Nothing Special   »   [go: up one dir, main page]

"A Cutter Layout Optimization Method for Full-Face Rock Tunnel Boring Machine."

Qi Geng et al. (2013)

Details and statistics

DOI: 10.1007/978-3-642-40849-6_72

access: closed

type: Conference or Workshop Paper

metadata version: 2017-05-24