Nothing Special   »   [go: up one dir, main page]

create a website
Employee scheduling and makespan minimization in a flow shop with multi-processor work stations: a case study. (2004). Martin, Clarence ; Cutright, Kenneth ; Huq, Faizul.
In: Omega.
RePEc:eee:jomega:v:32:y:2004:i:2:p:121-129.

Full description at Econpapers || Download paper

Cited: 5

Citations received by this document

Cites: 20

References cited by this document

Cocites: 70

Documents which have cited the same bibliography

Coauthors: 0

Authors who have wrote about the same topic

Citations

Citations received by this document

  1. A combinatorial Benders decomposition algorithm for parallel machine scheduling with working-time restrictions. (2021). Chu, Feng ; Chen, Lin ; Pinedo, Michael L ; Wang, Shijin ; Fang, Kan.
    In: European Journal of Operational Research.
    RePEc:eee:ejores:v:291:y:2021:i:1:p:128-146.

    Full description at Econpapers || Download paper

  2. Batching for work and rework processes on dedicated facilities to minimize the makespan. (2010). Kovalev, Mikhail ; Werner, Frank ; Gribkovskaia, Irina V..
    In: Omega.
    RePEc:eee:jomega:v:38:y:2010:i:6:p:522-527.

    Full description at Econpapers || Download paper

  3. A heuristic to minimize total flow time in permutation flow shop. (2009). Laha, Dipak ; Sarin, Subhash C..
    In: Omega.
    RePEc:eee:jomega:v:37:y:2009:i:3:p:734-739.

    Full description at Econpapers || Download paper

  4. A comparison of spreadsheet users with different levels of experience. (2009). Lawson, Barry R. ; Powell, Stephen G. ; Foster-Johnson, Lynn ; Baker, Kenneth R..
    In: Omega.
    RePEc:eee:jomega:v:37:y:2009:i:3:p:579-590.

    Full description at Econpapers || Download paper

  5. A hybrid genetic algorithm/mathematical programming approach to the multi-family flowshop scheduling problem with lot streaming. (2009). Martin, Clarence H.
    In: Omega.
    RePEc:eee:jomega:v:37:y:2009:i:1:p:126-137.

    Full description at Econpapers || Download paper

References

References cited by this document

  1. Armentano, V.A. ; Ronconi, K.D.P. Tabu search for total tardiness minimization in flow shop scheduling problems. 1999 Computers and Operations Research. 26 219-235
    Paper not yet in RePEc: Add citation now
  2. Askin, R.G. ; Standridge, C.R. . 1993 Wiley: New York
    Paper not yet in RePEc: Add citation now
  3. Bagchi TP, Subodha Kumar, Sriskandarajah C. Lot streaming heuristics for the m-machine no-wait flow shop. Department of Mechanical and Industrial Engineering, University of Toronto, 1996.
    Paper not yet in RePEc: Add citation now
  4. Baker, K.R. . 1974 Wiley: New York
    Paper not yet in RePEc: Add citation now
  5. Baker, K.R. A comparative survey of flow shop algorithms. 1975 Operations Research. 23 62-73
    Paper not yet in RePEc: Add citation now
  6. Daniels, R.L. ; Mazzola, J.B. Flow shop scheduling with resource flexibility. 1994 Operations Research. 42 504-522

  7. Dudek, R.A. ; Panwalkar, S.S. ; Smith, M.L. The lessons of flow shop scheduling research. 1992 Operations Research. 40 7-13
    Paper not yet in RePEc: Add citation now
  8. Goyal, S.K. Note on manufacturing cycle time determination for a multi-stage economic production quantity model. 1976 Management Science. 23 332-333

  9. Grabowski, J. ; Skubalska, E. ; Smutnicki, C. On flow shop scheduling with release and due dates to minimize maximum lateness. 1983 Journal of the Operational Research Society. 34 615-620
    Paper not yet in RePEc: Add citation now
  10. Guinet A. What is the most generic model: job-shop or flow-shop? Scheduling in Computer and Manufacturing Systems, Seminar Reports, Dagstuhl, June 1997.
    Paper not yet in RePEc: Add citation now
  11. Hall, N.G. ; Sriskandarajah, C. A survey of machine scheduling problems with blocking and no-wait in process. 1996 Operations Research. 44 510-525

  12. Kim, Y.-.D. Heuristics for flow shop scheduling problems minimizing mean tardiness. 1993 Journal of the Operational Research Society. 44 19-28
    Paper not yet in RePEc: Add citation now
  13. Lageweg, B.J. ; Lenstra, J.K. ; Rinnooy Kan, A.H.G. A general bounding scheme for the permutation flow shop problem. 1978 Operations Research. 26 53-67

  14. Leisten, R. Flow shop sequencing problems with limited buffer storage. 1990 International Journal of Production Research. 28 2085-2100
    Paper not yet in RePEc: Add citation now
  15. Moursli O, Pochet Y. Heuristics for scheduling a multiprocessor flow shop. Advances in Industrial Engineering Applications and Practice I (AICIE 96), Houston, 1996. p. 456–63.
    Paper not yet in RePEc: Add citation now
  16. Nawaz, M. ; Enscore, E.E. ; Ham, I. A heuristic algorithm for the m-machine, n-job flow shop sequencing problem. 1983 Omega. 11 91-95

  17. Pesch E. Batching to minimize job flow times on one machine. Scheduling in Computer and Manufacturing Systems, Seminar Reports, Dagstuhl, June 1997.
    Paper not yet in RePEc: Add citation now
  18. Reddi, S.S. ; Ramamoorthy, C.V. On the flow shop sequencing problem with no-wait in process. 1972 Operational Research Quarterly. 23 323-330
    Paper not yet in RePEc: Add citation now
  19. Suliman, S.M.A. A two-phase heuristic approach to the permutation flow shop scheduling problem. 2000 International Journal of Production Economics. 64 143-152

  20. Van de Velde S. Linear programming bounds for minimizing total completion time in a two-machine flow shop. Scheduling in Computer and Manufacturing Systems, Seminar Reports, Dagstuhl, June 1997.
    Paper not yet in RePEc: Add citation now

Cocites

Documents in RePEc which have cited the same bibliography

  1. Simultaneous lot sizing and scheduling in the animal feed premix industry. (2023). Bojovi, Neboja ; Val, Susana ; Milenkovi, Milo.
    In: Operational Research.
    RePEc:spr:operea:v:23:y:2023:i:2:d:10.1007_s12351-023-00772-y.

    Full description at Econpapers || Download paper

  2. A two-machine no-wait flow shop problem with two competing agents. (2022). Azerine, Abdennour ; Rebaine, Djamal ; Boudhar, Mourad.
    In: Journal of Combinatorial Optimization.
    RePEc:spr:jcomop:v:43:y:2022:i:1:d:10.1007_s10878-021-00755-9.

    Full description at Econpapers || Download paper

  3. A fuzzy integrated inventory system with end of life treatment: a possibility in sports industry. (2021). Motla, Ritu ; Saxena, Neha ; Singh, S R ; Kumar, Ashok.
    In: OPSEARCH.
    RePEc:spr:opsear:v:58:y:2021:i:4:d:10.1007_s12597-020-00492-3.

    Full description at Econpapers || Download paper

  4. Scheduling for multi-robot routing with blocking and enabling constraints. (2021). Mogali, Jayanth Krishna ; Rubinstein, Zachary B ; Smith, Stephen F ; Kinable, Joris.
    In: Journal of Scheduling.
    RePEc:spr:jsched:v:24:y:2021:i:3:d:10.1007_s10951-021-00684-9.

    Full description at Econpapers || Download paper

  5. Scheduling automated guided vehicles in very narrow aisle warehouses. (2021). Emde, Simon ; Polten, Lukas.
    In: Omega.
    RePEc:eee:jomega:v:99:y:2021:i:c:s0305048318304729.

    Full description at Econpapers || Download paper

  6. Four decades of research on the open-shop scheduling problem to minimize the makespan. (2021). Cheng, T. C. E., ; Salehipour, Amir ; Khatami, Mostafa ; Ahmadian, Mohammad Mahdi.
    In: European Journal of Operational Research.
    RePEc:eee:ejores:v:295:y:2021:i:2:p:399-426.

    Full description at Econpapers || Download paper

  7. Efficient primal heuristic updates for the blocking job shop problem. (2021). Barbulescu, Laura ; Mogali, Jayanth Krishna ; Smith, Stephen F.
    In: European Journal of Operational Research.
    RePEc:eee:ejores:v:295:y:2021:i:1:p:82-101.

    Full description at Econpapers || Download paper

  8. Mixed integer linear programming models for Flow Shop Scheduling with a demand plan of job types. (2020). Alfaro-Pozo, Rocio ; Bautista-Valhondo, Joaquin.
    In: Central European Journal of Operations Research.
    RePEc:spr:cejnor:v:28:y:2020:i:1:d:10.1007_s10100-018-0553-8.

    Full description at Econpapers || Download paper

  9. Minimizing total earliness and tardiness in a nowait flow shop. (2020). Jorge, ; Schaller, Jeffrey .
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:224:y:2020:i:c:s0925527319303688.

    Full description at Econpapers || Download paper

  10. A machine learning approach for flow shop scheduling problems with alternative resources, sequence-dependent setup times, and blocking. (2019). Benda, Frank ; Hartl, Richard F ; Doerner, Karl F ; Braune, Roland.
    In: OR Spectrum: Quantitative Approaches in Management.
    RePEc:spr:orspec:v:41:y:2019:i:4:d:10.1007_s00291-019-00567-8.

    Full description at Econpapers || Download paper

  11. Modeling and optimization of buffers and servers in finite queueing networks. (2019). H. S. R. Martins, ; F. L. P. Oliveira, ; Duarte, A R ; F. R. B. Cruz, .
    In: OPSEARCH.
    RePEc:spr:opsear:v:56:y:2019:i:1:d:10.1007_s12597-019-00362-7.

    Full description at Econpapers || Download paper

  12. The evolution of schematic representations of flow shop scheduling problems. (2019). Panwalkar, SS ; Koulamas, Christos.
    In: Journal of Scheduling.
    RePEc:spr:jsched:v:22:y:2019:i:4:d:10.1007_s10951-018-0594-9.

    Full description at Econpapers || Download paper

  13. No-idle, no-wait: when shop scheduling meets dominoes, Eulerian paths and Hamiltonian paths. (2019). J.-C. Billaut, ; Tkindt, V ; Salassa, F ; della Croce, F.
    In: Journal of Scheduling.
    RePEc:spr:jsched:v:22:y:2019:i:1:d:10.1007_s10951-018-0562-4.

    Full description at Econpapers || Download paper

  14. An evolutionary clustering search for the total tardiness blocking flow shop problem. (2019). Nagano, Marcelo ; Komesu, Adriano Seiko ; Miyata, Hugo Hissashi .
    In: Journal of Intelligent Manufacturing.
    RePEc:spr:joinma:v:30:y:2019:i:4:d:10.1007_s10845-017-1358-7.

    Full description at Econpapers || Download paper

  15. Improved bounded dynamic programming algorithm for solving the blocking flow shop problem. (2019). Ozolins, Ansis.
    In: Central European Journal of Operations Research.
    RePEc:spr:cejnor:v:27:y:2019:i:1:d:10.1007_s10100-017-0488-5.

    Full description at Econpapers || Download paper

  16. Flow shop scheduling with flexible processing times. (2018). Bultmann, Matthias ; Waldherr, Stefan ; Knust, Sigrid.
    In: OR Spectrum: Quantitative Approaches in Management.
    RePEc:spr:orspec:v:40:y:2018:i:3:d:10.1007_s00291-018-0520-8.

    Full description at Econpapers || Download paper

  17. Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility. (2018). Zhong, Weiya ; Shi, Yun.
    In: Journal of Combinatorial Optimization.
    RePEc:spr:jcomop:v:35:y:2018:i:1:d:10.1007_s10878-017-0155-8.

    Full description at Econpapers || Download paper

  18. No-wait flowshop scheduling problem with two criteria; total tardiness and makespan. (2018). Allahverdi, Ali ; Aydilek, Asiye.
    In: European Journal of Operational Research.
    RePEc:eee:ejores:v:269:y:2018:i:2:p:590-601.

    Full description at Econpapers || Download paper

  19. Classifying and modeling setups and cleanings in lot sizing and scheduling. (2017). Stefansdottir, Bryndis ; Akkerman, Renzo ; Grunow, Martin.
    In: European Journal of Operational Research.
    RePEc:eee:ejores:v:261:y:2017:i:3:p:849-865.

    Full description at Econpapers || Download paper

  20. Fast local neighborhood search algorithm for the no-wait flow shop scheduling with total flow time minimization. (2016). Qi, Xuemei ; Yang, Jie ; Chen, Fulong ; Zhang, JI ; Zhu, Haihong ; Wang, Hongtao.
    In: International Journal of Production Research.
    RePEc:taf:tprsxx:v:54:y:2016:i:16:p:4957-4972.

    Full description at Econpapers || Download paper

  21. Branch-and-bound and PSO algorithms for no-wait job shop scheduling. (2016). Benmedjdoub, Brahim ; Aitzai, Abdelhakim ; Boudhar, Mourad.
    In: Journal of Intelligent Manufacturing.
    RePEc:spr:joinma:v:27:y:2016:i:3:d:10.1007_s10845-014-0906-7.

    Full description at Econpapers || Download paper

  22. Modeling and optimizing the evacuation of hospitals based on the MRCPSP with resource transfers. (2016). Knust, Sigrid ; Poppenborg, Jens .
    In: EURO Journal on Computational Optimization.
    RePEc:spr:eurjco:v:4:y:2016:i:3:d:10.1007_s13675-015-0061-8.

    Full description at Econpapers || Download paper

  23. No-Wait Flowshop Scheduling Is as Hard as Asymmetric Traveling Salesman Problem. (2016). Sviridenko, Maxim ; Mucha, Marcin .
    In: Mathematics of Operations Research.
    RePEc:inm:ormoor:v:41:y:2016:i:1:p:247-254.

    Full description at Econpapers || Download paper

  24. Multi-processor Exact Procedures for Regular Measures of the Multi-mode RCPSP. (2015). Madhukar, Dayal ; Verma, Sanjay .
    In: IIMA Working Papers.
    RePEc:iim:iimawp:13334.

    Full description at Econpapers || Download paper

  25. Optimal Mixed Batch Shipment Policy with Variable Safety Factor for the Single-Vendor Single-Buyer Production-Inventory System. (2014). Hsiao, Yu-Cheng ; Ho, Wen-Tsung.
    In: Journal of Optimization Theory and Applications.
    RePEc:spr:joptap:v:161:y:2014:i:2:d:10.1007_s10957-012-0139-x.

    Full description at Econpapers || Download paper

  26. An Optimal Mixed Batch Shipment Policy for Multiple Items in a Single-Supplier Multiple-Retailer Integrated System. (2014). Huang, Yun-Kuei ; Lai, Shu-Fang ; Ho, Wen-Tsung.
    In: Journal of Optimization Theory and Applications.
    RePEc:spr:joptap:v:160:y:2014:i:2:d:10.1007_s10957-013-0280-1.

    Full description at Econpapers || Download paper

  27. Solving an integrated job-shop problem with human resource constraints. (2014). Lemaire, Pierre ; Guyon, Olivier ; Rivreau, David ; Pinson, Eric.
    In: Annals of Operations Research.
    RePEc:spr:annopr:v:213:y:2014:i:1:p:147-171:10.1007/s10479-012-1132-3.

    Full description at Econpapers || Download paper

  28. Modeling and scheduling no-wait open shop problems. (2014). Naderi, B. ; Zandieh, M..
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:158:y:2014:i:c:p:256-266.

    Full description at Econpapers || Download paper

  29. A combined robot selection and scheduling problem for flow-shops with no-wait restrictions. (2014). Shabtay, Dvir ; Edan, Yael ; Arviv, Kfir ; Stern, Helman .
    In: Omega.
    RePEc:eee:jomega:v:43:y:2014:i:c:p:96-107.

    Full description at Econpapers || Download paper

  30. A heuristic for scheduling in a two-stage hybrid flowshop with renewable resources shared among the stages. (2014). Figielska, Ewa .
    In: European Journal of Operational Research.
    RePEc:eee:ejores:v:236:y:2014:i:2:p:433-444.

    Full description at Econpapers || Download paper

  31. Review of the ordered and proportionate flow shop scheduling research. (2013). Panwalkar, SS ; Koulamas, Christos ; Smith, Milton L.
    In: Naval Research Logistics (NRL).
    RePEc:wly:navres:v:60:y:2013:i:1:p:46-55.

    Full description at Econpapers || Download paper

  32. Optimizing Multi-stage Production for an Assembly-Type Supply Chain with Unequal Sized Batch Shipments. (2012). Hsiao, Yu-Cheng ; Pan, Jason Chao-Hsien ; Ho, Wen-Tsung.
    In: Journal of Optimization Theory and Applications.
    RePEc:spr:joptap:v:153:y:2012:i:2:d:10.1007_s10957-011-9951-y.

    Full description at Econpapers || Download paper

  33. Scheduling in flowshops with flexible operations: Throughput optimization and benefits of flexibility. (2012). Gultekin, Hakan .
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:140:y:2012:i:2:p:900-911.

    Full description at Econpapers || Download paper

  34. An optimal solution technique to the single-vendor multi-buyer integrated inventory supply chain by incorporating some realistic factors. (2011). Hoque, M. A..
    In: European Journal of Operational Research.
    RePEc:eee:ejores:v:215:y:2011:i:1:p:80-88.

    Full description at Econpapers || Download paper

  35. Integrated Production and Outbound Distribution Scheduling: Review and Extensions. (2010). Chen, Zhi-Long.
    In: Operations Research.
    RePEc:inm:oropre:v:58:y:2010:i:1:p:130-148.

    Full description at Econpapers || Download paper

  36. Heuristic algorithms for production and transportation planning through synchronization of a serial supply chain. (2010). Jung, Jung Woo ; Lee, Young Hae .
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:124:y:2010:i:2:p:433-447.

    Full description at Econpapers || Download paper

  37. Optimal multi-stage logistic and inventory policies with production bottleneck in a serial supply chain. (2010). Lin, YI ; Huang, Yun-Kuei ; Hsiao, Yu-Cheng.
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:124:y:2010:i:2:p:408-413.

    Full description at Econpapers || Download paper

  38. A two-machine flowshop scheduling problem with deteriorating jobs and blocking. (2010). Wu, Chin-Chia ; Shiau, Yau-Ren ; Lee, Wen-Chiung ; Chen, Shiuan-Kang .
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:124:y:2010:i:1:p:188-197.

    Full description at Econpapers || Download paper

  39. Marked Markovian Arrivals in a Tandem G-Network with Blocking. (2009). Gomez-Corral, A ; Martos, M E.
    In: Methodology and Computing in Applied Probability.
    RePEc:spr:metcap:v:11:y:2009:i:4:d:10.1007_s11009-008-9080-8.

    Full description at Econpapers || Download paper

  40. Scheduling a flow shop with combined buffer conditions. (2009). Kozan, Erhan ; Liu, Shi Qiang .
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:117:y:2009:i:2:p:371-380.

    Full description at Econpapers || Download paper

  41. Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots. (2009). Che, Ada ; Chu, Chengbin.
    In: European Journal of Operational Research.
    RePEc:eee:ejores:v:199:y:2009:i:1:p:77-88.

    Full description at Econpapers || Download paper

  42. Integrated logistic and inventory model for a two-stage supply chain controlled by the reorder and shipping points with sharing information. (2008). Hsiao, Yu-Cheng.
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:115:y:2008:i:1:p:229-235.

    Full description at Econpapers || Download paper

  43. A single-lot, unified cost-based flow shop lot-streaming problem. (2008). Kalir, Adar A. ; Sarin, Subhash C. ; Chen, Ming.
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:113:y:2008:i:1:p:413-424.

    Full description at Econpapers || Download paper

  44. Some effective heuristics for no-wait flowshops with setup times to minimize total completion time. (2007). Ruiz, Ruben ; Allahverdi, Ali.
    In: Annals of Operations Research.
    RePEc:spr:annopr:v:156:y:2007:i:1:p:143-171:10.1007/s10479-007-0227-8.

    Full description at Econpapers || Download paper

  45. Lagrangian relaxation algorithms for real-time hybrid flowshop scheduling with finite intermediate buffers. (2006). Tang, L ; Xuan, H.
    In: Journal of the Operational Research Society.
    RePEc:pal:jorsoc:v:57:y:2006:i:3:d:10.1057_palgrave.jors.2602033.

    Full description at Econpapers || Download paper

  46. Operating rooms scheduling. (2006). Jebali, Aida ; Ladet, Pierre ; Hadj Alouane, Atidel B., .
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:99:y:2006:i:1-2:p:52-62.

    Full description at Econpapers || Download paper

  47. Scheduling and lot streaming in two‐machine open shops with no‐wait in process. (2005). Hall, Nicholas G ; Sriskandarajah, Chelliah ; Selvarajah, Esaignani ; Laporte, Gilbert.
    In: Naval Research Logistics (NRL).
    RePEc:wly:navres:v:52:y:2005:i:3:p:261-275.

    Full description at Econpapers || Download paper

  48. Minimizing Makespan in No-Wait Job Shops. (2005). Sviridenko, Maxim ; Mahdian, Mohammad ; Bansal, Nikhil .
    In: Mathematics of Operations Research.
    RePEc:inm:ormoor:v:30:y:2005:i:4:p:817-831.

    Full description at Econpapers || Download paper

  49. Sojourn times in a two‐stage queueing network with blocking. (2004). Gomezcorral, A.
    In: Naval Research Logistics (NRL).
    RePEc:wly:navres:v:51:y:2004:i:8:p:1068-1089.

    Full description at Econpapers || Download paper

  50. Total flowtime and makespan for a no-wait m-machine flowshop with set-up times separated. (2004). Brown, S I ; Ventura, J A ; McGarvey, R G.
    In: Journal of the Operational Research Society.
    RePEc:pal:jorsoc:v:55:y:2004:i:6:d:10.1057_palgrave.jors.2601695.

    Full description at Econpapers || Download paper

  51. Class Scheduling for Pilot Training. (2004). Qi, Xiangtong ; Yu, Gang ; Bard, Jonathan F.
    In: Operations Research.
    RePEc:inm:oropre:v:52:y:2004:i:1:p:148-162.

    Full description at Econpapers || Download paper

  52. Flow Shop Scheduling with Partial Resource Flexibility. (2004). Shi, Dailun ; Daniels, Richard L. ; Mazzola, Joseph B..
    In: Management Science.
    RePEc:inm:ormnsc:v:50:y:2004:i:5:p:658-669.

    Full description at Econpapers || Download paper

  53. A note on constructive heuristics for the flowshop problem with blocking. (2004). Ronconi, Debora P..
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:87:y:2004:i:1:p:39-48.

    Full description at Econpapers || Download paper

  54. Employee scheduling and makespan minimization in a flow shop with multi-processor work stations: a case study. (2004). Martin, Clarence ; Cutright, Kenneth ; Huq, Faizul.
    In: Omega.
    RePEc:eee:jomega:v:32:y:2004:i:2:p:121-129.

    Full description at Econpapers || Download paper

  55. Loading and scheduling of a flexible assembly system by mixed integer programming. (2004). Sawik, Tadeusz.
    In: European Journal of Operational Research.
    RePEc:eee:ejores:v:154:y:2004:i:1:p:1-19.

    Full description at Econpapers || Download paper

  56. Batch scheduling in a two-machine flow shop with limited buffer and sequence independent setup times and removal times. (2004). Pranzo, Marco .
    In: European Journal of Operational Research.
    RePEc:eee:ejores:v:153:y:2004:i:3:p:581-592.

    Full description at Econpapers || Download paper

  57. No-wait flowshops with bicriteria of makespan and maximum lateness. (2004). Allahverdi, Ali ; Aldowaisan, Tariq.
    In: European Journal of Operational Research.
    RePEc:eee:ejores:v:152:y:2004:i:1:p:132-147.

    Full description at Econpapers || Download paper

  58. Scheduling patients in an ambulatory surgical center. (2003). Hsu, Vernon Ning ; Lee, Chungyee ; de Matta, Renato.
    In: Naval Research Logistics (NRL).
    RePEc:wly:navres:v:50:y:2003:i:3:p:218-238.

    Full description at Econpapers || Download paper

  59. Operating theatre planning. (2003). Guinet, Alain ; Chaabane, Sondes.
    In: International Journal of Production Economics.
    RePEc:eee:proeco:v:85:y:2003:i:1:p:69-81.

    Full description at Econpapers || Download paper

  60. Solving the continuous flow-shop scheduling problem by metaheuristics. (2003). Fink, Andreas ; Voss, Stefan.
    In: European Journal of Operational Research.
    RePEc:eee:ejores:v:151:y:2003:i:2:p:400-414.

    Full description at Econpapers || Download paper

  61. Job-shop scheduling with blocking and no-wait constraints. (2002). Mascis, Alessandro ; Pacciarelli, Dario .
    In: European Journal of Operational Research.
    RePEc:eee:ejores:v:143:y:2002:i:3:p:498-517.

    Full description at Econpapers || Download paper

  62. Optimizing multi-stage production with constant lot size and varying number of unequal sized batches. (2001). Lindner, Gerd ; Buscher, Udo D. ; Bogaschewsky, Ronald W..
    In: Omega.
    RePEc:eee:jomega:v:29:y:2001:i:2:p:183-191.

    Full description at Econpapers || Download paper

  63. The two-group heuristic to solve the multi-product, economic lot sizing and scheduling problem in flow shops. (2001). Boctor, Fayez F. ; Ouenniche, Jamal.
    In: European Journal of Operational Research.
    RePEc:eee:ejores:v:129:y:2001:i:3:p:539-554.

    Full description at Econpapers || Download paper

  64. Minimizing Cycle Time in a Blocking Flowshop. (2000). Kamal, I N ; Sriskandarajah, Chelliah ; Hall, Nicholas G.
    In: Operations Research.
    RePEc:inm:oropre:v:48:y:2000:i:1:p:177-180.

    Full description at Econpapers || Download paper

  65. Scheduling multipurpose batch process industries with no-wait restrictions by simulated annealing. (2000). Hoogeveen, J. A. ; Raaymakers, W. H. M., .
    In: European Journal of Operational Research.
    RePEc:eee:ejores:v:126:y:2000:i:1:p:131-151.

    Full description at Econpapers || Download paper

  66. A heuristic for the two‐machine no‐wait openshop scheduling problem. (1999). Sidney, Jeffrey B ; Sriskandarajah, Chelliah.
    In: Naval Research Logistics (NRL).
    RePEc:wly:navres:v:46:y:1999:i:2:p:129-145.

    Full description at Econpapers || Download paper

  67. Scheduling in Robotic Cells: Heuristics and Cell Design. (1999). Hall, Nicholas G ; Kamoun, Hichem ; Sriskandarajah, Chelliah.
    In: Operations Research.
    RePEc:inm:oropre:v:47:y:1999:i:6:p:821-835.

    Full description at Econpapers || Download paper

  68. Dynamic Routing and Operational Controls in Workflow Management Systems. (1999). Kumar, Akhil ; Zhao, Leon J..
    In: Management Science.
    RePEc:inm:ormnsc:v:45:y:1999:i:2:p:253-272.

    Full description at Econpapers || Download paper

  69. Multi-level lot sizing: A literature survey. (1996). Drexl, Andreas ; Kimms, Alf.
    In: Manuskripte aus den Instituten für Betriebswirtschaftslehre der Universität Kiel.
    RePEc:zbw:cauman:405.

    Full description at Econpapers || Download paper

  70. Too much cocited documents. This list is not complete

Coauthors

Authors registered in RePEc who have wrote about the same topic

Report date: 2025-03-01 07:20:23 || Missing content? Let us know

CitEc is a RePEc service, providing citation data for Economics since 2001. Sponsored by INOMICS. Last updated October, 6 2023. Contact: CitEc Team.