project forecasting accuracy framework using project regularity. Ann. Oper. Res. 337(2): 501-521 (2024) - [j111]Xin Guan, Tom Servranckx, Mario Vanhoucke:
Risk response budget allocation based on fault tree analysis and optimization. Ann. Oper. Res. 337(2): 523-564 (2024) - [j110]Rob Van Eynde, Mario Vanhoucke, José Coelho:
On the summary measures for the resource-constrained project scheduling problem. Ann. Oper. Res. 337(2): 593-625 (2024) - [j109]Tom Servranckx, José Coelho, Mario Vanhoucke:
Project management and scheduling 2022. Ann. Oper. Res. 338(1): 1-12 (2024) - [j108]Majid Yazdani, Tarik Aouam, Mario Vanhoucke:
An exact decomposition technique for the deadline-constrained discrete time/cost trade-off problem with discounted cash flows. Comput. Oper. Res. 163: 106491 (2024) - [j107]Mario Vanhoucke, José Coelho:
Reducing the feasible solution space of resource-constrained project instances. Comput. Oper. Res. 165: 106567 (2024) - [j106]Dries Bredael, Mario Vanhoucke:
A genetic algorithm with resource buffers for the resource-constrained multi-project scheduling problem. Eur. J. Oper. Res. 315(1): 19-34 (2024) - [j105]Izel Ünsal-Altuncan, Mario Vanhoucke:
A hybrid forecasting model to predict the duration and cost performance of projects with Bayesian Networks. Eur. J. Oper. Res. 315(2): 511-527 (2024) - [j104]Forough Vaseghi, Annelies Martens, Mario Vanhoucke:
Analysis of the impact of corrective actions for stochastic project networks. Eur. J. Oper. Res. 316(2): 503-518 (2024) - [j103]Tom Servranckx, José Coelho, Mario Vanhoucke:
A genetic algorithm for the Resource-Constrained Project Scheduling Problem with Alternative Subgraphs using a boolean satisfiability solver. Eur. J. Oper. Res. 316(3): 815-827 (2024) - [j102]Mario Vanhoucke, José Coelho:
A matheuristic for the resource-constrained project scheduling problem. Eur. J. Oper. Res. 319(3): 711-725 (2024) - [j101]Broos Maenhout, Mario Vanhoucke:
Dynamic personnel rescheduling: insights and recovery strategies. J. Sched. 27(1): 1-27 (2024) - 2023
- [j100]Rojin Nekoueian, Tom Servranckx, Mario Vanhoucke:
Constructive heuristics for selecting and scheduling alternative subgraphs in resource-constrained projects. Comput. Ind. Eng. 182: 109399 (2023) - [j99]Forough Vaseghi, Mario Vanhoucke:
A comparison of activity ranking methods for taking corrective actions during project control. Comput. Ind. Eng. 183: 109505 (2023) - [j98]José Coelho, Mario Vanhoucke:
New resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithms. Comput. Oper. Res. 153: 106165 (2023) - [j97]Jakob Snauwaert, Rob Van Eynde, Mario Vanhoucke:
On the complexity of efficient multi-skilled team composition. Comput. Oper. Res. 157: 106277 (2023) - [j96]Weikang Guo, Mario Vanhoucke, José Coelho:
A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem. Eur. J. Oper. Res. 306(2): 579-595 (2023) - [j95]Jakob Snauwaert, Mario Vanhoucke:
A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem. Eur. J. Oper. Res. 307(1): 1-19 (2023) - [j94]Dries Bredael, Mario Vanhoucke:
Multi-project scheduling: A benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates. Eur. J. Oper. Res. 308(1): 54-75 (2023) - [j93]Jingyu Luo, Mario Vanhoucke, José Coelho:
Automated design of priority rules for resource-constrained project scheduling problem using surrogate-assisted genetic programming. Swarm Evol. Comput. 81: 101339 (2023) - 2022
- [j92]Humyun Fuad Rahman, Tom Servranckx, Ripon K. Chakrabortty, Mario Vanhoucke, Sondoss El Sawah:
Manufacturing project scheduling considering human factors to minimize total cost and carbon footprints. Appl. Soft Comput. 131: 109764 (2022) - [j91]Jakob Snauwaert, Mario Vanhoucke:
Mathematical formulations for project scheduling problems with categorical and hierarchical skills. Comput. Ind. Eng. 169: 108147 (2022) - [j90]Rob Van Eynde, Mario Vanhoucke:
A reduction tree approach for the Discrete Time/Cost Trade-Off Problem. Comput. Oper. Res. 143: 105750 (2022) - [j89]Pavel Milicka, Premysl Sucha, Mario Vanhoucke, Broos Maenhout:
The bilevel optimisation of a multi-agent project scheduling and staffing problem. Eur. J. Oper. Res. 296(1): 72-86 (2022) - [j88]Jie Song, Annelies Martens, Mario Vanhoucke:
Using Earned Value Management and Schedule Risk Analysis with resource constraints for project control. Eur. J. Oper. Res. 297(2): 451-466 (2022) - [j87]Rob Van Eynde, Mario Vanhoucke:
New summary measures and datasets for the multi-project scheduling problem. Eur. J. Oper. Res. 299(3): 853-868 (2022) - [j86]Jingyu Luo, Mario Vanhoucke, José Coelho, Weikang Guo:
An efficient genetic programming approach to design priority rules for resource-constrained project scheduling problem. Expert Syst. Appl. 198: 116753 (2022) - [j85]Tom Servranckx, José Coelho, Mario Vanhoucke:
Various extensions in resource-constrained project scheduling with alternative subgraphs. Int. J. Prod. Res. 60(11): 3501-3520 (2022) - [j84]Xue Li, Zhengwen He, Nengmin Wang, Mario Vanhoucke:
Multimode time-cost-robustness trade-off project scheduling problem under uncertainty. J. Comb. Optim. 43(5): 1173-1202 (2022) - [j83]Rob Van Eynde, Mario Vanhoucke:
A Theoretical Framework for Instance Complexity of the Resource-Constrained Project Scheduling Problem. Math. Oper. Res. 47(4): 3156-3183 (2022) - 2021
- [j82]Xin Guan, Tom Servranckx, Mario Vanhoucke:
An analytical model for budget allocation in risk prevention and risk protection. Comput. Ind. Eng. 161: 107657 (2021) - [j81]Mick Van Den Eeckhout, Mario Vanhoucke, Broos Maenhout:
A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing. Comput. Oper. Res. 128: 105163 (2021) - [j80]Tarik Aouam, Foad Ghadimi, Mario Vanhoucke:
Finite inventory budgets in production capacity and safety stock placement under the guaranteed service approach. Comput. Oper. Res. 131: 105266 (2021) - [j79]Mario Vanhoucke, José Coelho:
An analysis of network and resource indicators for resource-constrained project scheduling problem instances. Comput. Oper. Res. 132: 105260 (2021) - [j78]Jie Song, Annelies Martens, Mario Vanhoucke:
Using Schedule Risk Analysis with resource constraints for project control. Eur. J. Oper. Res. 288(3): 736-752 (2021) - [j77]Jakob Snauwaert, Mario Vanhoucke:
A new algorithm for resource-constrained project scheduling with breadth and depth of skills. Eur. J. Oper. Res. 292(1): 43-59 (2021) - [j76]Tom Servranckx, Mario Vanhoucke, Tarik Aouam:
Practical application of reference class forecasting for cost and time estimations: Identifying the properties of similarity. Eur. J. Oper. Res. 295(3): 1161-1179 (2021) - [j75]Weikang Guo, Mario Vanhoucke, José Coelho, Jingyu Luo:
Automatic detection of the best performing priority rule for the resource-constrained project scheduling problem. Expert Syst. Appl. 167: 114116 (2021) - 2020
- [j74]Mick Van Den Eeckhout, Broos Maenhout, Mario Vanhoucke:
Mode generation rules to define activity flexibility for the integrated project staffing problem with discrete time/resource trade-offs. Ann. Oper. Res. 292(1): 133-160 (2020) - [j73]Louis-Philippe Kerkhove, Mario Vanhoucke:
Multi-mode schedule optimisation for incentivised projects. Comput. Ind. Eng. 142: 106321 (2020) - [j72]Tom Servranckx, Mario Vanhoucke, Giel Vanhouwaert:
Analysing the impact of alternative network structures on resource-constrained schedules: Artificial and empirical experiments. Comput. Ind. Eng. 148: 106706 (2020) - [j71]Foad Ghadimi, Tarik Aouam, Mario Vanhoucke:
Optimizing production capacity and safety stocks in general acyclic supply chains. Comput. Oper. Res. 120: 104938 (2020) - [j70]José Coelho, Mario Vanhoucke:
Going to the core of hard resource-constrained project scheduling instances. Comput. Oper. Res. 121: 104976 (2020) - [j69]Jeroen Burgelman, Mario Vanhoucke:
Project schedule performance under general mode implementation disruptions. Eur. J. Oper. Res. 280(1): 295-311 (2020) - [j68]Mick Van Den Eeckhout, Mario Vanhoucke, Broos Maenhout:
A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems. Eur. J. Oper. Res. 280(3): 845-859 (2020) - [j67]Jie Song, Annelies Martens, Mario Vanhoucke:
The impact of a limited budget on the corrective action taking process. Eur. J. Oper. Res. 286(3): 1070-1086 (2020) - [j66]Rob Van Eynde, Mario Vanhoucke:
Resource-constrained multi-project scheduling: benchmark datasets and decoupled scheduling. J. Sched. 23(3): 301-325 (2020) - [c11]Jie Song, Tom Servranckx, Annelies Martens, Mario Vanhoucke:
A Simulation Study on the Impact of Activity Crashing on the Project Duration and Cost under Different Budget Release Scenarios. FedCSIS 2020: 603-606
2010 – 2019
- 2019
- [j65]Mario Vanhoucke:
Tolerance limits for project control: An overview of different approaches. Comput. Ind. Eng. 127: 467-479 (2019) - [j64]Mario Vanhoucke, Jordy Batselier:
Fitting activity distributions using human partitioning and statistical calibration. Comput. Ind. Eng. 129: 126-135 (2019) - [j63]Mick Van Den Eeckhout, Broos Maenhout, Mario Vanhoucke:
A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints. Comput. Oper. Res. 101: 144-161 (2019) - [j62]Jeroen Burgelman, Mario Vanhoucke:
Computing project makespan distributions: Markovian PERT networks revisited. Comput. Oper. Res. 103: 123-133 (2019) - [j61]Pieter Leyman, Niels Van Driessche, Mario Vanhoucke, Patrick De Causmaecker:
The impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment models. Comput. Oper. Res. 103: 184-197 (2019) - [j60]Tarik Aouam, Mario Vanhoucke:
An agency perspective for multi-mode project scheduling with time/cost trade-offs. Comput. Oper. Res. 105: 167-186 (2019) - [j59]Mario Vanhoucke, José Coelho:
Resource-constrained project scheduling with activity splitting and setup times. Comput. Oper. Res. 109: 230-249 (2019) - [j58]Mario Vanhoucke, Jordy Batselier:
A Statistical Method for Estimating Activity Uncertainty Parameters to Improve Project Forecasting. Entropy 21(10): 952 (2019) - [j57]Tom Servranckx, Mario Vanhoucke:
A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs. Eur. J. Oper. Res. 273(3): 841-860 (2019) - [j56]Annelies Martens, Mario Vanhoucke:
The impact of applying effort to reduce activity variability on the project time and cost performance. Eur. J. Oper. Res. 277(2): 442-453 (2019) - [j55]Tom Servranckx, Mario Vanhoucke:
Strategies for project scheduling with alternative subgraphs under uncertainty: similar and dissimilar sets of schedules. Eur. J. Oper. Res. 279(1): 38-53 (2019) - 2018
- [j54]Mario Vanhoucke, José Coelho:
A tool to test and validate algorithms for the resource-constrained project scheduling problem. Comput. Ind. Eng. 118: 251-265 (2018) - [j53]José Coelho, Mario Vanhoucke:
An exact composite lower bound strategy for the resource-constrained project scheduling problem. Comput. Oper. Res. 93: 135-150 (2018) - [j52]Broos Maenhout, Mario Vanhoucke:
A perturbation matheuristic for the integrated personnel shift and task re-scheduling problem. Eur. J. Oper. Res. 269(3): 806-823 (2018) - [j51]Jeroen Burgelman, Mario Vanhoucke:
Maximising the weighted number of activity execution modes in project planning. Eur. J. Oper. Res. 270(3): 999-1013 (2018) - 2017
- [j50]Broos Maenhout, Mario Vanhoucke:
A resource type analysis of the integrated project scheduling and personnel staffing problem. Ann. Oper. Res. 252(2): 407-433 (2017) - [j49]Annelies Martens, Mario Vanhoucke:
The integration of constrained resources into top-down project control. Comput. Ind. Eng. 110: 277-288 (2017) - [j48]Louis-Philippe Kerkhove, Mario Vanhoucke, Broos Maenhout:
On the resource renting problem with overtime. Comput. Ind. Eng. 111: 303-319 (2017) - [j47]Yanting Wang, Zhengwen He, Louis-Philippe Kerkhove, Mario Vanhoucke:
On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem. Comput. Ind. Eng. 114: 223-234 (2017) - [j46]Pieter Leyman, Mario Vanhoucke:
Capital- and resource-constrained project scheduling with net present value optimization. Eur. J. Oper. Res. 256(3): 757-776 (2017) - [j45]Mathieu Wauters, Mario Vanhoucke:
A Nearest Neighbour extension to project duration forecasting with Artificial Intelligence. Eur. J. Oper. Res. 259(3): 1097-1111 (2017) - [j44]Louis-Philippe Kerkhove, Mario Vanhoucke:
A parallel multi-objective scatter search for optimising incentive contract design in projects. Eur. J. Oper. Res. 261(3): 1066-1084 (2017) - [j43]Annelies Martens, Mario Vanhoucke:
A buffer control method for top-down project control. Eur. J. Oper. Res. 262(1): 274-286 (2017) - [j42]Cédric Verbeeck, Vincent Van Peteghem, Mario Vanhoucke, Pieter Vansteenwegen, El-Houssaine Aghezzaf:
A metaheuristic solution approach for the time-constrained project scheduling problem. OR Spectr. 39(2): 353-371 (2017) - 2016
- [j41]Pieter Leyman, Mario Vanhoucke:
Payment models and net present value optimization for resource-constrained project scheduling. Comput. Ind. Eng. 91: 139-153 (2016) - [j40]Mario Vanhoucke, José Coelho:
An approach using SAT solvers for the RCPSP with logical constraints. Eur. J. Oper. Res. 249(2): 577-591 (2016) - [j39]Mathieu Wauters, Mario Vanhoucke:
A comparative study of Artificial Intelligence methods for project duration forecasting. Expert Syst. Appl. 46: 249-261 (2016) - [j38]Broos Maenhout, Mario Vanhoucke:
An exact algorithm for an integrated project staffing problem with a homogeneous workforce. J. Sched. 19(2): 107-133 (2016) - 2015
- [j37]Vincent Van Peteghem, Mario Vanhoucke:
Influence of learning in resource-constrained project scheduling. Comput. Ind. Eng. 87: 569-579 (2015) - [j36]Veronique Sels, José Coelho, António Manuel Dias, Mario Vanhoucke:
Hybrid tabu search and a truncated branch-and-bound for the unrelated parallel machine scheduling problem. Comput. Oper. Res. 53: 107-117 (2015) - [j35]Jeroen Colin, Annelies Martens, Mario Vanhoucke, Mathieu Wauters:
A multivariate approach for top-down project control using earned value management. Decis. Support Syst. 79: 65-76 (2015) - [j34]Jeroen Colin, Mario Vanhoucke:
A comparison of the performance of various project control methods using earned value management systems. Expert Syst. Appl. 42(6): 3159-3175 (2015) - [j33]Christophe Van Huele, Mario Vanhoucke:
Operating theatre modelling: integrating social measures. J. Simulation 9(2): 121-128 (2015) - [c10]Mario Vanhoucke, Mathieu Wauters:
Blended Learning in Project Management - Experiences on Business Games and Case Studies. CSEDU (2) 2015: 267-276 - 2014
- [j32]Veronique Sels, Mario Vanhoucke:
A hybrid Electromagnetism-like Mechanism/tabu search procedure for the single machine scheduling problem with a maximum lateness objective. Comput. Ind. Eng. 67: 44-55 (2014) - [j31]Vincent Van Peteghem, Mario Vanhoucke:
An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances. Eur. J. Oper. Res. 235(1): 62-72 (2014) - [j30]Christophe Van Huele, Mario Vanhoucke:
Analysis of the Integration of the Physician Rostering Problem and the Surgery Scheduling Problem. J. Medical Syst. 38(6): 43 (2014) - 2013
- [c9]Broos Maenhout, Mario Vanhoucke:
An Artificial Immune System Based Approach for Solving the Nurse Re-rostering Problem. EvoCOP 2013: 97-108 - 2012
- [j29]Veronique Sels, Mario Vanhoucke:
A hybrid genetic algorithm for the single machine maximum lateness problem with release times and family setups. Comput. Oper. Res. 39(10): 2346-2358 (2012) - 2011
- [j28]Veronique Sels, Frederic Steen, Mario Vanhoucke:
Applying a hybrid job shop procedure to a Belgian manufacturing company producing industrial wheels and castors in rubber. Comput. Ind. Eng. 61(3): 697-708 (2011) - [j27]Broos Maenhout, Mario Vanhoucke:
An evolutionary approach for the nurse rerostering problem. Comput. Oper. Res. 38(10): 1400-1411 (2011) - [j26]José Coelho, Mario Vanhoucke:
Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers. Eur. J. Oper. Res. 213(1): 73-82 (2011) - [j25]Veronique Sels, Kjeld Craeymeersch, Mario Vanhoucke:
A hybrid single and dual population search procedure for the job shop scheduling problem. Eur. J. Oper. Res. 215(3): 512-523 (2011) - [j24]Vincent Van Peteghem, Mario Vanhoucke:
Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem. J. Heuristics 17(6): 705-728 (2011) - [c8]Veronique Sels, Mario Vanhoucke:
A Hybrid Dual-Population Genetic Algorithm for the Single Machine Maximum Lateness Problem. EvoCOP 2011: 14-25 - 2010
- [j23]Vincent Van Peteghem, Mario Vanhoucke:
A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem. Eur. J. Oper. Res. 201(2): 409-418 (2010) - [j22]Broos Maenhout, Mario Vanhoucke:
A hybrid scatter search heuristic for personalized crew rostering in the airline industry. Eur. J. Oper. Res. 206(1): 155-167 (2010) - [j21]Mario Vanhoucke:
Introducing Optimization Techniques to Students: An Exam Case Distribution Model. INFORMS Trans. Educ. 10(2): 53-61 (2010) - [j20]Broos Maenhout, Mario Vanhoucke:
Branching strategies in a branch-and-price approach for a multiple objective nurse scheduling problem. J. Sched. 13(1): 77-93 (2010)
2000 – 2009
- 2009
- [j19]Mario Vanhoucke, Broos Maenhout:
On the characterization and generation of nurse scheduling problem instances. Eur. J. Oper. Res. 196(2): 457-467 (2009) - [j18]Broos Maenhout, Mario Vanhoucke:
The impact of incorporating nurse-specific characteristics in a cyclical scheduling approach. J. Oper. Res. Soc. 60(12): 1683-1698 (2009) - [c7]Mario Vanhoucke:
A Genetic Algorithm for Net Present Value Maximization for Resource Constrained Projects. EvoCOP 2009: 13-24 - [c6]Vincent Van Peteghem, Mario Vanhoucke:
An Artificial Immune System for the Multi-Mode Resource-Constrained Project Scheduling Problem. EvoCOP 2009: 85-96 - 2008
- [j17]Broos Maenhout, Mario Vanhoucke:
Comparison and hybridization of crossover operators for the nurse scheduling problem. Ann. Oper. Res. 159(1): 333-353 (2008) - [j16]Mario Vanhoucke, Dieter Debels:
The impact of various activity assumptions on the lead time and resource utilization of resource-constrained projects. Comput. Ind. Eng. 54(1): 140-154 (2008) - [j15]Mario Vanhoucke:
Setup times and fast tracking in resource-constrained project scheduling. Comput. Ind. Eng. 54(4): 1062-1070 (2008) - [j14]Mario Vanhoucke, José Coelho, Dieter Debels, Broos Maenhout, Luís Valadares Tavares:
An evaluation of the adequacy of project network generators with systematically sampled networks. Eur. J. Oper. Res. 187(2): 511-524 (2008) - [j13]Eva Labro, Mario Vanhoucke:
Diversity in Resource Consumption Patterns and Robustness of Costing Systems to Errors. Manag. Sci. 54(10): 1715-1730 (2008) - 2007
- [j12]Broos Maenhout, Mario Vanhoucke:
An electromagnetic meta-heuristic for the nurse scheduling problem. J. Heuristics 13(4): 359-385 (2007) - [j11]Dieter Debels, Mario Vanhoucke:
A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem. Oper. Res. 55(3): 457-469 (2007) - [j10]Mario Vanhoucke, S. Vandevoorde:
A simulation and evaluation of earned value metrics to forecast the project duration. J. Oper. Res. Soc. 58(10): 1361-1374 (2007) - [j9]Mario Vanhoucke, Dieter Debels:
The discrete time/cost trade-off problem: extensions and heuristic procedures. J. Sched. 10(4-5): 311-326 (2007) - 2006
- [j8]Dieter Debels, Bert De Reyck, Roel Leus, Mario Vanhoucke:
A hybrid scatter search/electromagnetism meta-heuristic for project scheduling. Eur. J. Oper. Res. 169(2): 638-653 (2006) - [c5]Broos Maenhout, Mario Vanhoucke:
New Computational Results for the Nurse Scheduling Problem: A Scatter Search Algorithm. EvoCOP 2006: 159-170 - [c4]Mario Vanhoucke:
An Efficient Hybrid Search Algorithm for Various Optimization Problems. EvoCOP 2006: 272-283 - [c3]Mario Vanhoucke:
Scheduling an R&D Project with Quality-Dependent Time Slots. ICCSA (3) 2006: 621-630 - 2005
- [j7]Mario Vanhoucke:
New computational results for the discrete time/cost trade-off problem with time-switch constraints. Eur. J. Oper. Res. 165(2): 359-374 (2005) - [c2]Dieter Debels, Mario Vanhoucke:
The Electromagnetism Meta-heuristic Applied to the Resource-Constrained Project Scheduling Problem. Artificial Evolution 2005: 259-270 - [c1]Dieter Debels, Mario Vanhoucke:
A Bi-population Based Genetic Algorithm for the Resource-Constrained Project Scheduling Problem. ICCSA (4) 2005: 378-387 - 2003
- [j6]Mario Vanhoucke, Erik Demeulemeester, Willy Herroelen:
Progress payments in project scheduling problems. Eur. J. Oper. Res. 148(3): 604-620 (2003) - [j5]Erik Demeulemeester, Mario Vanhoucke, Willy Herroelen:
RanGen: A Random Network Generator for Activity-on-the-Node Networks. J. Sched. 6(1): 17-38 (2003) - 2002
- [j4]Mario Vanhoucke, Erik Demeulemeester, Willy Herroelen:
Discrete time/cost trade-offs in project scheduling with time-switch constraints. J. Oper. Res. Soc. 53(7): 741-751 (2002) - 2001
- [j3]Mario Vanhoucke, Erik Demeulemeester, Willy Herroelen:
An Exact Procedure for the Resource-Constrained Weighted Earliness-Tardiness Project Scheduling Problem. Ann. Oper. Res. 102(1-4): 179-196 (2001) - [j2]Mario Vanhoucke, Erik Demeulemeester, Willy Herroelen:
On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints. Manag. Sci. 47(8): 1113-1121 (2001)
1990 – 1999
- 1998
- [j1]Erik Demeulemeester, Bert De Reyck, Bram Foubert, Willy Herroelen, Mario Vanhoucke:
New computational results on the discrete time/cost trade-off problem in project networks. J. Oper. Res. Soc. 49(11): 1153-1163 (1998)
Coauthor Index
manage site settings
To protect your privacy, all features that rely on external API calls from your browser are turned off by default. You need to opt-in for them to become active. All settings here will be stored as cookies with your web browser. For more information see our F.A.Q.
Unpaywalled article links
Add open access links from to the list of external document links (if available).
Privacy notice: By enabling the option above, your browser will contact the API of unpaywall.org to load hyperlinks to open access articles. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Unpaywall privacy policy.
Archived links via Wayback Machine
For web page which are no longer available, try to retrieve content from the of the Internet Archive (if available).
Privacy notice: By enabling the option above, your browser will contact the API of archive.org to check for archived content of web pages that are no longer available. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Internet Archive privacy policy.
Reference lists
Add a list of references from , , and to record detail pages.
load references from crossref.org and opencitations.net
Privacy notice: By enabling the option above, your browser will contact the APIs of crossref.org, opencitations.net, and semanticscholar.org to load article reference information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Crossref privacy policy and the OpenCitations privacy policy, as well as the AI2 Privacy Policy covering Semantic Scholar.
Citation data
Add a list of citing articles from and to record detail pages.
load citations from opencitations.net
Privacy notice: By enabling the option above, your browser will contact the API of opencitations.net and semanticscholar.org to load citation information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the OpenCitations privacy policy as well as the AI2 Privacy Policy covering Semantic Scholar.
OpenAlex data
Load additional information about publications from .
Privacy notice: By enabling the option above, your browser will contact the API of openalex.org to load additional information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the information given by OpenAlex.
last updated on 2024-11-25 23:39 CET by the dblp team
all metadata released as open data under CC0 1.0 license
see also: Terms of Use | Privacy Policy | Imprint