Nothing Special   »   [go: up one dir, main page]

"Cyclic job shop scheduling problems with blocking."

Peter Brucker, Thomas Kampmeyer (2008)

Details and statistics

DOI: 10.1007/S10479-007-0276-Z

access: closed

type: Journal Article

metadata version: 2020-08-13