Percentage Boq: Validate Print Help
Percentage Boq: Validate Print Help
Percentage Boq: Validate Print Help
Contract No:
Bidder
Name :
PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable
to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
1 2 4 5 6 53 55
1 Cleaning,cutting thorny shrubs bushes grass as 2000.00 Sqm 2.10 #VALUE! #VALUE!
directed wiyh 15 m lead and lift upto 1.5 m.
2 Cuttung down trees including cutting trunk branches 30.00 Nos. 217.00 #VALUE! #VALUE!
and stacking the material as directed with 15 m lead
and lift up to 1.5 m etc comp. including uprooting and
refilling the pits with material as directed excluding
extra material required for filling etc comp
Greath 30 to 60 Cm
3 Removing wet silt from the canal bed with 15 m lead and 363.75 Cum 50.65 #VALUE! #VALUE!
1.50m lift including depositing the excavated stuff as
directed.
4 Providing casing embankment using selected pervious 677.35 Cum 109.75 #VALUE! #VALUE!
material available directly from excavation in layers
including cost of all materials, machinery, labour, all other
operations such as collection of material, spreading
material in layer of specified thickness,
5 Providing casing embankment using selected pervious 2857.39 Cum 132.20 #VALUE! #VALUE!
material from approved borrow areas in layers including
cost of all materials, machinery, labour, all other
operations such as collection of soil, spreading soil in layer
of specified thickness, sorting out, breaking clods,
levelling, sectioning edges / sides, watering, compacting
each layer to density control of not less than 95 percent or
as stipulated using vibratory compactor etc., complete
with lead upto1 km and 6m lift.
6 Providing and constructing 230 mm thick dry rubble 814.20 Cum 277.80 #VALUE! #VALUE!
stone pitching using stones and stone chips
fromapproved source from barrow area incliding cost
of material materials,including labour, hand packing /
wedging stone chips, finishing etc., complete with
lead upto 50 m and all lifts excluding royalty of
material.
8 ADD FOR ROYALTY 3795.28 x 158.33 = 600906 0.01 CUM 0.01 #VALUE! #VALUE!
and ad gst rs. 35684/-