Final Tesla Report
Final Tesla Report
Final Tesla Report
By:
Victor Okoye
Liladhar Patil
Adetola Adelaja
Rupali Rathore
Simranjit Kaur
Project Charter
• Title: 1 Million Tesla Charging Stations in Canada.
• Goal
This project also aims to provide EV owners with accessible and fast charging options across major cities, highways, and
popular travel routes. And to alleviate range anxiety, increase the confidence of electric vehicle owners, and contribute to
the transition to sustainable transportation in Canada
• Scope
Our approach to deploying 1 million Tesla charging stations in Canada focuses on creating an efficient and scalable
infrastructure that ensures a reliable power supply and integrates advanced technologies. By conducting thorough site
surveys and obtaining necessary permits, we will identify suitable locations strategically placed for accessibility and
convenience. Through the implementation of energy management systems, high-power charging capabilities, and smart
algorithms, we will optimize charging operations and maximize efficiency. Furthermore, we prioritize enhancing the user
experience by providing amenities and convenience features at the charging stations, ensuring a seamless and enjoyable
charging process. With these measures in place, we are confident in our ability to create a robust charging network that
promotes the widespread adoption of electric vehicles and supports a sustainable transportation ecosystem in Canada.
Project Charter
• Deliverables
– To Install Functional Charging Stations.
– To increase charging Speed and Capacity Optimization.
– To Improve charging network Connectivity and Management Systems.
– Compatibility Updates with other EV.
– Geographic Expansion in Canada.
– User Experience Enhancements.
– Future Expansion and Development Plans.
– Maintenance and Support to existing charging stations.
• Problem Statement
Tesla's initiative to create 1 million chargers in Canada aims to address numerous challenges faced by EV users.
the key challenges are:
– Range Anxiety: One of the main concerns for electric vehicle owners is the fear of running out of charge and being stranded.
– Slow Electric Vehicle Adoption: By expanding the charging infrastructure, Tesla aims to accelerate the adoption of electric vehicles in Canada.
– Long-Distance Travel: Electric vehicles have traditionally faced challenges when it comes to long-distance travel, requiring frequent stops for
charging.
– Environmental Impact: Tesla aims to reduce dependence on fossil fuels and mitigate the environmental impact of transportation.
Project KPI’s
• Number of Charging Stations Deployed
• Charging Capacity (kW or MW)
• Charging Speed (kWh or miles of range added per hour)
• Network Availability and Uptime
• Customer Satisfaction
• Infrastructure Utilization
• Environmental Impact (e.g., reduction in greenhouse gas
emissions)
• Cost and Budget Performance
• Stakeholder Engagement
• Timelines and Milestones
Stakeholder Analysis:
Stakeholder Role/Interest Influence/Power Attitude/Support Engagement Strategy
Government Authorities Regulatory oversight, infrastructure planning High Supportive Regular meetings, collaboration on permits and regulations
Utility Companies Electricity supply, grid integration High Supportive Partnerships for grid upgrades, joint initiatives
Tesla Customers Charging access, convenience Medium Supportive Customer surveys, communication on charging station locations
Electric Vehicle Owners Charging infrastructure availability Medium Supportive Outreach programs, information on charging station expansion
Environmental Organizations Sustainability, clean energy promotion Medium Supportive Collaboration on green initiatives, PR support
Local Communities Infrastructure impact, economic benefits Medium Mixed Community engagement, public meetings, addressing concerns
Auto Dealerships Electric vehicle sales Low Mixed Collaboration on charging station promotion, incentives
Risk Analysis:
Risk Likelihood Impact Severity Mitigation Strategy
Insufficient Power Supply High High High Collaborate with utility companies to assess power demand and plan for grid upgrades.
Maintain close communication with government authorities, proactively address regulatory requirements, and ensure
Regulatory Delays Medium High Medium
compliance.
Conduct thorough site surveys and feasibility studies to identify suitable locations for charging stations. Collaborate
Limited Access to Suitable Locations High High High
with property owners and municipalities to secure necessary permits and approvals.
Develop training programs and partnerships with educational institutions to upskill workforce in charging infrastructure
Lack of Skilled Workforce Low Medium Low
installation and maintenance.
Implement robust disaster preparedness plans, including backup power solutions, monitoring systems, and quick
Natural Disasters Low High Medium
response protocols. Collaborate with local authorities for emergency management.
Conduct detailed cost estimation and financial analysis. Regularly monitor project expenses, implement effective
Cost Overruns Medium High Medium
budget management, and proactively address any deviations.
Conduct comprehensive testing and compatibility assessments to ensure seamless integration with Tesla vehicles.
Technology Compatibility Issues Medium Medium Medium
Regular updates and maintenance to address any compatibility issues.
Risk Severity Matrix
Risk Event Likelihood Impact Severity
Insufficient Power Supply High High High