Project SURAT DIAMOND BOURSE
Project Location Khajod, Surat, Gujarat
Type of Project Commercial Complex
Structure Details 9 Towers of G+15 with 2 Basement
Built-up Area 65,00,000 Sqft
Contract Duration 30 months
Date of Commencement 5 December 2017
2
Cost Consultant Gleeds Hooloomann Consulting (I) Pvt. Ltd.
3
Surat Diamond Bourse
(G+15 9 Towers + 10 Podiums +
Spines with 2 Basements)
Window sills
Substation, & Frame
Utilities, Plant
room, DG room
including finishes,
fencing 4
SALIENT FEATURES OF PROJECT
4200+ Diamond Merchandise offices
Obstacle free landscape view from every office
Travel Time: Security gate to office in 4 minutes
24ft wide central Spine corridor connecting all offices
Heightened security
Landscape based on PANCHTATVA
9 Iconic Towers G+15 Floors
Office ranging from 300 to 75,000 sqft
Radiant cooling system in central spine corridor
125 Lifts connecting the floors @3m/s
PLATINUM rated green building
Club with Conference hall, Health club, Banquet hall, Restaurant and much
more.
Each building will have 8 ft. wide office corridors, 13ft. floor height and the
ground floor being gracefully 19ft. All the offices are centrally air
conditioned, through chilled water-cooling system, with each sighting onto
the exquisitely designed landscape courts spanning almost 200ft wide and
300ft long.
5
Project is basically divided in three parts:
FLOOR AREA OF TOWER, PODIUM AND SPINE
SDB-1
MEASUREMENT IN SQ. MT.
• Tower – 1,2,3
• Club house TOWER AREA SPINE AREA PODIUM AREA
• Spine 1 T1 3166 SP1 2011 P1 5648
• Podium – 1,2,3 T2 3568 SP2 2246 P2 3379
T3 2163 SP3 1837 P3 8115
SDB-2 T4 2301 SP4 2125 P4 7381
• Tower – 4,5,6 T5 1543 SP5 3953 P5 6844
• Spine – 2,3 T6 1652 P6 7077
• Podium
. – 4,5,6 T7 1543 P7 7513
T8 1547 P8 8179
SDB-3 T9 1558 P9 10738
• Tower – 7,8,9 P10 7745
• Spine – 4,5
• Podium – 7,8,9a,9b,10
• Utility building
Each of the SDB1, SDB2 and SDB3 has its own team for all the execution activities.
All the teams are headed by a central office from where all the departments like planning, billing, procurement and so on are
handled.
6
MAJOR QUANTITIES MILESTONE DATE REVIEW
MS NO MILESTONE DESCRIPTION (As per Tender AS PER
Only) BASELINE PLAN
9
QUALITY
QUALITY ASSURANCE
Quality Assurance is defined as a procedure or set of procedures intended to ensure that a product or service
under development (before work is complete, as opposed to afterwards) meets specified requirements. It is a
way of preventing mistakes and defects in manufactured products and avoiding problems when delivering
solutions or services to customers; which ISO 9000 defines as "part of quality management focused on
providing confidence that quality requirements will be fulfilled”.
Two principles included in Quality Assurance are:
Fit for purpose
Right first time
QUALITY CONTROL
It is set of procedures intended to ensure that a manufactured product or performed service adheres to a defined
set of quality criteria or meets the requirements of the client or customer.
10
Roles and Responsibilities:
Prepares the Quality Management Plan (QMP) for the project with inputs from the Site/Planning
Manager/Engineer & Site/Construction Manager. QMP consists of:
• The Project Organization Chart
• The Work Method Statement (WMS)
• Checklists for various works
• Quality Assurance Plan
• Quality Control Plan
• Material Testing Plan
• QA/QC Inspection Procedures and Formats
• Quality Control Reporting, Audit and Corrective Action Reports
Carries a format for Observation and Surveillance report. Surveillance of works and recording
observations to improve quality of work.
Issues NCRs in case of serious deficiencies in works.
Follow up for the closure of NCR.
Analyses the cause of non-conformity in product / process or services.
Records observations of Site/ Project In-charge during quality walk.
Assists Site/Project In-charge to identify root cause for every defect/non-conformity and set the target
date for corrective action.
11
MONTHLY QUALITY REPORT
12
PLANNING AND SCHEDULING
FLOWCHART
“Failing to plan is planning to fail”
13
ROLES AND RESPONSIBILITIES:
Preparation of Master Construction Schedule which includes WBS, assignment of duration to activities, technical
interdependencies, slab cycle times and critical activities.
Coordinate with Client regarding any issues related to project.
To write down the Minutes off meeting (MOM).
Preparation of Cash flows.
Preparation of site logistics plan.
Preparation of project execution plan.
Resource scheduling (Labor and staff).
Preparing the construction schedule for each stage.
Taking daily updates of the project and tracking it as per planned.
Providing method statements keeping in mind all the site conditions and monitor it.
Making of daily, weekly and monthly progress report for the higher authority to view the progress of project.
Raise RFI if there is any query related to drawing and structural details.
Discuss with contractor representative for resources requirement as per contract document.
Notify higher authorities for any shortage of resources.
Prepare plan for executing specific activities like mass concreting.
Making 3 months look ahead plan for execution depending on availability of drawings, materials, and other
resources which is mitigation plan to achieve planned schedule.
14
PROJECT MASTER SCHEDULE
15
PROJECT MONITORING
16
PROJECT TRACKING
17
REPORTS GENERATED
Internal DPR (Daily Progress Report)
PSP Projects_Surat Diamond Bourse\SDB\Planning\DPR,WPR,MPR,3 months look ahead
plan\Internal DPR April 19.xlsx
Client DPR
PSP Projects_Surat Diamond Bourse\SDB\Planning\DPR,WPR,MPR,3 months look ahead
plan\Client DPR - 30.04.2019.xlsx
WPR (Weekly Progress Report)
PSP Projects_Surat Diamond Bourse\SDB\Planning\DPR,WPR,MPR,3 months look ahead
plan\WPR 22nd April 19 to 28th April 19.xlsx
MPR (Monthly Progress Report)
PSP Projects_Surat Diamond Bourse\SDB\Planning\DPR,WPR,MPR,3 months look ahead
plan\MPR -April-19.xlsx
3 Months Look Ahead Plan
PSP Projects_Surat Diamond Bourse\SDB\Planning\DPR,WPR,MPR,3 months look ahead
plan\Apr_May_Jun 19 - SDB Three months look ahead plan.xlsx
18
PROCUREMENT
INDENT
Enquiry
Quotation
Comparitive
Statement
Generate
Purchase Order
19