Avoid common mistakes on your manuscript.
Annals of Operations Research
Due to proofing error during typesetting Figs. 3, 4 and 5 were left blank, published with black bar and has now been updated.
Original article has been updated.
Author information
Authors and Affiliations
Corresponding author
Additional information
Publisher’s Note
Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.
The online version of the original article can be found at https://doi.org/10.1007/s10479-023-05470-8.
Rights and permissions
About this article
Cite this article
Van Eynde, R., Vanhoucke, M. & Coelho, J. Correction to: On the summary measures for the resource-constrained project scheduling problem. Ann Oper Res 332, 1309 (2024). https://doi.org/10.1007/s10479-023-05511-2
Published:
Issue Date:
DOI: https://doi.org/10.1007/s10479-023-05511-2