BRIDGE OVER RIVER YAMUNA

(EASTERN PERIPERAL EXPRESSWAY) BSEC


WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

WORKSHOP ON IRC:112-
IRC:112-2011

DESIGN OF FOUNDATION

BRIDGE OVER RIVER YAMUNA


(EASTERN PHERIPHERAL EXPRESSWAY)

HARPREET SINGH
B&S ENGINEERING CONULTANTS PVT. LTD.

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

WELL FOUNDATION

1
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

2
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

3
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

4
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

5
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

6
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

ON WELL
HEIGHT OF SUBMERGED (FROM WELL TOP TO MSL), H 14.040m
RADIUS OF ENVELOPING CYLINDER,
CYLINDER R 3 450m
3.450m
FOR H/R = 4.07 Ce = 0.73 (AS PER TABLE 4)
AND WEIGHT OF WATER OF ENVELOPING CYLINDER, We 525.00t
HYDRODYNAMIC FORCE ON WELL 13.97t
DISTANCE OF CG OF FORCE ABOVE MSL 6.02m
TOTAL HYDRODYNAMIC FORCE 17.00t
ITS MOMENT AT FOUNDING LEVEL 582.15tm
TOTAL FORCE IN LONGITUDINAL DIR. (including braking) 255.5 t

30% TRANSVERSE SEISMIC FORCE 60.9 t

TOTAL MOMENT AT FOUNDING LEVEL IN LONGITUDINAL DIRECTION 12518.4 t-m


MOMENT AT FOUNDING LEVEL DUE TO SEISMIC IN TRANS. DIRECTION 2781.7 t-m
INCREASE IN VERTICAL LOAD 49.0 t

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

7
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

ON WELL
HEIGHT OF SUBMERGED (FROM WELL TOP TO MSL), H 14.040m
RADIUS OF ENVELOPING CYLINDER,
CYLINDER R 3 450m
3.450m
H/R 4.07
THEREFORE, Ce (AS PER TABLE 4) 0.730
AND WEIGHT OF WATER OF ENVELOPING CYLINDER, We 525.00t
HYDRODYNAMIC FORCE ON WELL 16.04t
DISTANCE OF CG OF FORCE ABOVE MSL 6.02m
TOTAL HYDRODYNAMIC FORCE 19.52t
ITS MOMENT AT FOUNDING LEVEL 574.48tm

TOTAL FORCE IN TRANSVERSE DIR. (including hydrodynamic force) 183.5 t


30% LONGITUDINAL SEISMIC FORCE (Including Hydrodynamic
force) 72.52 t
TOTAL MOMENT AT FOUNDING LEVEL IN TRANSVERSE DIRECTION 8697.8 tm
MOMENT AT FOUNDING LEVEL DUE TO SEISMIC IN LONG. DIRECTION 3755.5 tm
INCREASE IN VERTICAL LOAD 36.70 t

8
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

9
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

10
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

11
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

12
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

13
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

14
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

15
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

16
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

DESIGN OF WELL CAP

17
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

DESIGN OF WELL CAP


Well cap is provided to transfer the
loads and moments from pier to well
below.

Well cap top level is generally kept


above LWL.

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

For Well Cap Design Following steps are followed:

Estimation of Loads at pier Calculation of self weight


base and soil above cap

Application of loads over Staad Grillage Modelling


dispersed width /area

Calculation of Bending
Design & Detailing of
Moment & Shear Force in
reinforcement
SLS & ULS combinations

18
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

Preliminary Details:
Diameter off well
Di ll at top = 6.9m
69
Well cap Thickness = 2.2m
Steining Thickness = 0.95m
Diameter of pier = 3.0m
Well cap top /LWL = 186.5m
186 5m
Clear cover = 75mm
Grade of Concrete = M40
Reinforcement = Fe500

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

SKETCH WELL/WELL CAP/PIER

19
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

ESTIMATION OF LOADS AT PIER BASE


F
Forces att pier
i base
b are taken
t k from
f
pier design for all possible
combination in SLS and ULS
condition and same are used here
for the design of well cap.
cap
Seismic forces calculated above are
increased by 35%as per clause 219.8
of IRC:6

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

As per clause 6.2


6 2 and 6
6.4
4 of IRC 112
112- 2011,
2011 material
factors are different for basic/seismic and accidental
load combinations hence forces are compiled
separately and designed accordingly.
Reinforcement Steel = 0.87fyk; For accidental = fyk
Concrete = 0.446 fck; For accidental = 0.56fck

20
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

As per clause 16.4


16 4 (3) of IRC 112
112-2011
2011 for
hollow circular section a solid slab with
thickness 1/3rd of clear opening shall be
provided, integrally connected to walls.

Clear opening of well = 5m


Minimum thickness required = 1.67m,
Provided = 2.2m

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

STAAD MODELLING
Grillage with 0.25m member width is
developed in staad.
Self weight and weight of soil is applied
as member load over entire width.
Vertical loads and moments at pier base
are applied over dispersed area/width as
member loading.

21
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

STAAD MODEL

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

STAAD MODEL

TRANSVERSE MEMBERS

22
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

Diameter of pier = 3.0m


Effective depth of cap = 2.093m
2 093m
Dispersed diameter = 3+2.093*2
(at 45o dispersion) = 7.19m > 5.95m
(i.e. C/C steining)
Dispersed Area (π/4 * 5.952) = 27.8m2
Intensity of load on member
= Load * Width (0.25m) / Dispersed Area

Moment per meter length


= Moment / width of dispersion

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

Critical one quarter is


identified for design
bending moment &
Sh
Shear f
force

23
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

SKETCH SHOWING
BENDING MOMENT
IN LONGITUDINAL &
TRANSVERSE
DIRECTION AT
CRITICAL LOCATION

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

Governing load case in longitudinal direction under


SLS condition is: HFL case with wind leading with
Max ML case

and in transverse direction is: HFL case with wind


leading with Max MT case

Maximum Bending Moment in governing SLS case is


388 tm/m in longitudinal direction and 364tm/m in
transverse direction.

24
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

STRESS CHECK IN SLS CONDITION

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

25
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

Construction Stage is governing for the design of well


cap in ULS condition

Maximum longitudinal Bending Moment = 692 tm/m


Maximum Shear Force in Long dir = 938 t

Maximum transverse Bending Moment = 625tm/m


Maximum Shear Force in Long dir = 943 t

26
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

27
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

28
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

Shear in cap is checked as per clause 10.2.3 of IRC


112 2011 at distance deff from face of steining
112-2011, steining, in our
case it is at face of pier.

Punching shear is checked at periphery of pier and at


distance 0.5d from face of pier as per clause 10.4.2 of
IRC 112-2011.

Maximum punching shear in governing case is 4500t


and corresponding moment is 4200tm.

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

29
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

DETAILING AS PER CLAUSE 16.6 OF IRC 112-2011:


1 Min Ast
1. = 0.26f
0 26fctm/fykbtd
= 0.26*3 / 500*btd = .00156 btd
OR = 0.0013 btd

2. Min Ast = 0.025 Ac


Provided 0.0044 btd

3. As per clause 16.6.1.3 (3) of IRC:112-2011, top


reinforcement is 25% of the maximum sagging
moment in span.

BRIDGE OVER RIVER YAMUNA


(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

30
BRIDGE OVER RIVER YAMUNA
(EASTERN PERIPERAL EXPRESSWAY) BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

BSEC
WORKSHOP ON CODE OF PRACTICE FOR CONCRETE ROAD BRIDGES IRC:112 – 2011, ORGANISED BY IAHE

THANK YOU
FOR YOUR PATIENCE

31