Yamazumi FHcom Kaizen Forms
Yamazumi FHcom Kaizen Forms
Yamazumi FHcom Kaizen Forms
BASIC KAIZEN
KAIZEN
TOOLS
TOOLS
1.
1.
2.
2.
3.
3.
4.
4.
5.
5.
6.
6.
7.
7.
8.
8.
9.
9.
TARGET
TARGET PROGRESS
PROGRESS REPORT
REPORT
STANDARDIZED
STANDARDIZED WORK
WORK SHEET
SHEET
TIME
TIME OBSERVATION
OBSERVATION SHEET
SHEET
CYCLE
CYCLE TIME
TIME // TAKT
TAKT TIME
TIME BAR
BAR CHART
CHART
YAMAZUMI
YAMAZUMI (STACK)
(STACK) CHART
CHART
STANDARDIZED
STANDARDIZED WORK
WORK COMBINATION
COMBINATION SHEET
SHEET
CAPACITY
CAPACITY SHEET
SHEET
KAIZEN
KAIZEN PROPOSAL
PROPOSAL SHEET
SHEET
KAIZEN
KAIZEN NEWSPAPER
NEWSPAPER
Using
Using the
the Basic
Basic
Kaizen
Kaizen Tools
Tools
1
1
3
3
2
2
4
4
Observe site.
Observe site.
Identify Process.
Identify Process.
Prepare Standardized
Prepare Standardized
Work Sheet
Work Sheet
5
5
If equipment seems to
If equipment seems to
lack in capacity, use
lack in capacity, use
Capacity Sheet to define
Capacity Sheet to define
problems.
problems.
Fill out Standardized
Fill out Standardized
Work Combination Sheet
Work Combination Sheet
with best times.
with best times.
6
6
7
7
Kaizen
KaizenEVERY
EVERY
DAY!!.
DAY!!.
Date: ___/____/____/____/__________
Takt Time: _______________________
CATEGORY
SPACE (sq. ft.)
INVENTORY
WALKING DISTANCE
MATERIAL TRAVEL DISTANCE
LEAD TIME (sec.)
CYCLE TIME (sec.)
OUTPUT (units / day)
CREW SIZE
PRODUCTIVITY
CHANGEOVER TIME (sec.)
REMARKS:
CURRENT
TARGET
DAY 1
DAY 2
DAY 3
DAY 4
FINAL RESULT
% CHANGE
Process: __________________________
Part # ____________________________
Part Name: ________________________
Scope of
Operation
DATE: _____/____/____
Approvals:
FROM:
TO:
SYMBOLS
Quality
Safety
Standard Work
Check
Precaution
In Process
BASIC
DATA
Takt
Cycle
Operators
Work in Process
Time
Time
sec.
1/
Step
1
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Complete Cycle Time
10
12
13
14
15
Best Time
Cycle Time
1
4
8
Process
5
9
1.2
1
0.8
0.6
0.4
0.2
0
Before
T/T
Cycle Time
1
4
8
Process
5
9
T/T
Step
Description
STANDARDIZED
WORK
COMBINATION
SHEET
Time
Waiting
Totals
10
15
20
MANUAL:
Date: ______/______/_______
Section: __________________
AUTO:
WALKING:
30
35
40
45
50
55
60
65
70
75
80
85
90
Step
CAPACITY
SHEET
Description
Walking Time
Manual Time
Max Output
Part Name
Current Output
Line
pieces
per Day
Pieces/Run
Change Time
Needed
Times:
Time/Piece
Capacity
Remarks
Subtotal
NOTE
Update times when improvements are achieved through kaizen, and detail reasons for improvement in Remarks column.
Total
pieces
Per Day
Workers
Tools
Base Times
Machine
ID
Part No.
Manual
Automatic
Walking
Objective
Before
Problem
Date
Operator
After
KAIZEN NEWSPAPER
DATE: _______/_______/_______/___________
TEAM: __________________________________
No.
PROBLEM
WHO
BY WHEN
CHECK
Kaizen License
[Name of Recipient]
John Doe
Plant Manager
John Doe
Kaizen Promotion Leader
John Doe
Consultant