Control Valve Animation
Control Valve Animation
Control Valve Animation
C/S Team
28
29
22
12 23
13
24
21 27
20
10 19 11
18
8 9
17
15
16 7
6
14
26
25
5 4
2
3
C/S Team
1. Main relief valve
• Setting pressure
- Normal working :330 bar
- Pressure up ( Boost press.) : 350 bar
Fr
on
t
Front view
C/S Team
2. Check Valve
Fr
on
t
Front view
C/S Team
3. PA/PT Orifice
Fr
on
t
Front view
C/S Team
4. Travel spool (Right)
Fr
on
t
Front view
C/S Team
5. Travel straight spool
Fr
on
t
Front view
C/S Team
6. Travel spool (Left)
Fr
on
t
Front view
C/S Team
7. Option spool
Fr
on
t
Front view
C/S Team
8. Bucket spool
Fr
on
t
Front view
C/S Team
9. Swing spool
Fr
o nt
Front view
C/S Team
10. Boom 1 spool
Fr
on
t
Front view
C/S Team
12. Boom 2 spool
Fr
o nt
Front view
C/S Team
12. Arm 2 spool
Fr
on
t
Front view
C/S Team
13. Arm 1 spool
Fr
on
t
Front view
C/S Team
14. Overload valve for option
Fr
on
t
Front view
C/S Team
15. Boom priority valve (Right side)
Fr
on
t
Front view
C/S Team
15. Boom priority valve (Left side)
Fr
o nt
Front view
C/S Team
17. Overload valve for bucket
Fr
on
t
Front view
C/S Team
18. Overload valve for boom
Fr
on
t
Front view
C/S Team
19. Swing priority valve & Check valve
Fr
o nt
Rear view
C/S Team
20. Drain orifice
Fr
o nt
Front-top view
C/S Team
21. Boom holding valve
Fr
on
t
Front view
C/S Team
22. Arm holding valve
Fr
on
t
Front view
C/S Team
23. Check valve for arm 2 spool
Fr
on
t
Front-top view
C/S Team
24. Overload valve for arm
Fr
on
t
Front view
C/S Team
25. Check valve for parallel line
Fr
on
t
C/S Team
26. Orifice check valve for travel
Fr
on
t
C/S Team
27. Arm regeneration valve
Fr
on
t
Front view
C/S Team
28,29 Foot relief valve ( Negacon valve)
Fr
on
t
C/S Team