Procedure On How To Conduct Ethernet Testing

Download as ppt, pdf, or txt
Download as ppt, pdf, or txt
You are on page 1of 9

Procedure on How to Improve Ethernet Testing

(Globe IPPDH Project)

www.huawei.com

HUAWEI TECHNOLOGIES CO., LTD.


HUAWEI TECHNOLOGIES CO., LTD. Page 1
CASE 1. (Provisioned already)
AT DOWNLINK site:
WIMAX NODE B LAN cable is not yet connected to the EMS port

AT UPLINK site:
There is a LAN cable already connected in EMS board going to the existing Globe Mux

DONW LINK UP LINK

EMS Board EMS Board


1 2 3 4 1 2 3 4

WIMAX
LAN CABLE

Node B OSN or ALU


MUX

CALL Huawei IPPDH team before conducting any Ethernet testing

MAKE SURE NOT TO PUT ANY LOOPBACK CONNECTORS UPON REACHING THE SITE (NOT to put
loopback cable either in the UPLINK site or in the DOWNLINK site).

HUAWEI TECHNOLOGIES CO., LTD. Page 2


PROCEDURE for the ETHERNET TEST (during PAT) Case 1:

DONW LINK UP LINK

EMS Board EMS Board


1 2 3 4 1 2 3 4 1. Remove the LAN cable from EMS board going to Globe
existing Mux

1
WIMAX

Node B OSN or ALU MUX

DONW LINK UP LINK

EMS Board EMS Board


1 2 3 4 1 2 3 4 2. In preparation for the ETHERNET testing, placed the
LOOPBACK RJ45 connectors in EMS port
2 (NOTE: NEVER insert any loop-back connectors
WIMAX neither in the Uplink EMS port nor in the
JSDU
Node B (Ethernet Tester) 1 Downlink EMS port if the LAN cable between
EMS board and Globe existing Mux is not yet
OSN or ALU MUX removed)

HUAWEI TECHNOLOGIES CO., LTD. Page 3


PROCEDURE for the ETHERNET TEST (during PAT) Case 1:
DONW LINK UP LINK

EMS Board EMS Board


1 2 3 4 1 2 3 4
3. After conducting ALL Ethernet testing, removed all the
loopback connectors
3
WIMAX
Ethernet Tester
Node B (JDSU)

OSN or ALU MUX

DONW LINK UP LINK

EMS Board EMS Board


1 2 3 4 1 2 3 4 4. Return back the LAN cable connecting the EMS port
and the OSN or ALU MUX

4
WIMAX
Ethernet Tester
Node B (JDSU)

OSN or ALU MUX

HUAWEI TECHNOLOGIES CO., LTD. Page 4


CASE 2. (Integrated already)
AT DOWNLINK site:
WIMAX NODE B LAN cable already connected to the EMS port

AT UPLINK site:
There is a LAN cable already connected in EMS board going to the Globe existing Mux

DONW LINK UP LINK

EMS Board EMS Board


1 2 3 4 1 2 3 4

LAN CABLE
WIMAX LAN CABLE

Node B OSN or ALU MUX

CALL Huawei IPPDH team before conducting any Ethernet testing

MAKE SURE NOT TO PUT ANY LOOPBACK CONNECTORS UPON REACHING THE SITE (NOT to put
loopback cable either in the UPLINK site or in the DOWNLINK site).

HUAWEI TECHNOLOGIES CO., LTD. Page 5


PROCEDURE for the ETHERNET TEST (during PAT) CASE 2:
1. Call and confirm with Huawei IPPDH team if subcon
can now removed the LAN cable of the EMS port going
to OSN or ALU Mux (UPLINK site).
DONW LINK UP LINK
2. Huawei Team to inform GT NOC to confirm the FE
testing activity is about to start.
EMS Board EMS Board
We propose to applied MAR for this procedure to be
1 2 3 4 1 2 3 4 able to disconnect any existing connection. Expected
downtime is less than 10 minutes.
LAN CABLE

WIMAX

Node B OSN or ALU MUX

DONW LINK UP LINK


1. Remove the LAN cable from EMS board going to
ALCATEL SDH (Mux) or OSN Mux
EMS Board EMS Board
1 2 3 4 1 2 3 4
2. In preparation for the ETHERNET testing, placed the
LOOPBACK RJ45 connectors in EMS port
2
(NOTE: NEVER insert any loop-back connectors
WIMAX neither in the Uplink EMS port nor in the
Ethernet Tester
(JDSU) 1 Downlink EMS port if the LAN cable between
Node B
EMS board and ALU/OSN Mux is not yet
OSN or ALU MUX removed)

HUAWEI TECHNOLOGIES CO., LTD. Page 6


PROCEDURE for the ETHERNET TEST (during PAT) CASE 2:
DONW LINK UP LINK

EMS Board EMS Board


1 2 3 4 1 2 3 4
3. After conducting ALL Ethernet testing, removed all the
loopback connectors
3
WIMAX
Ethernet Tester
Node B (JDSU)

OSN or ALU MUX

DONW LINK UP LINK

EMS Board EMS Board


1 2 3 4 1 2 3 4 4. Return back the LAN cable connecting the EMS port
and the Alcatel SDH Mux in the UPLINK as well as the
LAN cable connecting the EMS port going to Wimax
4 Node B in the DOWNLINK.
WIMAX v
Ethernet Tester
Node B (JDSU)

OSN or ALU MUX

HUAWEI TECHNOLOGIES CO., LTD. Page 7


Summary

1. Huawei subcon to call Huawei IPPDH Project Team before conducting any
Ethernet testing during the PAT.
2. We propose to have approved MAR for the 10 minutes downtime for all
RFS Wimax BTS. In this way, we can remove all existing connection prior to
any FE testing.
3. Remove the provisioning cable connected in the IDU FE port of the uplink site
(site B).
4. After completing Ethernet testing, remove loopback cables used in the
testing.

HUAWEI TECHNOLOGIES CO., LTD. Page 8


Thank You
www.huawei.com

HUAWEI TECHNOLOGIES CO., LTD. Page 9