Materi HSE Committee Meeting Evaluasi Apr 2023
Materi HSE Committee Meeting Evaluasi Apr 2023
Materi HSE Committee Meeting Evaluasi Apr 2023
2
3
Objectives
2.Communicated and discussed the present HSE status including legislation update
and HSE performances
4
Agenda
Introduction
HSE Performance
Next Schedule
Closing Meeting
5
Introduction – HSE Committee Organization
Chairman : Azrul Azwar / Herry N. Takahipe
Secretary : 1. Aloysius Fery Kristiono
: 2. Edy Prasetyo
: 3. Edna S. Homer
Member :
1. Hary Fitrianto
2. Dede. A
3. Heri Leo
4. POSB Doctor
5. Damiran
6. Sukari
7. Denny. A
8. Matheus. A
7. Mulyono (Code 4)
8. Reksabumi
9. Schlumberger/Dowell
10. Halliburton/Baroid
11. Valaris
12. CSTS Reps
13. PSU Reps
14. TD Energy
15. Siaptek
16. Weatherford Reps
17. Baker Hughes Reps
18. Dokindo Reps
6
Opening Speech From Top Management
7
Safety Moment
Manage HSE 1. Achieve 100% mandatory Training resilient safety leadership and perform the measurement the 0% 10% 10% 10\% 20%
Training HSE subject as per training safety leadership level to staff and manager level
plan
Arrange training to enforce HSE personnel related to HSE excellence all 10% 10% 10% 10% 40%
2. Improve safety leadership projects.
and culture at all IMU
business Coordination with training department for implementation consolidation 10% 10% 10% 15% 45%
training
Safety Culture To Know the level safety Measurement of the safety culture maturity by independent institution 0%
Maturity culture IMU Business according to the designated project to measure the level of safety culture.
Measurement Lead and initiate by corporate office team
Kept Maintenance 1. Get the update and kept Establish update the master list HSE document at HO and each project 10% 10% 10% 20% 50%
Beyond 360 HSE maintain all HSE system &
Management procedure with valid as per
System (HSEMS) Developing & updating the HSE system & procedure at HO and all project 8% 8% 8% 15% 39%
system
5R Program Maintain cleanliness, orderly Establish and implement 5R program at warehouse area, jetty area, office 8% 8% 8% 10% 34%
Implementation at and safety workplace building and open yard area
Project
Achieving the Meet with the target for each 1. Evaluation of mangrove plants that have been planted in the site area 0% 0% 5% 10% 15%
Enviro initiative as area program for GHG since 2022
part ESG program emission, energy
as part of Indika consumption, waste 2. Conduct ESG program During 2023 (monitoring and evaluation energy 8% 8% 10% 15% 41%
Energy management and water usages)
Requirement
3. Bioreactor composting and continue establish program bank sampah 0% 5% 10% 15% 30%
HSE Lagging Fatality case = 0 1. Improve the system & procedure for criteria of completeness & 8% 8% 10% 15% 41%
Indicator Target Lost Time Injury Rate (LTIR) relevance in the Perfect Plan
Achieve =0
Total Recordable Injury Rate 2. Daily monitoring the perfect card performance and provide 10% 10% 10% 15% 45%
(TRIR) = 0 feedback to all project
10
Monitoring Objective Target Program POSB 2023
3 Evaluate the implementation of a perfect day everyday program and 8% 8% 10% 20% 46%
deliver in the PMR meeting
4. Conduct coordination perfect day review meeting with all projects 8% 8% 10% 20% 46%
HSE Campaign 1. No accident accouris due 1. Delivery biweekly Code of Life Saving Campaign 8% 8% 8% 15% 39%
Program to Code of Life Saving
Violation 2. Evaluate BBS findings related to potential Code of Life Saving 8% 8% 8% 15% 39%
violation quarterly
2. Improve HSE awareness
& group participation 3. Delivery Health routine campaign covid-19, and HIV AIDS and 8% 8% 8% 15% 39%
Hepatitis
5. Safety campaign by weekly sharing topic concern (Weekly HSE 8% 8% 8% 15% 39%
Meeting., Daily Pre-Job Safety Meeting)
Environmental No major finding from 1. Update monitoring and review the compliance at legal register 0% 0% 20% 25% 45%
Legal Compliance Gakum – KLHK and Local quarterly.
DLH (Dinas Lingkungan
Hidup) 1. Conduct environmental monitoring and reporting base on 0% 0% 0% 0% 0%
Environmental permit (semester, yearly)
Emergency Exercise and Drill implement 1.. Review and Update Emergency Response Team organization chart as 0% 10% 15% 20% 45%
Response Team as per ERP and gap per personnel strength and self-assessment of recent potential
Development compliance with emergency emergency condition.
procedure have been follow
up & managed 2. Refresh Training & Awareness for ERT 8% 8% 8% 15% 39%
Total 37%
11
Monitoring Legal Register & Compliance POSB 2023
12
HSE Performance, Lagging Indicator
14
HSE Leading Indicator April 2023
License/Authority 4
Not Ergonomic 4
Personal Protective Equipment 3
Failure to warn/signing 3
Reference Type
Procedure 68 %
Work Instruction 16 %
Locati
Docume Risk Hazard Nearmi
Date on/ Observer Unsafe Behavior Immediate Action SWA Status
nt No. Level Code ss
Area
Team serco
melakukan M-
BBS/ Johanes Stop pekerjaan dan
4/28/2 Bulk maintenance silo License / Complet
2023/04/ Junior instruksikan untuk Low (L) Yes No
023 Plant (painting) tetapi tidak Authority / ed
0206 Inanosa membuat JHA
ada JHA maupun Permit
permit kerja
20
Incident Summarize during April 2023
21
Lesson Learnt – Near Miss
What : Overflow SBM on deck WM Pacific Through The Air Vent
Who : Crew WM Pacific, Team LMP Baroid, Jetty Master, Control Room
How : On Thursday, April 13, 2023, at 12.55, there had been an overflow
during the blow line process at the end of the OBM product transfer through the air vent.
No product enters the body of water/sea because all the scupper plugs are properly installed.
Lesson Learnt :
Pre-Job Safety Meeting (offline) :
Shall be attend by all involved personnel [Service Company Leader & Team; OSV crew (minimum officer & engineer
rank]; HSE Supervisor/Officer; Control Room/Operation Team]
Permit to Work :
Shall be applied with completed supporting document [JHA/JSA with specific subject/tittle.; Loading Plan with specific
tank condition as well as Arrival Condition; Pic/Photo PJSM]
Cek Pressure (blow line) :
always monitor safe capacity of the tank and potential obstacle in the pipeline (at the start or end of transfer)
Open Manhole :
if necessary for ensure and cross-checked tank filling progress (double check with engine room)
Communication :
Periodic/Intermittent clear & informative reporting shall be addressed through Radio channel 6 as well (Radio Operator
need attention). Active warning/signal from Engine Room need to be declare when PJSM conducted.
Spill Prevention :
SOPEP and/or Oil Spill Prevention on board vessel shall be held on and ready to use with placement near air vent. All
Scupper plugs need to be re-ensured are installed & in good condition.
* As per BP’s Control of Work system : Performing Authority (Service Company, Vessel Crew) Area Authority (PM POSB),
Site Controller (HSE POSB)
22
Emergency Respond Activity April 2023
23
HSE Monthly Equip, Tools And Area Inspections
HSE Focus & Concern
Establish & Socialization Perfect Day Program (Perfect Plan & Perfect Card)
HSE Management Committee Meeting
HSE Daily, Weekly both Equipment and Workplace Inspections (APAR,
Hydrant, SCBA, Ambulance, MSDS Inspections., Etc.)
Continue Covid-19 Concern and Prevention at POSB Site Area
Emergency Drill/Exercise – Fire Fighting exercise & Function Test Hydrant
SWA awareness & Code of Life Saving Compliance
Continual Improvement based on Lesson Learnt from previous Incident
Employee Wellness Program
Safe & Positive Behavior Campaign
Personnel Hygiene & Health Campaign
Heat Wave prevention campaign
Clinic Visit
eye problem
11% Common Cold
fever 41%
15%
26
Clinic Visit
eye problem
11% Common Cold
fever 41%
15%
27
Number of Visits Based On Residence
35
31
30
25
20
15
10 9
5
0
Position
In Camp Out Camp
Jumlah Visitasi Per Tipe Pekerjaan April 2023
16 15
14
14
12 10
10
8 Position
6
4
2 1
0
Operation / Field CLIENT-SUBCONT Maintenance Office Work
Work
28
TOP 5 DISEASES (In Camp)
Dyspepsia
25% Common Cold
38%
Stomatitis
13%
ISPA Myalgia
13% 13%
stomatitis
10%
fever common cold
15% 35%
caries dentis
15%
abscess of skin
25%
29
Prevalence of Cardiovascular (BP) Diseases Based on MCU Results
100.00% 98.35%
80.00% 1 orang 1 orang
20.00%
0.83% 0.83%
0.00%
Normal BP (Blood Hypertension Stage 1 Hypertension Stage 2
Pressure)
*PS April 2023 = 121 Persons
Hipertensi Grade 1 : Receptionist, Operator Crane, Mechanic Supervisor, Mechanic, Operator Forklift, Helper Utilities, Rigger, Helper Waste Management,
Training Administrator, Warehouse Foreman, Helper Survey, Material Engineer, Helper Rigging Loft, Helper Rigger Operator Forklift
30
Prevalence of Metabolic Diseases Based on MCU Results
*PS April 2023 = 123 Persons
86.99%
METABOLIC DISEASE
AU >7.9 (masuk daftar Wellness Program) : 7 orang
7.32%
5,00% Series1
0%
al ia
Susp. DM (masuk daftar Wellness Program): 1 orang ia ia
rm e m e m e m
No yc ric ol
gl r Chol >239 (masuk daftar Wellness Program): 9 orang
e r eru ste
p p le
Hy Hy cho
p er
Hy
Hypercholesterolemia : Helper Maintenance, SHE Officer, Material Engineer, Helper Survey, Material Coordinator, Rigger, Admin Officer,
Operator Forklift, Operation Foreman, Operator Trailler, Helper Rigger, Warehouseman
Hypergllycemia : Material Engineer, Training Administrator, Operation Foreman, Operator Trailler, Helper Rigger, Operator Crane
Hyperurisemia : Warehouseman, Helper Rigger, Helper Rigging Loft, Waste Management Administrator, Operator Crane, Operator Trailler, Operator Forklift,
Operation Supervisor, Site General Admin Officer, Warehouse Assistant, Operation Foreman, Helper Survey, QA/QC Engineer, SHE Officer, Base Maintenance
Foreman, Dispatcher
31
Wellness Program POSB Clinic April 2023
Total : 52 Employee
Health Problem Total Actual Normal :13
Tinggi : 0
Hiperglikemia & DM 13 13
Dislipidemia 34 16
Normal : 4
Hiperuricemia 27 17 Tinggi : 12
Normal : 14
Tinggi : 3
32
Preventive – Random Fatigue Test April 2023
33
H RA
Maintenance Alat Berat
Existisng Control Measures Risk Rating (C x L)
Last Conse Likeliho Additional
review Lokasi Aktivitas Hazard Risk Eliminati Substitu Eng. Adm. Control PPE Control
quenc od Risk Rating Measures
date on tion Control e
34
H RA
Maintenance Alat Berat
Existisng Control Measures Risk Rating (C x L)
Last Conse Likeliho Additional
review Lokasi Aktivitas Hazard Risk Eliminati Substitu Eng. Adm. Control PPE Control
quenc od Risk Rating Measures
date on tion Control e
Posisi janggal
tubuh saat bekerja - JHA
24-Apr-23 Open MAINTEN
(saat mengangkat
- Konseling
Yard ANCE HV Muscle - Pengaturan jam
Ergonomi barang, memukul _ - _ _ Minor Unlikely Low _
palu, menaiki spasm kerja / shift
- Sosialisasi stretching
tangga sambil - Melakukan stretching
memperbaiki alat)
Beban kerja
berlebih - Pengaturan jam
Psikososial berpotensi Stress _ _ _ kerja / shift _ Minor Unlikely Low _
meningkatkan
terjadinya Fatigue - Olahraga
dan stress.
35
Preventive – Drug and Alcohol Test April 2023
Testing
Informed Consent
Sampling
Daftar hadir 36
Fit For Work
100 Valid; 93
90
80
70 Telah
60 dihubungi by
50 phone
40
30
20 On Progress;
10
10 Expired; 4
0
EXPIRED DALAM WAKTU
DEKAT
MEI 8
JUNI 6
JULI 1
37
RECENT HEALTH ISSUES-1
38
COVID-19 Update POSB Sorong
6 12
39
Health Performance Index (HPI – April 2023)
ANY SUGGESTION / COMMENT?
THANK YOU
42