Nothing Special   »   [go: up one dir, main page]

CERN Accelerating science

CERN Document Server 2,051 registres trobats  1 - 10següentfinal  anar al registre: La cerca s'ha fet en 0.52 segons. 
1.
Commissioning the New CERN Beam Instrumentation Following the Upgrade of the LHC Injector Chain / Roncarolo, Federico (CERN) ; Bart Pedersen, Stephane (CERN) ; Belleman, Jeroen (CERN) ; Belohrad, David (CERN) ; Bozzolan, Michele (CERN) ; Bracco, Chiara (CERN) ; Di Carlo, Salvatore (CERN) ; Emery, Jonathan (CERN) ; Goldblatt, Aurélie (CERN) ; Guerrero, Ana (CERN) et al.
The LHC injectors Upgrade (LIU) program has been fully implemented during the second long shutdown (LS2), which took place in 2019-20. In this context, new or upgraded beam instrumentation was developed to cope with H⁻ beam in LINAC4 and the new Proton Synchrotron Booster (PSB) injection systems which would provide high brightness proton beams in the rest of the injector complex. [...]
Geneva : JACoW, 2021 - 4 p. - Published in : JACoW IPAC 2021 (2021) 976-979 Fulltext: PDF;
In : 12th International Particle Accelerator Conference (IPAC 2021), Online, 24 - 28 May 2021, pp.976-979
2.
PSB H0-H⁻ Monitor Calibration and Commissioning / Navarro Fernandez, Araceli (CERN) ; Belohrad, David (CERN) ; Bracco, Chiara (CERN) ; Renner, Elisabeth (CERN) ; Roncarolo, Federico (CERN) ; Tassan-Viol, Jean (CERN)
During the LHC Long Shutdown 2 (LS2), the H⁻ LINAC4 replaced the proton LINAC2 as Proton Synchrotron Booster (PSB) injector. In each of the four PSB rings, the injection region was upgraded to accommodate the necessary elements for a proper H⁻ charge exchange injection systems. [...]
JACoW, 2021 - 5 p. - Published in : JACoW IBIC 2021 (2021) 429-433 Fulltext: PDF;
In : 10th International Beam Instrumentation Conference (IBIC 2021), Online, Korea, 13 - 17 Sep 2021, pp.429-433
3.
Matching Studies Between the CERN PSB and PS Using Turn-by-Turn Beam Profile Acquisitions with a Residual Beam Gas Ionisation Monitor / Fraser, Matthew (CERN) ; Coly, Marcel (CERN) ; Guerrero, Ana (CERN) ; Huschauer, Alexander (CERN) ; Jensen, Steen (CERN) ; Levasseur, Swann (CERN) ; Roncarolo, Federico (CERN) ; Rossi, Adriana (CERN) ; Sandberg, Hampus (CERN) ; Storey, James (CERN)
In the framework of the LHC Injectors Upgrade project, the Beam Gas Ionisation (BGI) profile monitors installed in the Proton Synchrotron (PS) were fitted with a gas injection system capable of boosting the signal rate high enough to capture single turn acquisitions immediately after injection. This contribution reports on the studies carried out during the beam commissioning of the BGI system in a turn-by-turn matching monitor mode for its eventual implementation in an optimisation framework to preserve emittance during transfer between the PS Booster and PS. [...]
2022 - 4 p. - Published in : JACoW IPAC 2022 (2022) 2161-2164 Fulltext: PDF;
In : 13th International Particle Accelerator Conference (IPAC 2022), Bangkok, Thailand, 12 - 17 Jun 2022, pp.2161-2164
4.
Commissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H⁻ Beam / Guidoboni, Greta (CERN) ; Allica, Juan (CERN) ; Bracco, Chiara (CERN) ; Burger, Stephane (CERN) ; Focker, Gerrit Jan (CERN) ; Mikulec, Bettina (CERN) ; Navarro Fernandez, Araceli (CERN) ; Roncarolo, Federico (CERN) ; Søby, Lars (CERN) ; Zamantzas, Christos (CERN)
In the framework of the LHC Injector Upgrade (LIU) project, the Proton Synchrotron Booster (PSB) will be extensively modified during the Long Shutdown 2 (LS2, 2019-2020) at CERN [1]. This includes a new injector, Linac4, which will provide a 160 MeV H⁻ beam and a complete new injection section for the PSB composed essentially of a chicane and a stripping foil system. [...]
2018 - 4 p. - Published in : 10.18429/JACoW-IBIC2017-MOPWC07 Fulltext: PDF;
In : 6th International Beam Instrumentation Conference, Grand Rapids, MI, USA, 20 -24 Aug 2017, pp.MOPWC07
5.
Beam Instrumentation for the CERN LINAC4 and PSB Half Sector Test / Roncarolo, Federico (CERN) ; Allica Santamaria, Juan (CERN) ; Bozzolan, Michele (CERN) ; Bracco, Chiara (CERN) ; Burger, Stephane (CERN) ; Focker, Gerrit Jan (CERN) ; Guidoboni, Greta (CERN) ; Hofmann, Thomas (Royal Holloway, U. of London) ; Jensen, Lars (CERN) ; Mikulec, Bettina (CERN) et al.
The construction, installation and initial commissioning of CERN's LINAC4 was completed in 2016 with H⁻ ions successfully accelerated to its top energy of 160 MeV. The accelerator is equipped with a large number of beam diagnostic systems that are essential to monitor, control and optimize the beam parameters. [...]
CERN-ACC-2017-127.- 2017 - 4 p. - Published in : 10.18429/JACoW-IPAC2017-MOPAB120 Fulltext: PDF;
In : 8th International Particle Accelerator Conference, Copenhagen, Denmark, 14 - 19 May 2017, pp.MOPAB120
6.
Commissioning and Results of the Half-Sector Test Installation with 160 MeV H⁻ beam from Linac4 / Mikulec, Bettina (CERN) ; Aguglia, Davide (CERN) ; Allica Santamaria, Juan (CERN) ; Baud, Cedric (CERN) ; Bracco, Chiara (CERN) ; Burger, Stephane (CERN) ; Guidoboni, Greta (CERN) ; Jorat, Louise Olivia (CERN) ; Martin, Christophe (CERN) ; Navarro Fernandez, Araceli (CERN) et al.
During the Long Shutdown 2 (LS2) at CERN in 2019/20, the Proton Synchrotron Booster (PSB) will undergo a profound upgrade in the framework of the LHC Injector Upgrade (LIU) project involving also the connection to the new Linac4 injector. The 160 MeV Linac4 H' injection entails a complete replacement of the PSB injection section, including a stripping foil system, injection chicane, an H⁰/H' dump and novel beam instrumentation. [...]
CERN-ACC-2017-276.- 2017 - 4 p. - Published in : 10.18429/JACoW-IPAC2017-MOPIK047 Fulltext: PDF;
In : 8th International Particle Accelerator Conference, Copenhagen, Denmark, 14 - 19 May 2017, pp.MOPIK047
7.
Time-Resolved Transverse Beam Profile Measurements with a Rest Gas Ionisation Profile Monitor Based on Hybrid Pixel Detectors / Levasseur, Swann (Royal Holloway, U. of London) ; Bertsche, William (U. Manchester (main)) ; Bodart, Dominique (CERN) ; Gibson, Stephen (Royal Holloway, U. of London) ; Huschauer, Alexander (CERN) ; Sandberg, Hampus (U. Manchester (main)) ; Sapinski, Mariusz (Darmstadt, GSI) ; Satou, Kenichirou (JAEA, Ibaraki) ; Schneider, Gerhard (CERN) ; Storey, James (CERN) et al.
A novel rest gas ionisation profile monitor which aims to provide continuous, bunch-by-bunch and turn-by-turn measurement of the transverse beam profile has recently been in- stalled in the CERN Proton Synchrotron (PS) as part of the LHC Injector Upgrade (LIU) project. The instrument consists of an electric drift field to transport ionisation electrons produced by beam-gas interaction onto a measurement plane, and a magnetic field to maintain the transverse position of the ionisation electrons. [...]
2018 - 4 p. - Published in : 10.18429/JACoW-IPAC2018-WEPAL075 Fulltext: PDF;
In : 9th International Particle Accelerator Conference, Vancouver, Canada, 29 Apr - 4 May 2018, pp.WEPAL075
8.
Beam Diagnostics Measurements at 3MeV of the LINAC4 $H^{−}$ Beam at CERN / Zocca, Francesca (CERN) ; Allica Santamaria, Juan (CERN) ; Duraffourg, Michel (CERN) ; Focker, Gerrit Jan (CERN) ; Gerard, Delphine (CERN) ; Kolad, Blazej (CERN) ; Lenardon, Franco (CERN) ; Ludwig, Michael (CERN) ; Raich, Uli (CERN) ; Roncarolo, Federico (CERN) et al.
As part of the CERN LHC injector chain upgrade, LINAC4 will accelerate H^{−} ions to 160 MeV, replacing the old 50 MeV proton linac. The ion source, the Low Energy Beam Transfer (LEBT) line, the 3 MeV Radio Frequency Quadrupole and the Medium Energy Beam Transfer (MEBT) line hosting a chopper, have been first commissioned in a dedicated test stand and are now tested in the LINAC4 tunnel. [...]
2014 - 3 p. - Published in : , pp. THPME179 Fulltext: PDF; External link: JACoW server
In : 5th International Particle Accelerator Conference, Dresden, Germany, 15 - 20 Jun 2014, pp.THPME179
9.
Measuring the Beam Profile by Counting Ionization Electrons / Sandberg, Hampus (Manchester U. ; CERN) ; Bertsche, William (Manchester U.) ; Bodart, Dominique (CERN) ; Dehning, Bernd (CERN) ; Gibson, Stephen (Royal Holloway, U. of London) ; Levasseur, Swann (CERN) ; Satou, Kenichirou (J-PARC ; KEK, Tsukuba ; JAEA, Ibaraki) ; Schneider, Gerhard (CERN) ; Storey, James (CERN) ; Veness, Raymond (CERN)
The principle of non-destructive beam profile measurement with rest gas ionization electrons has remained largely unchanged since the technique was first proposed in the late 1960's. Ionization electrons (or ions) are transported by an electrostatic field onto an imaging detector, where the spatial distribution of detected electrons is a direct measure of the transverse beam profile. [...]
2019 - 4 p. - Published in : 10.18429/JACoW-IBIC2019-TUBO04 Fulltext: PDF;
In : 8th International Beam Instrumentation Conference (IBIC 2019), Malmo, Sweden, 8 - 12 Sep 2019, pp.TUBO04
10.
Installation and Test of Pre-series Wire Scanners for the LHC Injector Upgrade Project at CERN / Veness, Raymond (CERN) ; Andersson, Patrik (CERN) ; Andreazza, William (CERN) ; Chritin, Nicolas (CERN) ; Dehning, Bernd (CERN) ; Emery, Jonathan (CERN) ; Goldblatt, Aurélie (CERN) ; Gudkov, Dmitry (CERN) ; Roncarolo, Federico (CERN) ; Sirvent, Jose (CERN) et al.
A new generation of fast wire scanners is being developed for the LHC Injectors Upgrade (LIU) project at CERN. These will be essential tools for transverse profile measurement with the higher brightness LIU beams, and are planned for installation in 2019 in all three synchrotrons making up the LHC injector chain. [...]
CERN-ACC-2017-199.- 2017 - 3 p. - Published in : 10.18429/JACoW-IPAC2017-MOPAB121 Fulltext: PDF;
In : 8th International Particle Accelerator Conference, Copenhagen, Denmark, 14 - 19 May 2017, pp.MOPAB121

No heu trobat el que estaveu cercant? Proveu la vostra cerca a:
recid:2806715 dins Amazon
recid:2806715 dins CERN EDMS
recid:2806715 dins CERN Intranet
recid:2806715 dins CiteSeer
recid:2806715 dins Google Books
recid:2806715 dins Google Scholar
recid:2806715 dins Google Web
recid:2806715 dins IEC
recid:2806715 dins IHS
recid:2806715 dins INSPIRE
recid:2806715 dins ISO
recid:2806715 dins KISS Books/Journals
recid:2806715 dins KISS Preprints
recid:2806715 dins NEBIS
recid:2806715 dins SLAC Library Catalog