• Usually low liquid inflow to Slug catcher, however slugs were observed as reported by GASCO operator.
EAST VALVE STATION
EVS C-1 BLOWCASE CONNECTED WITH K-23 / K-35
Dump Time 8 minutes
Equalizing Time 1.3 minutes
Filling Time 10 minutes
Total 3 dumps in one hour
Blowcase Dumping Capacity 280 BPD
• Two control valves in parallel are used to control liquid level in HP slug catcher.
• Two control valves in parallel are used to control liquid level in LP slug catcher.
• As per CCR operator, all mentioned valves limit at the event of flow line pigging.
KADANWARI CENTRAL FACILITY
• Fluid from HP and LP slug catchers comingles in a pipeline header, from where flow can be
diverted towards kadanwari PW treatment system or towards Miano PW treatment system.
• As per CCR operator kadanwari PW treatment system is currently obsolete. Liquid from HP
and LP slug catchers move towards Miano PW treatment system.
HP SC controller
LP SC controller