CNC Honda Cylinder Line: Saad Ahmed Khan
CNC Honda Cylinder Line: Saad Ahmed Khan
CNC Honda Cylinder Line: Saad Ahmed Khan
Rough Boring
Bottom face turning
Top face turning and diameter
Drilling and chamfering bottom side
Drilling top side
Drilling and spot facing on sides
Finish boring
Rough honing
Finish honing
Inspection
Rough Boring
Matech Vertical Rough boring machine
Cycle time 45-50 seconds including handling
4 insets used on cartridges on boring bar
SNMG 120408/412 for boring
TCMT 11204-24 for facing
Bottom facing
CL-15, Chinese DALIAN DALI CNC
Cycle time 35-40 seconds including handling
CNMG 120408/412 insert. DCBNR2020K12
holder.
Obtuse angle corner of insert used for plane
facing.
Face to face length 62.6mm0.05
Total length 88.5mm0.15
15-20 pieces per insert
m8 reamer
m6 tap on m5.1 hole
Cycle time 790-820 seconds per 10 pieces
Sandvick Golden drill 1000pcs, black drill 24pcs
Hole gauge, counter gauge, vernier for hole
positioning, depth and milling thickness gauging G or
NG
M7.5 x3
M8 x1
M9 x1 counter (5mm 0.3)
M6.5 x1
M8 reamer 2 holes 8mm deep + 0.1
M5 through drill
M6.6 +0.1, 8mm deep counter 0.2
M6 tap both sides
Cycle time 45 seconds including handling
Finish boring
Matech vertical boring machine
3 insets used
CCMT 60204-24
SCMT
TCMT (Chamfering)
100pcs per insert change
Rough honing
Matech rough honing vertical
Diamond steel tool stick SD230J60MH4(upto
4000pcs)
Diameter maintained 46.990mm -0.01
Cycle time 40-50 seconds including handling
Dial Gauge used for measurement
Finish honing
Matech rough honing vertical
600 grit K grade GC abrasive tool stick
GC600K10VGB3 (200-250pcs)
Diameter maintained 47.005 +0.015, ovality
0.005, taper 0.005
Cycle time 20-30 seconds including handling
Air micrometer used for measurement
Layout CD 70
Rough
Boring
Finish Boring
Rough Honing
CL 15
Manual tap
and drill
Finish Honing
CL 15
VDL1000-3
VDL1000-1
VDL1000-2
Inspection
Production
Rough boring
Cycle time
(seconds)
Available time
(hours)
Production possible
(pieces)
45
560
6.5
520
480
630
6.5
585
540
630
6.5
585
540
315
6.5
292
270
336
6.5
312
288
40
Cl-15
Top face turning
40
Cl-15
Drilling bottom side
800/10
VDL1000-1
Drilling top side
VDL1000-2
900/12
Cycle time
(seconds)
Available time
(hours)
Production possible
(pieces)
180/3
420
6.5
390
360
560
6.5
520
480
504
6.5
468
432
560
6.5
520
480
840
6.5
780
720
VDL1000-3
Drilling and tapping
45
50
45
Finish honing
Matech vertical honing
30
CP data
Finish honing
USL = 47.015, LSL = 47.005
CP = 1.8053, CPu = 1.4671, CPl = 2.1435
Finish boring
USL = 46.910, LSL = 46.890
CP = 6.8150, CPu = 6.6787, CPl = 6.9513
Face to Face CL 15
USL = 62.65, LSL = 62.55
CP = 1.8173, CPu = 1.3569, CPl = 2.2777
Conclusion
VDL1000-1 is bottle neck
Add machine in parallel to increase production
HSE and 5S
Workers advised on safety gear
5S awareness in workers is needed
Workers advised on proper stacking and
movement of cylinders