Loading AI tools
From Wikipedia, the free encyclopedia
Line S4 is a line on the Munich S-Bahn network. It is operated by DB Regio Bayern. It runs from Geltendorf station to Ebersberg station via Pasing, central Munich, Munich East and Grafing station.
Overview | |
---|---|
Line number | S4 |
Locale | Munich, Bavaria, Germany |
Service | |
System | Munich S-Bahn |
Route number | 999.4 |
Operator(s) | S-Bahn Munich |
Rolling stock | DBAG Class 423 |
Technical | |
Electrification | 15 kV, 16.7 Hz AC Overhead lines |
S4: stations and transfer opportunities | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Source: German railway atlas[1] |
The line is operated at 20-minute intervals between Grafrath or Buchenau and Grafing station. Two out of three trains an hour continue from Buchenau to Geltendorf and from Grafing station to Ebersberg, so that the gap between trains alternates between 20 and 40 minutes. It is operated using class 423 four-car electrical multiple units, usually as two coupled sets. In the evenings and on Sundays they generally run as single sets.
The line runs over lines built at various times:
S-Bahn services on line S 4 between Geltendorf and Ebersberg commenced on 28 May 1972. For a period up to 2009, the section from Munich East to Ebersberg was operated as the former line S 5.
Seamless Wikipedia browsing. On steroids.
Every time you click a link to Wikipedia, Wiktionary or Wikiquote in your browser's search results, it will show the modern Wikiwand interface.
Wikiwand extension is a five stars, simple, with minimum permission required to keep your browsing private, safe and transparent.