default search action
Seyyed M. T. Fatemi Ghomi
Person information
- affiliation: Amirkabir University of Technology
Refine list
refinements active!
zoomed in on ?? of ?? records
view refined list in
export refined list as
2020 – today
- 2024
- [j93]Shadi Sadri, S. M. T. Fatemi Ghomi, Amin Dehghanian:
Analysis of a time-cost trade-off in a resource-constrained GERT project scheduling problem using the Markov decision process. Ann. Oper. Res. 338(1): 535-568 (2024) - [j92]M. Khojaste Sarakhsi, Seyedhamidreza Shahabi Haghighi, S. M. T. Fatemi Ghomi, Elena Marchiori:
A 3D multi-scale CycleGAN framework for generating synthetic PETs from MRIs for Alzheimer's disease diagnosis. Image Vis. Comput. 146: 105017 (2024) - 2023
- [j91]Mehran Hemmati, S. M. T. Fatemi Ghomi, Mohsen S. Sajadieh:
Separate and bundling selling strategies for complementary products in a participative pricing mechanism. Comput. Ind. Eng. 177: 109018 (2023) - 2022
- [j90]M. Khojaste Sarakhsi, Seyedhamidreza Shahabi Haghighi, S. M. T. Fatemi Ghomi, Elena Marchiori:
Deep learning for Alzheimer's disease diagnosis: A survey. Artif. Intell. Medicine 130: 102332 (2022) - 2021
- [j89]S. M. T. Fatemi Ghomi, Behrooz Karimi, Javad Behnamian, J. Firoozbakht:
A Multi-objective Particle Swarm Optimization Based on Pareto Archive for Integrated Production and Distribution Planning in A Green Supply Chain. Appl. Artif. Intell. 35(2): 133-153 (2021) - [j88]Mehran Hemmati, Seyed Mohammad Javad Mirzapour Al-e-hashem, S. M. T. Fatemi Ghomi:
Heuristic analyses of separate and bundling sales for complimentary products under consignment stock policy. Comput. Ind. Eng. 157: 107297 (2021) - [j87]Javad Behnamian, Seyyed Mohammad Taghi Fatemi Ghomi:
Multi-objective multi-factory scheduling. RAIRO Oper. Res. 55(Supplement): S1447-S1467 (2021) - 2020
- [j86]Kamran Forghani, S. M. T. Fatemi Ghomi:
Joint cell formation, cell scheduling, and group layout problem in virtual and classical cellular manufacturing systems. Appl. Soft Comput. 97(Part B): 106719 (2020) - [j85]Hadi Mosadegh, S. M. T. Fatemi Ghomi, Gürsel A. Süer:
Stochastic mixed-model assembly line sequencing problem: Mathematical modeling and Q-learning based simulated annealing hyper-heuristics. Eur. J. Oper. Res. 282(2): 530-544 (2020) - [j84]Kamran Forghani, S. M. T. Fatemi Ghomi, Reza Kia:
Solving an integrated cell formation and group layout problem using a simulated annealing enhanced by linear programming. Soft Comput. 24(15): 11621-11639 (2020)
2010 – 2019
- 2019
- [j83]Fateme Marandi, S. M. T. Fatemi Ghomi:
Network configuration multi-factory scheduling with batch delivery: A learning-oriented simulated annealing approach. Comput. Ind. Eng. 132: 293-310 (2019) - [j82]Fateme Marandi, Seyyed M. T. Fatemi Ghomi:
Integrated multi-factory production and distribution scheduling applying vehicle routing approach. Int. J. Prod. Res. 57(3): 722-748 (2019) - [j81]H. Khorshidian, Mohsen Akbarpour Shirazi, S. M. T. Fatemi Ghomi:
An intelligent truck scheduling and transportation planning optimization model for product portfolio in a cross-dock. J. Intell. Manuf. 30(1): 163-184 (2019) - [j80]S. A. Lesany, S. M. T. Fatemi Ghomi, A. Koochakzadeh:
Development of fitted line and fitted cosine curve for recognition and analysis of unnatural patterns in process control charts. Pattern Anal. Appl. 22(2): 747-765 (2019) - 2018
- [j79]Somayeh Torkaman, S. M. T. Fatemi Ghomi, Behrooz Karimi:
Hybrid simulated annealing and genetic approach for solving a multi-stage production planning with sequence-dependent setups in a closed-loop supply chain. Appl. Soft Comput. 71: 1085-1104 (2018) - [j78]Nima Hamta, Mohsen Akbarpour Shirazi, Sara Behdad, S. M. T. Fatemi Ghomi:
Modeling and measuring the structural complexity in assembly supply chain networks. J. Intell. Manuf. 29(2): 259-275 (2018) - 2017
- [j77]Reza Maihami, Behrooz Karimi, Seyyed Mohammad Taghi Fatemi Ghomi:
Effect of two-echelon trade credit on pricing-inventory policy of non-instantaneous deteriorating products with probabilistic demand and deterioration functions. Ann. Oper. Res. 257(1-2): 237-273 (2017) - [j76]Somayeh Torkaman, S. M. T. Fatemi Ghomi, Behrooz Karimi:
Multi-stage multi-product multi-period production planning with sequence-dependent setups in closed-loop supply chain. Comput. Ind. Eng. 113: 602-613 (2017) - [j75]Hadi Mosadegh, S. M. T. Fatemi Ghomi, Gürsel A. Süer:
Heuristic approaches for mixed-model sequencing problem with stochastic processing times. Int. J. Prod. Res. 55(10): 2857-2880 (2017) - [j74]Mehran Hemmati, S. M. T. Fatemi Ghomi, Mohsen S. Sajadieh:
Vendor managed inventory with consignment stock for supply chain with stock- and price-dependent demand. Int. J. Prod. Res. 55(18): 5225-5242 (2017) - [j73]Javad Behnamian, S. M. T. Fatemi Ghomi, Behrooz Karimi, M. Fadaei Moludi:
A Markovian approach for multi-level multi-product multi-period capacitated lot-sizing problem with uncertainty in levels. Int. J. Prod. Res. 55(18): 5330-5340 (2017) - [j72]Hadi Mosadegh, S. M. T. Fatemi Ghomi, Gürsel A. Süer:
A control theoretical modelling for velocity tuning of the conveyor belt in a dynamic mixed-model assembly line. Int. J. Prod. Res. 55(24): 7473-7495 (2017) - [c10]Aliakbar Eslami Baladeh, Mirmehdi Seyyed-Esfahani, S. M. T. Fatemi Ghomi, Mohammad Ali Farsi, Morteza Cheraghi:
Stochastic programming via scenario planning for system reliability optimization. ICSRS 2017: 36-40 - 2016
- [j71]S. Rahmanzadeh Tootkaleh, S. M. T. Fatemi Ghomi, M. Sheikh Sajadieh:
Cross dock scheduling with fixed outbound trucks departure times under substitution condition. Comput. Ind. Eng. 92: 50-56 (2016) - [j70]M. Khojaste Sarakhsi, S. M. T. Fatemi Ghomi, Behrooz Karimi:
A new hybrid algorithm of scatter search and Nelder-Mead algorithms to optimize joint economic lot sizing problem. J. Comput. Appl. Math. 292: 387-401 (2016) - [j69]Javad Behnamian, S. M. T. Fatemi Ghomi:
A survey of multi-factory scheduling. J. Intell. Manuf. 27(1): 231-249 (2016) - 2015
- [j68]Masoud Jenabi, S. M. T. Fatemi Ghomi, Seyed Ali Torabi, S. Hossein Hosseinian:
Acceleration strategies of Benders decomposition for the security constraints power system expansion planning. Ann. Oper. Res. 235(1): 337-369 (2015) - [j67]Javad Behnamian, Seyyed M. T. Fatemi Ghomi:
Minimizing cost-related objective in synchronous scheduling of parallel factories in the virtual production network. Appl. Soft Comput. 29: 221-232 (2015) - [j66]Rasul Jamshidi, Seyyed M. T. Fatemi Ghomi, Behrooz Karimi:
Flexible supply chain optimization with controllable lead time and shipping option. Appl. Soft Comput. 30: 26-35 (2015) - [j65]R. Ghasemy Yaghin, S. M. T. Fatemi Ghomi, S. Ali Torabi:
A hybrid credibility-based fuzzy multiple objective optimisation to differential pricing and inventory policies with arbitrage consideration. Int. J. Syst. Sci. 46(14): 2628-2639 (2015) - 2014
- [j64]Javad Behnamian, S. M. T. Fatemi Ghomi:
Multi-objective fuzzy multiprocessor flowshop scheduling. Appl. Soft Comput. 21: 139-148 (2014) - [j63]Mostafa Hajiaghaei-Keshteli, Majid Aminnayeri, S. M. T. Fatemi Ghomi:
Integrated scheduling of production and rail transportation. Comput. Ind. Eng. 74: 240-256 (2014) - [j62]S. Shahin Moghadam, S. M. T. Fatemi Ghomi, Behrooz Karimi:
Vehicle routing scheduling problem with cross docking and split deliveries. Comput. Chem. Eng. 69: 98-107 (2014) - [j61]Javad Navaei, Seyyed Mohammad Taghi Fatemi Ghomi, Fariborz Jolai, Ashkan Mozdgir:
Heuristics for an assembly flow-shop with non-identical assembly machines and sequence dependent setup times to minimize sum of holding and delay costs. Comput. Oper. Res. 44: 52-65 (2014) - [j60]Reza Mohammadi, S. M. T. Fatemi Ghomi, Farzad Zeinali:
A new hybrid evolutionary based RBF networks method for forecasting time series: A case study of forecasting emergency supply demand time series. Eng. Appl. Artif. Intell. 36: 204-214 (2014) - [j59]Abbas Saghaei, S. M. T. Fatemi Ghomi, S. Jaberi:
Economic Design of Exponentially Weighted Moving Average Control Chart Based on Measurement Error Using Genetic Algorithm. Qual. Reliab. Eng. Int. 30(8): 1153-1163 (2014) - [j58]Mohammad R. Gholamian, S. M. T. Fatemi Ghomi, Mehdi Ghazanfari:
Applying FARSJUM intelligent system to derive priorities in sparse hierarchical problems. Soft Comput. 18(2): 299-311 (2014) - 2013
- [j57]Mehdi Iranpoor, S. M. T. Fatemi Ghomi, Mostafa Zandieh:
Due-date assignment and machine scheduling in a low machine-rate situation with stochastic processing times. Comput. Oper. Res. 40(4): 1100-1108 (2013) - [j56]R. Ghasemy Yaghin, S. M. T. Fatemi Ghomi, S. Ali Torabi:
A possibilistic multiple objective pricing and lot-sizing model with multiple demand classes. Fuzzy Sets Syst. 231: 26-44 (2013) - [j55]Javad Behnamian, S. M. T. Fatemi Ghomi:
The heterogeneous multi-factory production network scheduling with adaptive communication policy and parallel machine. Inf. Sci. 219: 181-196 (2013) - [j54]Mohammad Mirabi, Seyyed M. T. Fatemi Ghomi, Fariborz Jolai:
A two-stage hybrid flowshop scheduling problem in machine breakdown condition. J. Intell. Manuf. 24(1): 193-199 (2013) - [j53]Masoud Jenabi, Seyyed M. T. Fatemi Ghomi, S. Ali Torabi, S. Hossein Hosseinian:
A Benders decomposition algorithm for a multi-area, multi-stage integrated resource planning in power systems. J. Oper. Res. Soc. 64(8): 1118-1136 (2013) - [j52]Mehdi Mahnam, Ghasem Moslehi, Seyyed Mohammad Taghi Fatemi Ghomi:
Single machine scheduling with unequal release times and idle insert for minimizing the sum of maximum earliness and tardiness. Math. Comput. Model. 57(9-10): 2549-2563 (2013) - [j51]H. Moheb Alizadeh, A. R. Arshadi Khamseh, S. M. T. Fatemi Ghomi:
Fuzzy hypothesis testing with vague data using likelihood ratio test. Soft Comput. 17(9): 1629-1641 (2013) - 2012
- [j50]Maedeh Bank, S. M. T. Fatemi Ghomi, Fariborz Jolai, Javad Behnamian:
Application of particle swarm optimization and simulated annealing algorithms in flow shop scheduling problem under linear deterioration. Adv. Eng. Softw. 47(1): 1-6 (2012) - [j49]Siamak Baradaran, S. M. T. Fatemi Ghomi, Mohammad Ranjbar, S. S. Hashemin:
Multi-mode renewable resource-constrained allocation in PERT networks. Appl. Soft Comput. 12(1): 82-90 (2012) - [j48]Javad Behnamian, S. M. T. Fatemi Ghomi, Fariborz Jolai, Omid Amirtaheri:
Minimizing makespan on a three-machine flowshop batch scheduling problem with transportation using genetic algorithm. Appl. Soft Comput. 12(2): 768-777 (2012) - [j47]Hadi Mosadegh, Mostafa Zandieh, S. M. T. Fatemi Ghomi:
Simultaneous solving of balancing and sequencing problems with station-dependent assembly times for mixed-model assembly lines. Appl. Soft Comput. 12(4): 1359-1370 (2012) - [j46]R. Sakiani, S. M. T. Fatemi Ghomi, Mostafa Zandieh:
Multi-objective supply planning for two-level assembly systems with stochastic lead times. Comput. Oper. Res. 39(7): 1325-1332 (2012) - [j45]Kamran Kianfar, S. M. T. Fatemi Ghomi, A. Oroojlooy Jadid:
Study of stochastic sequence-dependent flexible flow shop via developing a dispatching rule and a hybrid GA. Eng. Appl. Artif. Intell. 25(3): 494-506 (2012) - [j44]Javad Behnamian, S. M. T. Fatemi Ghomi, Mostafa Zandieh:
Hybrid flowshop scheduling with sequence-dependent setup times by hybridizing max-min ant system, simulated annealing and variable neighbourhood search. Expert Syst. J. Knowl. Eng. 29(2): 156-169 (2012) - [j43]Javad Behnamian, S. M. T. Fatemi Ghomi:
Incorporating transportation time in multi-agent production network scheduling. Int. J. Comput. Integr. Manuf. 25(12): 1111-1128 (2012) - 2011
- [j42]M. Hekmatfar, S. M. T. Fatemi Ghomi, Behrooz Karimi:
Two stage reentrant hybrid flow shop with setup times and the criterion of minimizing makespan. Appl. Soft Comput. 11(8): 4530-4539 (2011) - [j41]Alireza Boloori Arabani, Mostafa Zandieh, S. M. T. Fatemi Ghomi:
Multi-objective genetic-based algorithms for a cross-docking scheduling problem. Appl. Soft Comput. 11(8): 4954-4970 (2011) - [j40]S. M. T. Fatemi Ghomi, S. A. Lesany, A. Koochakzadeh:
Recognition of unnatural patterns in process control charts through combining two types of neural networks. Appl. Soft Comput. 11(8): 5444-5456 (2011) - [j39]Amir Kamali, S. M. T. Fatemi Ghomi, Fariborz Jolai:
A multi-objective quantity discount and joint optimization model for coordination of a single-buyer multi-vendor supply chain. Comput. Math. Appl. 62(8): 3251-3269 (2011) - [j38]R. Sakiani, Mostafa Zandieh, S. M. T. Fatemi Ghomi:
Corrigendum to: "Genetic algorithm for supply planning in two-level assembly systems with random lead times" [Engineering Applications of Artificial Intelligence 22 (2009) 906-915]. Eng. Appl. Artif. Intell. 24(5): 917-918 (2011) - [j37]Alireza Boloori Arabani, S. M. T. Fatemi Ghomi, Mostafa Zandieh:
Meta-heuristics implementation for scheduling of trucks in a cross-docking system with temporary storage. Expert Syst. Appl. 38(3): 1964-1979 (2011) - [j36]E. Moradi, S. M. T. Fatemi Ghomi, Mostafa Zandieh:
Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem. Expert Syst. Appl. 38(6): 7169-7178 (2011) - [j35]Mohammad Mohammadi, Seyyed M. T. Fatemi Ghomi:
Genetic algorithm-based heuristic for capacitated lotsizing problem in flow shops with sequence-dependent setups. Expert Syst. Appl. 38(6): 7201-7207 (2011) - [j34]Mohammad Mohammadi, Seyyed M. T. Fatemi Ghomi, Niloofar Jafari:
A genetic algorithm for simultaneous lotsizing and sequencing of the permutation flow shops with sequence-dependent setups. Int. J. Comput. Integr. Manuf. 24(1): 87-93 (2011) - [j33]M. Narenji, S. M. T. Fatemi Ghomi, S. V. R. Nooraie:
Grouping in decomposition method for multi-item capacitated lot-sizing problem with immediate lost sales and joint and item-dependent setup cost. Int. J. Syst. Sci. 42(3): 489-498 (2011) - [j32]B. Naderi, S. M. T. Fatemi Ghomi, Majid Aminnayeri, Mostafa Zandieh:
Scheduling open shops with parallel machines to minimize total completion time. J. Comput. Appl. Math. 235(5): 1275-1287 (2011) - [j31]H. Moheb Alizadeh, S. M. T. Fatemi Ghomi:
Fuzzy development of Mean and Range control charts using statistical properties of different representative values. J. Intell. Fuzzy Syst. 22(5-6): 253-265 (2011) - [j30]Javad Behnamian, Mostafa Zandieh, S. M. T. Fatemi Ghomi:
Bi-objective parallel machines scheduling with sequence-dependent setup times using hybrid metaheuristics and weighted min-max technique. Soft Comput. 15(7): 1313-1331 (2011) - [c9]Nima Hamta, Seyyed M. T. Fatemi Ghomi, Mehrdad Hakimi-Asiabar, Pedram Hooshangi-Tabrizi:
Multi-objective assembly line balancing problem with bounded processing times, learning effect, and sequence-dependent setup times. IEEM 2011: 768-772 - [c8]Javad Behnamian, Seyyed M. T. Fatemi Ghomi, Mostafa Zandieh:
Hybrid solving algorithm for complex machine scheduling problem. IEEM 2011: 794-798 - [c7]Rasul Jamshidi, Seyyed M. T. Fatemi Ghomi:
Service impact on customer demand and member profit in a supply chain. IEEM 2011: 923-927 - [c6]M. Pazoki, Seyyed M. T. Fatemi Ghomi, Fariborz Jolai:
A new approach in supply chain modeling. IEEM 2011: 955-958 - 2010
- [j29]Siamak Baradaran, S. M. T. Fatemi Ghomi, Mahdi Mobini, S. S. Hashemin:
A hybrid scatter search approach for resource-constrained project scheduling problem in PERT-type networks. Adv. Eng. Softw. 41(7-8): 966-975 (2010) - [j28]B. Naderi, S. M. T. Fatemi Ghomi, Majid Aminnayeri:
A high performing metaheuristic for job shop scheduling with sequence-dependent setup times. Appl. Soft Comput. 10(3): 703-710 (2010) - [j27]Fardin Ahmadizar, Mehdi Ghazanfari, Seyyed M. T. Fatemi Ghomi:
Group shops scheduling with makespan criterion subject to random release dates and processing times. Comput. Oper. Res. 37(1): 152-162 (2010) - [j26]B. Naderi, S. M. T. Fatemi Ghomi, Majid Aminnayeri, Mostafa Zandieh:
A contribution and new heuristics for open shop scheduling. Comput. Oper. Res. 37(1): 213-221 (2010) - [j25]Javad Behnamian, S. M. T. Fatemi Ghomi:
Development of a PSO-SA hybrid metaheuristic for a new comprehensive regression model to time-series forecasting. Expert Syst. Appl. 37(2): 974-984 (2010) - [j24]Mohammad Mohammadi, S. M. T. Fatemi Ghomi, Behrooz Karimi, S. Ali Torabi:
Rolling-horizon and fix-and-relax heuristics for the multi-product multi-level capacitated lotsizing problem with sequence-dependent setups. J. Intell. Manuf. 21(4): 501-510 (2010) - [j23]S. M. T. Fatemi Ghomi, Mehdi Iranpoor:
Earliness-tardiness-lost sales dynamic job-shop scheduling. Prod. Eng. 4(2-3): 221-230 (2010) - [c5]Bahman Naderi, Masoud Jenabi, S. M. T. Fatemi Ghomi, Davoud Talebi:
An electromagnetism-like metaheuristic for sequence dependent open shop scheduling. BIC-TA 2010: 489-497 - [c4]Masoud Jenabi, Bahman Naderi, S. M. T. Fatemi Ghomi:
A bi-objective case of no-wait flowshops. BIC-TA 2010: 1048-1056
2000 – 2009
- 2009
- [j22]Javad Behnamian, Mostafa Zandieh, S. M. T. Fatemi Ghomi:
Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm. Expert Syst. Appl. 36(6): 9637-9644 (2009) - [j21]Javad Behnamian, S. M. T. Fatemi Ghomi, Mostafa Zandieh:
A multi-phase covering Pareto-optimal front method to multi-objective scheduling in a realistic hybrid flowshop using a hybrid metaheuristic. Expert Syst. Appl. 36(8): 11057-11069 (2009) - [j20]Abolfazl Mirzazadeh, Mir Mehdi Seyyed Esfahani, S. M. T. Fatemi Ghomi:
An inventory model under uncertain inflationary conditions, finite production rate and inflation-dependent demand rate for deteriorating items with shortages. Int. J. Syst. Sci. 40(1): 21-31 (2009) - [j19]Bahman Naderi, Mostafa Zandieh, Seyyed M. T. Fatemi Ghomi:
A study on integrating sequence dependent setup time flexible flow lines and preventive maintenance scheduling. J. Intell. Manuf. 20(6): 683-694 (2009) - [j18]Ali Husseinzadeh Kashan, Behrooz Karimi, S. M. T. Fatemi Ghomi:
A note on minimizing makespan on a single batch processing machine with nonidentical job sizes. Theor. Comput. Sci. 410(27-29): 2754-2758 (2009) - 2008
- [j17]Amir Azaron, S. M. T. Fatemi Ghomi:
Lower bound for the mean project completion time in dynamic PERT networks. Eur. J. Oper. Res. 186(1): 120-127 (2008) - 2007
- [j16]Mehdi Iranpoor, Seyyed M. T. Fatemi Ghomi, A. Mohamadinia:
Earliness tardiness production planning and scheduling in flexible flowshop systems under finite planning horizon. Appl. Math. Comput. 184(2): 950-964 (2007) - [j15]Masoud Jenabi, S. M. T. Fatemi Ghomi, S. Ali Torabi, Behrooz Karimi:
Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines. Appl. Math. Comput. 186(1): 230-245 (2007) - [j14]Mohammad R. Gholamian, Seyyed M. T. Fatemi Ghomi:
Meta knowledge of intelligent manufacturing: An overview of state-of-the-art. Appl. Soft Comput. 7(1): 1-16 (2007) - [j13]Masoud Rabbani, S. M. T. Fatemi Ghomi, Fariborz Jolai, N. S. Lahiji:
A new heuristic for resource-constrained project scheduling in stochastic networks using critical chain concept. Eur. J. Oper. Res. 176(2): 794-808 (2007) - [j12]Mohammad R. Gholamian, Seyyed M. T. Fatemi Ghomi, Mehdi Ghazanfari:
Farsjum, a Fuzzy System for Ranking Sparse Judgment Matrices: a Case Study in Soccer tournaments. Int. J. Uncertain. Fuzziness Knowl. Based Syst. 15(1): 115-129 (2007) - [j11]Mohammad R. Gholamian, Seyyed M. T. Fatemi Ghomi, Mehdi Ghazanfari:
A hybrid system for multiobjective problems - A case study in NP-hard problems. Knowl. Based Syst. 20(4): 426-436 (2007) - [c3]H. Zolfi, S. M. T. Fatemi Ghomi, Behrooz Karimi:
Supply Chain Operations Planning with Setup Times and Multi Period Capacity Consumption. APMS 2007: 69-76 - 2006
- [j10]Mostafa Zandieh, S. M. T. Fatemi Ghomi, S. M. Moattar Husseini:
An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times. Appl. Math. Comput. 180(1): 111-127 (2006) - [j9]H. Khademi Zare, S. M. T. Fatemi Ghomi, Behrooz Karimi:
Developing a heuristic algorithm for order production planning using network models under uncertainty conditions. Appl. Math. Comput. 182(2): 1208-1218 (2006) - [j8]Mohammad R. Gholamian, Seyyed M. T. Fatemi Ghomi, Mehdi Ghazanfari:
A hybrid intelligent system for multiobjective decision making problems. Comput. Ind. Eng. 51(1): 26-43 (2006) - [j7]S. Ali Torabi, S. M. T. Fatemi Ghomi, Behrooz Karimi:
A hybrid genetic algorithm for the finite horizon economic lot and delivery scheduling in supply chains. Eur. J. Oper. Res. 173(1): 173-189 (2006) - [j6]Behrooz Karimi, S. M. T. Fatemi Ghomi, John M. Wilson:
A tabu search heuristic for solving the CLSP with backlogging and set-up carry-over. J. Oper. Res. Soc. 57(2): 140-147 (2006) - 2005
- [j5]Mohammad R. Gholamian, Seyyed M. T. Fatemi Ghomi, Mehdi Ghazanfari:
A hybrid systematic design for multiobjective market problems: a case study in crude oil markets. Eng. Appl. Artif. Intell. 18(4): 495-509 (2005) - [c2]Mohammad R. Gholamian, S. M. T. Fatemi Ghomi, Mehdi Ghazanfari:
A Fuzzy System for Multiobjective Problems. AIAI 2005: 1-13 - 2004
- [c1]Mohammad R. Gholamian, Seyyed M. T. Fatemi Ghomi:
An Empirical Research in Intelligent Manufacturing: A Frame Based Representation of AI Usages in Manufacturing Aspects. BASYS 2004: 161-172 - 2003
- [j4]S. M. T. Fatemi Ghomi, Masoud Rabbani:
A new structural mechanism for reducibility of stochastic PERT networks. Eur. J. Oper. Res. 145(2): 394-402 (2003) - [j3]Amir Azaron, S. M. T. Fatemi Ghomi:
Optimal control of service rates and arrivals in Jackson networks. Eur. J. Oper. Res. 147(1): 17-31 (2003) - 2002
- [j2]S. M. T. Fatemi Ghomi, E. Teimouri:
Path critical index and activity critical index in PERT networks. Eur. J. Oper. Res. 141(1): 147-152 (2002)
1990 – 1999
- 1999
- [j1]S. M. T. Fatemi Ghomi, S. S. Hashemin:
A new analytical algorithm and generation of Gaussian quadrature formula for stochastic network. Eur. J. Oper. Res. 114(3): 610-625 (1999)
Coauthor Index
manage site settings
To protect your privacy, all features that rely on external API calls from your browser are turned off by default. You need to opt-in for them to become active. All settings here will be stored as cookies with your web browser. For more information see our F.A.Q.
Unpaywalled article links
Add open access links from to the list of external document links (if available).
Privacy notice: By enabling the option above, your browser will contact the API of unpaywall.org to load hyperlinks to open access articles. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Unpaywall privacy policy.
Archived links via Wayback Machine
For web page which are no longer available, try to retrieve content from the of the Internet Archive (if available).
Privacy notice: By enabling the option above, your browser will contact the API of archive.org to check for archived content of web pages that are no longer available. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Internet Archive privacy policy.
Reference lists
Add a list of references from , , and to record detail pages.
load references from crossref.org and opencitations.net
Privacy notice: By enabling the option above, your browser will contact the APIs of crossref.org, opencitations.net, and semanticscholar.org to load article reference information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Crossref privacy policy and the OpenCitations privacy policy, as well as the AI2 Privacy Policy covering Semantic Scholar.
Citation data
Add a list of citing articles from and to record detail pages.
load citations from opencitations.net
Privacy notice: By enabling the option above, your browser will contact the API of opencitations.net and semanticscholar.org to load citation information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the OpenCitations privacy policy as well as the AI2 Privacy Policy covering Semantic Scholar.
OpenAlex data
Load additional information about publications from .
Privacy notice: By enabling the option above, your browser will contact the API of openalex.org to load additional information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the information given by OpenAlex.
last updated on 2024-10-07 22:11 CEST by the dblp team
all metadata released as open data under CC0 1.0 license
see also: Terms of Use | Privacy Policy | Imprint