SAP PP Materials Requirement Planning HTTP Sapdocs Info

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 33

What are the cutover activities followed for PP module?

I am listing some cut over activities to be followed (for PP - Discrete


Manufacturing).

Production Planning / Master data:


For Production planning, only master data shall be migrated to SAP. In the 1st
Stage, there is no master data. Following is the master data elements relevant for
PP:

- Bill of materials
- Routing.
- Work Centres.

Transaction data:
As of the cut off date, ideally there should not be any work in process. All the open
production orders should be closed and semi finished goods should be dismantled
and should be added to Raw materials. This strategy should be followed for all
production orders where lead time to complete the production order is not large.

Since, the production orders are for longer duration and it is not possible to
dismantle the product and add it to inventory, following can be the strategy for
migrating the data to SAP:

- Create a material master for the work in process and set the standard price as the
cost incurred for that product (ie. Work in process)
- Create a bill of material (which will be used only for this production order)
including this material and other materials still to be consumed.
- Create Routing for rest of the production process.
- Bring the work in process material into inventory as of the cut off date.
- Create the production orders in SAP for the Work in process and issue materials
to production order.

Complete the production process after the cut off date of the project.

Tips by: K.S.Kulkarni

What happens to planned after it has been converted into production order?

When you convert Planned order to Production order. the planned order are offset
by production order. Reference of planned order can be seen in the production
order.

How to attach a drawing for a material to BOM? Is it possible?


Yes, you can attach a drawing.
First create a document using Transaction Code "CV01N - Create Document".
Attach your drawing in that document.
The system will generate a document number. Assign this document in the BOM
with item category D.

Report in Long Term Planning - You use long term planning for your
customers, what they need are very simple, just to calculate future
requirements for 1 or 2 years.
Are there any reports in SAP to list of material requirement from LTP?
You need a list of material requirement from long term planning result for
each item.

Use MS70 then use MCEC.

Scheduling planned order - How can you get planned orders scheduled so
that you can do capacity leveling?
MD11 and then Schedule works fine but ideally you would want the the
planned order scheduled automatically on creation? You have tried setting up
an action to schedule the orders but cannot get that to work either.

When running MRP, try selecting "2" in the scheduling box this will bring planned
orders into CM01 and CM21

Capacity planning CM01 - When you run capacity planning T-code: CM01,
you found the plan orders are not included in the pegged requirement, you
checked the profile, the check box for order and plan order are all actived.

Guess that planned orders have been created without capacity requirement
indicator in MRP ("2" - Lead Time scheduling), if this is the case, then when
converted to process orders they will have impact on the Resource. If you want to
see them as planned orders, re-run the MRP or change in every planned order,
going to the Menu: Edit --> Scheduling

Another couple of possibilities are to do with the routing/work centres used and
whether it isactually calculates consumption of capacity of the category at the work
centre being displayed in CM01 (it might consume a capacity pool or it might not
consume the category).

MPS in Backgound/Online - You want to run MPS for a plant either online or
in the background, but you do not get any results. If you run MPS for a single
material/plant, then everything is 100% OK.

You need to run a planning file and a consistency check first, transaction OMDO
and MDRE respectively you'll need to set up two jobs to do it but it is straight
forward, once you've done this set up the background job for MPS to run and do it
in NEUPL first time round and then change to NETCH after that.

What is the output of MPS run?

From MPS run you plan the materials which are of 'A' type in the abc analysis
(80% dollar value) that have to be planned before hand.
MPS is also a type of MRP only in which components just below the materials on
which MPS run is taken place, are planned.

Table for production order status - What is the table for finding status (for Ex
TECO ed prodn orders). We are not able to find from AFKO and AFRU
tables the status of production orders or at least the link tables if known can
be mentionned. You are unable to link the structure caufvd and IOHEADER
WITH AFKO and AFRU.

JEST is the table.

Data dictonary table for SOP planning data - You are using Standard SOP
(Info structure S076), in which table can you see the planning values that you
maintained in MC93 transaction?
You looked under table "S076" and did not see any values there.

Use T.Code MC95 to display your entries under the version which maintained the
the table S076.

Production order operation's component allocation - How does SAP know


that an operation has components as indicated by the component allocation
indicator? Tcode CO08.

Component allocation is done via routing maintenance or BOM maintenance for


the assembly. This is master data maintenance. As soon as a PO is created, the
master data is read into the PO.

How to delete groups of products?


How to delete a group of products that was created in screen MC84?

Delete the members in the product group and then archive the product group in
transaction SARA, object=MM_MATNR.
(The product group is created as a material master record with material type PROD
and this record is deleted in SARA.)
1. Which is the highest organisational level in SAP

a) Plant b) Client c) Storage Location

Ans: b

2. For Material Master record PP Data which is the highest organisational


level

a) Plant b) Client c) Storage Location

Ans: a

3. What is the difference between F1 Help & F4 Help.

a) F1 is for possible values and F4 is for application help


b) F1 is for Application Help and F4 is for Technical Help
c) F1 is for Field Help and F4 is for possible entries.
d) None of the above

Ans: c

4. Variant Configuration is typically used in

a) Make – to – stock Environment


b) Make – to – Order Environment
c) Spare parts Sale
d) Repetitive Manufacturing Environment

Ans: a

5. Configurable Material check for a material is set in _____________

a) Basic Data b) MRP View


c) Sales View d) Classification

Ans:

6. Basic Data screen contains general data such as

a) Material Number
b) Material description
c) Base unit of measure
d) Technical data

Ans: a, b, c
7. Functions of Classification are

a) To find an appropriate object


b) To find similar objects
c) To establish that no appropriate object exists.

Ans:

8. Entering “/o” in command field

a) Ends current transaction


b) Ends the current cession
c) Opens new cession
d) Opens new transaction

Ans:

9. For creating Material Master the following Transaction Code is used :

a) md01
b) mm01
c) me01
d) mc01

Ans: b

10. The unit in which the stock keeping is done in a company is called

a) Stock unit of measure


b) Base unit of measure
c) Unit of issue
d) Purchase unit of measure

Ans: b

11. Batch is

a) Same as material code


b) Partial quantity of material managed separately from other quantity of same
material in stock
c) A non reproducible homogeneous unit with unique specifications
d) None of above
e) All of above

Ans: b
12. A _____________________________ is a complete, formally structured list
of the components that make up a product or assembly.

Ans:

13. Component in the BOM are allocated to operation in

a) BOM
b) Material Master
c) Routing
d) Work Center

Ans: c

14. BOM contains the following

a) List of Components
b) Qty of Components
c) Operation to which components is attached.
d) Unit of Measure of components

Ans: a, b, d

15. BOMs are always created as

a) Single Level
b) Multi Level
c) Components
d) Along with routings

Ans: a

SAP-PP online test, online practice test, exam, quiz

Online Practice Test > SAP-PP (Total 10 questions) (Time spent 0:0)

1. Routing contains information about which of the following?

Material Components

Operations

Capacity for Work Centers

Inspection Characteristics

All the above


a,b and c
2. A Material BOM is created without plant. What would you call it?

Reference BOM

Master BOM

Group BOM

Master group

None of the above

3. Production Planning Module is integrated with which of the following modules?

Material Management

Controlling

Quality Management

Sales and Distribution

All the above

None of the above


4. What is the T Code for displaying planning file entry?

MD21

MD12

MD11

MD10

5. Movement Type for Goods Receipt in to Ware House

261

301

101

102

6. Where is Work Center used?


Routing

BOM

Material Master

Inspection Plans

All the above

a and d

7. What is the use of BOM?

MRP

Costing

Inspection data

Sales and Distribution

None of the above

All the above

8. Which of the following are valid BOM categories?

Inspection BOM

Material BOM

Equipment BOM

Costing BOM

All the above

Only b,c and d

SAP PP Certification Sample Question Set - 2


Sample Questions:

01. Which objects can affect the calculation of capacity requirements for an operation?

Note: There are 3 correct answers to this question.

a) Standard values (routing)

b) In-house production time (material master)

c) Transport time (routing)

d) Formulas (work center)

e) Operation control key (routing)

02. A user of the SAP ECC system wants a rolling planning time fence (firming type = 1) to be set up
for a material; in other words, new planned orders are firmed within a planning time fence. When an
unforeseen production failure occurs, it can happen that such firmed planned orders are not being
processed because time passes. What solution would automatically delete firmed planned orders?

Note: Please choose the correct answer.

a) In the material master, an MRP type is used in which the roll-forward mechanism is activated
(Customizing for requirements planning).

b) The demand adjustment activated in the Customizing for demand adjustment is used.

c) Firmed planned orders can only ever be deleted manually because of the header data firming.

03. In the Customizing for requirements planning, a project team notices that the alternatives P1, P2,
P3 and P4 are also delivered as standard in addition to MRP type Pd) The number in each of these
alternatives represents a firming type.

What does a firming type define?

Note: There are 2 correct answers to this question.

a) Handling existing procurement proposals outside the planning time fence.

b) Handling existing procurement proposals within a planning time fence.

c) Handling new requirements within the planning time fence.

d) Handling new procurement proposals that need to be created due to new requirements within
the planning time fence.
04. What options does the SAP ECC system offer to retrieve the available capacity for work centers?

Note: There are 3 correct answers to this question.

a) Attendance list

b) Standard available capacity

c) Shift plan

d) Interval of available capacity

e) Shift sequence

05. Which of the following master data can be used with process orders?

Note: There are 3 correct answers to this question.

a) Serial numbers

b) Master recipes

c) Resources

d) Production/resource tools

e) Production versions

06. Which of the following organizational units does the manufacturing, planning, and execution
process use?

Note: There are 2 correct answers to this question.

a) Storage Location

b) Sales Area

c) Purchase Organization

d) Plant

07. You want to enhance the system statuses of a production order with user statuses.

How do you do this?

Note: Please choose the correct answer.


a) Define the user statuses in the order type-dependent parameters.

b) Define a status profile in Customizing and assign it to the production scheduling profile.

c) Define a status profile in Customizing and assign it to the order type.

d) Define the user statuses in the Customizing table of the system statuses.

08. You enter a new BOM (Bill of Materials) in SAP ECC but forget to enter a plant reference.

Which of the following statements describes what happens when you try to save it?

Note: Please choose the correct answer.

a) When saving the BOM, a group BOM is created which can, under certain conditions, be assigned
to a plant later.

b) When saving the BOM, a dialog box appears prompting the user to enter a plant.

c) When saving the BOM, an error message appears stating that it is not possible to save a BOM
without a plant reference.

d) When saving the BOM, a warning message appears. In the corresponding dialog box, it is possible
to create a plant-specific engineering BOM.

09. You want to use the different options for planning in SAP ECC.

What is the correct sequence of the planning procedures?

Note: Please choose the correct answer.

a) Sales and operations planning -> Demand management -> Long-term planning -> Material
requirements planning -> Capacity planning

b) Demand management -> Sales and operations planning -> Capacity planning -> Long-term
planning -> Material requirements planning

c) Material requirements planning -> Demand management -> Sales and operations planning ->
Long-term planning -> Capacity planning

d) Long-term planning -> Sales and operations planning -> Demand management -> Material
requirements planning -> Capacity planning

10. In the SAP ECC system, you interpret the result of a routing schedule.

When scheduling a routing in the SAP ECC system which of the following time elements are
interoperation times?
Note: There are 2 correct answers to this question.

a) Safety time

b) Floats before and after production

c) Processing time

d) Move time

11. Which activity can trigger an automatic availability check for the components of a production
order?

Note: Please choose the correct answer.

a) Material staging

b) Order rescheduling

c) Order release

d) Goods receipt for a missing part

12. During the implementation of SAP ECC material requirements planning, the project team defines
MRP controller numbers in Customizing under the entry "Define MRP Controller" that can be
assigned to the planners responsible for the material.

Which of the following statements are correct concerning these MRP controllers?

Note: There are 2 correct answers to this question.

a) The MRP controller number is a central selection

b) A planner responsible for a material can have multiple MRP controller numbers.

c) In multilevel single-item planning, materials are selected using the MRP controller number.

d) The MRP controller number is assigned using the production version.

13. Which of the following scheduling types can only be used in capacity planning?

Note: Please choose the correct answer.

a) Midpoint

b) Forward

c) Only capacity requirements


d) Backward

14. The company you are advising uses a plant data collection system from company XYZ and would
like to distribute production orders to the terminals on this system and enter feedback using these
terminals.

Which integration possibilities would you recommend so that as little work as possible is required
for the customer to implement this?

Note: Please choose the correct answer.

a) SAP Manufacturing Integration and Intelligence (SAP MII)

b) The plant data collection interface (PP-PDC)

c) Execution Steps (XSteps)

d) The process control system interface PI-PCS

15. The final assembly of a finished product should only be triggered when a customer order arrives.

Which planning strategy for the finished product do you use?

Note: Please choose the correct answer.

a) Planning with make-to-stock (strategy 10)

b) Planning at the assembly level (strategy 70)

c) Planning without final assembly (strategy 50)

d) Planning with final assembly (strategy 40)

16. Which options can you use to convert planned orders into production orders in the SAP ECC
system?

Note: There are 3 correct answers to this question.

a) Mass processing

b) Automatically in the planning run (MRP)

c) Background processing in a program

d) Customizing for the planned order

e) Order progress report


17. You want to use the function "Read PP master data" in the production order.

However, while calling the function you receive an error message. What could be the reason?

Note: Please choose the correct answer.

a) The material availability check has been performed.

b) Goods movements have been posted.

c) The production order has been released.

d) Order papers have been printed.

18. Which statements about the reorganization of planned independent requirements in SAP ECC
are true?

Note: There are 2 correct answers to this question.

a) The reorganization only affects planned independent requirements that lie on a time axis to the
past from a specified key date.

b) The reorganization can be parameterized using a plant-specific reorganization interval.

c) The reorganization only deletes planned independent requirements that have no fixed planned
orders to them.

d) The reorganization is a form of demand adjustment in which non-settled planned independent


requirements for the planning are set to inactive but are not deleted.

19. Which types of objects can be changed with Engineering Change Management (ECM)?

Note: There are 3 correct answers to this question.

a) Task list

b) Work center

c) Production version

d) Bill of material

e) Material master

20. Which BOM (bill of materials) selection possibilities are available for opening a production order?
Note: There are 2 correct answers to this question.

a) Manual selection

b) Automatic selection controlled with Customizing settings

c) Selection by BOM number in the material master of the material to be produced

d) Selection using the production scheduling profile

e) Selection using a production version

Solutions:

QUESTION: 01

Answer: a, d, e

QUESTION: 02

Answer: a

QUESTION: 03

Answer: b, d

QUESTION: 04

Answer: b, d, e

QUESTION: 05

Answer: b, c, e

QUESTION: 06

Answer: a, d
QUESTION: 07

Answer: c

QUESTION: 08

Answer: a

QUESTION: 09

Answer: a

QUESTION: 10

Answer: b, d

QUESTION: 11

Answer: c

QUESTION: 12

Answer: a, b

QUESTION: 13

Answer: a

QUESTION: 14

Answer: b

QUESTION: 15
Answer: c

QUESTION: 16

Answer: a, c, e

QUESTION: 17

Answer: b

QUESTION: 18

Answer: a, b

QUESTION: 19

Answer: a, d, e

QUESTION: 20

Answer: b, e

1. Which is the highest organisational level in SAP

a) Plant b) Client c) Storage Location

Ans: b

2. For Material Master record PP Data which is the highest organisational level

a) Plant b) Client c) Storage Location

Ans: a

3. What is the difference between F1 Help & F4 Help.

a) F1 is for possible values and F4 is for application help


b) F1 is for Application Help and F4 is for Technical Help
c) F1 is for Field Help and F4 is for possible entries.
d) None of the above

Ans: c
4. Variant Configuration is typically used in

a) Make – to – stock Environment


b) Make – to – Order Environment
c) Spare parts Sale
d) Repetitive Manufacturing Environment

Ans: a

5. Configurable Material check for a material is set in _____________

a) Basic Data b) MRP View


c) Sales View d) Classification

Ans:

6. Basic Data screen contains general data such as

a) Material Number
b) Material description
c) Base unit of measure
d) Technical data

Ans: a, b, c

7. Functions of Classification are

a) To find an appropriate object


b) To find similar objects
c) To establish that no appropriate object exists.

Ans:

8. Entering “/o” in command field

a) Ends current transaction


b) Ends the current cession
c) Opens new cession
d) Opens new transaction

Ans:

9. For creating Material Master the following Transaction Code is used :

a) md01
b) mm01
c) me01
d) mc01

Ans: b
10. The unit in which the stock keeping is done in a company is called

a) Stock unit of measure


b) Base unit of measure
c) Unit of issue
d) Purchase unit of measure

Ans: b

11. Batch is

a) Same as material code


b) Partial quantity of material managed separately from other quantity of same material in
stock
c) A non reproducible homogeneous unit with unique specifications
d) None of above
e) All of above

Ans: b

12. A _____________________________ is a complete, formally structured list of the


components that make up a product or assembly.

Ans:

13. Component in the BOM are allocated to operation in

a) BOM
b) Material Master
c) Routing
d) Work Center

Ans: c

14. BOM contains the following

a) List of Components
b) Qty of Components
c) Operation to which components is attached.
d) Unit of Measure of components

Ans: a, b, d

15. BOMs are always created as

a) Single Level
b) Multi Level
c) Components
d) Along with routings
Ans: a

Caution: more than one answer may be correct.


Please mark ALL correct answers.

Question:
The following control parameters can be set in a long-term planning scenario :

A Planning period
B Opening stock
C Strategy group
D MRP type
E Version of available capacity

Question:
What is the name of the planning level for the MRP run?

A. SOP
B. MP
C. MRP
D. COPA

Question:
What are the main features of the MRP types 'PD' or 'VB'?

A. 'PD' can only be used with 'Net Change Planning'


B. 'VM' can only be used in total planning
C. 'PD' triggers a BOM explosion
D. 'VM' can use the forecast for the calculation of the safety stock

Question:
What is the meaning of the planning time fence?

A. It determines the planning period for the planning run


B. It determines the period in which the planned orders are to be converted into production
orders
C. It determines the period in which no automatic changes are to be made to the production
plan

Question:
In forecast-based planning, which forecast model does SAP support?

A. dynamic model
B. seasonal trend model
C. split trend model
D. Consumption model

Question:
What conditions must be fulfilled in Customizing if a production order is to be checked
for availability?
A. Scope of check
B. Checking group
C. checking rule
D. Checking assignment
E. Inspection period

Answers for SAP PP Certification Sample Questions

Q) Can any body explain me why work scheduling view is required for semi finished
and finished products? (Because we'll mention all details in MRP views)

A) We need to maintain working scheduling view in order to make that finished or semi finished
goods available for production as we assign production scheduler and production scheduler profile
in this view, if not maintained conversion of planned order to production will not be possible.

Answers for SAP PP Certification Sample Questions


Question:
The following control parameters can be set in a long-term planning
scenario :

Answer:
A Planning period
B Opening stock
C Strategy group
D MRP type
E Version of available capacity

Question:
What is the name of the planning level for the MRP run?

Answer:
A. SOP
B. MP
C. MRP
D. COPA

Question:
What are the main features of the MRP types 'PD' or 'VB'?

Answer:
A. 'PD' can only be used with 'Net Change Planning'
B. 'VM' can only be used in total planning
C. 'PD' triggers a BOM explosion
D. 'VM' can use the forecast for the calculation of the safety stock
Question:
What is the meaning of the planning time fence?

Answer:
A. It determines the planning period for the planning run
B. It determines the period in which the planned orders are to be converted into
production orders
C. It determines the period in which no automatic changes are to be made to
the production plan

Question:
In forecast-based planning, which forecast model does SAP support?

Answer:
A. dynamic model
B. seasonal trend model
C. split trend model
D. Consumption model

Question:
What conditions must be fulfilled in Customizing if a production order is to be
checked for availability?

Answer:
A. Scope of check
B. Checking group
C. checking rule
D. Checking assignment
E. Inspection period

During an implementation, the SAP ERP landscape will typically consist of three
servers DEV (development) QA (quality assurance) PROD (production) TEST (Test)
TRAIN (Trainning).

Once the configuration changes are moved to the QA server, ______ testing will
take place within the PP module and within the other applications in SAP ERP, such
as materials management (MM) and Sales and Distribution (SD), for example.

Master data in SAP ERP is a ______ function. This means that the data is be
intended to be stored once and replication is to be avoided.

The master data that will be used for production planning in SAP ERP is as follows:
Material masters Bills of material Work centers Task lists/routings Cost centers
Purchasing info record Vendor masters Customer masters.

During implementations, each business must determine how the


_________________ process within SAP ERP will integrate with their specific
business processes.

The _____ is a unit within an SAP ERP system that is self-contained both in legal
and organizational terms, and in terms of data.

A ____________ is the smallest organizational unit of external accounting for which


a complete, self-contained bookkeeping system can be replicated.

The ______ is an organizational unit within logistics that subdivides an enterprise


from the viewpoints of production, procurement, and materials planning.

The __________ is an organizational unit that facilitates the differentiation of stocks


of materials within a plant.

The ___________ is the organizational level at which material quantities and values
are managed. It is essential for product costing that a __________ exists for each
plant.

A _____________ is a key for a buyer or a group of buyers who are responsible for
certain purchasing activities. Internally is responsible for the procurement of a
material or class of materials. Externally, it is the principal channel for an
enterprise’s dealings with its vendors.

The ____________ is an organizational unit within logistics that subdivides the


enterprise according to the purchasing requirements. Procures materials or services,
negotiates conditions of purchase with vendors, and assumes responsibility for these
transactions.

The ____________ is responsible for selling and distributing goods and services. It
is liable for the products sold and responsible for a customer’s rights of recourse. It
can be used to represent a regional, national, or international subdivision of a
marketplace in which products are sold.

A sales organization is uniquely assigned to a company code, however a company


code may have more than one sales organization assigned to it. True False.
The Company Code is the highest summation level in sales statistics. True False.

A _____________ is a means through which saleable materials or services reach the


customer, it is assigned to a sales organization.

The ________ is the organizational element that manages your shipping activities.
Each outbound delivery is processed at a __________.

Shipping points are assigned to plants. A shipping point should have physical
proximity to the plant to which it is assigned. More than one shipping point can be
assigned to a plant. Several plants can also have a shared shipping point assigned to
them, for example, several plants in same physical proximity sharing the same
railroad depot. True False.

The ____________ contains information on the materials that a company constructs,


procures, manufactures, stores, and sells. The information is stored in a database
that is a central source of data on materials. It integrates data from different areas
of a company.
A ______ is a complete, formally structured list of the components that make up a
product or assembly.

Bills of material can exist at the plant and/or client level. True False.

BOMs are single level. True False.

a BOM can contain only stock items. False True.

A __________ is a location that defines when and where production resources are
required according to order requirements.

A ______ defines operations and the sequence in which they are carried out. The
following is also defined in the ______: • Where the work is to be done • How long
the work should take • What materials are needed for each operation • What tools
and fixtures are required.

The planned time for each operation is stored in the routing as a _______.

These standard values are the basis for:.


When creating a storage location, companies have the opportunity to define a
different address for each storage location. This may be done for one of several
reasons: • The storage location represents a sub-contractor location where inventory
is held. • The storage location represents a company facility with a different shipping
address. True False.

MRP areas are defined as part of MRP configuration. There are three types of MRP
areas: plant storage location Vendor (subcontractor). Client Company code.
Organizational Levels of the Material Master Client Company code Plant Storage
Location Purchasing organization Sales organization Controlling area.

The person who creates the first view of each material master record must define:

The material number The industry sector The material type The unit of measure The
description Plant Storage Location Initial Stock.

The _______ determines which business processes (such as sales, production, or


purchasing) and functions (use of material in BOM or routing) are allowed for a
material.

The ________ determines which data fields and screens are available for input
during material master maintenance. Industry sector is one of several influencing
factors. In the configuration of the material master, industry sector can act as one
key in specifying whether a field is required, changeable, display only, or hidden. In
addition, ________ is used in configuration to determine what views and what
sequence a user can display the material master.

Material numbering is defined at the _____ level. Client Company Code Plant
Storage Location.

All units of measure in the SAP system that are additional to the base unit of
measure are grouped together under the title “alternative units of measure.” The
following alternative units of measure are supported: Base unit of measure (Basic
Data 1): Order unit (Purchasing): Sales unit (Sales: sales org 1): Production unit
(Work Scheduling): Unit of issue (Work Scheduling/Whse Mgmt 1):.

If there is no standard formula to convert an alternative unit of measure to the base


unit of measure, you must enter the conversion factor for the units of measure in
material master maintenance. True False.

A _________ describes specifications of an object, such as length, width, weight,


color. Essentially, they are user-defined fields, which are defined as master data.

A ___________ describes a group of objects that have common or similar


specifications. When creating a class, a user must specify a ______.

A ______ can contain one or more characteristics. Within the _____, companies can
further restrict the characteristic values. A _____ will then be attached to the
material master to specify the custom fields that were needed.

The ________ allows you to control where a material can be used in business
applications. You define the __________ in the material master record in
accordance with the material, client, and plant. You can limit the use of a material in
different ways: • You can flag the material for deletion • You can use the ______ to
lock the material for certain business processes in materials management and
production planning,.

The classification system, all classes, characteristics, and characteristic values are
predefined by SAP and delivered with the system and cannot be changed by users.
True False.

Only material master records can be classified using the classification system. True
False.

A batch is a unique homogeneous subset of a material, which is not reproducible.


True False.

Variant configuration uses classification to select specific items on the bill of material
and the corresponding operation on the routing for products that have many
different options. True False.

BOM categories define the connection to an object. Material BOMs Order BOMs
Equipment BOMs Functional location BOMs.

When creating BOMs with different usages for one material, the system saves each
BOM with the same internal number. True False.

The BOM status controls BOM processing in different application areas. True False.

When you create a BOM, a low-level code is automatically assigned to each material
which is used in MRP and costing. Low-level codes are used in material requirements
planning (MRP) to determine the sequence in which materials are planned and by
product costing to determine how costs are rolled up. True False.

To define the precise conditions under which a material must be used by different
areas in a company, you define an area of validity and a validity period. True False.
A group BOM is a BOM without reference to any one plant. True False.

Which BOM item's categories are defined in sap ecc system? Stock Items Non-Stock
Items Document Items Variable-size item Text Item Document Item Class Item PM
Structure element Intra Material Assembly.

You can add a non-stock item to a BOM, only if it has a material master record True
False.

You can create where-used lists for: Work centers Capacities Production
resources/tools Reference operation sets Materials Movement type Item Category.

The BOM comparison is single-level. True False.

A bill of material is a complete, formally structured list of components that make up


a product or assembly True False.

All of the components are stored in a multilevel bill of material for the finished goods.
True False.

A material BOM is the only BOM category that can be created in the SAP ECC system.
True False.
A material BOM can have many different usages for specific departments within a
company. True False.

Each material BOM is material and plant unique and each material plant combination
BOM has a separate internal number assigned to it. True False.

At minimum a basic data view of a material master record must exist before you can
create a BOM for that material. True False.

The base unit of measure defaults into the BOM item but can be overridden with the
issue unit of measure from the work scheduling view if it is populated. True False.

Each time a BOM is saved the system calculates the low level code which is used for
planning. True False.

Which report would you use to determine which BOMs will be affected by a
component change? A BOM comparison B Level by level BOM explosion C Multilevel
BOM explosion D Material where-used list.

Which report would you use to see an overview of all the necessary parts and
materials? A BOM comparison B Level by level BOM explosion C Multilevel BOM
explosion D Material where-used list.

Which report would you use to see the differences between two BOMs with different
change statuses? A BOM comparison B Level by level BOM explosion C Multilevel
BOM explosion D Material where-used list.

A _________ is a location that defines where production activities take place


according to order requirements. In different companies, _______ are also called
machine centers or capacity centers.
A _____ shows operations in a sequence and acts as a template for production
orders. The planned time for each operation is stored in the ____ as standard values.
________ represent the times to be measured when the work center is used on a
task list, for example, machine time, labor time, and setup time.

These times are grouped together using a ____________. This __________


determines which standard values are displayed for the work center.
___________ refers to the ability of a work center to perform a specific task.

Capacities can be entered and changed in work centers, but can also be maintained
independently. The system distinguishes between: Work center capacities Pooled
capacities Reference capacities Default capacities.

The system uses the ________ to determine move times only if you have not
entered any move times in the Interoperation times section of the Operation detail
screen.

The move time can be maintained separately. You can maintain a minimum move
time and a normal move time in the Interoperation times section of the Operation
detail screen. If reduction measures are necessary, the system uses the minimum
move time for scheduling. True False.

You can maintain the queue time in the work center and in the routing operation.
However, the system uses the queue time from the work center for scheduling only
if you have not maintained a queue time in the operation. You cannot reduce this
time. True False.

Capacity is specific to a given work center, it can represent a group of people or


machines, False True.

By creating reference capacities, users can maintain one set of capacities that
applies to several work centers independently by linking the capacity data to each
relevant work center. When it is necessary to update the capacity, the planner only
needs to maintain the reference resource. The information is relevant for all
resources that have been linked by the reference function. Once the work center
capacity category has been referenced, it can no longer be maintained. The capacity
data can only be maintained by editing the reference capacity header. True Flase.

For operation costing, it is necessary to assign the work center to a cost center.
Additionally, activity types with cost unit rates are required because multiple work
centers can belong to one cost center. True False.

They are not created for a specific material Routings Reference operation sets Rate
routings Reference rate routings Master recipes Rough-cut capacity profiles Standard
Networks Inspections plans.

They are used mostly by repetitive manufacturing Routings Reference operation sets
Rate routings Reference rate routings Master recipes Rough-cut capacity profiles
Standard Networks Inspections plans.

They are used in production planning for process industries. Routings Reference
operation sets Rate routings Reference rate routings Master recipes Rough-cut
capacity profiles Standard Networks Inspections plans.
They are used to view resource loads in sales and operations planning without BOM
explosion Routings Reference operation sets Rate routings Reference rate routings
Master recipes Rough-cut capacity profiles Standard Networks Inspections plans.

They contain instructions on how to perform tasks in a specific way, in a specific


order, and in a specific time period, and are used in project systems. Routings
Reference operation sets Rate routings Reference rate routings Master recipes
Rough-cut capacity profiles Standard Networks Inspections plans.

They describe the inspection process for a material and are used in quality
management. Routings Reference operation sets Rate routings Reference rate
routings Master recipes Rough-cut capacity profiles Standard Networks Inspections
plans.

The material and routing should belong to the same plant, for example, the planning
plant and the production plant must be the same. False True.

The material assignment can be done in different ways You can create the routing
for a specific material You can use the material assignment functionality in the
routing header You can use a production version.

Sub-Operations Suboperations are subordinate to an operation and used for more


detailed planning of the process step that is described in the operation. They are
typically used to carry out more detailed planning for capacity or costing for an
operation. For example, you can use suboperations to assign several people or
machines that are required at the same time, to an operation. A suboperation can be
costed, but can only be scheduled relative to the superior operation. You can
cumulate standard values from suboperations on the corresponding operation. You
can determine whether suboperations belonging to an operation are copied into the
production order. A suboperation can't be costed.
The dates of the suboperations are determined using the start or finish reference for
an operation when you specify an offset value. The reference dates for the start and
finish of a suboperation are: • Start date for setup • Start date for processing • Start
date for teardown • Finish date for execution • Start date for wait time • Finish date
for wait time • Finish date for setup • Finish date for processing.

If an operation is divided into suboperations, the standard values for the


suboperations can be cumulated under the main operation. If the suboperations run
in parallel, this kind of cumulation is not possible because the cumulated values
would be too high. True False.

Engineering Change Management in routings Without History With Change


Documents With History With History but without Change Documents.
You may need this information if you want to delete a work center or reference
operation set but you want to first check if it is being used in a routing. where-used
lists Mass change.
If you want to replace an object in several routings with another object (for example,
an old work center with a new one) where-used lists Mass change.
When you use the mass replace function without a change number, the new objects
will have the same validity periods as the old objects. True False.
Which of the following is not a way to create routing material assignments in SAP
ERP? A Create a material specific routing B Copy a materials master record and the
BOM and routing are automatically copied also C In the routing header create a
material assignment D Create a production version.
Which of the following is not a pre-requisite for component allocation? A Operations
in the routing must exist B Production version must exist C BOM for the material to
be produced must exist D Backflush indicator must be set.
Any materials component that is not assigned to an operation in the routing will
default to the first operation. True False.
Each item on the BOM can be assigned to one and only one operation on the routing.
True False.
Component allocation to an operation is the only additional information which can be
maintained with regard to components. False True.
Suboperations can be used for more detailed capacity planning and costing. True
False.
When using suboperations costing is automatically done at the operation level
regardless of the control keys. False True.
You can use user-defined fields to assign data fields to an operation or suboperation
for information purposes only. False True.
Which of the following are ways to make changes to routings in SAP ERP? □ A
Without record of changes □ B With change documents □ C With history using ECM □
D All of the above.
A where-used list can show you which task lists will be affected by a change in work
center True False.
It is not possible to make mass changes to routings using an ECM number. False
True.
A __________ is a logical grouping of materials. A __________ is usually created
within engineering to describe a number of components easily and manage them as
a whole. The components in a __________ are placed immediately into the superior
assembly.
The settings for phantoms can occur in different places in SAP R/3 The highest level
to determine a part as a phantom assembly is at the material master. In the MRP 2
view, users can set an item to be a phantom assembly by setting the special
procurement key. In bill of materials the details of the component, under the MRP
section, users can use the explosion type or special procurement.
The phantom item settings in the BOM have priority over the material master since
they are specific to a usage or manufacturing process. True False.
Co-product Is manufactured simultaneously with the main product. The main
material cannot be manufactured in isolation. Have a non-zero inventory valuation.
Are earmarked for cost settlement at the end of the process order life cycle, and
appear in the header settlement rule. Is manufactured simultaneously with the main
product. The main material cannot be manufactured in isolation. Have a non-zero
inventory valuation. Aren't earmarked for cost settlement at the end of the process
order life cycle, and do not appear in the header settlement rule. Is manufactured
simultaneously with the main product. The main material cannot be manufactured in
isolation. Have a zero inventory valuation. Aren't earmarked for cost settlement at
the end of the process order life cycle, and do not appear in the header settlement
rule.
By-Product Is manufactured simultaneously with the main product. The main
material cannot be manufactured in isolation. Have a non-zero inventory valuation.
Aren't earmarked for cost settlement at the end of the process order life cycle, and
do not appear in the header settlement rule. Is manufactured simultaneously with
the main product. The main material cannot be manufactured in isolation. Have a
non-zero inventory valuation. Are earmarked for cost settlement at the end of the
process order life cycle, and appear in the header settlement rule. Is manufactured
simultaneously with the main product. The main material cannot be manufactured in
isolation. Have a zero inventory valuation. Aren't earmarked for cost settlement at
the end of the process order life cycle, and do not appear in the header settlement
rule.
Waste Is manufactured simultaneously with the main product. The main material
cannot be manufactured in isolation. Have a zero inventory valuation. Aren't
earmarked for cost settlement at the end of the process order life cycle, and do not
appear in the header settlement rule. Is manufactured simultaneously with the main
product. The main material cannot be manufactured in isolation. Have a non-zero
inventory valuation. Are earmarked for cost settlement at the end of the process
order life cycle, and appear in the header settlement rule. Is manufactured
simultaneously with the main product. The main material cannot be manufactured in
isolation. Have a non-zero inventory valuation. Aren't earmarked for cost settlement
at the end of the process order life cycle, and do not appear in the header
settlement rule.
Component that is to be discontinued is replaced by a follow-up material as of a
certain date, as soon as the stock available for MRP of the discontinued component
is zero. This means that when the stock available for MRP of the discontinued
material is zero, the dependent requirements are diverted from the discontinued
material to the follow-up material.
If the stock available for MRP for the discontinued material becomes greater than
zero again, due to a later order for instance, the material is used again. True False.
Pre-requisites for simple discontinuation In the material master record of the
discontinued component, the discontinued indicator is set to 1 A follow-up material
is entered Discontinued date is set. the discontinued indicator is set to 1 and the
follow-up indicator 3 appears in the material master record of the follow-up material.
In the material master record of the main discontinued component,the discontinued
indicator is set to 1 and the follow-up indicator 3 appears in the material master
record of the dependent discontinued component. In the extras for the BOM item,
define a discontinuation group under follow-up/discontinued dates;The main
component to be discontinued and its dependent component are identified using the
same discontinuation group.
Pre-requisites for parallel discontinuation In the material master record of the main
discontinued component,the discontinued indicator is set to 1 and the follow-up
indicator 3 appears in the material master record of the dependent discontinued
component. A follow-up material is entered Discontinued date is set. the
discontinued indicator is set to 1 and the follow-up indicator 3 appears in the
material master record of the follow-up material. In the material master record of
the discontinued component, the discontinued indicator is set to 1 In the extras for
the BOM item, define a discontinuation group under follow-up/discontinued
dates;The main component to be discontinued and its dependent component are
identified using the same discontinuation group.
One product may be made of different combinations of components, depending on
the quantity (lot size) to be manufactured or the date. This type of product is often
represented by alternative BOMs (alternatives). These alternative BOMs differ only
slightly from one another, usually in terms of the component quantity. The field BOM
group can also be used as an external BOM number. All alternatives for a multiple
BOM are saved under one internal BOM number. You can assign one name to all the
alternatives in a ________ by entering a BOM group in the BOM header. Multiple
BOM Variant BOM Super BOM.
If several similar products are manufactured whose parts only differ in minor ways,
you can represent these various products using a ________. Variants can also differ
in component quantity alone. Several products created as variants of a ______ are
saved under one internal BOM number. You can give a name to all of the variants of
a ________ by entering a BOM group in the BOM header. Each variant has its own
material number. Variant BOM Multiple BOM Super BOM.
The following item changes are supported for material items, document items, and
class items: Changing the component quantity Changing the item data Adding of
items Replacing an item – In all selected BOMs – With assignment of a new item
quantity if necessary – Using Engineering Change Management if necessary – With
restrictive selection criteria such as plant and/or usage Deleting an item – In all
selected BOMs – Using Engineering Change Management if necessary – With
restrictive selection criteria, such as plant and/or usage True False.
A component with a negative quantity exists on a BOM. Select each of the following
that it could be. A Co-product B By-product C Waste product D Recursive product.
Co-products, by-products, and waste products are materials on the BOM which you
can choose to produce. True False.
One of the differences between co-products, by-products, and waste products is
their inventory valuation and settlement True False.
In order to use a material on a BOM as a co-product, you must first enable it to be
used as a co-product in the material master. True False.
Only rate routings can have alternative sequences, parallel sequences can be
created in both routings and rate routings. False True.
A _________ enables you to process several operations at the same time. It is
carried out at the same time as the corresponding section in the standard sequence.
It is a special form of overlapping operations.
You can create parallel sequences in routings and rate routings. You cannot create
them in reference operation sets or reference rate routings True False.
Alternative sequences are linked to the standard sequence. Branch operations in the
standard sequence are ignored in the procedure. True False.
You can only create alternative sequences in routings. You cannot create them in
reference operation sets, reference rate routings or rate routings. True False.
A _____________ is a standard operation sequence for performing a task that is
frequently used. Creating a ___________ provides an efficient way to maintain this
set of operations. It can be used either as a reference or as a template when you
create a routing.
A reference operation set allow parallel or alternative sequences. True False.
Material components, PRTs, and trigger points can be assigned to an operation in a
reference operation set. Any assignments to a reference operation set will be copied
into the routing. Any change made to a reference operation set will update all
routings that use it. True False.
The ___________ has the following two functions in the order: It can compensate
for delays in the staging of the material components or if there is a capacity
bottleneck at the work centers involved, you can move the production dates forward
in the future.
The ________ is used in the order to compensate for unexpected interruptions in
the production process. It prevents a delay of the scheduled finish.
The order float can be predefined and is controlled by the scheduling margin key. In
Customizing, the ____________ is defined and then assigned on the MRP 2 view of
the material master record.
The duration of an ______ consists of a maximum of five time components: Queue
time Setup time Processing time Teardown time Process-related wait time.
In addition to the floats before and after production, you can define an operation
float in the form of a _______. The ______ is used to compensate for malfunctions
and delays within an operation. The _______ is the interval between the earliest and
latest dates of the operation.
The ________ is the time needed to prepare the work center for operations to
perform there. The _____ is part of the lead-time.
The _______ is the time needed to process a material in an operation. The ______
is dependent on the order quantity, and does not contain a setup or teardown time.
It is part of the execution time.
The _____ is the time needed to restore a work center to its normal state after
operations have been processed. The ______ is part of the execution time.
The _____ is the time between the end of the execution time and the start of move
time. In the SAP system, types of _______ are: Maximum Minimum In scheduling,
only the _____ time is taken into account. The maximum _____ is used for
information.
the ______ is the time needed to move a material from one work center to the next
one. _______ is always between two operations and is assigned to the preceding
operation.
________ are assigned to operations in a routing to trigger certain functions in the
production order at a later time. _________ can trigger functions when an
operation’s status changes or when an operation is confirmed.
Scrap is used for material requirements planning and product costing, the calculation
procedures supported are: Assembly scrap Component scrap Operation scrap
Storage management scrap Tansport scrap Storage quality inspection scrap.
You use this function to plan the scrap that results from the production of an
assembly. __________ increases the order quantity of the assembly and,
subsequently, increases the order quantity for each component in the BOM of the
assembly by adjusting the quantity of the dependent requirements generated during
the MRP run.
You use this function to plan the scrap of a component that may break during
production of an assembly. You can define ___________ in two places: In the BOM
on the Item Detail Screen: General Data (quantity data section). This component
scrap is only relevant for the individual BOM. In the material master (MRP 4 view) in
the ____________ field. This component scrap is relevant for all BOMs. The
___________ quantity maintained for a material component in the BOM has the
higher priority. ____________ increases the dependent requirements quantity of
the component. If a scrap quantity is planned for a higher-level assembly, assembly
scrap and _________ are both added to the component level.
Before high-value components are built into an assembly, your manufacturing
process may require a quality control check of the assembly. Faulty materials that
were taken into account in assembly scrap are not passed on to the next operation;
they are removed from the manufacturing process. Therefore, for a high-value
component, you plan using ________ instead of general assembly scrap.
__________ are required for production but are not consumed. A PRT may be
needed in order to carry out an operation and therefore must be assigned to that
operation. The PRT must be identified by a material master, equipment master, or a
PRT master.
Float time that can be modeled in the scheduling of the routing include: A Float
before production B Float after production C Setup time D Queue time E Teardown
time.
The duration of an operation consists of a maximum of 5 components. True False.
Teardown and wait time are always scheduled simultaneously. True False.
Only the minimum wait time is scheduled. True False.
Move time is defined only in the operation details. True False.
You can only split an operation processing time on a work center with more than 1
individual capacity. True False.
Operation can be set to overlap so that the next operation starts before the previous
operation has finished. True False.
Reduction measures are applied when the lead time schedule of a routing does not
fit within the basic date schedule. True False.
Which of the following are types of PRT’s? A Material B Equipment C Component D
Miscellaneous E Document.
PRT is another name for a component that is used in production. True False.
The same PRT can be assigned to more than one operation on the same routing.
True False.
The ______ is part of the PP module in SAP R/3, and is a complex tool for the
integrated processing of BOMs and routings. This means that both object types and
their links are maintained simultaneously and in detail, with the same user interface.
Engenieering Workbench The screen layout is divided into three elements: Toolbar
Cockpit Overview screen Document Tree Item Data Header Data.
A _________ is an object of the focus object type that meets the selection criteria
that you enter. focus object environment object.
An _________ is an object whose object type is contained in the working
environment and that is assigned to a focus object. focus object environment object.
Product Centric View You can monitor the configuration and use of PCV. PCV consists
of four components: User Interface - The software layer of PCV that contains visual
presentation. Query Management - The software layer of PCV that processes queries.
Search Integration - The software layer of PCV that contains the integration of data
source searches in PCV. The data is provided to query management in a unique
structure. Foundation, Monitoring - The software layer of PCV that contains basic
functions for all layers. True False.
When you create a material master record, you must define ________ for the
material. The material type determines which business processes (such as sales,
production, or purchasing) and functions (use of material in BOM or routing) are
allowed for a material. Material Type Industry Sector Material Number.
When you create a material master record, you must define material type for the
material. The material type determines: Procurement Type Which departments can
maintain the material master record Wich industry-specific data appears Which data
fields and screens are available for input during material master maintenance.
The__________ defines which plants can use a bill of material. Material staging
Validity area Production version Production order.
When creating BOMs with different usages for one material, the system saves each
BOM with a separate internal number for each usage. True False.
One product may be made of different combinations of components, depending on
the quantity (lot size) to be manufactured or the date. This type of product is often
represented by Variant BOM SIMPLE BOM Alternative BOM.
Low-level codes are used in material requirements planning (MRP) to determine the
sequence in which materials are planned and by product costing to determine how
costs are rolled up. the sequence in which materials are planned and by product
costing to determine how costs are rolled down. the minimum material quantity in
the BOM the final material in the explosion.
The ________ provides an answer to this question: Where is a material used and in
what quantity? where-used list BOM Comparison BOM Explosion, multilevel BOM
Explosion, sumarized.
BOM Prerequisites What is the BOM going to be used for? When does the BOM need
to become effective? Activate MRP Activate EWB.
BOM Structure BOM Header Item Data Routing Data Low-Level Code PRT.
BOM reports: BOM Multilevel BOM Comparison BOM Single Level BOM where used-
list Low-level code analisys BOM explosion.
Enter this item category to represent parts of a material of different sizes under one
material number. Variable size item Variant Dimension Item PRT Non Stock Item
Alternative Item.