Nothing Special   »   [go: up one dir, main page]

CERN Accelerating science

CERN Document Server 2,035 εγγραφές βρέθηκαν  1 - 10επόμενοτέλος  μετάβαση στην εγγραφή: Η έρευνα πήρε 0.67 δευτερόλεπτα. 
1.
BDF/SHiP at the ECN3 high-intensity beam facility / SHiP Collaboration
The BDF/SHiP collaboration has proposed a general-purpose intensity-frontier experimental facility operating in beam-dump mode at the CERN SPS accelerator to search for feebly interacting GeV-scale particles and to perform measurements in neutrino physics. [...]
CERN-SPSC-2023-033 ; SPSC-P-369.
- 2023.
Fulltext
2.
BDF/SHiP at the ECN3 high-intensity beam facility / SHiP Collaboration
The BDF/SHiP collaboration has proposed a general-purpose intensity-frontier experimental facility operating in beam-dump mode at the CERN SPS accelerator to search for feebly interacting GeV-scale particles and to perform measurements in neutrino physics. [...]
CERN-SPSC-2022-032 ; SPSC-I-258.
- 2022.
Fulltext
3.
The new ECN3 high intensity facility for the BDF/SHiP experiment and high intensity beam transfer / Fraser, Matthew Alexander (CERN)
CERN-HI-ECN3-CONF-2024-002.- Geneva : CERN, 2024 Fulltext: PPTX;
In : 13th International Workshop on Neutrino Beams and Instrumentation (NBI 2024), Ibaraki, Japan, 7 - 10 Oct 2024, pp.CERN-HI-ECN3-CONF-2024-002
4.
The experimental setup of BDF/SHiP proposed for ECN3 / Bick, Daniel (speaker) (Institut fur Experimentalphysik, Universität Hamburg)
The BDF/SHiP experiment has been proposed as a general purpose intensity-frontier experiment for the search of feebly interacting GeV-scale particles and to perform neutrino physics measurements at the CERN SPS. After the Technical Proposal in 2015 and a subsequent comprehensive design study, it has recently been optimized to operate in the existing SPS ECN3 underground facility, taking full advantage of the available 4x10^19 protons per year at 400 GeV.The experimental setup consists of two complementary detectors downstream an active muon shield. [...]
2023 - 4213. Detector Seminar External link: Event details In : The experimental setup of BDF/SHiP proposed for ECN3
5.
Target systems design for a high intensity facility in the CERN's ECN3 area / Ximenes, R F (CERN) ; Grenard, J-L (CERN) ; Ruiz, J M Martin (CERN) ; Ahdida, C (CERN) ; Bernhard, J (CERN) ; Brugger, M (CERN) ; Calviani, M (CERN) ; Esposito, L (CERN) ; Fraser, M (CERN) ; Jacobsson, R (CERN) et al.
A new high intensity fixed target facility could be accommodated at CERN by fully exploiting the Super Proton Synchrotron. Multiple physics experiment proposals such as BDF/SHiP, NA62-BD, HIKE and SHADOWS are being considered. [...]
2023 - 4 p. - Published in : JACoW IPAC 2023 (2023) WEPM112 Fulltext: PDF;
In : 14th International Particle Accelerator Conference (IPAC 2023), Venice, Italy, 7 - 12 May 2023, pp.WEPM112
6.
SHiP sets a new course in intensity-frontier exploration
Published in: CERN Courier Volume 56, Number 2, March 2016
Geneva : CERN, 2016
7.
Design considerations for the BDF/SHiP production target / Franqueira Ximenes, Rui (CERN)
CERN-HI-ECN3-CONF-2024-004.- Geneva : CERN, 2024 Fulltext: PPTX;
In : 13th International Workshop on Neutrino Beams and Instrumentation (NBI 2024), Ibaraki, Japan, 7 - 10 Oct 2024, pp.CERN-HI-ECN3-CONF-2024-004
8.
Study of alternative locations for the SPS Beam Dump Facility / Aberle, Oliver (CERN) ; Ahdida, Claudia (CERN) ; Arrutia, Pablo (CERN) ; Balazs, Kincso (CERN) ; Bernhard, Johannes (CERN) ; Brugger, Markus (CERN) ; Calviani, Marco (CERN) ; Dutheil, Yann (CERN) ; Ximenes, Rui Franqueira (CERN) ; Fraser, Matthew (CERN) et al.
As part of the main focus of the BDF Working Group in 2021, this document reports on the study of alternative locations and possible optimisation that may accompany the reuse of existing facilities with the aim of significantly reducing the costs of the facility. [...]
arXiv:2204.03549 ; CERN-SPSC-2022-009 ; SPSC-SR-305.
- 2022. - 34 p.
Fulltext - Original Document (SPSC-SR-263) - Fulltext
9.
Development of a magnet system for the CERN BDF/SHiP Facility / Bayliss, Victoria (RAL) ; Boehm, Josef (RAL) /SHiP Collaboration
The SHiP experimental setup requires a magnet-based shield immediately after the proton target in order to deflect the very large background flux of muons away from the detector acceptance. To this end, a magnet system integrated within the hadron stopper in the target bunker has been proposed. [...]
CERN-SHiP-NOTE-2019-004.- Geneva : CERN, 02 Fulltext: 2019_004_HadronStopperMagnetisation - PDF; 2019_004_HadronStopperMagnetisation_2 - PDF;
10.
FLUKA-Geant4 comparison for the muon flux experiment in the H4 beamline / Ahdida, Claudia Christina (CERN) ; Casolino, Mirkoantonio (The Barcelona Institute of Science and Technology (BIST) (ES)) ; Dijkstra, Hans (CERN) ; Froeschl, Robert (CERN) ; Van Herwijnen, Eric (CERN) ; Ruf, Thomas (CERN) /SHiP Collaboration
The FLUKA - Geant4 comparison for the the muon flux experiment is reported. The experiment was performed in 2018 on the H4 400 GeV/c proton beamline to measure the muon flux emanating from a SHiP replica target. [...]
CERN-SHiP-NOTE-2019-005.- Geneva : CERN, 2019 Fulltext: PDF;

Δεν βρήκατε αυτό που αναζητούσατε; Δοκιμάστε την έρευνά σας σε άλλους servers:
recid:2878604 σε Amazon
recid:2878604 σε CERN EDMS
recid:2878604 σε CERN Intranet
recid:2878604 σε CiteSeer
recid:2878604 σε Google Books
recid:2878604 σε Google Scholar
recid:2878604 σε Google Web
recid:2878604 σε IEC
recid:2878604 σε IHS
recid:2878604 σε INSPIRE
recid:2878604 σε ISO
recid:2878604 σε KISS Books/Journals
recid:2878604 σε KISS Preprints
recid:2878604 σε NEBIS
recid:2878604 σε SLAC Library Catalog