Nothing Special   »   [go: up one dir, main page]

"A note: Minmax due-date assignment problem with lead-time cost."

Baruch Mor, Gur Mosheiov, Dvir Shabtay (2013)

Details and statistics

DOI: 10.1016/J.COR.2013.03.004

access: closed

type: Journal Article

metadata version: 2020-02-18