Sewerage
Sewerage
Sewerage
General
Design,Supply,Construction,Insta 50.00
llation, Testing, Commissioning
of STP including civil,
mechanical, electrical,
instrumentation and associated
Works for 25 MLD STP plant
Cost Elements
Particulars
Sewer System
Reuse of Water
construction of New OHT Reuse water storage
Providing , lowering, laying & jointing Reuse network of various
diameter in project
Per Capita Cost of Sewerage
Asset Review
Asset Inventory
Detailed consumer survey
Water Audit
Energy Audit
Identification of leakage points
Credit Rating
It is the assessment of credit worthiness of the ULBs
using the established methodology as per the SEBI
Guidelines.
To identify the areas of strengths and weakness of the
ULBs in management of its finances.
Recommend a road map for Financial improvement
plan to improve credit rating.
To assess the borrowing capacity of the ULB.
Key Questions
1. What is the extent of financial dependence on the
state
2. The intrinsic credit quality of the Government.
3. How much of costs are recovered from own revenues.
4. Track record of revising user charges
5. What is the standard of basic services.
6. The progress in introducing reforms.
7. Nature and magnitude of projects envisaged.
8. How equipped is the ULB to handle such projects.
Forms of PPP
1.Contracts in which Private Sector Invests capital in
full or in Part
2.Contracts in which Private Sector does not Invest
Capital.
Where Capital is Invested,
BOT,BOO,BOOT.
When money is not invested, they are
Management/Service/Works Contracts.
PPP Models
Option Asset O&M Investment Risk Duration
ownership
Service Public Private Public Public 1-2 years
Contract
Manageme Public Private Public Public 3-5 Years
nt Contract
Lease Public Private Shared Shared 8-15 years
BOT/BOO Public/Pri Private Private Private 20-35 Years
vate
Annuity Private Private Private Private 10-15 years
Viability Gap Funding Scheme
Provides fund in the form of grant to meet Gap to
make PPP viable.
Funding of 20% of the Project Cost and additional 20
% in case where Private Sector Public Infrastructure
assets and provides infrastructure services for a
fee/user charge under a concession agreement.
Concession is granted on the basis of transparent
bidding process.
One of the bidding parameter is grant of VGF
Alandur Sewerage Project
To improve the standard of living of the residents of
Alandur (on par with that of Chennai);
Means of Finance
Equity 322.70 Crores.
Debt 700.30 Crores.
FIRSTs
1.First water and sanitation project to be implemented
on PPP basis.
2. Largest private investment in urban sector.
3. Viable model to implement other projects.
4. Providing quality water to the industries.
5. Protect ground water exploitation.
6. Position TN as the textile export state.
7. Help industrial growth.
8. Beneficiaries participating in the Project.
Thank You