Nothing Special   »   [go: up one dir, main page]

"Minimizing the makespan in the two-machine flowshop scheduling problem ..."

Chung-Yee Lee (1997)

Details and statistics

DOI: 10.1016/S0167-6377(96)00041-7

access: closed

type: Journal Article

metadata version: 2017-05-27