Nothing Special   »   [go: up one dir, main page]

CERN Accelerating science

CERN Document Server 2,039 のレコードが見つかりました。  1 - 10次最後  レコードへジャンプ: 検索にかかった時間: 0.30 秒 
1.
Calibration of the T08.XSEC devices by means of Al-foil activation and BCTF measurements / Ravotti, Federico (CERN (EP-DT)) ; Ruffieux, Romain Brice (CERN (SY-BI)) ; Ollacarizqueta, Ana Guerrero (CERN (SY-BI))
The IRRAD/CHARM irradiation facility in the East experimental area exploits a proton beam of standard intensity 5×10^{11} p/spill slow-extracted from the CERN PS accelerator to the T08 beam line over about 400ms. This document summarizes the procedure employed for the calibration of the Secondary Emission Chamber (XSEC) devices of T08 used to monitor the total proton intensity per spill during facility operation. [...]
EP-Tech-Note-2022-001.- Geneva : CERN, 2022 - 11 p. Fulltext: PDF;
2.
Not yet available
Developing electronics boards through standardisation, specialised tools and collaboration / Boccardi, Andrea (speaker) (CERN)
The Beam Instrumentation Group (SY-BI) is responsible for designing, building and maintaining the instruments that allow observation of the particle beams and the measurement of related parameters for all CERN accelerators and transfer lines. Those instruments are often highly specialised and require the design of dedicated electronics, especially but not only for the elements exposed to radiation. This contribution will illustrate the type of electronics boards and systems designed in SY-BI, the specification and review process in place in the group, the tools used, the CERN services we rely on and the network of collaborations with other groups that supports those designs..
2024 - 1253. ATS Workshop; ATS Workshop 2024 External links: Talk details; Event details In : ATS Workshop 2024
3.
Chapter 3: Design of the East Area facility after renovation / Bernhard, Johannes Benedikt (CERN) ; Dogru, G (CERN) ; Evrard, S (CERN) ; Froeschl, Robert (CERN) ; Harrouch, E (CERN) ; Lazzaroni, M (CERN)
The PS primary proton beam is slowly extracted at 24 GeV/c towards the East Area with the help of the third- order resonance technique over a typical spill length of 350 to 450 ns within 2.4 s cycles. The number of East Area extractions is usually around five to six per overall PS super-cycle of typically 40 s and depends on both users and schedule constraints, respectively. [...]
2021 - 26 p. Fulltext: PDF;
In : CERN Proton Synchrotron East Area Facility, pp.17-42
4.
Hardware & FPGA firmware development in the frame of the Beam Position Monitoring (BPM) system upgrade for the Super Proton Synchrotron (SPS) / Barros Marin, Manoel
This Master Thesis described the development of hardware and firmware for “Field programmable Gate Array” (FPGA) devices in the frame of the “A Logarithmic Position System” (ALPS) project [...]
CERN-THESIS-2021-152 - 122 p.

5.
Calibration of the Beam-Spill Control System at LAMPF / Parker, J R ; Liska, D J
1975 External link: Published version from JACoW
In : 6th IEEE Particle Accelerator Conference, Washington, DC, USA, 12 - 14 Mar 1975, pp.1517
6.
Treatment of H$^{0}$ and H$^{-}$ beams spilled at the stripper foil at full energy charge-exchange injection scheme / Yamane, I
KEK-90-93.- Tsukuba : KEK, 1991 - 12 p.
In : 11th Meeting of the International Collaboration on Advanced Neutron Sources, v.1-2, KEK, Tsukuba, Japan, 22 - 26 Oct 1990, pp.224-234
7.
A New High-intensity Proton Irradiation Facility at the CERN PS East Area / Gkotse, B (CERN) ; Glaser, M (CERN) ; Lima, P (CERN) ; Matli, E (CERN) ; Moll, M (CERN) ; Ravotti, F (CERN)
The proton and mixed-field irradiation facilities in the CERN PS East Area (known as IRRAD1 and IRRAD2), were heavily and successfully used for irradiation of particle detectors, electronic components and materials since 1992. These facilities operated with particle bursts - protons with momentum of 24GeV/c - delivered from the PS accelerator in “spills” of about 400ms (slow extraction). [...]
AIDA-CONF-2014-019.- Geneva : CERN, 2014 - Published in :
- Published in : PoS: TIPP2014 (2014) , pp. 354 Fulltext: PDF;
In : International Conference on Technology and Instrumentation in Particle Physics 2014, Amsterdam, Netherlands, 2 - 6 Jun 2014, pp.354
8.
Calibration of the BSI foils in front of the SPS T9 target / Ferioli, G ; de Rijk, G
SL-MD-Note-192.- Geneva : CERN, 1995 - 3 p. Note
9.
Propositions pour une methode de diagnostic du 'servo spill '
CERN-SPS-ABM-JB-Note-79-15 - 1979. - 5 p.
10.
Obtaining slow beam spills at the SSC collider / Ritson, D M
SLAC-PUB-6332.- Stanford, CA : SLAC, 1993 - 7 p. Access to document: TIF PDF;
In : Workshop on B Physics at Hadron Accelerators, Snowmass, CO, USA, 21 Jun - 2 Jul 1993, pp.681-684

捜していたものを見つけなかったならば、他のサーバーもお試しください:
recid:2845051 中の Amazon
recid:2845051 中の CERN EDMS
recid:2845051 中の CERN Intranet
recid:2845051 中の CiteSeer
recid:2845051 中の Google Books
recid:2845051 中の Google Scholar
recid:2845051 中の Google Web
recid:2845051 中の IEC
recid:2845051 中の IHS
recid:2845051 中の INSPIRE
recid:2845051 中の ISO
recid:2845051 中の KISS Books/Journals
recid:2845051 中の KISS Preprints
recid:2845051 中の NEBIS
recid:2845051 中の SLAC Library Catalog