Balco Railway Project: Ohe Works
Balco Railway Project: Ohe Works
Balco Railway Project: Ohe Works
OHE WORKS
OHE
Major Activity
UOM
Qty
Foundation
Nos
176
75
101
Mast erection
Bracket
erection
Nos
183
100
83
Nos
342
120
222
Wiring
TKM
34.5
16
Power Block
Hours
Capacitor Bank
(CB, PT, CT,
etc) and BayTSS
Sets
CR Panel &
SCADA
LS
modificationTSS
Battery bank &
RTU- SSP
Testing &
Commissioning
SSP
34.5
LS
LS
Remarks
Bed and track alignment
required for approx 100
foundations.
12.5
34.5
2
1
Mar'1
5
2
1
OHE
Other Activities-
1.
2.
3.
4.
5.
OHE
Major Material Required1. Complete Capacitor Bank items (PT, CT, CB, SR, steel str., sps,
cables, C&R panel of Cap Bank, LA, etc).
2. OHE & PSI Spares items for Railway.
3. Auxiliary Transformers(10KVA)-3 Nos including CLS Panel, LV
Box, D/o Fuse and Cable(2x70 sq mm).
4. Galvanised mast (Bridge & AT)
5. Cu Jumper wire (150 sq mm & 160 sq mm)
6. Large Span Wires (130 sq mm)
7. 40x6 MS Flat for Bonds
8. Number Plates & Caution Boards for OHE, TSS, SSP, Feeder.
9. 6 Core Optical Fibre Cable 7000 mtr (for SSP RTU)
10.C&R Panel for TSS
11.Data logger cards for RTU at TSS
12.Insulated Catenary
OHE
P& M Required
1. Wiring Trolley
2. Ladder trolley
3. Tirfor/ hook-chook(1.5T/2T), Pull-lift (0.75T, 1.5T), Misc tools.
4. Aluminium Ladder
5. Bench Drilling Machine
6. Cutting Machine.
7. Rail hole Drilling Machine for Bonding
8. Dropper making Zig
9. Pick Up van for material shifting inside & outside plant
Note: For Sl No 3 to 8- Required in case sub-contractor engaged without T&P.
Input Required
A. Internal10. Dedicated store supervisor for new inside plant store for counting, stacking, handling,
issue of OHE materials.
11. Finalization of OHE foundation contractor.
12. Finalization of OHE electrical contractor.
13. OHE foundation fitters during foundation works.
14. OHE fitters during OHE execution works.
B. Client15. OHE expert/ consultant for supervision and certification of OHE works.
16. Track lowering drawing approval from Railway.
17. EHT approval from railways for EIG.
GE
Balance Works:
1. 2 Nos of High mast Erection with necessary cabling
2. Wiring at Goomty
3. Rectification work at cabins & goomties
Major Materials Required:
4. No major material (Tube lights, Fans, etc as required)
P& M Required:
Nil
Target date of Completion:
15th Feb 2015
Input Required:
A. Client:
1. Final handover of GE Items
OHE & GE
Cost Booking
OHE Execution
TSS & Feeder
SSP
Supply & Execution Capacitor
Bank-equipments & Structure
Construction of Depot Building
Dec'14
Jan'15
650,000.00 500,000.00
OHE Materials
Invoicing
Stringing of OHE Items for Rail
Network - 10KM
Supply of Series Reactor
Supply of CT,AT & NFP Relays
Supply of Other accessories like
Busbar,Cable,Earth Strip etc
Supply of building material for
Depot Building construction
Supply of OHE Tools &
Equipments and spares
Supply of Capacitor Bank
Supply of career communication
system
Supply of GE Spares
Erection of Series
Reactor,CT,PT ,Isolator
1,000,000.00
1,500,000.00
525000.00
2,500,000.00
1,500,000.00
2,000,000.00
Feb'15
7,000,000.00
180,000.00 100,000.00
2,50,000.00
1,000,000.00
1,000,000.00
Dec'14
Jan'15
Feb'15
Mar'15
Remarks
2,804,625.00
3,684,100.00
3,684,100.00
1,662,000.00
Mar'15
2,804,625.00
Remarks
SCM
SCM
921,025.00
SCM
Approval from BALCO &
7,202,000.00 Railways
Approval from BALCO &
8,587,000.00 Railways
4,570,500.00 SCM
SCM
921,025.00
3,157,800.00