PROPOSED GOLF COURSE PROJECT

SRI LANKA AIR FORCE STATION SIGIRIYA


CONTENT
 Introduction
 Aim
 Objectives
 Selected Site and Proposed Golf Course
 Construction Plan
 Budgetary Requirement Summary
 Machinery Requirement
 Man Power Requirement
 Actual Photograph of the Selected Site
 Conclusion
2
INTRODUCTION
To utilize the existing land area around the runway at SLAF Stn Sgr to
make an 18 - Hole Golf Course ( Greens - 18, Tees - 72, Fairways - 18) by
utilizing existing resources and manpower of the SLAF.

3
AIM
To establish an international level golf course for the both local and
foreign golf players under exclusive historical environmental background
with the spirit of warm hospitality provided by the proposed Hotel project.

4
OBJECTIVES
 To enhance the recreational facility to SLAF Service personnel
and their families by offering these facilities on concessionary rates.
 To create a premier golf destination that attracts local and
foreign players at the foremost tourism destination.
 To make another profitable non public venture to the SLAF.

5
SELECTED SITE AND PROPOSED GOLF COURSE

Cont… 6
…cont SELECTED SITESELECTED SITE AND PROPOSED GOLF COURSE

 Proposed 18 - Hole Golf Course

Cont… 7
…cont SELECTED SITESELECTED SITE AND PROPOSED GOLF COURSE

 Distances of Fairways
HOLE INDEX DISTANCE PAR
Green 01 07 222 yd 3
Green 02 08 387 yd 4
Green 03 01 110 yd 3
Green 04 12 451 yd 5
Green 05 17 242 yd 4
Green 06 13 314 yd 4
Green 07 15 271 yd 4
Green 08 11 179 yd 3
Green 09 05 188 yd 3
Green 10 04 494 yd 5
Green 11 03 563 yd 5
Green 12 06 269 yd 4
Green 13 14 278 yd 4
Green 14 09 452 yd 5
Green 15 16 245 yd 4
Green 16 10 252 yd 4
Green 17 02 171 yd 3
Green 18 18 119 yd 3
TOTAL 5209 yd 70

Cont… 8
CONSTRUCTION PLAN
 Phase 1 - Preparation of Land and Establishing of Fairways
 Phase 2 - Irrigation Network
 Phase 3 - Plantation of Grass/ Greens and Tees
 Phase 4 - Development of Other Facilities
 Phase 5 - Operationalization and Maintenance of Golf Course

Cont… 9
…cont CONSTRUCTION PLAN

 Phase 1 - Preparation of Land and Establishing of Fairways


Preparation of Land & Fairways - Rs. 3,000,000.00
Preparation of sand Bunkers (Qty 5) - Rs. 200,000.00
Construction of Bridge (Qty 2) - Rs. 2,500,000.00

Cont… 10
…cont CONSTRUCTION PLAN

 Phase 2 - Irrigation Network


Installation of Irrigation System - Rs. 14,306,000.00

Cont… 11
…cont CONSTRUCTION PLAN

 Phase 2 - Proposed Irrigation Network

Cont… 12
…cont CONSTRUCTION PLAN

 Phase 3 - Plantation of Grass/ Greens and Tees


Grass and other materials cost - Rs. 6,518,400.00

Cont… 13
…cont CONSTRUCTION PLAN

 Phase 4 - Development of Other Facilities


Construction of Golf Resort - Rs. 513,430,000.00

Cont… 14
…cont CONSTRUCTION PLAN

 Phase 4 - Development of Other Facilities


Construction of Caddies’ Hut (Qty 3) - Rs. 1,500,000.00

Cont… 15
…cont CONSTRUCTION PLAN

 Phase 5 - Operationalization and Maintenance of Golf


Course
Purchase of Maintenance Machinery - Rs. 34,450,000.00

Cont… 16
BUDGETARY REQUIREMENT SUMMARY
 Phase 1 - Preparation of Land and Establishing of Fairways
Golf Course Preparation - Rs. 3,000,000.00
Preparation of sand Bunkers (Qty 5) - Rs. 200,000.00
Construction of Bridge (Qty 2) - Rs. 2,500,000.00
 Phase 2 - Irrigation Network
Installation of Irrigation System - Rs. 14,306,000.00
 Phase 3 - Plantation of Grass/ Greens and Tees
Grass and other materials cost - Rs. 6,518,400.00
 Phase 4 - Development of Other Facilities
Construction of Golf Resort - Rs. 513,430,000.00
Construction of Caddies’ Hut (Qty 3) - Rs. 1,500,000.00
 Phase 5 - Operationalization and Maintenance of Golf Course
Purchase of Maintenance Machinery - Rs. 34,450,000.00
Total Project Cost - Rs. 575,904,400.00 17
MACHINERY REQUIREMENT
 For Construction Works
S/No Description Req. Qty Remarks

01. Backhoe 01

02. Excavator Machine 01


It is planned to obtain
these machineries from
03. Motor Grader machine 01
SLAF for 03 Months
period.
04. Dump Truck 02

05. Four Wheel Tractors 02

Cont… 18
…cont MACHINERY REQUIREMENT

 For Maintenance Works


Approximate Approximate
S/No Description Req. Qty
Unit Price (Rs) Total Price (Rs)
01. Golf Mower Machine 01 15,000,000.00 15,000,000.00
02. Golf Green Cutter Machine 01 4,300,000.00 4,300,000.00
03. Green Iron Machine 01 5,000,000.00 5,000,000.00
04. Grass Cutter Machine 05 30,000.00 150,000.00
05. Two Wheel Tractor 01 800,000.00 800,000.00
06. Four Wheel Tractor 01 4,000,000.00 4,000,000.00
07. Buggy carts (Four-Seater) 02 2,600,000.00 5,200,000.00
Estimated Total Cost (Rs.) 34,450,000.00

19
MAN POWER REQUIREMENT
 For Construction Works
S/ Total Strength
Trade Remarks
No requirement
01 Qualified Agro Officer 01 Supervision of all construction works
02 Agro Asst 18 -For preparation works of 72 Qty of Tees, 18 Qty of Golf
03 Ops Grd 16 Greens and Fairways of the Golf Course

04 Plumber 02
-For establishment of Irrigation System, installation of
05 Mason 04 tube wells and construction works of 03 Qty of Caddy
06 Welders 02 huts
- Required period is 03 months
07 Carpenters 04
Total 47

Cont… 20
…cont MAN POWER REQUIREMENT

 For Maintenance and Operational requirement

Total
S/No Trade Strength Remarks
requirement
Supervision of all Operational and
01. Qualified Agro Officer 01
Administrative Functions
02. Agro Asst 12 Golf Ground Maintenance Duties -12

Golf Ground Maintenance Duties -12


03. Ops Grd 24 Caddies and Ball Boy Duties -10
Pro-Shop Duties/ Buggy Cart Duties-02

Total 37

21
ACTUAL PHOTOGRAPH OF THE SELECTED SITE

22
…cont ACTUAL PHOTOGRAPH OF THE SELECTED SITE

Cont… 23
…cont ACTUAL PHOTOGRAPH OF THE SELECTED SITE

Cont… 24
CONCLUSION