Nothing Special   »   [go: up one dir, main page]

ARE HSE Weekly Report Format

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 3
At a glance
Powered by AI
The document outlines the structure and contents of a weekly progress report for safety statistics, incidents, observations, and training delivered on construction sites.

A weekly progress report includes sections for weekly safety statistics, any incidents or near misses, safety activities conducted, observations and findings, and toolbox/training delivered for the week.

Safety statistics tracked in the weekly report include man hours worked, recordable injuries, lost work days, incident rates, and safety metrics like number of safety walks and audits conducted.

Weekly Progress Report Format DOC # ARE-SF-19

Issue N0. Revision No. Issue Date Page


01 00 01-05-2018

Report Number: Week Start Date:

Week Start Date: Week Ending Date:

1. Weekly Cumulative Safety Statistics

S/# Title This Week Cumulative


Figures
01 Safe Man Hours Worked 0 0
02 Total Man Hours 0 0
03 Man Hours Since LTA (Mega Project LTA) 0 0
03 Man Power Direct 0 N.A.
In-Direct 0
Total 0
04 Fatality Case (Fatal) 0 0
05 Lost Workday Case (LWC) 0 0
06 Restricted Workday Case (RWC) 0 0
07 Medical Treatment Case (MTC) 0 0
08 First Aid Case (FAC) 0 0
09 Property Damage (PD) 0 0
10 Near Miss (NM) 0 0
11 Motor Vehicle Accident (MVA) 0 0
12 Fire Incident (FI) 0 0
13 Environmental Incident 0 0
14 Total Number of First Aid Cases 0 0
14 Total Number of Recordable Injuries 0 0
15 Number of Lost Work Days 0 0
16 Number of Restricted/ Job Transfer Days 0 0
17 Total Number of Days Lost 0 0
18 Total Recordable Incident Rate (TRIR) 0 0
19 Lost Time Incident Rate (LTIR) 0 0
20 Safe Man Days 0 0

Note:
2. Narration of Incident/Accident and Near Miss Reported This Week

1
INSERT DATE/TIME AND NARRATIVE OF ANY AND ALL INCIDENTS
(FIRST AID, PROPERTY DAMAGE, FIRE, ENVIRONMENTAL
INCIDENT, ETC.) AND NEAR MISSES OCCURING ON SITE

3. Other HSE Activities

Description This Week Cumulative


Safety Walkthrough 0 0
Safety Audits 0 0
Weekly Progress Report Format DOC # ARE-SF-19
Issue N0. Revision No. Issue Date Page
01 00 01-05-2018

Safety Highlights

 INSERT WEEKLY HIGH POINTS


4. Observations and Findings (Current Week)

Sr. No Company Name Observations Remarks


Pending Closed
1. 0 0

2. 0 0

3. 0 0

TOTAL 0 0

5. Toolbox Topics / Training Delivered

This Week Cumulative


0 0

5.1 List of Tool box Topics

TOPIC HOURS PERSONNEL TIME


1 INSERT TOPICS
2 Example Below
3 Hot Work and Fire Extinguishers .5 16 8
4 Heat Stress and Water .25 14 3.5
5 Fatigue and Driving .5 22 11
6
TOTAL 1.25 52 22.5

5.2 List of Training Topics

TOPIC HOURS PERSONNEL TIME


1 INSERT TOPICS
2
3
4
5
6
TOTAL

Prepared By: Approved By:


Weekly Progress Report Format DOC # ARE-SF-19
Issue N0. Revision No. Issue Date Page