CONTOUR CRAFTING

Presented by
Temy peter
1
CONTENTS
•INTRODUCTION
•DEMAND FOR INNOVATION
•CONTOUR CRAFTING METHODOLOGY
•APPLICATIONS
•ADVANTAGES
•IMPACTS
•CASE STUDY-NASA
•CASE STUDY-CHINA
•CONCLUSIONS
•REFERENCES
2
INTRODUCTION
•Current “cast-in-place” construction used in the field
since roman ages
•Remains labour intense
•Problems in the areas of productivity, quality, safety,
and skilled labour shortages
•To address these issues, various types of automation
and robotic technologies have been proposed and
implemented
•Require a paradigm shift in process technology
3
DEMAND FOR INNOVATION IN
CONSTRUCTION TECHNIQUES

4
CURRENT CONSTRUCTION
•Labor intensive
•Slow
•Dangerous
•Corrupt
•Over budget
•Low work quality
•Difficult to control

5
CONTOUR CRAFTING(CC)

6
CC
•Type of 3D printing technology
•“Additive fabrication” technology
•Building layer by layer
•Combination of extrusion and filling
•Uses CAD-CAM
•Do automated
plumbing, electrical
network etc..

7
Contd..

8
IDEA BEHIND THE TECHNIQUE

CONSTRUCTION TOOLS COMPUTER AIDED ROBOTICS


DESIGN

9
CONTOUR CRAFTING PROCESS
3D PRINTER IN CONTOUR CRAFTING

10
QUIKRETE® Fast-Setting
Concrete Mix
special blend of fast-setting
cements, sand and gravel
designed to set hard in
approx. 20 to 40 minutes

Placing concrete in CC
11
NOZZLES AND TOOLS

12
Cylinder
Connector
Bevel gear
Nozzle
Side trowel
Control mechanism
of movable side
trowel
501
Trowel rotation system of the
CC process

CC single nozzle
CC multinozzle
13
Contd..

14
MOULDS

15
CC -METHODOLOGY
•Planning and optimisation
•Defining tool path and nozzle control
•Operational facts
•Logistic issues
•Environmental impact
•Sustainability potential

16
HOUSE BUILDING PROCESS
Flattening of the surface

Excavation of trenches for foundation

CC runs on specially developed rails

17
Cross beam is provided to link the limbs

The raw material is pumped using


pipes
18
19
As the concrete hardens fast , it
provides the support for the other
layer

Window and ceilings are


laid using robotic arms

As the pre manufactured ceiling


is being laid it offers surface roof

20
VIDEO ON CC

21
APPLICATIONS
• DESIGN FLEXIBILITY

•MULTIPLE MATERIALS

•AUTOMATED PLUMBING

•AUTOMATED ELECTRICAL
Construction of adobe
AND COMMUNICATION WIRING: buildings

•AUTOMATED PAINTING:

22
Complex Wall Section Automated Tiling
23
Plumbing modules and grippers

24
Electrical modules
AUTOMATED REINFORCEMENT

25
Machines used in Utilities

Reinforcement

Electrical Works
Painting

Plumbing

26
Free-standing Objects / Industrial
parts

27
APPLICATIONS

• Commercial applications
• Emergency housing
• Low income housing
• Space colonies

28
Lunar Construction Road construction

29
Adobe house Construction
IMPACTS OF CC
ECONOMIC IMPACT

EMPLOYMENT IMPACT

SOCIAL IMPACT

REGULATORY IMPACT

ENVIRONMENT IMPACT

ARCHITECTURAL IMPACT
30
Construction by Mobile Robots

31
EXTRATERRESTRIAL APPLICATIONS
Case study 1-Construction on MARS & MOON by NASA

•To shield heat, cold, cosmic


rays and meteorite impact
•Landing and launching off
will be much safer
•Ability to construct support
less structures
•Ability to use in-situ
materials Fuel storage tank in space32
Contd..

33
Machine at NASA

34
Case study 2
Winsun Design Engineering, China

35
INDIAN SCENARIO IN CC

36
ADVANTAGES OVER
CONVENTIONAL METHODS
The reduction of construction duration by
Implementing contour crafting:

STUDY CARRIED OUT BY :Carel M. Rouhana and Farook R. Hamzeh

MODEL USED: single unit square shaped of size by EZStrobe

METHOD OF CONSTRUCTION: conventional construction method


and contour crafting
RESULT

duration of 29.54±0.065
duration of 90.52±2.12 hours
hours with a standard error
with a standard error of 0.067
of 0.002
37
COST REDUCTION BY CC
S NO. COST REASON VARIATION USING CONTOUR
PORTION% CRAFTING
1 20-25 FINANCING SHORT PROJECT LENGTH AND
CONTROL OF TIME TO
MARKET WILL DRAMATICALLY
REDUCE THE COST.

2 25-30 MATERIAL WILL BE WASTE LESS (LEAN)


PROCESS.
3 45-55 LABOR WILL BE SIGNIFICANTLY
REDUCED

STUDY CONDUCTED BY MR. BEHROKH KHOSHNEVIS 38


COMPETITIVE ADVANTAGE

39
LIMITATIONS OF CC

•Employment issues
•Initial cost of machine is high
•Foundation need to
constructed conventionally
•Not suitable for high rise
buildings

40
CONCLUSION
•Immediate application in low income housing
•Emergency shelter construction
• Little or no material waste
•Construction of structures with exotic architectural
designs
•High speed and efficiency
•Promising new method in construction industry

41
REFERENCE
1. Extraterrestrial Construction Using Contour Crafting,behrokh
Khoshnevis, Professor (Khoshnev@usc.Edu, august 15,2012
2. Concrete Wall Fabrication By Contour Crafting,dooil Hwang And
Behrokh Khoshnevis,daniel J,2014
3. International Journal Of Research In Advent Technology (E-ISSN:
2321-9637, 19 March 2016 , Contour Crafting A Potential Revolution
In The Construction Industry By Nohil B. Thakur
4. Journal Of The International Association Of Advanced Technology
And Science, automated Constructions By Contour Crafting,piyush
Sharma, department Of Civil Engineering
5. The Reduction Of Construction Duration By Implementing Contour
Crafting ,Conference Paper, June 2014
6. International Journal Of Engineering Research & Technology (IJERT)
ISSN: 2278-0181,IJERTV4IS080593),Aug ust 2015
7. Automated Construction Using Contour Crafting,B. Khoshnevis, H.
Kwon, And S. Bukkapatna 2011 42
43