Nothing Special   »   [go: up one dir, main page]

Too Fast Too Sleep: Arc363: Building Materials & Construction Technology Iii School of Architecture and Design

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

SCHOOL OF ARCHITECTURE AND DESIGN

ARC363: BUILDING MATERIALS &


CONSTRUCTION TECHNOLOGY III

Too fast too sleep


INSTRUCTOR: Owner
Piangphet Saengtuangkit
59120500051

3/10/2561 3:07:08
1

A Level 1
7000 7000 9000 5000 6000 9000

1 : 200
1

F
7000

E
4000

D
UP

6000

C
7500

B
A401
1

6000

A
A402
1

3/10/2561 3:07:08
1. Check all measurements on site. SUBJECT: ARC 363 ARCHITECT: PROJECT STATUS: A3 SCALE:
KING MONGKUT'S Do not scale off drawings. BUILDING MATERIALS Piangphet Saengtuangkit Too fast too sleep Project Status 1 : 200
UNIVERSITY OF TECHNOLOGY 2. All discrepancies are to be & CONSTRUCTION 59120500051
immediately reported to architect.
THONBURI 3. All measurements are in
TECHNOLOGY III INSTRUCTOR: DRAWING TITLE SUBMISSION DATE: SHEET NO.
Owner
millimeters. First Floor Plan Issue Date A202
1

7
7000 7000 9000 5000 6000 9000

F
7000

E
4000

D
DN

6000

C
7500

B
6000

A
3/10/2561 3:07:09
1. Check all measurements on site. SUBJECT: ARC 363 ARCHITECT: PROJECT STATUS: A3 SCALE:
KING MONGKUT'S Do not scale off drawings. BUILDING MATERIALS Piangphet Saengtuangkit Too fast too sleep Project Status 1 : 200
UNIVERSITY OF TECHNOLOGY 2. All discrepancies are to be & CONSTRUCTION 59120500051
immediately reported to architect.
THONBURI 3. All measurements are in
TECHNOLOGY III INSTRUCTOR: DRAWING TITLE SUBMISSION DATE: SHEET NO.
Owner
millimeters. Second Floor Plan Issue Date A203