Nothing Special   »   [go: up one dir, main page]

create a website
Optimizing multi-stage production with constant lot size and varying number of unequal sized batches. (2001). Lindner, Gerd ; Buscher, Udo D. ; Bogaschewsky, Ronald W..
In: Omega.
RePEc:eee:jomega:v:29:y:2001:i:2:p:183-191.

Full description at Econpapers || Download paper

Cited: 11

Citations received by this document

Cites: 12

References cited by this document

Cocites: 25

Documents which have cited the same bibliography

Coauthors: 0

Authors who have wrote about the same topic

Citations

Citations received by this document

  1. Production planning for a two-stage production system with multiple parallel machines and variable production rates. (2018). Kim, Taebok ; Glock, Christoph H.
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:196:y:2018:i:c:p:284-292.

    Full description at Econpapers || Download paper

  2. .

    Full description at Econpapers || Download paper

  3. Coordination of a production network with a single buyer and multiple vendors with geometrically increasing batch shipments. (2017). Beck, Fabian G ; Glock, Christoph H ; Kim, Taebok.
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:193:y:2017:i:c:p:633-646.

    Full description at Econpapers || Download paper

  4. Optimizing a multi-stage production/inventory system by DC programming based approaches. (2014). Le Thi, Hoai ; Tran, Duc.
    In: Computational Optimization and Applications.
    RePEc:spr:coopap:v:57:y:2014:i:2:p:441-468.

    Full description at Econpapers || Download paper

  5. Optimizing Multi-stage Production for an Assembly-Type Supply Chain with Unequal Sized Batch Shipments. (2012). Hsiao, Yu-Cheng ; Pan, Jason Chao-Hsien ; Ho, Wen-Tsung.
    In: Journal of Optimization Theory and Applications.
    RePEc:spr:joptap:v:153:y:2012:i:2:d:10.1007_s10957-011-9951-y.

    Full description at Econpapers || Download paper

  6. A production planning model to reduce risk and improve operations management. (2010). O'Brien, C. ; Li, Y. ; Wang, X..
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:124:y:2010:i:2:p:463-474.

    Full description at Econpapers || Download paper

  7. Optimal multi-stage logistic and inventory policies with production bottleneck in a serial supply chain. (2010). Lin, YI ; Huang, Yun-Kuei ; Hsiao, Yu-Cheng.
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:124:y:2010:i:2:p:408-413.

    Full description at Econpapers || Download paper

  8. A single-lot, unified cost-based flow shop lot-streaming problem. (2008). Kalir, Adar A. ; Sarin, Subhash C. ; Chen, Ming.
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:113:y:2008:i:1:p:413-424.

    Full description at Econpapers || Download paper

  9. Lot streaming with variable sublots: an integer programming formulation. (2006). Biskup, D ; Feldmann, M.
    In: Journal of the Operational Research Society.
    RePEc:pal:jorsoc:v:57:y:2006:i:3:d:10.1057_palgrave.jors.2602016.

    Full description at Econpapers || Download paper

  10. The impact of lot-sizing on net profits and cycle times in the n-job, m-machine job shop with both discrete and batch processing. (2005). Neureuther, Brian D. ; Kenyon, George ; Canel, Cem .
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:97:y:2005:i:3:p:263-278.

    Full description at Econpapers || Download paper

  11. Time bucket size and lot-splitting approach. (2002). Riezebos, Jan.
    In: Research Report.
    RePEc:gro:rugsom:02a42.

    Full description at Econpapers || Download paper

References

References cited by this document

  1. Drezner, Z ; Szendrovits, A.Z ; Wesolowsky, G.O Multi-stage production with variable lot sizes and transportation of partial lots. 1984 European Journal of Operational Research. 17 227-237

  2. Goyal, S.K Determination of optimum production quantity for a two-stage production system. 1977 Operational Research Quarterly. 28 865-870
    Paper not yet in RePEc: Add citation now
  3. Goyal, S.K Economic batch quantity in a multi-stage production system. 1977 International Journal of Production Research. 16 267-273
    Paper not yet in RePEc: Add citation now
  4. Goyal, S.K Note on Manufacturing cycle time determination for a multi-stage economic production quantity model. 1976 Management Science. 23 332-333

  5. Goyal, S.K ; Szendrovits, A.Z A constant lot size model with equal and unequal sized batch shipments between production stages. 1986 Engineering Costs and Production Economics. 10 203-210

  6. Schwarz, L.B ; Schrage, L Optimal and system myopic policies for multi-echelon production/inventory assembly systems. 1975 Management Science. 21 1285-1294

  7. Szendrovits, A.Z A comment on determination of optimum production quantity for a two-stage production system. 1978 Journal of the Operational Research Society. 29 1017-1020
    Paper not yet in RePEc: Add citation now
  8. Szendrovits, A.Z An inventory model for interrupted multi-stage production. 1987 International Journal of Production Research. 25 129-143
    Paper not yet in RePEc: Add citation now
  9. Szendrovits, A.Z Manufacturing cycle time determination for a multi-stage economic production quantity model. 1975 Management Science. 22 298-308

  10. Szendrovits, A.Z On the optimality of sub-batch sizes for a multi-stage EPQ model — a rejoinder. 1976 Management Science. 23 334-338
    Paper not yet in RePEc: Add citation now
  11. Szendrovits, A.Z ; Drezner, Z Optimizing multi-stage production with constant lot size and varying numbers of batches. 1980 Omega. 8 623-629

  12. Szendrovits, A.Z ; Golden, M The effect of two classes of process organisations on multi-stage production/inventory systems. 1984 INFOR. 22 40-55
    Paper not yet in RePEc: Add citation now

Cocites

Documents in RePEc which have cited the same bibliography

  1. A fuzzy integrated inventory system with end of life treatment: a possibility in sports industry. (2021). Motla, Ritu ; Saxena, Neha ; Singh, S R ; Kumar, Ashok.
    In: OPSEARCH.
    RePEc:spr:opsear:v:58:y:2021:i:4:d:10.1007_s12597-020-00492-3.

    Full description at Econpapers || Download paper

  2. Lot sizing and unequal-sized shipment policy for an integrated production-inventory system. (2014). Giri, B C ; Sharma, S.
    In: International Journal of Systems Science.
    RePEc:taf:tsysxx:v:45:y:2014:i:5:p:888-901.

    Full description at Econpapers || Download paper

  3. Optimal Mixed Batch Shipment Policy with Variable Safety Factor for the Single-Vendor Single-Buyer Production-Inventory System. (2014). Hsiao, Yu-Cheng ; Ho, Wen-Tsung.
    In: Journal of Optimization Theory and Applications.
    RePEc:spr:joptap:v:161:y:2014:i:2:d:10.1007_s10957-012-0139-x.

    Full description at Econpapers || Download paper

  4. An Optimal Mixed Batch Shipment Policy for Multiple Items in a Single-Supplier Multiple-Retailer Integrated System. (2014). Huang, Yun-Kuei ; Lai, Shu-Fang ; Ho, Wen-Tsung.
    In: Journal of Optimization Theory and Applications.
    RePEc:spr:joptap:v:160:y:2014:i:2:d:10.1007_s10957-013-0280-1.

    Full description at Econpapers || Download paper

  5. Optimizing a multi-stage production/inventory system by DC programming based approaches. (2014). Le Thi, Hoai ; Tran, Duc.
    In: Computational Optimization and Applications.
    RePEc:spr:coopap:v:57:y:2014:i:2:p:441-468.

    Full description at Econpapers || Download paper

  6. Optimizing the Two-Stage Supply Chain Inventory Model with Full Information Sharing and Two Backorders Costs Using Hybrid Geometric-Algebraic Method. (2013). Seliaman, Mohamed E.
    In: Journal of Optimization.
    RePEc:hin:jjopti:519180.

    Full description at Econpapers || Download paper

  7. Optimizing Multi-stage Production for an Assembly-Type Supply Chain with Unequal Sized Batch Shipments. (2012). Hsiao, Yu-Cheng ; Pan, Jason Chao-Hsien ; Ho, Wen-Tsung.
    In: Journal of Optimization Theory and Applications.
    RePEc:spr:joptap:v:153:y:2012:i:2:d:10.1007_s10957-011-9951-y.

    Full description at Econpapers || Download paper

  8. An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors. (2011). Hoque, M. A..
    In: European Journal of Operational Research.
    RePEc:eee:ejores:v:215:y:2011:i:1:p:80-88.

    Full description at Econpapers || Download paper

  9. Optimal multi-stage logistic and inventory policies with production bottleneck in a serial supply chain. (2010). Lin, YI ; Huang, Yun-Kuei ; Hsiao, Yu-Cheng.
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:124:y:2010:i:2:p:408-413.

    Full description at Econpapers || Download paper

  10. Integrated logistic and inventory model for a two-stage supply chain controlled by the reorder and shipping points with sharing information. (2008). Hsiao, Yu-Cheng.
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:115:y:2008:i:1:p:229-235.

    Full description at Econpapers || Download paper

  11. A single-lot, unified cost-based flow shop lot-streaming problem. (2008). Kalir, Adar A. ; Sarin, Subhash C. ; Chen, Ming.
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:113:y:2008:i:1:p:413-424.

    Full description at Econpapers || Download paper

  12. The joint economic lot sizing problem: Review and extensions. (2008). Ertogral, K. ; Darwish, M. ; Ben-Daya, M..
    In: European Journal of Operational Research.
    RePEc:eee:ejores:v:185:y:2008:i:2:p:726-742.

    Full description at Econpapers || Download paper

  13. Optimal production and shipment models for a single-vendor-single-buyer integrated system. (2007). Wang, Sheng-Dong ; Zhou, Yong-Wu.
    In: European Journal of Operational Research.
    RePEc:eee:ejores:v:180:y:2007:i:1:p:309-328.

    Full description at Econpapers || Download paper

  14. Lot streaming with variable sublots: an integer programming formulation. (2006). Biskup, D ; Feldmann, M.
    In: Journal of the Operational Research Society.
    RePEc:pal:jorsoc:v:57:y:2006:i:3:d:10.1057_palgrave.jors.2602016.

    Full description at Econpapers || Download paper

  15. Synchronization in common cycle lot size scheduling for a multi-product serial supply chain. (2006). Kingsman, B. G. ; Hoque, M. A..
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:103:y:2006:i:1:p:316-331.

    Full description at Econpapers || Download paper

  16. A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer. (2006). Hoque, Mohammad A. ; Goyal, Suresh K..
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:102:y:2006:i:2:p:217-225.

    Full description at Econpapers || Download paper

  17. On lot streaming in multistage production systems. (2005). Hoque, M. A. ; Goyal, S. K..
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:95:y:2005:i:2:p:195-202.

    Full description at Econpapers || Download paper

  18. Inventory management in supply chains: A bargaining problem. (2005). Sucky, Eric .
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:93-94:y:2005:i:1:p:253-262.

    Full description at Econpapers || Download paper

  19. An optimal policy for a single-vendor single-buyer integrated production-inventory problem with process unreliability consideration. (2004). Huang, Chao-Kuei .
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:91:y:2004:i:1:p:91-98.

    Full description at Econpapers || Download paper

  20. Employee scheduling and makespan minimization in a flow shop with multi-processor work stations: a case study. (2004). Martin, Clarence ; Cutright, Kenneth ; Huq, Faizul.
    In: Omega.
    RePEc:eee:jomega:v:32:y:2004:i:2:p:121-129.

    Full description at Econpapers || Download paper

  21. Optimizing multi-stage production with constant lot size and varying number of unequal sized batches. (2001). Lindner, Gerd ; Buscher, Udo D. ; Bogaschewsky, Ronald W..
    In: Omega.
    RePEc:eee:jomega:v:29:y:2001:i:2:p:183-191.

    Full description at Econpapers || Download paper

  22. The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops. (2001). Boctor, Fayez F. ; Ouenniche, Jamal.
    In: European Journal of Operational Research.
    RePEc:eee:ejores:v:129:y:2001:i:3:p:539-554.

    Full description at Econpapers || Download paper

  23. An optimal policy for a single-vendor single-buyer integrated production-inventory system with capacity constraint of the transport equipment. (2000). Hoque, M. A. ; Goyal, S. K..
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:65:y:2000:i:3:p:305-315.

    Full description at Econpapers || Download paper

  24. Multi-level lot sizing: A literature survey. (1996). Drexl, Andreas ; Kimms, Alf.
    In: Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel.
    RePEc:zbw:cauman:405.

    Full description at Econpapers || Download paper

  25. An optimal solution algorithm for the constant lot-size model with equal and unequal sized batch shipments for the single product multi-stage production system. (1995). Kingsman, B. G. ; Hoque, M. A..
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:42:y:1995:i:2:p:161-174.

    Full description at Econpapers || Download paper

Coauthors

Authors registered in RePEc who have wrote about the same topic

Report date: 2025-01-31 14:24:00 || Missing content? Let us know

CitEc is a RePEc service, providing citation data for Economics since 2001. Sponsored by INOMICS. Last updated October, 6 2023. Contact: CitEc Team.