Nothing Special   »   [go: up one dir, main page]

"A DE-based approach to no-wait flow-shop scheduling."

Bin Qian et al. (2009)

Details and statistics

DOI: 10.1016/J.CIE.2009.02.006

access: closed

type: Journal Article

metadata version: 2023-07-04