Procedure On How To Conduct Ethernet Testing
Procedure On How To Conduct Ethernet Testing
Procedure On How To Conduct Ethernet Testing
www.huawei.com
AT UPLINK site:
There is a LAN cable already connected in EMS board going to the existing Globe Mux
WIMAX
LAN CABLE
MAKE SURE NOT TO PUT ANY LOOPBACK CONNECTORS UPON REACHING THE SITE (NOT to put
loopback cable either in the UPLINK site or in the DOWNLINK site).
1
WIMAX
4
WIMAX
Ethernet Tester
Node B (JDSU)
AT UPLINK site:
There is a LAN cable already connected in EMS board going to the Globe existing Mux
LAN CABLE
WIMAX LAN CABLE
MAKE SURE NOT TO PUT ANY LOOPBACK CONNECTORS UPON REACHING THE SITE (NOT to put
loopback cable either in the UPLINK site or in the DOWNLINK site).
WIMAX
1. Huawei subcon to call Huawei IPPDH Project Team before conducting any
Ethernet testing during the PAT.
2. We propose to have approved MAR for the 10 minutes downtime for all
RFS Wimax BTS. In this way, we can remove all existing connection prior to
any FE testing.
3. Remove the provisioning cable connected in the IDU FE port of the uplink site
(site B).
4. After completing Ethernet testing, remove loopback cables used in the
testing.